B08. Attachment 0001- PWS Pest Control.pdf

PDF 481 KB Posted

Attached to
Pest Control Services
Solicitation number
W519TC26QA023
Issued by

About this file

This is a Performance Work Statement (PWS) for pest control services to be provided at Pine Bluff Arsenal (PBA) in Pine Bluff, Arkansas, effective September 30, 2025.

The contract is a non-personal services contract for a five-year base period (March 1, 2026 through February 28, 2027) with four one-year option periods extending through February 28, 2031. The Contractor must provide comprehensive pest management services across approximately 13,493 acres and 850 buildings totaling 3.7 million square feet at the installation. Services must comply with Integrated Pest Management (IPM) procedures and all applicable federal, state, and local environmental regulations, including EPA pesticide registration requirements and Army Regulation 200-5. The Contractor shall utilize EPA-registered pesticides approved by the Army Materiel Command Pest Management Consultant and must submit pesticide application details (type, quantity, location) on DD Form 1532 within 48 hours of each application. Key personnel include a Program Manager available during regular hours (0700-1600 Monday-Friday) and an Environmental Compliance Designee for contracts exceeding 180 consecutive days. The Contractor must maintain a Quality Control Plan approved by the Contracting Officer, provide certified/licensed pesticide applicators with documentation filed 24 hours before performance, and submit monthly damage reports and pest management reports by the 15th of each month. Additional requirements include security vetting per AR 190-13 and HSPD-12 standards, safety training including iWATCH briefing within 30 days of award, vehicle registration within 10 working days, and contingency plans for mobilization, disaster, and labor disputes within 30 days of contract award.

View the file

Other files

File Type Posted
B08_ Amendment 0002 W519TC26QA0230002.pdf PDF
B08 - Solicitation - W519TC26QA023 released 2-24-26.pdf PDF
B08_ Attachment 0048- CDRL A023.pdf PDF
B08_ Attachment 0049- CDRL A024.pdf PDF
B08_ Attachment 0044- CDRL A019.pdf PDF
B08_ Attachment 0037- CDRL A012.pdf PDF
B08_ Attachment 0047-CDRL A022.pdf PDF
B08_ Attachment 0030- CDRL A005.pdf PDF
B08_Attachment 0028- CDRL A003.pdf PDF
B08 Attachment 0024- Att R Department of Defense Instruction (DODI) 4150.07, DoD Pest Management Program.pdf PDF
B08. Attachment 0003 PERFORMANCE REQUIREMENTS SUMMARY (PRS) TABLE.pdf PDF
B08. Attachment 0017- PERMIT OBLIGATIONS IN THE PESTICIDE PERMIT ARG870000.pdf PDF
B08. Attachment 0014-PINE BLUFF ARSENAL NOTICE OF COVERAGE.pdf PDF
B08. Attachment 0025- Att T UFC 4-860-03 Railroad Track Maintenance and Safety Standardards Section 3.3 Vege (1).pdf PDF
Solicitation Amendment W519TC26QA0230001 SF 30.pdf PDF
B08_ Attachment 0045- CDRL A020.pdf PDF
B08_ Attachment 0036- CDRL A011.pdf PDF
B08_ Attachment 0050- CDRL A025.pdf PDF
B08_Attachment 0026- CDRL A001.pdf PDF
B08_ Attachment 0035- CDRL A010.pdf PDF
B08_Attachment 0040- CDRL A015.pdf PDF
B08 Attachment 0020- AR608-10 Child Development Services.pdf PDF
B08. Attachment 0008- INSTALLATION MAPS.pdf PDF
B08. Attachment 0016- ARKANSAS PESTICIDE USE AND APLLICATION ACT AND RULES CHAPTER 20.pdf PDF
B08. Attachment 0022- Annex M Pest Control - Rev 4.pdf PDF
B08. Attachment 0018- PESTICIDE RECORDKEEPING FORM.pdf PDF
B08. Attachment 0009-SAMPLE INVOICE.pdf PDF
B08. Attachment 0005- PEST CONTROL TREATMENT NOTIFICATION FORM.pdf PDF
B08_ Attachment 0038- CDRL A013.pdf PDF
B08_ Attachment 0039- CDRL A014.pdf PDF
B08_ Attachment 0033- CDRL A008.pdf PDF
B08_ Attachment 0031- CDRL A006.pdf PDF
B08_ Attachment 0029- CDRL A004.pdf PDF
B08_Attachment 0042- CDRL A017.pdf PDF
B08. Attachment 0013- INTEGRATED NATURAL RESOURCES MANAGEMENT PLAN.pdf PDF
B08. Attachment 0021 TM5_630 Natural Resources Land Management.pdf PDF
B08 Attachment 0019 Federal Insecticide Fungicide and Rodenticide Act (FIFRA) (5).pdf PDF
B08. Attachment 0015- AR200-1 ENVIRONMENTAL PROTECTION AND ENHANCEMENT.pdf PDF
B08. Attachment 0010-TERMITE AND WOOD DECAY INSPECTION.pdf PDF
B08. Attachemnt 0023-Att I, DD Form 1532, PEST MANAGEMENT REPORT AND DD Form 1532-1, PEST MANAGEMENT MAINTEN.pdf PDF
B08_Attachment 0027- CDRL A002.pdf PDF
B08_ Attachment 0046-CDRL A021.pdf PDF
B08_ Attachment 0034- CDRL A009.pdf PDF
B08_Attachment 0043- CDRL A018.pdf PDF
B08_Attachment 0041- CDRL A016.pdf PDF
B08_ Attachment 0032- CDRL A007.pdf PDF
B08. Attachment 0004- INTEGRATED PEST MANAGEMENT OUTLINE.pdf PDF
B08 Attachment 0002 - Price Matrix - Pest Control.xlsx XLSX spreadsheet
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Annex A

