This document is an attachment to a solicitation for construction services to rehabilitate Conata Road and Picnic Area located at Badlands National Park. The solicitation number is 140P6324B0007 and is being issued by the Department of the Interior National Park Service Midwest Region to rehabilitate the road and picnic area. Bids are due by the specified date for the project, which includes structural testing and special inspections during construction. Pricing is to be provided using standard construction pricing terms.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 1 of 24
Statement of Structural Tests and Special Inspections National Park Service (NPS) - Denver Service Center (DSC) | 6-29-21
Park: Badlands National Park
Project Management Information System (PMIS) Number: 227786
Project Name: Repair and Rehabilitate Conata Picnic Road
Structural Engineering Firm: WBK (soil & foundations) and DJ&A (superstructure)
This Statement of Structural Tests and Special Inspections is being submitted as required by Chapter 17 of the 2021 International Building Code (IBC-21). It includes the following:
1. Seismic requirements
2. Wind requirements
3. Qualification Requirements for Inspectors and Testing Technicians
4. Listing of Required Structural Tests and Special Inspections
The Construction Contractor’s Quality Control Supervisor will provide copies of all special inspection reports and associated documentation to the Contracting Officer (CO). The Construction Contractor will be required to correct all deficiencies discovered in the Special Inspection and Structural Testing program.
Prepared By: Justian Crane (soil & foundations); Terry Elliot (superstructure) (Type or print name)
Signature: See seals embedded below w/signatures_______________________ Date: 7/31/23
Stamped by Professional Engineer (PE) or Structural Engineer (SE)
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 2 of 24
Seismic and Wind Requirements
Seismic Requirements, IBC-21 Section 1704.3 Description of seismic-force-resisting system and designated seismic systems subject to special inspections:
Not applicable – Structure is assigned to seismic design category A.
Wind Requirements, IBC-21 Section 1704.3 Description of wind-force-resisting system and designated wind systems subject to special inspections:
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 3 of 24
Not applicable – Structure in wind exposure category C has Vasd less than 110 mph.
Instructions:
1. Under Listing of Required Structural Tests and Special Inspections:
a. Required? - Place an X for all Special Inspections and Tests required for this project.
b. Required Qualifications - Provide qualifications for the special inspector, using the Qualification
Requirements for Inspector and Testing Technicians list below, for all required Structural Tests and Special Inspections.
c. Continuous - If marked with an X, continuous special inspection shall be as defined in Chapter 2, IBC-21.
d. Periodic - If marked with an X, provide the minimum number of tests, i.e. 20% of all field welds, or the amount of work to be inspected (e.g. 10% of all wall surfaces).
2. Attach completed Statement of Structural Tests and Special Inspections to the end of NPS DSC Division 1 Specifications Section 01 40 00 Quality Requirements.
Qualification Requirements for Inspectors and Testing Technicians
PE/SE Structural Engineer – licensed PE or SE specializing in the design of buildings and structures PE/GE Geotechnical Engineer – licensed PE specializing in soil mechanics and foundations EIT Engineer-In-Training – graduate engineer who has passed the Fundamentals of engineering examination
American Concrete Institute (ACI) Certification ACI-CCSI Concrete Construction Special Inspector ACI-LTT Concrete Laboratory Testing Technician Level 1 or 2 ACI-STT Concrete Strength Testing Technician
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 4 of 24
ACI-FTT Concrete Field Testing Technician – Grade I
American Society of Non-Destructive Testing (ASNT) Certification Non-Destructive Testing Technician – Level II or III
American Welding Society (AWS) Certification AWS-CWI Certified Welding Inspector
Exterior Design Institute (EDI) Certification EDI-EIFS Certified EIFS inspector
International Code Council (ICC) Certification ICC-PCSI Prestressed Concrete Special Inspector ICC-RCSI Reinforced Concrete Special Inspector ICC-SSI Soils Special Inspector ICC-SFSI Spray-applied Fireproofing Special Inspector ICC-SMSI Structural Masonry Special Inspector ICC-SSBSI Structural Steel and Bolting Special Inspector ICC-SWSI Structural Welding Special Inspector
National Institute for Certification in Engineering Technologies (NICET) Certification NICET-CT Concrete Technician – Levels I, II, III and IV NICET-GET Geotechnical Engineering Technician - Levels I, II, III and IV NICET-ST Soils Technician - Levels I, II, III and IV
Other
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 5 of 24
Listing of Required Structural Tests and Special Inspections
R eq ui re d?
