This document contains a customer rating questionnaire template for evaluating contractor past performance on a federal contract. The questionnaire requests ratings on a scale of 1 to 5 in key areas such as quality control, schedule adherence, management and safety. It also includes open fields for additional comments. Upon completion, the form is to be returned via email to the point of contact listed for consideration in source selection for Solicitation 140P3022R0016 concerning rehabilitation of the East Potomac Maintenance Yard Fuel Station for the National Park Service. Specific areas of evaluation cover quality program responsiveness, procedure completeness, timeliness, management and personnel capabilities, flexibility in meeting requirements, safety compliance, regulatory compliance, innovation, customer satisfaction and overall performance.

View the file

Other files

File Type Posted
Sol_140P3022R0016_Amd_0005.pdf PDF
Sol_140P3022R0016_Amd_0004.pdf PDF
B09_Amendment_0004_140P3022R0016_QA_NAMA_EPMY_Fuel_Station_Rehab_8_16_22_0004.docx DOCX document
B09_Amendment_0003_140P3022R0016_QA_NAMA_EPMY_Fuel_Station_Rehab_8_15_22_0003.docx DOCX document
Sol_140P3022R0016_Amd_0003.pdf PDF
B09_Amendment_0003_140P3022R0016__Attachment_2_DOL_WD_DC20220002_Bldg_8_5_22_0003.pdf PDF
Sol_140P3022R0016_Amd_0002.pdf PDF
B09_Amendment_0002_140P3022R0016__Attachment_2_DOL_WD_DC20220002_Bldg_7_29_22_0002.pdf PDF
Sol_140P3022R0016_Amd_0001.pdf PDF
B09_Attachment_2_DOL_WD_DC20220002_Bldg_7_22_22_0001.pdf PDF
Sol_140P3022R0016.pdf PDF
B08_Attachment_15_Option_Line_Item_Specifications_CS_Reviewed_7_19_22.pdf PDF
B08_Attachment_1_CAAC_Letter_2020-04.pdf PDF
B08_Attachment_9_Submittal_Log.pdf PDF
B08_Attachment_3_EPMY_Drawings.pdf PDF
B08_Attachment_11_CO_COVID-19_Memo.pdf PDF
B08_Attachment_13_PERM_BCIV_BUILDINGPermit_Prod_20200222_v1_20210930_072550.pdf PDF
B08_Attachment_4_EPMY_Product_Data_Specifications.pdf PDF
B08_Attachment_16_Site_Visit_Agenda_EPMY_Fuel_Rehabilitation_8-2-22_9AM_ED.doc DOC document
B08_Attachment_6_Erosion___Sedement_Control_Plan_Drawing.pdf PDF
B08_Attachment_5_EPMY_Specifications.pdf PDF
B08_Attachment_2_DOL_WD_DC202_DOL_WD_DC20220002_Bldg_7_8_22.pdf PDF
B08_Attachment_10_Waste_Tracking_Sheet_4-21-22.doc DOC document
B08_Attachment_14_Subcontracting_Percentage_Worksheet_v1_2.docx DOCX document
B08_Attachment_7_Contractor_Experience_Form.doc DOC document
B08_Attachment_12_COVID-19_Vaccination_Certification_Form.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUSTOMER RATING QUESTIONNAIRE

140P3022R0016 Reference is provided for: _____________________

Please provide information for the primary individuals completing this survey.

Name: ____________________________________________________________________

Office Identifier: _____________________________________________________________

Telephone Number: __________________________________________________________

Mailing Address: _____________________________________________________________

E-Mail Address: ______________________________________________________________

Contract # and Title, and Relation to Contract: ______________________________________

THE QUESTIONNAIRE SHOULD BE SUBMITTED BY THE FOLLOWING MEANS:

Return via e-mail to brian_dankmeyer@nps.gov.

RATING DESCRIPTIONS: Use the following descriptions as guidance in providing ratings.

RATING
DEFINITION
Exceptional = (1)
Indicates the contractor’s performance record within the area of evaluation Exceeded that required by the contract.
Very Good = (2)
Indicates the contractor’s performance record within the area of evaluation Met All contractual requirements.
Satisfactory = (3)
Indicates the contractor’s performance record within the area of evaluation Met Essentially All contractual requirements.
Marginal = (4)
Indicates the contractor’s performance record within the area of evaluation Met Some of the contractual requirements. However, changes to the contractor’s existing processes may be necessary in order to achieve contract requirements.
Unsatisfactory = (5)
Indicates the contractor’s performance record within the area of evaluation Failed to Meet the minimum Government requirements.
Unknown or Not Applicable = (6)
The question does not apply. No performance record identifiable within the area of evaluation.

SOURCE SELECTION SENSITIVE WHEN COMPLETED

(1) How responsive was the contractor’s quality program in identifying, correcting, and preventing initial and recurring contract discrepancies?

1
2
3
4
5
6

REMARKS:

(2) How complete were the contractor’s quality procedures and how well do employees follow them?
1
2
3
4
5
6

REMARKS:

(3) Rate timeliness in meeting requirements and adhering to contract schedules (delivery/performance).
1
2
3
4
5
6

REMARKS:

(4) Did the contractor provide adequate, competent and qualified, management, key personnel and technical personnel capable of meeting contract requirements throughout the performance period of the contract?
1
2
3
4
5
6

REMARKS:

(5) How flexible, cooperative, and reasonable was the contractor in meeting mission

Requirements, particularly when faced with short-notice mission changes?

1
2
3
4
5
6

REMARKS:

(6) How effective was the contractor’s safety program to ensure compliance with federal, state and local regulations? Did the contractor implement and follow their safety plan? Did they run a “safe” jobsite?
1
2
3
4
5
6

REMARKS:

(7) Applicable to Federal Contracts – How well did the contractor comply with applicable Federal Laws and Regulations such as Service Contract Act – timely payrolls and compliance; Drug-Free Workplace; Executive Order 13101?
1
2
3
4
5
6

REMARKS:

(8) How innovative was the contractor in performing the technical aspects of this contract and resolving problems? How well did the contractor respond to and act on customer feedback? (Customer Satisfaction)
1
2
3
4
5
6

REMARKS:

(9) How would you rate the Contractor’s overall performance?
1
2
3
4
5
6

(10) Please Provide Any Additional Information You Feel Is Important Not Covered Elsewhere:

Thank you for your remarks. Be sure to return this document via email to brian_dankmeyer@nps.gov and not to the Contractor whom you are providing reference for.

Signature:____________________________________ Date Completed:___________________________

File details come from the government source that posted it. Updated .