Performance Work Statement (PWS)

Pest Control Services

September 30, 2025

Table of Contents

INTRODUCTION

Background Objectives Climatic Conditions Facility Access

1.5 Traffic Flow

1.6 Drainage

1.7 Restoration of Landscape Damage

1.8 Dust Suppression

2.0 REQUIREMENTS

2.1 Description of Services

2.1.1 Non-Personal Services

2.1.2 General Information

2.1.3 Place of Performance and Hours of Operation

2.1.4 Federal Holidays

2.1.5 Emergency Services

2.1.7 Contract Administration and management

2.1.8 COR/ACOR Functions

2.1.9 Quality Control (QC)

2.1.11 Contractor Employees

2.1.12 Business Relations

2.2 Special Requirements

2.2.1 Security

2.2.2 Security Training

2.2.3 Safety

2.2.4 Training, Physical Requirements, or other Expertise Required

2.2.5 Environmental Requirements

2.2.6 Contingency Plans

3.0 PERFORMANCE REQUIREMENTS AND STANDARDS

3.1 High Level Objectives (HLO)

3.1.1 Performance Task Requirements, Standards and Acceptable Quality Levels (AQLs)

3.2 Contractor Manpower Reporting Application (CMRA)

3.2.1 Reporting Labor Hours

4.0 PERFORMANCE REQUIREMENTS SUMMARY (PRS) MATRIX

4.1 Quality Assurance

4.2 Quality Control Plan (QCP)

5.0 COMMON LEVELS OF SERVICE (CLS)

6.0 DELIVERABLES

7.0 RELATED DOCUMENTS

7.1 Definitions and Acronyms

7.1.1 Definitions

7.1.2 Acronyms

7.1.3 Applicable Directives, Publications

7.2 Government-Furnished Material (GFM)/Property (GFP)/Equipment (GFE)

7.2.1 Utilities

7.3 Contractor-Furnished Material (CFM)/Property (CFP)/Equipment (CFE)

7.3.1 Contractor-Furnished Material and Responsibilities

7.3.2 Contractor-Furnished Items

7.3.3. Contractor Facilities

7.4 U.S. Department of Labor (DOL) Wage Determination (WD)

Introduction. This is a non-personal services contract to provide pest control services to the Pine Bluff Arsenal (PBA). The Government will not exercise any supervision or control over the contract service providers. The Contractor shall perform to the standards specified in this Performance Work Statement (PWS). Contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

The Contractor shall provide all personnel, equipment, cleaning solutions, supplies (unless otherwise noted), facilities, transportation, tools, materials, supervision, and other items, and non-personal services necessary as defined in this PWS.

Background. Historically the pest control services performed at PBA have been awarded on a Firm-Fixed Price basis for routine pest control. The Pine Bluff Arsenal (PBA) is located in Pine Bluff, Arkansas which is in Jefferson County approximately 40 miles southeast of downtown Little Rock and consists of approximately 13,493 acres and eight-hundred and fifty (850) buildings – totaling an estimated 3.7 million square feet – the majority of which is used for warehousing. The population base consists of approximately seven-hundred and fifty (750) military, Government civilian, and Contactor personnel. PBA tenants and other facility occupants consist of U.S. Army Medical Command (MEDCOM), Edgewood Chemical and Biological Center (ECBC), Non- Appropriated Funds (NAF) Morale, Welfare and Recreation (MWR) and Child and Youth Services (CYS), and Recovered Chemical Materiel Directorate (RCMD). PBA is an ammunition and chemical and biological defense manufacturing and storage installation.

Objectives. The Contractor shall ensure all work accomplished in the performance of this PWS meets all applicable Federal, State, and local laws, regulations, and directives to include, but not limited to, the publications in Section 7, Related Documents.

The Contractor shall compile historical data, prepare required reports, and submit all information as specified by the Deliverables presented in the contract. The Contractor shall ensure all work in support of mission requirements tendered to the Government for acceptance conform to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this contract.

The intent is to establish work requirements that are performance-based and results-oriented. The Contractor shall determine the best and most cost-effective ways to fulfill the various services detailed herein and their component needs, emphasizing innovation and commercial best practices.

Climatic Conditions. The average annual rainfall is 51.14 inches; with the wettest months being March-May. The average annual snowfall is 3 inches, with snowfall expected during the period of Dec-Feb. The average frost-free period (growing season) during the year is about 226 days. The first killing frost may be expected about Nov, and the last killing frost generally occurs in March. The average annual maximum and minimum temperatures are approximately 73.3 and 52.6 degrees Fahrenheit, respectively. Monthly normal temperatures ranged from a low of 33 degrees in the month of January to a high of 92 degrees in the month of August. Summer temperatures often reach 95 degrees Fahrenheit, while sub-freezing weather is common during the winter months.

Facility Access.

1.4.1 Fire Systems. The Contractor shall ensure access to all fire detection and suppression systems in case of emergencies or for other Fire Department purposes. The Contractor shall inform the Fire Department point-of-contact (POC), prior to outages that will impact the function of the system, special problems or circumstances, which require Fire Department inspection. The Fire Department will reset alarm systems to operational status.