Structural Test or Special Inspection Required Qualifications
C on tin uo us
P er io di c Frequency of Periodic Test or Inspection
Steel Construction (IBC-21 Section 1705.2; American Institute of Steel Construction: AISC 360-16 Chapter N, AISC 341-16 Chapter J)
Prior to Welding (AISC 360-16 Table N5.4-1)
X 1. Welder qualification records and continuity records ICC-SWSI/AWS-CWI X
X 2. Welding procedure specifications (WPS) available
ICC-SWSI/AWS-CWI
X
X 3. Manufacturer certifications for welding consumables available
ICC-SWSI/AWS-CWI
X
X 4. Material identification (type/grade)
ICC-SWSI/AWS-CWI
X Weekly observations
X 5. Welder identification system
ICC-SWSI/AWS-CWI
X Weekly observations
6. Fit-up of groove welds (including joint geometry)
ICC-SWSI/AWS-CWI
X a. Joint preparation
ICC-SWSI/AWS-CWI
X Weekly observations
X b. Dimensions (alignment, root opening, root face, bevel)
ICC-SWSI/AWS-CWI
X
Weekly observations
X c. Cleanliness (condition of steel surfaces)
ICC-SWSI/AWS-CWI
X Weekly observations
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 6 of 24
R eq ui re d?
Structural Test or Special Inspection Required Qualifications
C on tin uo us
P er io di c Frequency of Periodic Test or Inspection
X d. Tacking (tack weld quality and location)
ICC-SWSI/AWS-CWI
X Weekly observations
X e. Backing type and fit (if applicable)
ICC-SWSI/AWS-CWI
X Weekly observations
7. Fit-up of CJP (complete joist penetration) groove welds of HSS (hollow structural sections) T-, Y- and K-joints without backing (including joint geometry)
X a. Joint preparation
ICC-SWSI/AWS-CWI
X
X b. Dimensions (alignment, root opening, root face, bevel)
ICC-SWSI/AWS-CWI
X
X c. Cleanliness (condition of steel surfaces)
ICC-SWSI/AWS-CWI
X
X d. Tacking (tack weld quality and location)
ICC-SWSI/AWS-CWI
X
X 8. Configuration and finish of access holes ICC-SWSI/AWS-CWI X
Weekly observations
9. Fit-up of fillet welds
X a. Dimensions (alignment, gaps at root)
ICC-SWSI/AWS-CWI
X Weekly observations
X b. Cleanliness (condition of steel surfaces)
ICC-SWSI/AWS-CWI
X Weekly observations
X c. Tacking (tack weld quality and location)
ICC-SWSI/AWS-CWI
X
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 7 of 24 eq ui re d?
Structural Test or Special Inspection Required Qualifications
C on tin uo us
P er io di c Frequency of Periodic Test or Inspection
X 10. Check welding equipment ICC-SWSI/AWS-CWI X
Weekly observations
During Welding (AISC 360-16 Table N5.4-2)
1. Control and handling of welding consumables
X a. Packaging
ICC-SWSI/AWS-CWI
X Weekly observations
X b. Exposure control
ICC-SWSI/AWS-CWI
X Weekly observations
X 2. No welding over cracked tack welds
ICC-SWSI/AWS-CWI
X Weekly observations
3. Environmental conditions
X a. Wind speed within limits
ICC-SWSI/AWS-CWI
X Weekly observations
X b. Precipitation and temperature
ICC-SWSI/AWS-CWI
X Weekly observations
4. WPS followed
X a. Settings on welding equipment
ICC-SWSI/AWS-CWI
X Weekly observations
X b. Travel speed
ICC-SWSI/AWS-CWI
X Weekly observations
X c. Selected welding materials
ICC-SWSI/AWS-CWI
X Weekly observations
X d. Shielding gas type/flow rate
ICC-SWSI/AWS-CWI
X
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 8 of 24 eq ui re d?
