B08_Attachment_14_Subcontracting_Percentage_Worksheet_v1_2.docx

DOCX document 99 KB Posted

Attached to
East Potomac Maintenance Yard Fuel Station Rehabil
Solicitation number
140P3022R0016
Issued by

About this file

This document contains a subcontracting percentage worksheet template for use under a National Park Service solicitation for landscape maintenance services. The worksheet requires contractors to input direct labor, fringe benefits, and general and administrative costs for both the prime contractor and any subcontractors. These figures are then used to calculate the total labor costs for each entity and the resulting subcontracting labor cost percentage. The related federal contract opportunity is for rehabilitation of the fuel station at the East Potomac Maintenance Yard in Washington, D.C., issued by the National Park Service National Capital Region office under the Department of the Interior.

View the file

Other files

File Type Posted
Sol_140P3022R0016_Amd_0005.pdf PDF
Sol_140P3022R0016_Amd_0004.pdf PDF
B09_Amendment_0004_140P3022R0016_QA_NAMA_EPMY_Fuel_Station_Rehab_8_16_22_0004.docx DOCX document
B09_Amendment_0003_140P3022R0016_QA_NAMA_EPMY_Fuel_Station_Rehab_8_15_22_0003.docx DOCX document
Sol_140P3022R0016_Amd_0003.pdf PDF
B09_Amendment_0003_140P3022R0016__Attachment_2_DOL_WD_DC20220002_Bldg_8_5_22_0003.pdf PDF
Sol_140P3022R0016_Amd_0002.pdf PDF
B09_Amendment_0002_140P3022R0016__Attachment_2_DOL_WD_DC20220002_Bldg_7_29_22_0002.pdf PDF
Sol_140P3022R0016_Amd_0001.pdf PDF
B09_Attachment_2_DOL_WD_DC20220002_Bldg_7_22_22_0001.pdf PDF
Sol_140P3022R0016.pdf PDF
B08_Attachment_15_Option_Line_Item_Specifications_CS_Reviewed_7_19_22.pdf PDF
B08_Attachment_1_CAAC_Letter_2020-04.pdf PDF
B08_Attachment_9_Submittal_Log.pdf PDF
B08_Attachment_3_EPMY_Drawings.pdf PDF
B08_Attachment_11_CO_COVID-19_Memo.pdf PDF
B08_Attachment_13_PERM_BCIV_BUILDINGPermit_Prod_20200222_v1_20210930_072550.pdf PDF
B08_Attachment_4_EPMY_Product_Data_Specifications.pdf PDF
B08_Attachment_16_Site_Visit_Agenda_EPMY_Fuel_Rehabilitation_8-2-22_9AM_ED.doc DOC document
B08_Attachment_6_Erosion___Sedement_Control_Plan_Drawing.pdf PDF
B08_Attachment_5_EPMY_Specifications.pdf PDF
B08_Attachment_2_DOL_WD_DC202_DOL_WD_DC20220002_Bldg_7_8_22.pdf PDF
B08_Attachment_10_Waste_Tracking_Sheet_4-21-22.doc DOC document
B08_Attachment_8_Contractor_Reference_Form.doc DOC document
B08_Attachment_7_Contractor_Experience_Form.doc DOC document
B08_Attachment_12_COVID-19_Vaccination_Certification_Form.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

NATIONAL PARK SERVICE

NATIONAL CAPITAL REGION

1100 Ohio Drive S.W.

Washington, D.C., 20242

NPS-National Capital Region Solicitation: 140P3019R0015 – Landscape Maintenance Page 2 of 2

18 July 2022

SUBJECT: FAR CLAUSE 52.219-14, SUBCONTRACTING PERCENTAGE WORKSHEET

PRIME CONTRACTOR: _________________________

SUBCONTRACTOR: ___________________________

To calculate, either follow the below directions OR right click the above Excel ‘Object’ and select ‘Worksheet Object’ then ‘Edit’. You can then input Direct Labor/Fringe Benefits/G&A % and it will calculate for you.

a) To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).

b) Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).

c) Calculate the subcontractor's LABOR G&A by multiplying the subcontractor's G&A rate by the subcontractor's SUBTOTAL figure in (B).

d) Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.

e) Next, using the formula below, calculate the subcontracting labor percentage.

____(D)____

(C) + (D)

SUBCONTRACTING LABOR COST PERCENTAGE = %

*The firm must demonstrate that their labor overhead is allowable in accordance with FAR 3 l.205- 6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.

**G&A denotes General and Administrative Costs ***You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor's costs.

NPS-National Capital Region Page 1 of 1

FOR OFFICIAL USE ONLY

SOURCE SELECTION INFORMATION – SEE FAR 3.104

Preserving unimpaired the natural and cultural resources and values of the national park system for the enjoyment, education, and inspiration of this and future generations.

FOR OFFICIAL USE ONLY

SOURCE SELECTION INFORMATION – SEE FAR 3.104

image1.emf

Microsoft_Excel_Worksheet.xlsx Sheet1

PRIME CONTRACTOR SUBCONTRACTOR

DIRECT LABOR $100.00 $75.00

FRINGE BENEFITS $100.00 $75.00

SUB TOTAL (A)$200 (B)$150

LABOR G&A** @ 10.00% $20.00 10.00% $15.00

TOTAL LABOR COST (C)$220 (D)$165

Subcontracting Labor Percentage 42.86% image2.jpeg image3.jpeg

File details come from the government source that posted it. Updated .