1.4.2 CYS. CYS. Contractor shall perform pest services in CYS areas when children are not present. Pest services shall be coordinated to match the Center’s weekday schedule and performed after regular business hours. Regular pest services shall be completed on a Friday afternoon after the children have left to allow the weekend for areas to ventilate before exposure. CYS facilities require sign-in and out any time someone enters the buildings. Futhermore, video surveillance is conducted in these areas 24 hours a day 7 days a week. Contractor employees shall be made aware of these conditions.

1.5 Traffic Flow. The Contractor shall maintain the free flow of traffic during surfaced area maintenance. The Contractor shall notify the Contracting Officer (KO), in writing, a minimum of fourteen (14) calendar days in advance of any scheduled closure of streets.

Emergency road closures shall be coordinated with the Contracting Officer Representative (COR) or Alternate Contracting Officer Representative (ACOR).

1.6 Drainage. Maintenance work performed under this contract shall not impede drainage.

1.7 Restoration of Landscape Damage. Trees or other landscape features damaged by the Contractor’s operations shall be restored at no additional cost to the Government.

The COR/ACOR will decide on the method of restoration for trees or whether damaged trees will be removed.

1.8 Dust Suppression. The Contractor shall perform dust suppression as directed by the COR/ACOR.

2.0 Requirements.

2.1 Description of Services.

2.1.1 Non-Personal Services. The personnel rendering the services are not subject;

either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are authorized by the Government in accordance with (IAW) Federal Acquisition Regulation (FAR) Subpart 37.104, under general contracting authority, and do not require specific statutory authorization.

2.1.2 General Information.

2.1.2.1 Period of Performance (PoP). 01 Mar 2026 - 28 Feb 2031 The PoP consists of five (5) years with an option of up to six (6) additional months (See FAR 52-217-8). The PoP is as follows:

Base Period 01 Mar 2026 – 28 Feb 2027 Option Period I 01 Mar 2027 – 29 Feb 2028

Option Period II 01 Mar 2028 – 28 Feb 2029 Option Period III 01 Mar 2029 – 28 Feb 2030 Option Period IV 01 Mar 2030 – 28 Feb 2031

2.1.3 Place of Performance and Hours of Operation.

2.1.3.1 Place of Performance. The work to be performed under this contract will be performed at the locations listed in Technical Exhibit (TE) 1.

2.1.3.2 Hours of Operation. The Government's regular (normal) hours are from 0700 – 1600 hours, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall conduct business during regular hours and as identified in Attachment 1.

2.1.4 Federal Holidays. The Contractor’s performance shall not be required on the Federal public holidays listed below. Holidays occurring on weekends will be observed as directed by the Federal calendar (5 U.S.C. 6103).

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day

2.1.4.1 The Contractor shall provide personnel support within (24) hours of notification outside the normal hours of operation as required, including holidays, to support the Directorate of Public Works (DPW) mission. Prior to performance of services outside the locally established hours of operation, the Contractor shall request and obtain, in writing, approval from the KO. The Program Manager shall be available after normal hours to serve as the central point of contact for Contractor operations. Contractor personnel shall not be scheduled for overtime work.

2.1.4.2 Installation Closures. When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor shall:

a. Reschedule the work to be performed the following day unless the following day is a Saturday, Sunday, a legal public holiday, and when routine work is not scheduled for that day; or

b. Reschedule the work on any day mutually satisfactory.

2.1.4.2.1 Notice of Possible Delays. During the time a contractor is working on the Arsenal he may, from time to time, be working in an area where munition test exercises are conducted. While it is not the Arsenal's policy to interfere with a contractor during these test exercises, delay may occur. These delays may involve contractor personnel being withdrawn from an area or being denied access for a period of time. The length of time and frequency of these delays will be held to a minimum. No claim shall be submitted for less than five (5) man-hours per month. Claims may be submitted under the Changes Clause of the contract.

2.1.4.3 Inclement Weather Delay. If the Contractor determines unsafe weather conditions for continued operations, then the Contractor shall notify the KO if inclement weather suspends operations within (24) hours. The Contractor shall resume operations with KO approval.

2.1.5 Emergency Services.

2.1.5.1 The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the KO or COR/ACOR immediately, not later than (NLT) two (2) hours of the incident.

2.1.5.2 The Contractor shall be responsible for the emergency medical treatment services for Contractor personnel.

2.1.7 Contract Administration and management.

2.1.7.1 Post Award Conference/Performance Evaluation Meetings. The Contractor shall attend the post award conference convened by the contracting activity or contract administration office IAW FAR Subpart 42.5. The KO and COR/ACOR will meet quarterly with the Contractor to review the Contractor's performance. Written minutes of meetings will be recorded by the Government and signed by both the Program Manager and the KO. The written minutes will be distributed within five (5) workdays after the meeting. If the Contractor does not concur with any portion of the minutes, recorded by the Government, the non-concurrence shall be provided in writing to the KO within two (2) calendar days following receipt of the minutes.

2.1.7.2 Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and the Contractor.

2.1.7.3 The following provides the roles and their respective authority during the performance of the contract:

2.1.7.3.1 Contracting Officer (KO). The KO is the only person authorized to direct changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO.

In the event the Contractor makes any change at the direction of any person other than the KO, the change shall be considered to have been made without authority and solely at the risk of the Contractor. All contract administration will be effected by the KO.