Structural Test or Special Inspection Required Qualifications
C on tin uo us
P er io di c Frequency of Periodic Test or Inspection
X e. Preheat applied
ICC-SWSI/AWS-CWI
X Weekly observations
X f. Interpass temperature maintained (minimum/maximum)
ICC-SWSI/AWS-CWI
X
Weekly observations
X g. Proper position (F, V, H, OH)
I ICC-SWSI/AWS-
CWI X
Weekly observations
X
h. Intermix of filler metals avoided unless approved (reference: AISC 341-10 Table J6.2)
ICC-SWSI/AWS-CWI
X
Weekly observations
X 5. Use of qualified welders
ICC-SWSI/AWS-CWI
X
6. Welding techniques
X a. Interpass and final cleaning
ICC-SWSI/AWS-CWI
X Weekly observations
X b. Each pass within profile limitations
ICC-SWSI/AWS-CWI
X Weekly observations
X c. Each pass meets quality requirements
ICC-SWSI/AWS-CWI
X Weekly observations
X 7. Placement and installation of headed stud anchors
ICC-SWSI/AWS-CWI
X
After Welding (AISC 360-16 Table N5.4-3)
X 1. Welds cleaned
ICC-SWSI/AWS-CWI
X
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 9 of 24 eq ui re d?
Structural Test or Special Inspection Required Qualifications
C on tin uo us
P er io di c Frequency of Periodic Test or Inspection
X 2. Size, length and location of welds
ICC-SWSI/AWS-CWI
X
3. Welds meet visual acceptance criteria
X a. Crack prohibition
ICC-SWSI/AWS-CWI
X
X b. Weld/base-metal fusion
ICC-SWSI/AWS-CWI
X
X c. Crater cross section
ICC-SWSI/AWS-CWI
X
X d. Weld profiles
ICC-SWSI/AWS-CWI
X
X e. Weld size
ICC-SWSI/AWS-CWI
X
X f. Undercut
ICC-SWSI/AWS-CWI
X
X g. Porosity
ICC-SWSI/AWS-CWI
X
X 4. Arc strikes
ICC-SWSI/AWS-CWI
X
X 5. k-area
ICC-SWSI/AWS-CWI
X
X 6. Weld access holes in rolled heavy shapes and built-up heavy shapes
ICC-SWSI/AWS-CWI
X
X 7. Backing removed and weld tabs removed (if required)
ICC-SWSI/AWS-CWI
X
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 10 of 24 eq ui re d?
Structural Test or Special Inspection Required Qualifications
C on tin uo us
P er io di c Frequency of Periodic Test or Inspection
X 8. Repair activities
ICC-SWSI/AWS-CWI
X
X 9. Document acceptance or rejection of welded joint or member
ICC-SWSI/AWS-CWI
X
X 10. No prohibited welds have been added without the approval of the EOR (Engineer of Record)
ICC-SWSI/AWS-CWI
X
X 11. Placement of reinforcing or contouring fillet welds (if required) (reference: AISC 341-16)
ICC-SWSI/AWS-CWI
X
Nondestructive Testing (AISC 360-16 Section N5 and AISC 341-16 Section J6)
X
1. Risk Category II Structures - Perform Ultrasonic Testing on 10% of CJP groove welds in butt, T-and corner joints subject to transversely applied tension loading, in materials 5/16 inch thick or greater.
