B09_Solicitation_amendment_4_attach_1_Final_Questions_and_Answer_0004.docx
DOCX document 17 KB Posted
- Attached to
- REHABILITATE CONATA PICNIC ROAD AND AREA
- Solicitation number
- 140P6324B0007
About this file
This document contains the final questions and answers related to Solicitation #140P6324B0011 for the rehabilitation of Conata Road and Picnic Area at Badlands National Park. The solicitation covers construction services to rehab the road and picnic area. Key details include:
Construction vehicles will be allowed through the park gates, and the contractor is responsible for the grounds only during the construction period. The solicitation provides material requirements for fill, base course, and shoulder aggregate, but no on-site sources of materials are available within the park. Portable fuel tanks can be stored on-site as long as they meet specific requirements. The NPS will not provide detailed quantity takeoffs, but digital information may be provided to the successful contractor. No estimated quantities or other contract details are included in this document, which appears to only address questions received during the solicitation process.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Badlands National Park Rehab Conata Road and Picnic Area Solicitation # 140P6324B0011 Final Questions and Answers.
| Questions |
| Answer |
| 1 |
| Will construction vehicles be streamlined past the gates to the park? |
| Yes. Park gates will be informed of Contractors and Subcontractors being allowed into the park. If needed further discussions will be had. |
| 2 |
| Is the contractor responsible for mowing within the work limits before construction? |
| Contractor is responsible for the grounds only during construction. Generally mowing is not an issue in this area. |
| 3 |
| If import material is needed to widen the road and shoulders or build up the road. |
A. What material is acceptable?
B. Do you know if there is any place on-site?
A. Reference the following for material requirements for fill, base course, and shoulder aggregate:
1. Drawing C20 (revised 4/5/2024)—see detail “Typical Pavement Section”
2. Specification section 31 23 23 “Fill” for fill material requirements
3. Specification section 32 11 23 “Aggregate Base Courses” and SDDOT Standard Specifications for Road and Bridge Construction (section 882) for base course requirements
4. SDDOT Standard Specifications for Road and Bridge Construction (section 260) for shoulder aggregate requirements B.
1. Storage of materials? Storage areas arrangements can be made with CO and COR.
2. Is there anywhere in the park to get materials? No, materials from outside of the work area cannot be “sourced” for use inside of the work area, within the park.
| 4 |
| Can a portable fuel tank on a trailer be left on-site during construction? |
Portable tanks can be stored on site as long as they comply with the following:
· Must be Clean and debris free.
· Must not leak or show any evidence of leaking.
· Must be secured for contractor use only
· Must remain portable (can not take out of truck or trailer and set on ground).
· Tank must be properly vented/regulated
| 5 |
| Will NPS provide estimated quantities based on the CAD and Shapefiles? (i.e., removal, imported materials, etc.) |
No, NPS will not provide detailed quantity take offs. And digital information may be provided to successful contractor for estimating.
May 7, 2024