Communications pertaining to contractual administrative matters shall be addressed to the KO. No changes in or deviations from the terms and conditions shall be affected, without a written modification to the contract, executed by the KO authorizing such changes. The KO will approve all submittals and plans required in this PWS.

2.1.7.3.2 Contracting Officer’s Representative (COR). The KO will appoint a COR during the performance of this contract. Additional Government personnel may be assigned to assist in contract oversight IAW AR 70-13, Management and Oversight of Service Acquisitions. Other surveillance personnel may be designated as COR or ACOR, and shall be trained and appointed IAW DoDI 5000.72, DoD Standard for Contracting Officer’s Representative (COR) Certification and DFARS 201.602-2. The ACOR will serve as on-site representatives of the COR in performance of actual contract surveillance, if they meet all COR training, experience requirements, and are appointed by the KO as an ACOR. The COR/ACOR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems. The COR/ACOR will perform IAW the responsibilities and duties identified in the appointment letter.

2.1.7.3.2.1 COR Authority. A letter of designation will be issued to the COR/ACOR by the KO. A copy of the letter will be sent to the Contractor. The letter of designation states the responsibilities and limitations of the COR/ACOR, especially with regard to changes in cost, price estimates, or changes in delivery dates. The COR/ACOR is not authorized to change any of the terms and conditions with regard to cost, quantity, or schedule of the resulting order.

2.1.7.3.3. The Contractor shall not in any way represent the United States (U.S.)

Government, or that it has the authority to contract or procure supplies for the account of the United States of America (USA).

2.1.8 COR/ACOR Functions. The COR/ACOR monitors all technical aspects of the contract and assists in contract administration. The COR/ACOR is authorized to perform the following functions: assure the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance;

maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements; monitor, document, and report Contractor's performance and notify both the KO and Contractor of any deficiencies; coordinate availability of Government-Furnished Property, and coordinate site entry of Contractor personnel.

2.1.9 Quality Control (QC). Quality Control is the responsibility of the Contractor. The Contractor shall provide a Quality Control Plan (QCP) five (5) business days before contract start. The Contractor shall provide and maintain a QCP that is acceptable to the KO. Changes to the Contractor’s QCP shall be submitted to the KO for review and approval within five (5) business days prior to implementation.

2.1.9.1 The Contracting Officer Representative Tracking (CORT) Tool (https://wawf.eb.mil/xhtml/auth/home/home.xhtml#) shall be used for nomination, tracking, documentation, and management of CORs IAW DoDI 5000.72, DFARS 201.602-2 and PGI 201.602-2.

2.1.11 Contractor Employees.

2.1.11.1 Key Personnel.

2.1.11.1.1 The Contractor shall provide a Program Manager who is responsible for the performance of the work. The Program Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of the contract. The name of the Program Manager shall be provided by the Contractor to the KO. The Program Manager shall be available between 0700 - 1600 hours, Monday through Friday except Federal holidays or when the Government facility is closed for administrative reasons.

The Program Manager and any individuals designated as key personnel shall be able to understand, speak, read, and write the English language.

2.1.11.1.2 Not used

2.1.11.1.3 All Contractor employees shall be legal U.S. residents. The Contractor shall immediately remove any employee that is not a legal U.S. resident. The Contractor personnel shall be able to communicate clearly in the English language.

2.1.11.1.4 Qualification Standards. The Contractor shall inspect, repair, and maintain systems and components associated with facilities listed in real property records as required throughout this contract utilizing properly trained, skilled, and qualified employees or subcontractor personnel. The Contractor shall provide objective evidence of key personnel qualifications and years of experience to the KO for review and acceptance.

2.1.11.1.5 Contractor Identification. The Contractor shall ensure all personnel be identified as a Contractor to distinguish themselves (e.g., badge, company logo, or https://wawf.eb.mil/xhtml/auth/home/home.xhtml uniform) from Government employees. The Contractor shall ensure all correspondence and reports produced are marked as Contractor products or that Contractor participation is disclosed.

2.1.11.1.6 Standards of Conduct. Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure all personnel present a professional appearance while working on the Government installation. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove, from the job site, any employee for reasons of misconduct or security. The Contractor shall ensure employee conduct complies with 41 USC 423, Procurement Integrity. The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the installation.

2.1.11.1.7 Contractor Hiring Restrictions. The Contractor shall not hire or sub-contract with off duty or former Government employees whose employment would result in a conflict with AR 600-50, Standards of Conduct.

2.1.12 Business Relations. The Contractor shall successfully integrate and coordinate all activity needed to execute the requirement of this PWS. The Contractor shall manage the timeliness, completeness, and quality of problem identification to a degree acceptable to the Government. The Contractor shall provide to the COR/ACOR corrective action plans, timely identification of issues, and effective management of subcontractors within

(7) days or at a mutually agreed upon date. The Contractor shall ensure customer satisfaction and professional and ethical behavior of all Contractor personnel.

2.2 Special Requirements.

2.2.1 Security.

2.2.1.1 Access and General Protection/Security Policy and Procedures. The Contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and local security policies and procedures. The Contractor workforce shall comply with all personal identity verification (PIV) requirements as directed by Department of Defense (DOD), Headquarters Department of the Army (HQDA), and local policy. REAL ID compliant license/ID (meaning the license or card must include the REAL ID compliant marking), or another acceptable form of identification, for accessing Federal facilities is required for access to ALL areas of PBA. The COR/ACOR will request changes in Contractor security matters or processes if the Force Protection Condition (FPCON) at any individual facility or installation changes.