ANST Level II
X
2. Risk Category III or IV Structures - Perform Ultrasonic Testing on all CJP groove welds subject to transversely applied tension loading in butt, T- and corner joints, in materials 5/16 inch thick or greater.
X
3. Access Holes – Perform Magnetic Particle Testing or Liquid Penetrant Testing when the flange thickness exceeds 2 inches for rolled shapes, or when the web thickness exceeds 2 inches for built-up shapes.
X
4. Welded Joints Subject to Fatigue X
Nondestructive Testing (AISC 341-16 Section J6)
Column Splice and Column to Base Plate PJP Groove Weld (AISC 341-16 Section J6 2b)
X
1. Perform Ultrasonic Testing on 100% of PJP
(partial-joint-penetration) groove welds in column splices and column to base plate welds
ICC-SWSI/AWS-CWI
X
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 11 of 24 eq ui re d?
Structural Test or Special Inspection Required Qualifications
C on tin uo us
P er io di c Frequency of Periodic Test or Inspection
X 2. CJP Groove weld ICC-SWSI/AWS-CWI X
X 3. Lamellar tearing ICC-SWSI/AWS-CWI X
X 4. Beam cope and access hole ICC-SWSI/AWS-CWI
X 5. Reduced beam section repair
ICC-SWSI/AWS-CWI
X
6. Weld tab removal
Prior to Bolting (AISC 360-16 Table N5.6-1)
These inspections are not required for snug-tight joints.
1. Manufacturer’s certifications available for fastener materials
2. Fasteners marked in accordance with ASTM requirements
3. Correct fasteners selected for the joint detail (grade, type, bolt length if threads are to be excluded from shear plane)
4. Correct bolting procedure selected for joint detail
5. Connecting elements, including the appropriate faying surface condition and hole preparation, if specified, meet applicable requirements
6. Pre-installation verification testing by installation personnel observed and documented for fastener assemblies and methods used
7. Protected storage provided for bolts, nuts, washers and other fastener components
During Bolting (AISC 360-16 Table N5.6-2)
These inspections are not required for snug-tight joints.
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 12 of 24 eq ui re d?
Structural Test or Special Inspection Required Qualifications
C on tin uo us
P er io di c Frequency of Periodic Test or Inspection
These inspections are not required for pretensioned joints and slip-critical joints, when the installer is using the turn-of-nut method with matchmarking techniques, the direct-tension-indicator method, or the twist-off-type tension control bolt method.
1. Fastener assemblies, of suitable condition, placed in all holes and washers (if required) are positioned as required
2. Joint brought to the snug-tight condition prior to the pretensioning operation
3. Fastener component not turned by the wrench prevented from rotating
4. Fasteners are pretensioned in accordance with the RCSC (Resource Council on Structural Connections) Specification, progressing systematically from the most rigid point toward the free edges
After Bolting (AISC 360-16 Table N5.6-2)
Document acceptance or rejection of bolted connections.
Other Inspection Tasks (AISC 360-16 Section N5.7)
X 1. Verify compliance of fabricated steel with the details shown on the approved shop drawings.
ICC-SSBSI
X
Weekly observations
X
2. Verify compliance of the erected steel frame with the details shown on the approved erection drawings, including braces, stiffeners, member locations and joint details.
ICC-SSBSI
X
Weekly observations
3. Anchor rods and other embedments support structural steel
X a. Verify the diameter, grade, type and length of the anchor rod or embedded item.
ICC-SSBSI or
ICC-RCSI X
Weekly observations
X b. Verify the extent or depth of embedment into the concrete.
ICC-SSBSI or
ICC-RCSI X
Weekly observations
4. RBS (reduce beam section) requirements, if applicable (AISC 341-16)
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 13 of 24 eq ui re d?
