B08_Attachment_13_PERM_BCIV_BUILDINGPermit_Prod_20200222_v1_20210930_072550.pdf
PDF 110 KB Posted
- Solicitation number
- 140P3022R0016
About this file
This document contains a building permit issued by the District of Columbia for work on a federal fuel station rehabilitation project. The permit authorizes demolition, excavation, pavement removal and replacement, and utility work to replace an existing fuel station and underground fuel storage tanks with a new fuel station featuring above-ground fuel storage tanks. It also allows for construction of an outdoor vehicle wash station with a trench drain and oil/water separator. The work is located at 500 Buckeye Drive SW in Washington, DC and is for the East Potomac Maintenance Yard Fuel Station Rehabilitation project solicited by the National Park Service under solicitation number 140P3022R0016. The building permit lists details of the work, parties involved, codes and regulations to be followed, fees, expiration timelines, and inspection requirements. It grants permission for the specified construction work to the United States of America for improvements at the East Potomac Maintenance Yard.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERMIT NO.
BUILDING CIVIL PERMIT
THIS PERMIT MUST ALWAYS BE CONSPICUOUSLY DISPLAYED AT THE
ADDRESS OF WORK UNTIL WORK IS COMPLETED AND APPROVED
Issue Date: 09/30/2021
Ward:
Description Of Work:
Address of Project: Zone: Square: Lot: Suffix:
PAR 0005
Bciv
09/30/2022 Expiration Date:
Department of Consumer and Regulatory Affairs Permit Operations Division
1100 4th Street SW Washington DC 20024
Tel. (202) 442 - 4589 Fax (202) 442 - 4862
Work under this permit is for sediment/erosion control only, DCMR 12A section 101.14.1.1 Federal premises. Applicability of environmental laws and regulations.
Replacement of existing fuel station & underground fuel storage tanks with new fuel station with above ground fuel storage tanks including all associated demolition, excavation, pavement removal & replacement, and utility work. Project also an outdoor wash station with trench drain to collect water during fleet vehicle washing operations & discharging it to a new oil/water separator.
500 BUCKEYE DR SW UNZONED
BCIV2100102
Agent Name:
Agent Address:
Permit Type:
Permission Is Hereby Granted To: Owner Address: PERMIT FEE:
$36.30
Agent Phone #:
Contractor Name:
Contractor Address: Contractor Phone #:
United States Of America
900 OHIO DRIVE, SW
WASHINGTON, DC 20242
United States Of America
2028410110 900 Ohio Drive, Sw Washington, DC 20242
Conditions/ Restrictions:
Before any land disturbing activities may begin, contact DOEE to request a pre-construction meeting: Email IEB.scheduling@dc.gov.
WORK UNDER THIS PERMIT IS FOR SEDIMENT/EROSION CONTROL ONLY PER RESONSE, TO COMPLY WITH DCMR 12A SECTION 101.14.1.1 FEDERAL
PREMISES APPLICABILITY OF ENVIRONMENTAL LAWS AND REGULATIONS.
As a condition precedent to the issuance of this permit, the owner agrees to conform with all conditions set forth herein, and to perform the work authorized hereby in accordance with the approved application and plans on file with the District Government and in accordance with all applicable laws and regulations of the District of Columbia. The District of Columbia has the right to enter upon the property and to inspect all work authorized by this permit and to require any change in construction which may be necessary to ensure compliance with the permit and with all the applicable regulations of the District of Columbia. Work authorized under this Permit must start within one(1) year of the date appearing on this permit or the permit is automatically void. If work is started, any application for partial refund must be made within six months of the date appearing on this permit.
All Construction Done According To The Current Building Codes And Zoning Regulations;
This Permit Expires if no Construction is Started Within 1 Year or if the Inspection is Over 1 Year.
If this permit was issued to a building built before 1978, it is subject to full compliance with the Lead-Hazard Prevention and Elimination Act, its associated regulations, and the EPA Lead Renovation, Repair and Painting Rule. To determine how to comply, submit a Lead-Activity Notification form at
Permit Clerk
TCARRINGTON
Director:
Ernest Chrappah
TO REPORT WASTE, FRAUD OR ABUSE BY ANY DC GOVERNMENT OFFICIAL, CALL THE DC INSPECTOR GENERAL AT 1-800-521-1639
Call Miss Utility at 811 or 1-800-257-7777 at least 48 Hours prior to excavation to obtain a ticket. //www.missutility.net/wshingtondc/dcstatelaw.asp
To schedule a CONSTRUCTION INSPECTION or for INQUIRIES CALL (202) 442-9557
File details come from the government source that posted it. Updated .