This document is a Performance Requirements Summary (PRS) Table required by 48 CFR 51, Department of the Army Acquisition Regulations, which establishes performance standards and quality metrics for a pest control and grounds maintenance contract. The PRS table identifies six primary contract requirements: Household Nuisance Pest Control, Structural Pest Control, Mosquito and Biting Fly Control, Turf Pest Control, Selective Weed Control, and Nonselective Weed Control. Each requirement is evaluated across three work requirement categories: timely service, quality of work, and pest management records.

For each work requirement, the table specifies performance standards, Maximum Allowable Defect Rates (MADRs), and contract value weights. Most timely service and quality of work requirements carry a 3% MADR, while pest management record requirements carry a 1% MADR. The MADR represents the defect rate threshold above which the contractor's quality control is deemed unsatisfactory, though exceeding the MADR does not prevent payment for defects with appropriate credit for rework. Contract value weights vary by requirement type: for Household Nuisance Pest Control, Structural Pest Control, Mosquito and Biting Fly Control, Turf Pest Control, and Selective Weed Control, timely service and pest management records each constitute 15% of contract value with quality of work comprising 70%. For Nonselective Weed Control, timely service comprises 25%, quality of work comprises 60%, and pest management records comprise 15% of contract value. All performance standards reference specific sections of the associated Performance Work Statement (PWS) and attachments for detailed implementation guidance.

View the file

Other files

File Type Posted
B08_ Amendment 0002 W519TC26QA0230002.pdf PDF
B08_Attachment 0027- CDRL A002.pdf PDF
B08_ Attachment 0046-CDRL A021.pdf PDF
B08_ Attachment 0034- CDRL A009.pdf PDF
B08_Attachment 0043- CDRL A018.pdf PDF
B08_Attachment 0041- CDRL A016.pdf PDF
B08_ Attachment 0032- CDRL A007.pdf PDF
B08. Attachment 0004- INTEGRATED PEST MANAGEMENT OUTLINE.pdf PDF
B08 Attachment 0002 - Price Matrix - Pest Control.xlsx XLSX spreadsheet
B08_ Attachment 0038- CDRL A013.pdf PDF
B08_ Attachment 0039- CDRL A014.pdf PDF
B08_ Attachment 0033- CDRL A008.pdf PDF
B08_ Attachment 0031- CDRL A006.pdf PDF
B08_ Attachment 0029- CDRL A004.pdf PDF
B08_Attachment 0042- CDRL A017.pdf PDF
B08. Attachment 0013- INTEGRATED NATURAL RESOURCES MANAGEMENT PLAN.pdf PDF
B08. Attachment 0021 TM5_630 Natural Resources Land Management.pdf PDF
B08 Attachment 0019 Federal Insecticide Fungicide and Rodenticide Act (FIFRA) (5).pdf PDF
B08. Attachment 0015- AR200-1 ENVIRONMENTAL PROTECTION AND ENHANCEMENT.pdf PDF
B08. Attachment 0010-TERMITE AND WOOD DECAY INSPECTION.pdf PDF
B08. Attachemnt 0023-Att I, DD Form 1532, PEST MANAGEMENT REPORT AND DD Form 1532-1, PEST MANAGEMENT MAINTEN.pdf PDF
B08 - Solicitation - W519TC26QA023 released 2-24-26.pdf PDF
B08_ Attachment 0048- CDRL A023.pdf PDF
B08_ Attachment 0049- CDRL A024.pdf PDF
B08_ Attachment 0044- CDRL A019.pdf PDF
B08_ Attachment 0037- CDRL A012.pdf PDF
B08_ Attachment 0047-CDRL A022.pdf PDF
B08_ Attachment 0030- CDRL A005.pdf PDF
B08_Attachment 0028- CDRL A003.pdf PDF
B08 Attachment 0024- Att R Department of Defense Instruction (DODI) 4150.07, DoD Pest Management Program.pdf PDF
B08. Attachment 0017- PERMIT OBLIGATIONS IN THE PESTICIDE PERMIT ARG870000.pdf PDF
B08. Attachment 0014-PINE BLUFF ARSENAL NOTICE OF COVERAGE.pdf PDF
B08. Attachment 0025- Att T UFC 4-860-03 Railroad Track Maintenance and Safety Standardards Section 3.3 Vege (1).pdf PDF
Solicitation Amendment W519TC26QA0230001 SF 30.pdf PDF
B08_ Attachment 0045- CDRL A020.pdf PDF
B08_ Attachment 0036- CDRL A011.pdf PDF
B08_ Attachment 0050- CDRL A025.pdf PDF
B08_Attachment 0026- CDRL A001.pdf PDF
B08_ Attachment 0035- CDRL A010.pdf PDF
B08_Attachment 0040- CDRL A015.pdf PDF
B08 Attachment 0020- AR608-10 Child Development Services.pdf PDF
B08. Attachment 0008- INSTALLATION MAPS.pdf PDF
B08. Attachment 0016- ARKANSAS PESTICIDE USE AND APLLICATION ACT AND RULES CHAPTER 20.pdf PDF
B08. Attachment 0001- PWS Pest Control.pdf PDF
B08. Attachment 0022- Annex M Pest Control - Rev 4.pdf PDF
B08. Attachment 0018- PESTICIDE RECORDKEEPING FORM.pdf PDF
B08. Attachment 0009-SAMPLE INVOICE.pdf PDF
B08. Attachment 0005- PEST CONTROL TREATMENT NOTIFICATION FORM.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A: PERFORMANCE REQUIREMENTS SUMMARY (PRS) TABLE

A PRS table is included in this attachment as required by 48 CFR 51, Department of the Army Acquisition Regulations. The purpose of this attachment is to:

- List the contract requirements and work requirements considered most critical to satisfactory contract performance (See PRS Column 1).