Structural Test or Special Inspection Required Qualifications
C on tin uo us
P er io di c Frequency of Periodic Test or Inspection
a. Contour and finish
b. Dimensional tolerances
5. Protected zone - no holes and unapproved attachments made by fabricator or erector, as applicable. (AISC 341-16)
6. H-piles - Protected zone - no holes and unapproved attachments made by the responsible contractor, as applicable. (AISC 341-16)
Cold-formed Steel Deck (IBC-21 1705.2.2)
1. Special inspections in accordance with QA/QC- 2017 Standard for Quality control (QC) and Quality assurance (QA) for Installation of Steel Deck
Open-Web steel Joists and Joist Girders (IBC-21 Table 1705.2.3)
1. Installation of open-web steel joists and joist girders.
a. End connections - welding or bolted
b. Bridging - horizontal or diagonal
1. Standard bridging
2. Bridging that differs from the SJI (Steel Joist Institute) specifications listed in Section 2207.1.
Inspection of Composite Structures Prior to Concrete Placement (AISC 341-16 Table J9.1)
1. Material identification of reinforcing steel (Type/Grade)
2. Determination of carbon equivalent for reinforcing steel other than ASTM A706
3. Proper reinforcing steel size, spacing and orientation
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 14 of 24 eq ui re d?
Structural Test or Special Inspection Required Qualifications
C on tin uo us
P er io di c Frequency of Periodic Test or Inspection
4. Reinforcing steel has not been rebent in the field
5. Reinforcing steel has been tied and supported as required
6. Required reinforcing steel clearances have been provided
7. Composite member has required size
Inspection of Composite Structures During Concrete Placement (AISC 341-16 Table J9.2)
1. Concrete: Material identification (mix design, compressive strength, maximum large aggregate size, maximum slump)
2. Limits on water added at the truck or pump
3. Proper placement techniques to limit segregation
Inspection of Composite Structures During Concrete Placement (AISC 341-16 Table J9.2)
1. Achievement of minimum specified concrete compressive
Cold-formed Steel Trusses Spanning 60-feet or Greater (IBC-21 Section 1705.2.4)
1. Verify temporary installation restraint/bracing installed in accordance with the approved shop drawings.
2. Verify permanent individual truss member restraint/bracing installed in accordance with the approved shop drawings.
Concrete Construction (IBC-21 Section 1705.3)
1. Inspect reinforcing steel, including prestressing tendons, and placement.
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 15 of 24 eq ui re d?
Structural Test or Special Inspection Required Qualifications
C on tin uo us
P er io di c Frequency of Periodic Test or Inspection
2. Inspection of reinforcing steel welding
a. Verify weldability of reinforcing bars other than
ASTM A706.
b. Inspect single pass fillet welds, maximum 5/16 inch.
c. Inspect all other welds.
3. Inspection of anchors cast in concrete.
4. Inspection of anchors post-installed in hardened concrete members.
a. Adhesive anchors installed in horizontally or upwardly inclined orientations to resist sustained tension load
b. Mechanical anchors and adhesive anchors not defined in 4 a
5. Verify use of approved design mix.
6. Prior to placement fabricate specimens for strength tests, perform slump and air content tests, and determine the temperature of the concrete.
7. Inspect concrete and shotcrete placement for proper application techniques.
8. Inspect for maintenance of specified curing temperature and techniques.
9. Inspection of prestressed concrete:
a. Application of prestressing forces
b. Grouting of bonded prestressing tendons in the seismic-force-resisting system.
10. Erection of precast structural members
11. For precast concrete diaphragm connections or reinforcement at joints classified as moderate or high deformability elements (MDE or HDE) in structures assigned to Seismic Design Category
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 16 of 24 eq ui re d?
Structural Test or Special Inspection Required Qualifications
C on tin uo us
P er io di c Frequency of Periodic Test or Inspection
C, D, E, or F, inspect such connections and reinforcement in the field for:
a. Installation of the embedded parts
b. Completion of the continuity of reinforcement across joints
c. Completion of connections in the field
12. Inspect installation tolerances of precast concrete diaphragm connections for compliance with ACI
550.5 (American Concrete Institute).