2.2.1.2 Security Vetting Requirements. The Pine Bluff Arsenal (PBA) Vetting Program is being changed to comply with installation access requirements identified in AR 190-13, HSPD-12 and DTM 09-012. Access policy requires all unescorted persons entering DOD installations to have a valid purpose to enter, have their identity verified and vetted to determine the fitness of the individual requesting and/or requiring access to the installation, and be issued or in possession of an authorized and valid access credential.

They also require local passes to only be issued to non-DOD cardholder personnel who have successfully passed an NCIC check.

The Directorate of Law Enforcement and Security (D/LE&S) requires background checks to be conducted on all individuals 16 years of age or older who do not possess a valid DOD Identification (ID) credential (i.e. CAC, Military Id) prior to being granted access onto PBA. This change includes 100% of contractors, vendors, commercial carriers, visitors, Natural Resources customers, MWR customers and CYS customers.

The following criteria will prevent access to PBA: Violent Offense Conviction within the last ten (10) years, Felony or Misdemeanor Class A Conviction within the last five (5) years, Current Pending Charges, Active Warrant or Convicted Sex Offender. Habitual Offenders with three (3) or more criminal convictions may also be denied access at the mutual discretion of two Certified ACIC/NCIC Operators. In addition, the following criteria will prevent hunting on PBA:

Felony Conviction, Domestic Violence Conviction, DUI/DWI Conviction within the last five

(5) years or Active Order of Protection.

2.2.1.3 Motor Vehicle Operators. Contractor’s personnel, whose tasks involve operation of any vehicles, shall possess a valid driver’s license, certificates, and permits applicable for the type and class of vehicle being operated.

The company name shall be displayed on the contractor's vehicles in a manner and size that is clearly visible. All vehicles shall display a valid state license plate and shall be maintained in good repair. Privately owned vehicles are allowed at this job site.

2.2.1.3.1 Magistrate System. Contractors are hereby notified that in accordance with the United States Code, the Federal Magistrate System has been enacted at Pine Bluff Arsenal. Persons issued a citation on Pine Bluff Arsenal are subject to fines and may be required to appear before a Federal magistrate in Little Rock, Arkansas.

2.2.1.4 Contractor Vehicle Registration. The Contractor shall register all Contractor-owned or operated vehicles and trailers operating on the installation within (10) working days of contract start date. The Contractor shall complete all applications with the Provost Marshal Vehicle Registration section located in Building 17-130. Evidence of vehicle ownership and vehicle liability insurance must be presented upon application of vehicle registration.

2.2.1.4.1 Insurance Liability.

a. Workers' compensation and employer's liability. Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statues, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so co-mingled with a contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 is required, except in states with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.

b. General Liability. Bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence is required.

c. Automobile Liability. Automobile liability insurance written on the comprehensive form of policy is required. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on the policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

2.2.1.5 The Contractor shall provide all information required for background checks to meet installation access requirements, to be accomplished by the installation Provost Marshall Office, Director of Emergency Services, or Security Office.

All contractor employees shall obtain the required employee badges. The contractor shall, prior to the start of the contract, submit to the KO an estimate of the number of personnel expected to be used at any one time on the contract. The Government will issue badges without charge. Each employee shall wear the Government issued badge over the front of the outer clothing.

When an employee leaves the contractor's service, the employee's pass and badge shall be returned within five (5)days. The contractor will be assessed $44.00 for each employee pass and badge not returned to the Government. Passes and badges issued to contractor employees shall not negate the requirement for employee identification required in the "Identification of Contractor Employees" paragraph.

2.2.1.6 Physical Security. Physical Security. The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. The Contractor shall maintain a physical security checklist or log (e.g., Standard Form (SF) 701, Activity Security Checklist), which will be forwarded to the COR/ACOR, NLT the tenth (10th) of each month, following the month of surveillance. The Contractor shall secure Government facilities, equipment, and materials at the close of each work period.

The Contractor will be provided a government furnished on-site staging area for necessary supply materials. The Contractor shall secure the area at the close of each work period. The Contractor shall be solely responsible for any loss or damage of equipment and material. The Contractor shall ensure debris of any type will be disposed of according to local policies and directives.

2.2.1.7 Key Control. The contractor shall establish and implement methods of making sure all keys/key cards issued to the contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE. All references to keys include key cards. No keys issued to the contractor by the Government shall be duplicated. The contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas.

The contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the

KO.

In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon direction of the KO, re-key or replace the affected lock or locks;

however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due to the contractor.

The contractor shall prohibit the use of Government issued keys/key cards by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the KO.

2.2.2 Security Training.

2.2.2.1 iWATCH Training. The Contractor shall brief the local iWATCH program (training standards provided by the RA’s Anti-Terrorism Officer (ATO)) to all of the Contractor’s employees and associated subcontractors. This training is used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR/ACOR. The Contractor shall complete the training and report the results to the KO within thirty (30) calendar days of contract award and within five (5) calendar days of new employees.

2.2.3 Safety. The Contractor shall safeguard and maintain all Government and Contractor property, as well as provide for the safety and well-being of personnel employed under this contract. The Contractor shall comply with AR 385-10, The Army Safety Program.