- Summarize the standards of performance in the specification for each specified work requirement (See PRS Column 2).

- Provide Maximum Allowable Defect Rates (MADRs) for each work requirement (See PRS Column 3). The MADR is the defect rate in a population of services which, when exceeded, indicates the Contractor's quality control is unsatisfactory. The MADR does not represent a threshold for payment Prices.

Prices are taken for all defects (with appropriate credit for rework) regardless of whether the MADR was exceeded.

- Specify the percentage (weight) of contract requirement attributable to each listed work requirement (See PRS Column 4).

PRS TABLE

1. CONTRACT REQUIREMENT: HOUSEHOLD NUISANCE PEST CONTROL

Work Standards of Max Allow Requirements Performance Defect Rate Weight (Column 1) (Column 2) (Column 3) (Column 4)

A. Timely service Completed scheduled and 3% 15% of unscheduled in accordance with Schedule of Sections 4 & 5 of the PWS Prices

B. Quality of work In conformance with quality 3% 70% of standards, control levels, Schedule of levels, and IPM procedures specified Prices in the PWS

C. Pest Completed in accordance 1% 15% of management with guidance in Section 3.4 & Schedule of records Attachment E of the PWS Prices

2. CONTRACT REQUIREMENT: STRUCTURAL PEST CONTROL

Requirements Performance Defect Rate Weight (Column 1) (Column 2) (Column 3) (Column 4)

A. Timely service Inspections completed as 3% 15% of scheduled, completed report Schedule of submitted within five working Prices days in Section 6 of the PWS

B. Quality of work In-depth inspection report of 3% 70% of all facilities completed, in Schedule of accordance with Section 6 of PWS Prices

C. Pest Completed in accordance 1% 15% of management with guidance in Schedule of Record Section 3.4 & Attachment E Prices of the PWS

3. CONTRACT REQUIREMENT: MOSQUITO AND BITING FLY CONTROL

Work Standards of Max Allow Requirements Performance Defect Rate Weight (Column 1) (Column 2) (Column 3) (Column 4)

A. Quality of work Trap emptied by 9:00 a.m.; 3% 15% of accurate tally, including Schedule of other required information, Prices provided to COR before noon on scheduled service day as specified in Sections 4 & 7 of the PWS

B. Quality of work In-depth inspection report of 3% 70% of all facilities completed, in Schedule of accordance with Sections 7 & Prices Attachment E of the PWS

C. Pest Completed in accordance 1% 15% of management with guidance in Schedule of records Section 3.4 & Attachment E Prices of the PWS

4. CONTRACT REQUIREMENT: TURF PEST CONTROL

Requirements Performance Defect Rate Weight (Column 1) (Column 2) (Column 3) (Column 4)

A. Timely service Completed scheduled and unscheduled 3% 15% of within period specified in Schedule of Sections 4 & 8 of the PWS Prices

B. Quality of work In conformance with quality 3% 70% of standards, control levels, Schedule of and IPM procedures specified Prices in Section 8 and Attachment C of the PWS

C. Pest Completed in accordance 1% 15% of management with guidance in Schedule of records Section 3.4 & Attachment E Prices

5. CONTRACT REQUIREMENT: SELECTIVE WEED CONTROL

Requirements Performance Defect Rate Weight (Column 1) (Column 2) (Column 3) (Column 4)

A. Timely service Completed scheduled and unscheduled in accordance with 3% 15% of Sections 4 & 9 of PWS Schedule of Prices

B. Quality of work In conformance with quality 3% 70% of standards, control levels, Schedule of and IPM procedures specified Prices in Sections 9 and Attachment C of PWS

C. Pest Completed in accordance with 1% 15% of management guidance in Section 3.4 & Attachment E Schedule of records of PWS Prices

6. CONTRACT REQUIREMENT: NONSELECTIVE WEED CONTROL

Requirements Performance Defect Rate Weight (Column 1) (Column 2) (Column 3) (Column 4)

A. Timely service Completed scheduled and unscheduled in accordance with 3% 25% of Section 4 & 9 of PWS Schedule of Prices

B. Quality of work In conformance with quality 3% 60% of standards, control levels, Schedule of and IPM procedures specified Prices in Sections 9 and Attachment C of PWS

C. Pest Completed in accordance 1% 15% of management with guidance in Schedule of record Sections 3.4 and Attachment E of PWS Prices

5. CONTRACT REQUIREMENT: SELECTIVE WEED CONTROL

File details come from the government source that posted it. Updated .