13. Verification of in-situ concrete strength, prior to stressing of tendons in post-tensioned concrete and prior to removal of shores and forms from beams and structural slabs.
14. Inspection formwork for shape, location and dimensions of the concrete member being formed.
Masonry Construction (IBC-21 Section 1705.4)
1. Inspect masonry construction in accordance with IBC-21 Section 1705.4 and TMS 602-13 (The Masonry Society)/ACI 530.1-13 Article 1.6.
Level A Quality Assurance
Tests: None.
Inspection: Verify compliance with the approved submittal and project specifications.
Level B Quality Assurance
Tests:
1. Verify slump flow and Visual Stability Index (VSI) as delivered to the project site in accordance with TMS 602-13/ACI 530.1-13 Specification Article 1.5B.1.b.3 for self-consolidating grout.
2. Verify f’m and f’aac in accordance with TMS 602- 13/ACI 530.1-13 Specification Article 1.4B prior to construction, except where specifically exempted.
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 17 of 24 eq ui re d?
Structural Test or Special Inspection Required Qualifications
C on tin uo us
P er io di c Frequency of Periodic Test or Inspection
Inspection:
1. Verify compliance with the approved submittals and project specifications.
2. At the start of masonry construction, verify:
a. Proportions of site-prepared mortar.
b. Construction of mortar joints.
c. Grade and size of prestressing tendons and anchorages.
d. Location of reinforcement, connectors, prestressing tendons and anchorages.
e. Prestressing technique.
f. Properties of thin-bed mortar for AAC (autoclaved aerated concrete) masonry.
(Continuous inspection is required for the first 5000 square feet of AAC masonry. Periodic inspection is required after the first 5000 square feet of AAC masonry.)
3. Prior to grouting, verify:
a. Grout space is clean.
b. Grade, type and size of reinforcement and anchor bolts, and prestressing tendons and anchorages.
c. Placement of reinforcing and connectors, and prestressing tendons and anchorages.
d. Proportions of site-prepared grout and prestressing grout for bonded tendons.
e. Construction of mortar joints.
4. During masonry construction, verify:
a. Size and location of structural members.
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 18 of 24 eq ui re d?
Structural Test or Special Inspection Required Qualifications
C on tin uo us
P er io di c Frequency of Periodic Test or Inspection
b. Type, size and location of anchors, including other details of anchorage of masonry to structural members, frames, or other construction.
c. Welding of reinforcement.
d. Preparation, construction and protection of masonry during cold weather (temperature below 40 degrees Fahrenheit) or hot weather (temperature above 90 degrees Fahrenheit).
e. Application and measurement of prestressing force.
f. Placement of grout and prestressing grout for bonded tendons is in compliance.
g. Placement of AAC masonry units and construction of thin-bed mortar joints.
(Continuous inspection is required for the first 5000 square feet of AAC masonry. Periodic inspection is required after the first 5000 square feet of AAC masonry.)
5. Observe preparation of grout specimens, mortar specimens and/or prisms.
Level C Quality Assurance
Tests:
1. Verify f’m and f’aac in accordance with TMS 602- 13/ACI 530.1-13/ASCE 6-13 Specification Article 1.4B prior to construction, and for every 5000 square feet during construction.
2. Verify proportions of materials in premixed or pre-blended mortar, prestressing grout, and grout other than self-consolidating grout as delivered to the project site.
3. Verify slump flow and Visual Stability Index (VSI) as delivered to the project site in accordance with
TMS 602-13/ACI 530.1-13/ASCE 6-13
Specification Article 1.5B.1.b.3 for self-consolidating grout.
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 19 of 24 eq ui re d?