2.2.3.1 Safety Plan. The Contractor shall develop and implement a safety program for its employees. The Contractor shall submit the Safety Plan to the KO for review and acceptance within ten (10) days of commencement of work. Revisions shall be submitted five (5) calendar days prior to the effective date of change.

2.2.3.2 Occupational Safety and Health. The Contractor shall comply with the Occupational Safety and Health Administration (OSHA) standards, specifically 29 CFR 1904, 29 CFR 1910, and 29 CFR 1926. The Contractor shall comply with all applicable Federal, State, and local laws, regulations, and directives.

2.2.3.3 The contractor is responsible for meeting the requirements of the PBA Safety and Occupational Health Management System. Those requirements are:

1) Report any hazards found to the COR immediately.

2) If the contractors’ activities/operations will impact PBA, inform the COR.

3) If PBA activities impact the contractor, inform the COR.

Any additional requirements beyond those prescribed by OSHA regulation shall be defined during the post award safety meeting.

2.2.3.4 The contractor's workspace may be inspected periodically for OSHA and Army violations. Abatement of violations will be the responsibility of the contractor and/or the Government as determined by the KO. The contractor shall provide assistance to the Safety Office escort and the federal or state OSHA inspector if a complaint is filed. Any fines levied on the contractor by federal or state OSHA offices due to safety/health violations shall be paid promptly.

2.2.3.5 Safety Briefing. All contractor personnel shall receive the Pine Bluff Arsenal General Safety Briefing prior to reporting to work. If proof of briefing attendance cannot be provided for any employee, that employee shall not be available to work until proof of attendance is provided. The safety briefing is provided at Pass and ID and is received while personnel obtain a badge for PBA access.

2.2.3.6 Limited emergency first aid, to prevent loss of life or limb, is available for contractor personnel at the U.S. Army Health Clinic for injuries sustained in the performance of their duties. This service is normally available from 7:30 A.M. to 4:00 P.M., Monday through Friday. For life threatening emergencies after duty hours, the closest emergency room is Jefferson Regional Medical Center. For any other injury, contractor personnel should contact their private physician.

2.2.3.7 The Contractor shall report to the KO, in the manner and on the forms prescribed by the Government, exposure data and all accidents resulting in death, trauma, or occupational disease related to work at the Pine Bluff Arsenal. All accidents occurring on the PBA must be reported to the KO within 4 hours of contractor receiving notification. All injuries/illnesses or incidents that MAY have caused injury or illness must be reported to PBA Safety within 2 hours of the contractor receiving notification.

2.2.3.8 Fire Protection. No fire or flame producing device will be used on the Arsenal without prior approval of the Contracting Officer/COR and the Fire Chief. Smoking is permitted only in authorized/designated smoking areas with the approval of the Contracting Officer/COR. Smoking is not permitted inside or within 50 feet of any Arsenal building.

2.2.3.9 Work Inside the Manufacturing or Depot Areas. All personnel working inside either the ammunition production area or the depot area at Pine Bluff Arsenal must have an additional safety briefing given by Safety personnel prior to beginning work.

2.2.3.10 Personal Protective Equipment. The contractor shall ensure compliance with PBA Policy Letter 385-3, “Wearing of Safety Clothing and Equipment in Manufacturing Areas of Pine Bluff Arsenal”. The Contractor shall install warning and safety signs at all strategic locations on the work site. Signs and barricades shall be constructed in accordance with OSHA standards.

2.2.3.11 Work Along Roadways. All contractor personnel will comply with ANSI Z133.1;

wear reflective bright orange or lime green vests while conducting operations on roadways. Work will be performed in a manner which will allow the passage of traffic, especially emergency vehicles, at all times.

2.2.3.12 Quality Evaluation Facility Bldg 34-161. Workers assigned to this building will receive an additional safety briefing from the QEF.

2.2.3.13 Equipment. Equipment shall be maintained in a safe operating at all times.

Equipment shall be stored in the areas so designated. The contractor shall secure vehicles and mobile equipment by removing the keys from key operated ignition or by other physical means when not in use. Electrical equipment must operate using existing building circuits. The contractor shall prevent the operation of electrical equipment which requires power exceeding capacity of existing building circuits.

2.2.4 Training, Physical Requirements, or other Expertise Required.

2.2.4.1 The Contractor shall ensure all Contractor’s employees and associated subcontractors are certified or licensed in the specific areas required by the State of Arkansas. The Contractor shall ensure employees are certified or licensed in the appropriate Environmental Protection Agency (EPA) areas required. The Contractor shall ensure all required documentation of certification or licensure for Contractor personnel are filed with the COR/ACOR within twenty-four (24) hours prior to employees commencing performance.

2.2.5 Environmental Requirements.

2.2.5.1 Compliance with Environmental Laws and Regulations: Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), as well as Major Subordinate Command (MSC) and installation regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement, or Status-of-Forces Agreement. Contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of Army Regulation 200-1, and any specifications within this contract to the Contracting Officer Representative (COR).

2.2.5.2 Compliance with Green Procurement Requirements: Contractor shall follow Federal EPA Comprehensive Procurement guidelines (www.epa.gov/cpg) and Army Contracting Command Quick Guide (https://acc.aep.army.mil/accapps/ACCMAP/Documents/Quick-Guide-for- Sustainable-Procurement.docx) for acquisition of building materials and products and select materials that have a long life cycle. the least toxic materials; recyclable materials; materials that are resource-efficient; materials with the maximum recycled content; materials harvested on a sustained yield basis; and products causing the least pollution during their manufacture, use, and reuse.

