B08_Attachment_15_Option_Line_Item_Specifications_CS_Reviewed_7_19_22.pdf

PDF 84 KB Posted

Attached to
East Potomac Maintenance Yard Fuel Station Rehabil
Solicitation number
140P3022R0016
Issued by

About this file

This document outlines an optional line item for contaminated soil remediation as part of a federal solicitation for the East Potomac Maintenance Yard Fuel Station Rehabilitation project. If soil contamination testing reveals contaminated soil, the contracting agency may exercise this option to remove and dispose of up to 500 cubic yards of contaminated soil. The contractor would excavate, remove, and properly dispose of contaminated soil in accordance with the recycling and disposal regulations and environmental regulations sections of the solicitation and resulting contract. The contractor must provide disposal documentation and record hazardous materials on a waste tracking sheet to the contracting officer's representative within 48 hours of disposal. The contractor shall also backfill the excavated area with clean fill material in the same manner as specified for earth moving work.

View the file

Other files

File Type Posted
Sol_140P3022R0016_Amd_0005.pdf PDF
Sol_140P3022R0016_Amd_0004.pdf PDF
B09_Amendment_0004_140P3022R0016_QA_NAMA_EPMY_Fuel_Station_Rehab_8_16_22_0004.docx DOCX document
B09_Amendment_0003_140P3022R0016_QA_NAMA_EPMY_Fuel_Station_Rehab_8_15_22_0003.docx DOCX document
Sol_140P3022R0016_Amd_0003.pdf PDF
B09_Amendment_0003_140P3022R0016__Attachment_2_DOL_WD_DC20220002_Bldg_8_5_22_0003.pdf PDF
Sol_140P3022R0016_Amd_0002.pdf PDF
B09_Amendment_0002_140P3022R0016__Attachment_2_DOL_WD_DC20220002_Bldg_7_29_22_0002.pdf PDF
Sol_140P3022R0016_Amd_0001.pdf PDF
B09_Attachment_2_DOL_WD_DC20220002_Bldg_7_22_22_0001.pdf PDF
Sol_140P3022R0016.pdf PDF
B08_Attachment_1_CAAC_Letter_2020-04.pdf PDF
B08_Attachment_9_Submittal_Log.pdf PDF
B08_Attachment_3_EPMY_Drawings.pdf PDF
B08_Attachment_11_CO_COVID-19_Memo.pdf PDF
B08_Attachment_13_PERM_BCIV_BUILDINGPermit_Prod_20200222_v1_20210930_072550.pdf PDF
B08_Attachment_4_EPMY_Product_Data_Specifications.pdf PDF
B08_Attachment_16_Site_Visit_Agenda_EPMY_Fuel_Rehabilitation_8-2-22_9AM_ED.doc DOC document
B08_Attachment_6_Erosion___Sedement_Control_Plan_Drawing.pdf PDF
B08_Attachment_5_EPMY_Specifications.pdf PDF
B08_Attachment_2_DOL_WD_DC202_DOL_WD_DC20220002_Bldg_7_8_22.pdf PDF
B08_Attachment_10_Waste_Tracking_Sheet_4-21-22.doc DOC document
B08_Attachment_8_Contractor_Reference_Form.doc DOC document
B08_Attachment_14_Subcontracting_Percentage_Worksheet_v1_2.docx DOCX document
B08_Attachment_7_Contractor_Experience_Form.doc DOC document
B08_Attachment_12_COVID-19_Vaccination_Certification_Form.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Option Line Item Contaminated Soil Remediation Specifications

7/19/2022

1.0 Option Line Item – Contaminated Soil Remediation

1.1 If soil contamination testing yields the presence of contaminated soil, this Option Line Item may be exercised, subject to available funds, to remove and replace up to 500 CY of soil.

1.2 The contractor shall excavate, remove, and properly disposed of all contaminated soil up to 500 CY in accordance with Section C.9 RECYCLING AND DISPOSAL OF REFUSE and C.16 ENVIRONMENTAL REGULATIONS of the solicitation and resulting contract. A copy of the disposal ticket shall be provided via email to the COR. The contractor shall record all hazardous materials disposed of on the Waste Tracking Sheet to be submitted to the COR via email within 48 hours of disposal.

1.3 The contractor shall backfill the excavation with uncontaminated/clean fill material up to 500 CY in the same manner outlined in EPMY Specifications, Section 312000 – Earth Moving.

File details come from the government source that posted it. Updated .