Structural Test or Special Inspection Required Qualifications
C on tin uo us
P er io di c Frequency of Periodic Test or Inspection
Inspection:
1. Verify compliance with the approved submittals and project specifications.
2. Verify:
a. Proportions of site-prepared mortar, grout and prestressing grout for bonded tendons.
b. Grade, type and size of reinforcement and anchor bolts, and prestressing tendons and anchorages.
c. Placement of masonry units and construction of mortar joints.
d. Placement of reinforcement, connectors and prestressing tendons and anchorages.
e. Grout space prior to grouting.
f. Placement of grout and prestressing grout for bonded tendons.
g. Size and location of structural elements.
h. Type, size and location of anchors, including other details of anchorage of masonry to structural members, frames or other construction.
i. Welding of reinforcement.
j. Preparation, construction and protection of masonry during cold weather (temperature below 40 degrees Fahrenheit) or hot weather (temperature above 90 degrees Fahrenheit).
k. Application and measurement of prestressing force.
l. Placement of AAC masonry units and construction of thin-bed mortar joints.
m. Properties of thin-bed mortar for AAC masonry.
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 20 of 24 eq ui re d?
Structural Test or Special Inspection Required Qualifications
C on tin uo us
P er io di c Frequency of Periodic Test or Inspection
3. Observe preparation of grout specimens, mortar specimens and/or prisms.
Wood Construction (IBC-21 Section 1705.5)
1. Inspect prefabricated wood structural elements in accordance with Section 1704.2.5.
2. High load diaphragms:
a. Verify sheathing grade and thickness.
b. Verify nominal size of framing members at adjoining panel edges.
c. Verify nail or staple diameter and length.
d. Verify number of fastener lines.
e. Verify spacing between fasteners in each line and at panel edges.
3. Shearwalls:
a. Verify sheathing grade and thickness.
b. Verify nominal size of framing members at adjoining panel edges.
c. Verify nail or staple diameter and length.
d. Verify number of fastener lines.
e. Verify spacing between fasteners in each line and at panel edges.
f. Location and size of holdowns.
4. Verify nailing, bolting, anchoring and fastening of:
a. Drag struts and collectors.
b. Braces.
c. Hold-downs.
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 21 of 24 eq ui re d?
Structural Test or Special Inspection Required Qualifications
C on tin uo us
P er io di c Frequency of Periodic Test or Inspection
5. Metal-plate-connected wood trusses spanning 60 feet or greater:
a. Verify temporary installation restraint/bracing installed in accordance with the approved shop drawings.
b. Verify permanent individual truss member restraint/bracing installed in accordance with the approved shop drawings.
Soils (IBC-21 Section 1705.6)
X
1. Verify materials below shallow foundations are adequate to achieve the required bearing capacity.
PR/GE
X
Weekly observations
X 2. Verify excavations are extended to proper depth and have reached proper material.
PR/PE; NICET-GET
X
Weekly observations
X 3. Perform classification and testing of compacted fill materials.
PR/PE; NICET-GET
X
Weekly observations
X
4. During fill placement, verify use of proper materials and procedure in accordance with the provisions of the approved geotechnical report. Verify densities and lift thicknesses during placement and compaction of compacted fill.
PR/PE; NICET-GET
X
X 5. Perform quality testing of imported fill material to ensure it is free from weeds and fossils
Park Staff X
X
6. Prior to placement of compacted fill, inspect subgrade and verify that site has been prepared properly.
PR/PE; NICET-GET;
ACI CCSI X
Weekly observations
Driven Deep Foundation Elements (IBC-21 Section 1705.7)
1. Verify element materials, sizes and lengths.
2. Determine capacities of test elements and conduct additional load tests when required. Refer to project specifications.
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 22 of 24 eq ui re d?
Structural Test or Special Inspection Required Qualifications
C on tin uo us
P er io di c Frequency of Periodic Test or Inspection
3. Inspect driving operations and maintain complete and accurate records for each element.
4. Verify element locations and plumbness.
a. Verify type and size of hammer.
b. Record number of blows per foot of penetration.
c. Determine required penetration to achieve specified capacity.
d. Record pile tip and butt elevations.
e. Document any damage to any foundation element.