In accordance with Section 6002 of the Resource Conservation and Recovery Act of 1976 (RCRA) requires the use of recycled and recovered products identified in the EPA’s Comprehensive Procurement Guidelines.

The Contractor shall use these recycled or recovered products unless they cannot be procured within a reasonable period of time not to exceed seven (7) calendar days; at prices not to exceed five (5) percent of prevailing rates; or the product(s) does not meet technical or performance standards. EPA Guidelines are the minimum requirement. The Contractor shall use materials and products commonly used in industry. The Contractor shall maintain records and submit an annual report to the COR/ACOR, along with the annual certification required by FAR 52.223-9 (Certification and Estimate of Percentage of Recovered Material Content for EPA Designated Items), upon completion of the base year and each option year.

2.2.5.3 Compliance with License and Certification Requirements: Contractor shall obtain all license and certification required by Federal, State, and Local environmental laws and regulations, which includes but is not limited to AR Division of Environmental Quality and Arkansas State Plant Board, as necessary to adhere to the specifications of this contract.

The Contractor shall submit all plans, notifications, reports, submittal documents, and fees required by Federal, State, and Local environmental laws and regulations to the appropriate Federal, State, and Local authority and/or agency as necessary to adhere to the specification of this contract. All required licenses and certifications required by Federal, State, and Local environmental laws and/or regulations shall be considered a contract deliverable upon award.

2.2.5.3.a. Notification of Federal and State Regulators: Contractor shall immediately notify the Designated Government Representative (DGR) and COR of the arrival on site of any Federal, State, and/or DoD environmental regulator or enforcement agent and/or the receipt of any correspondence from a Federal or State environmental agency.

2.2.5.3.b.Inspections of Work Sites: Contractor shall submit to potential Federal, State, Army and installation work site environmental regulatory inspections and/or investigations into noncompliance and fully cooperate with such inspections/investigations by providing the appropriate records and documentation. Environmental regulatory agencies are authorized by law to inspect any work site for environmental compliance with regulatory requirements. If an inspection is conducted, it will not stop or disrupt ongoing contract activities. The inspection will only require the work site environmental officer, or supervisor/manager to answer questions and/or escort the inspector to specific work site areas with the potential to affect environmental quality.

2.2.5.3.c. Reporting Noncompliance: Contractor shall immediately report any nonconformance and/or noncompliance with applicable Federal, State or Local environmental laws, Army and installation environmental regulations or policies to the COR and DGR.

2.2.5.3.d. Verification of National Environmental Policy Act Documents: Contractor shall obtain from the COR or DGR, a copy of AMC's National Environmental Policy Act Policy and 32 CFR 651 which addresses actions to be taken by contractor. These documents include but are not limited to the analysis-associated decision document of an Environmental Impact Statement and Record of Decision; Environmental Assessment and Finding of No Significant Impact or Notice to Proceed; or Record of Environmental Consideration on the proposed contract actions prior to commencement of such actions.

2.2.5.3.e. Conformance with Environmental Management System: Contractor shall take the necessary actions to identify, monitor, and control those contract operations and activities that pose risk of contamination, or can negatively impact the natural and/or human environment.

Assignment of Environmental Compliance Designee (ECD): Contractor shall appoint an ECD for all contract work periods exceeding 180 consecutive days. Contractor shall appoint a primary and alternate ECD for each production, shop or work area that uses and/or stores hazardous materials and/or generates hazardous wastes. Contractor ECDs shall monitor implementation of all environmental regulatory requirements, report all environmental noncompliance to the work site supervisor, correct all environmental noncompliance, and verify implementation of directed actions to correct identified environmental noncompliance. Contractor shall have at least one ECD on duty at all times at each shop or work area. Contractor shall require all personnel designated as ECDs to complete the initial ECD training through the installation or Major Subordinate Command (MSC) environmental compliance point of contact within 15 days of the start of contract performance. Contractor personnel appointed as ECDs may perform other duties provided they do not prevent the performance of ECD duties. Contractors may request a waiver of this requirement through the COR and DGR, if using and/or storing very small quantities of hazardous materials.

2.2.5.3.f. Competency Training for Contractor Personnel: Contractor shall not allow personnel to perform any activities and/or tasks on AMC installations without proper and adequate qualifications or job competency training. In the event of any identified noncompliance, the Contractor shall, if requested, provide proof of contract personnel training or qualification (individual name, training/qualification type, training/qualification certificate, and date of training/qualification) to perform those contract activities associated with the identified noncompliance.

2.2.5.3.g. Generation of Solid Waste: Contractor shall remove from the installation and dispose of all solid waste generated, which cannot be recycled to an approved and permitted off-post disposal facility. 11.1. Contractor shall make every effort to divert construction, demolition debris, and all other solid waste to comply with the Army Integrated Solid Waste Management Policy.

11.2. Prior to removing any waste from the installation for disposal, the Contractor shall coordinate with the installation Qualified Recycling Program (QRP) Manager, DGR, and COR to arrange for recyclable materials to be removed and diverted from the waste stream. 11. 3. Submit in writing the quantities of waste removed and recycled to the DGR and/or COR on a monthly basis. The submittal shall include the date of disposal/recycling, the disposal/recycling facility, the types of material disposed/recycled, and the quantities of materials disposed/recycled by weight. 11. 4.