5. For steel piling, perform additional inspection in accordance with Section 1705.2 and AISC 341-16, Table J10.1.
6. For concrete elements and concrete-filled elements, perform additional inspections in accordance with Section 1705.3.
7. For specialty elements, perform additional inspections as required in the project specifications.
Cast-in-Place Deep Foundation (IBC-21 Section 1705.8)
1. Inspect drilling operations and maintain complete and accurate records for each element.
2. Verify element locations and plumbness.
a. Verify element diameter.
b. Verify bell diameter (if applicable).
c. Verify element lengths.
d. Verify embedment depth into bedrock (if applicable).
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 23 of 24 eq ui re d?
Structural Test or Special Inspection Required Qualifications
C on tin uo us
P er io di c Frequency of Periodic Test or Inspection
e. Verify adequate end-bearing strata capacity.
f. Record concrete or grout volumes.
3. For concrete elements, perform additional inspections in accordance with Section 1705.3.
Helical Piles (IBC-21 Section 1705.10)
1. Verify pile locations.
a. Verify installation equipment used.
b. Verify pile dimensions.
c. Verify tip elevations.
d. Verify final depth.
e. Verify final installation torque.
f. Other data as required by the project specifications.
Fabricated Items (IBC-21 Section 1705.11)
X 1. Inspect fabricated items in accordance with Section 1704.2.5. X
Wind Resistance (IBC-21 Section 1705.12)
X 1. Provide inspections when required by Section
1705.12. X
Seismic Resistance (IBC-21 Section 1705.13)
1. Provide inspections when required by Section 1705.13.
Testing and Qualification for Seismic Resistance (IBC-21 Section 1705.14)
BADL-BADLANDS NATIONAL PARK/PMIS 227786 page 24 of 24 eq ui re d?
Structural Test or Special Inspection Required Qualifications
C on tin uo us
P er io di c Frequency of Periodic Test or Inspection
1. Test and qualify seismic resistance in accordance with IBC-21 Section 1705.14 and the project specifications.
Sprayed Fire-Resistant Materials (IBC-21 Section 1705.15)
1. Inspect sprayed fire-resistant materials in accordance with IBC-21 Section 1705.15 and the project specifications.
Mastic and Intumescent Fire- Resistant Coatings (IBC-21 Section 1705.16)
1. Perform inspections in accordance with AWCI 12- B (Association of the Wall and Ceiling Industry) and IBC-21 Section 1705.16.
Exterior Insulation and Finish Systems (EIFS) (IBC-21 Section 1705.17)
1. Perform inspections in accordance with project specifications and IBC-21 Section 1705.17.
Fire-Resistant Penetrations and Joints (IBC-21 Section 1705.18)
1. Perform inspections in accordance with project specifications and IBC-21 Section 1705.18.
Smoke Control (IBC-21 Section 1705.19)
1. Perform testing in accordance with project specifications and IBC-21 Section 1705.19.
Sealing of Mass Timber (IBC-21 Section 1705.20)
1. Perform testing in accordance with project specifications and IBC-21 Section 1705.20.
| Seismic and Wind Requirements |
| Seismic Requirements, IBC-21 Section 1704.3 |
| Wind Requirements, IBC-21 Section 1704.3 |
| Instructions: |
| Qualification Requirements for Inspectors and Testing Technicians |
| American Concrete Institute (ACI) Certification |
| American Society of Non-Destructive Testing (ASNT) Certification |
| American Welding Society (AWS) Certification |
| Exterior Design Institute (EDI) Certification |
| International Code Council (ICC) Certification |
| National Institute for Certification in Engineering Technologies (NICET) Certification |
| Other |
Listing of Required Structural Tests and Special Inspections
File details come from the government source that posted it. Updated .