The Contractor shall establish a program to promote cost-effective waste reduction in all operations and facilities covered by the contract. This includes collection, separation, and processing products or other materials recovered from solid waste streams for use in the form of raw materials. 11. 5. The Contractor shall make maximum effort to reduce and prevent waste.

2.2.5.3.h. Generation of Hazardous Waste: Contractor shall assign all hazardous waste management responsibilities to the appointed ECD. Contractor shall contact the DGR and/or COR to obtain technical assistance from the Environmental Office for assisting the ECD with achieving and maintaining compliance with hazardous waste storage and disposal requirements. Contractor shall properly profile all waste generated as part of this contract to determine if any waste is hazardous waste as defined by 40 CFR. Contractor shall accumulate hazardous waste prior to disposal shipment in a satellite accumulation point at or near the point of generation or in a less-than-90-day site, in accordance with Federal, State, Army, and installation regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement or Status-of-Forces Agreement. The Contractor shall properly package the hazardous waste and complete the hazardous waste manifest, then take the manifest to DGR for approval and signature prior to removing any hazardous waste from the installation. Contractor shall contact DGR to obtain the installation’s hazardous waste EPA ID number for the hazardous waste manifest. The Contractor shall notify the DGR 24 hours prior to removing any hazardous waste from the installation. The contractor shall remove and dispose of manifested hazardous waste generated by contract activities from the installation to an approved off-post permitted hazardous waste disposal facility. The DGR shall assist contractors with profiling their waste upon request.

2.2.5.3.i. Use of Hazardous Materials: Contractor shall assign all hazardous materials management responsibilities to the appointed ECD. Contractor shall contact the DGR or COR to obtain technical assistance from Environmental Office for assisting the ECD with achieving and maintaining compliance with hazardous material storage, issue, use, and disposal requirements.

Contractor shall submit to the COR and/or DGR a hazardous material inventory. The hazardous material inventory will be submitted 30 days prior to commencement of work for contracts that exceed 180 consecutive days. The inventory list will contain the hazardous material type and maximum quantities of materials anticipated to be stored on-site. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. The Contractor shall maintain copies of Safety Data Sheets for all hazardous materials used and stored on-site during performance of the contract. Contractor shall not supply or deliver any hazardous materials or chemicals to an installation that are listed on EPA toxic chemical list without prior written approval from DGR and/or COR.

2.2.5.3.j. Prevention of Storm Water Pollution: The Contractor shall perform, track, participate, implement, and comply with storm water pollution prevention minimum control measures, protocols, and best management practices (BMP) and ensure that water quality standards are not violated in accordance with all regulations and policies as applicable to the Pollutant Discharge Elimination System general permit requirements. Applicable permits include: 1) The installation’s Small Municipal Separate Storm Sewer System (MS4) Permit; 2) The Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activities (MSGP); and, 3) All Construction Activity Storm Water permits minimum control measures include, but not limited to: • Public Education and Outreach on Storm Water Impacts • Public Involvement and Participation • Illicit Discharge Detection and Elimination • Construction Site Storm Water Run-off Control • Post Construction Storm Water Management in New Development and Redevelopment

• Pollution Prevention/Good Housekeeping for Municipal Operations Contractors will comply with the MSGP permit when the activity is identified as a permitted industrial activity. BMPs include, but are not limited to: • Practicing spill prevention and good housekeeping. • Installing and managing erosion and sediment control. • Meeting the requirements of the MS4 permit. • Contractors will obtain permit coverage for construction activities disturbing over one acre of land (total acreage is cumulative across all portions of the project). BMPs include, but are not limited to: • Preparing and implementing a site-specific Storm Water Pollution Prevention Plan (SWPPP) as outlined in the permit and prior to any soil disturbance. • Installing and managing erosion and sediment control. • Make available, upon request, permit associated documentation. • Practicing spill prevention and good housekeeping. • Meeting the requirements of the MS4 permit. • Schedule inspections and provide corrective actions for noted deficiencies.

2.2.5.3.k. Storm Water Management Low Impact Design/Development (LID): The Contractor shall perform, track, participate, implement, and comply with Section 438 of the Energy Independence and Security Act; Executive Order 13514; and the DOA memorandum (2010) for full implementation of low impact design/development (LID) techniques to restore predevelopment hydrology to the maximum extent technically feasible for both new and renovation construction projects regardless of size. In support of LID, Contractors will adhere to installation landscape codes and the guidance found in the Installation Design Guide concerning Low Impact Design/Development for storm water management. The following LID practices include, but are not limited to: • Restoring predevelopment hydrology to the maximum extent technically feasible

• Promoting natural removal of pollutants such as nutrients, oil and grease, and sediments from storm water • Managing rainfall at the point where it falls • Meeting the requirements of the MS4 permit • Important Note: Utilization of permanent retention/detention ponds is prohibited without authorization from the Installation Planning Division.

2.2.5.3.l. Use of Pesticides: Contractor shall submit the type and quantity of regulated pesticides to be applied, the application purpose, and location to the DGR and COR for approval 10 working days prior to the initial application. The Contractor shall submit the actual quantities applied (DD1532 or equivalent) to the DGR and COR within 2 working days (48 hours) after each approved application. The Contractor shall utilize Integrated Pest Management (IPM) technology and procedures in strict compliance with all applicable Federal, State, Army, and installation regulations, to include the installation's integrated pest management plan.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .