This document package includes an erosion and sediment control plan drawing and details for the East Potomac Maintenance Yard Fuel Station Rehabilitation project. The project involves replacing underground fuel storage tanks with above-ground tanks on a concrete pad, demolishing and replacing an existing canopy, renovating a maintenance building to add vehicle washing capabilities, and installing associated utilities and pavement. The site currently contains a fuel station and maintenance building. Soils on site include Lindside loam, Melvin silt loam, Udorthents, and urban land. Erosion and sediment control measures shown on the plans include filter socks, curb inlet protection, storm drain inlet protection, and a dewatering structure. The sequence of construction and narrative describe installation and maintenance of these controls during site work activities.

View the file

Other files

File Type Posted
Sol_140P3022R0016_Amd_0005.pdf PDF
Sol_140P3022R0016_Amd_0004.pdf PDF
B09_Amendment_0004_140P3022R0016_QA_NAMA_EPMY_Fuel_Station_Rehab_8_16_22_0004.docx DOCX document
B09_Amendment_0003_140P3022R0016_QA_NAMA_EPMY_Fuel_Station_Rehab_8_15_22_0003.docx DOCX document
Sol_140P3022R0016_Amd_0003.pdf PDF
B09_Amendment_0003_140P3022R0016__Attachment_2_DOL_WD_DC20220002_Bldg_8_5_22_0003.pdf PDF
Sol_140P3022R0016_Amd_0002.pdf PDF
B09_Amendment_0002_140P3022R0016__Attachment_2_DOL_WD_DC20220002_Bldg_7_29_22_0002.pdf PDF
Sol_140P3022R0016_Amd_0001.pdf PDF
B09_Attachment_2_DOL_WD_DC20220002_Bldg_7_22_22_0001.pdf PDF
Sol_140P3022R0016.pdf PDF
B08_Attachment_15_Option_Line_Item_Specifications_CS_Reviewed_7_19_22.pdf PDF
B08_Attachment_1_CAAC_Letter_2020-04.pdf PDF
B08_Attachment_9_Submittal_Log.pdf PDF
B08_Attachment_3_EPMY_Drawings.pdf PDF
B08_Attachment_11_CO_COVID-19_Memo.pdf PDF
B08_Attachment_13_PERM_BCIV_BUILDINGPermit_Prod_20200222_v1_20210930_072550.pdf PDF
B08_Attachment_4_EPMY_Product_Data_Specifications.pdf PDF
B08_Attachment_16_Site_Visit_Agenda_EPMY_Fuel_Rehabilitation_8-2-22_9AM_ED.doc DOC document
B08_Attachment_5_EPMY_Specifications.pdf PDF
B08_Attachment_2_DOL_WD_DC202_DOL_WD_DC20220002_Bldg_7_8_22.pdf PDF
B08_Attachment_10_Waste_Tracking_Sheet_4-21-22.doc DOC document
B08_Attachment_8_Contractor_Reference_Form.doc DOC document
B08_Attachment_14_Subcontracting_Percentage_Worksheet_v1_2.docx DOCX document
B08_Attachment_7_Contractor_Experience_Form.doc DOC document
B08_Attachment_12_COVID-19_Vaccination_Certification_Form.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WARNING - EROSION & SEDIMENT CONTROL SHALL BE STRICTLY ENFORCED !

PROJECT ADDRESS: 500 BUCKEYE DRIVE, SW, WASHINGTON, DC 20024

21-s17452

07-28-2021 12:26 PM

The following stamps were applied via the Surface and Groundwater System. Each stamp was signed electronically at the indicated time.

BCIV2100102

HPRB Review - Andrew Lewis - 08-19-2021 DOEE FP Review - Victor Ukpolo - 08-19-2021 DOEE SE-SW Review - Saba Gharavi - 08-19-2021 CFA Review - Andrew Lewis - 08-19-2021

08/19/21

AutoCAD SHX Text: 13' AutoCAD SHX Text: CONC/CURB & GUTTER AutoCAD SHX Text: CONC/CURB & GUTTER AutoCAD SHX Text: EDGE CONC/PAVEMENT AutoCAD SHX Text: WALL AutoCAD SHX Text: CONC AutoCAD SHX Text: AIR STATION AutoCAD SHX Text: BOLLARD AutoCAD SHX Text: WALL AutoCAD SHX Text: EDGE CONC/PAVEMENT AutoCAD SHX Text: CHAIN LINK FENCE AutoCAD SHX Text: BUILDING AutoCAD SHX Text: BUILDING AutoCAD SHX Text: GATE AutoCAD SHX Text: CHAIN LINK FENCE AutoCAD SHX Text: BUILDING LINE AutoCAD SHX Text: 13' AutoCAD SHX Text: 13' AutoCAD SHX Text: 13' AutoCAD SHX Text: 13' AutoCAD SHX Text: 13' AutoCAD SHX Text: 13' AutoCAD SHX Text: 13' AutoCAD SHX Text: 13' AutoCAD SHX Text: 13' AutoCAD SHX Text: GM AutoCAD SHX Text: B AutoCAD SHX Text: B AutoCAD SHX Text: B AutoCAD SHX Text: MH AutoCAD SHX Text: MH AutoCAD SHX Text: D AutoCAD SHX Text: GV AutoCAD SHX Text: D AutoCAD SHX Text: MAINTENANCE BUILDING AutoCAD SHX Text: SAND & OIL INTERCEPTOR AutoCAD SHX Text: SD AutoCAD SHX Text: SD AutoCAD SHX Text: 6" STORM (ATRD) AutoCAD SHX Text: (ATRD) AutoCAD SHX Text: STORM (ATRD) AutoCAD SHX Text: 13 AutoCAD SHX Text: 13 AutoCAD SHX Text: 13 AutoCAD SHX Text: RIM = 13.16 INV IN (4" PVC) (E)= 11.06 INV OUT (4" PVC) (W)= 9.71 BOTTOM ELEV = 8.89 AutoCAD SHX Text: S AutoCAD SHX Text: STORM (ATRD) AutoCAD SHX Text: GASOLINE STORAGE TANK AutoCAD SHX Text: DIESEL STORAGE TANK AutoCAD SHX Text: FUEL CONTROL BLDG AutoCAD SHX Text: STAIRWAY AutoCAD SHX Text: STAIRWAY AutoCAD SHX Text: FUEL DISPENSER SEE MECHANICAL AutoCAD SHX Text: TRENCH DRAIN AutoCAD SHX Text: TRENCH DRAIN AutoCAD SHX Text: 1.3% AutoCAD SHX Text: 13 85TC AutoCAD SHX Text: MATCH EX TC AutoCAD SHX Text: MATCH EX AutoCAD SHX Text: MATCH EX AutoCAD SHX Text: 13 65TS AutoCAD SHX Text: 13 65TS AutoCAD SHX Text: 1.0% AutoCAD SHX Text: 0.8% AutoCAD SHX Text: 13 40TS AutoCAD SHX Text: 13 40TS AutoCAD SHX Text: 12 90 AutoCAD SHX Text: 12 90 AutoCAD SHX Text: 13 28 AutoCAD SHX Text: 1.5% AutoCAD SHX Text: 1% AutoCAD SHX Text: 13 15 AutoCAD SHX Text: 13 AutoCAD SHX Text: 13 15 AutoCAD SHX Text: 13 40 AutoCAD SHX Text: 13 90TS AutoCAD SHX Text: 12 94 AutoCAD SHX Text: 12 93 AutoCAD SHX Text: 1% AutoCAD SHX Text: 12 70EP AutoCAD SHX Text: 0.9% AutoCAD SHX Text: 13 35 AutoCAD SHX Text: MATCH EX TC AutoCAD SHX Text: 1.9% AutoCAD SHX Text: 2% AutoCAD SHX Text: 13 40 AutoCAD SHX Text: 13 90TS AutoCAD SHX Text: 13 AutoCAD SHX Text: 1.2% AutoCAD SHX Text: 13 50 AutoCAD SHX Text: 13 73TC AutoCAD SHX Text: 13 65 AutoCAD SHX Text: 13 70TS AutoCAD SHX Text: 13 95TS AutoCAD SHX Text: 13 45TS AutoCAD SHX Text: 13 50 AutoCAD SHX Text: 13 05 AutoCAD SHX Text: 13 65 AutoCAD SHX Text: 13 81TC AutoCAD SHX Text: 13 85 AutoCAD SHX Text: 13 85 AutoCAD SHX Text: 13 85 AutoCAD SHX Text: 12 70 AutoCAD SHX Text: 13 82 AutoCAD SHX Text: CIP AutoCAD SHX Text: CIP AutoCAD SHX Text: 12.74 AutoCAD SHX Text: 13.08 AutoCAD SHX Text: TC AutoCAD SHX Text: 12.92 AutoCAD SHX Text: TC AutoCAD SHX Text: EP AutoCAD SHX Text: EP AutoCAD SHX Text: EP AutoCAD SHX Text: TC AutoCAD SHX Text: EP AutoCAD SHX Text: 13.11 AutoCAD SHX Text: 13.22 AutoCAD SHX Text: 13.45 AutoCAD SHX Text: 13.07 AutoCAD SHX Text: 12.87 AutoCAD SHX Text: EP AutoCAD SHX Text: EP AutoCAD SHX Text: EP AutoCAD SHX Text: EP AutoCAD SHX Text: EP AutoCAD SHX Text: 12.58 AutoCAD SHX Text: 13.05 AutoCAD SHX Text: TC AutoCAD SHX Text: 13.26 AutoCAD SHX Text: TC AutoCAD SHX Text: TC AutoCAD SHX Text: 13.48 AutoCAD SHX Text: REHABILITATION OF THE FUEL SYSTEMS AutoCAD SHX Text: NATIONAL MALL AND MEMORIAL PARKS (NAMA) AutoCAD SHX Text: OF AutoCAD SHX Text: SHEET AutoCAD SHX Text: DWG. NO.

AutoCAD SHX Text: DATE AutoCAD SHX Text: SUB SHEET NUMBER AutoCAD SHX Text: TITLE OF DRAWING AutoCAD SHX Text: Mark AutoCAD SHX Text: Sheet AutoCAD SHX Text: Initial AutoCAD SHX Text: Date AutoCAD SHX Text: REVISION AutoCAD SHX Text: DESIGNED AutoCAD SHX Text: DRAWN AutoCAD SHX Text: CHECKED AutoCAD SHX Text: TITLE OF PROJECT AutoCAD SHX Text: NAME OF PARK AutoCAD SHX Text: 165425 AutoCAD SHX Text: 802 AutoCAD SHX Text: PMIS# AutoCAD SHX Text: 254579 AutoCAD SHX Text: LOCATION WITHIN PARK AutoCAD SHX Text: EAST POTOMAC MAINTENANCE YARD AutoCAD SHX Text: 15 AutoCAD SHX Text: NATIONAL PARK SERVICE - INTERIOR REGION 1 - NATIONAL CAPITAL AREA AutoCAD SHX Text: DESIGN AND PROJECT MANAGEMENT AutoCAD SHX Text: UNITED STATES AutoCAD SHX Text: DEPARTMENT OF THE INTERIOR AutoCAD SHX Text: 21000 ATLANTIC BOULEVARD,SUITE 400 DULLES, VA 20166 (703) 450-0800 www.alphacorporation.com AutoCAD SHX Text: 06.15.2021 AutoCAD SHX Text: NOT FOR CONSTRUCTION AutoCAD SHX Text: 100% SUBMISSION AutoCAD SHX Text: C-301 AutoCAD SHX Text: EROSION & SEDIMENT CONTROL AutoCAD SHX Text: 8 AutoCAD SHX Text: JCH AutoCAD SHX Text: JCH AutoCAD SHX Text: DQ AutoCAD SHX Text: CIP AutoCAD SHX Text: CURB INLET PROTECTION AutoCAD SHX Text: LIMITS OF DISTURBANCE AutoCAD SHX Text: EROSION AND SEDIMENT CONTROL LEGEND AutoCAD SHX Text: FILTER SOCK AutoCAD SHX Text: FS-18 AutoCAD SHX Text: SOIL DATA TABLE AutoCAD SHX Text: SOILS INFORMATION MAP AutoCAD SHX Text: MAP SYMBOL AutoCAD SHX Text: MAP UNIT NAME AutoCAD SHX Text: HYDROLOGIC AutoCAD SHX Text: SOIL GROUP AutoCAD SHX Text: PERCENT AutoCAD SHX Text: OF SITE AutoCAD SHX Text: Ld AutoCAD SHX Text: Lindside loam AutoCAD SHX Text: C AutoCAD SHX Text: 11.4 AutoCAD SHX Text: Mp AutoCAD SHX Text: Melvin silt loam AutoCAD SHX Text: B/D AutoCAD SHX Text: .02 AutoCAD SHX Text: U1 AutoCAD SHX Text: Udorthents AutoCAD SHX Text: - AutoCAD SHX Text: 20.8 AutoCAD SHX Text: Ub AutoCAD SHX Text: Urban land AutoCAD SHX Text: - AutoCAD SHX Text: 67.6 AutoCAD SHX Text: 12. RECONSTRUCT CONCRETE SIDEWALK SURROUNDING THE NEW FUEL CONTROL BUILDING. 13. AS CONTRIBUTORY DRAINAGE AREAS ARE STABILIZED AND WITH THE PERMISSION OF THE EROSION AND SEDIMENT CONTROL INSPECTOR, RELOCATE INDIVIDUAL EROSION AND SEDIMENT CONTROL PRACTICES AS REQUIRED. 14. INSPECT ALL STORM INLETS FOR SEDIMENT AND REMOVE & PROPERLY DISPOSE OF SEDIMENT. 15. UPON FINAL STABILIZATION OF THE ENTIRE PROJECT AREA, REQUEST DOEE INSPECTOR'S APPROVAL AS INDICATED IN DOEE SOIL AND SEDIMENT CONTROL GENERAL NOTE 11 (SHOWN THIS SHEET) PRIOR TO REMOVAL OF EROSION & SEDIMENT CONTROLS.

AutoCAD SHX Text: 10 AutoCAD SHX Text: 0 AutoCAD SHX Text: 10 AutoCAD SHX Text: 20 AutoCAD SHX Text: SCALE OF FEET AutoCAD SHX Text: 1" = 10' AutoCAD SHX Text: MAINTENANCE BLDG SITE WORK SEQUENCE OF CONSTRUCTION 10. REMOVE EX ASPHALT PAVEMENT & PORTIONS OF CURB & GUTTER AS SHOWN ON THE DEMOLITION PLAN AS REQUIRED FOR INSTALLATION OF NEW OIL-WATER SEPARATOR & ASSOCIATED SANITARY SEWER, TRENCH DRAIN, & STORM SEWER. PROVIDE TRENCH BOX TO MINIMIZE EXCAVATION IN THE VICINITY OF THE OIL-WATER SEPARATOR TO WITHIN THE LIMITS OF DISTURBANCE SHOWN. DURING CONSTRUCTION, ENSURE THE NEW VALVES IN BOTH THE NEW SANITARY SEWER & NEW STORM SEWER SYSTEMS ARE CLOSED TO PREVENT DISCHARGE TO DOWNSTREAM UTILITY SYSTEMS. DEWATERING DEWATERING SHALL BE DISCHARGED THROUGH AN APPROVED DEWATERING STRUCTURE PRIOR TO DISCHARGE INTO THE EXISTING STORM DRAIN.

AutoCAD SHX Text: 11. CONSTRUCT UTILITY CONNECTIONS FROM THE NEW FUEL CONTROL BUILDING TO THE EX MAINTENANCE BUILDING AS INDICATED ON THE MECHANICAL & ELECTRICAL SITE PLANS AND THE UTILITY PLAN.

AutoCAD SHX Text: SEQUENCE OF CONSTRUCTION: 1. SCHEDULE AND HOLD ALL PRECONSTRUCTION MEETINGS. SCHEDULE AND HOLD ALL PRECONSTRUCTION MEETINGS. THE CONTRACTOR SHALL CONTACT DOEE INSPECTION AS INDICATED IN DOEE SOIL AND SEDIMENT CONTROL GENERAL NOTE 3 (SHOWN THIS SHEET). 2. ALL PERIMETER CONTROLS ARE TO BE IN PLACE PRIOR TO ALL PERIMETER CONTROLS ARE TO BE IN PLACE PRIOR TO ANY LAND DISTURBING ACTIVITY, INCLUDING DEMOLITION.

AutoCAD SHX Text: SEQUENCE OF CONSTRUCTION (CONTINUED): 3. INSTALL ALL SEDIMENT AND EROSION CONTROL MEASURES DOWNSTREAM OF DISTURBED AREAS PRIOR TO ANY LAND DISTURBING ACTIVITY, INCLUDING DEMOLITION, PER THE STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL FOR THE DISTRICT OF COLUMBIA. EROSION CONTROL MEASURES ARE SHOWN ON THIS SHEET. IF AN ON-SITE INSPECTION REVEALS FURTHER EROSION CONTROL MEASURES ARE NECESSARY THE SAME SHALL BE PROVIDED BY THE CONTRACTOR. 4. INSTALL THE APPROPRIATE TYPE OF STORM DRAIN INLET PROTECTION AS SHOWN ON THIS SHEET AND PER THE EROSION CONTROL DETAILS PROVIDED ON THE EROSION & SEDIMENT CONTROL DETAILS SHEET. 5. PRIOR TO START OF DEMOLITION ACTIVITIES, CONTRACTOR TO PROVIDE TEMPORARY FUELING STATIONS. SEE DEMOLITION NOTE 1 ON DEMOLITION PLAN FOR ADDITIONAL INFORMATION.

AutoCAD SHX Text: SEQUENCE OF CONSTRUCTION (CONTINUED) FUEL STATION SITE WORK SEQUENCE OF CONSTRUCTION 6. REMOVE EX CANOPY & CANOPY ROOF DRAINS. CAP CANOPY ROOF DRAINS AT UTILITY DEMOLITION LIMIT SHOWN ON DEMOLITION PLAN FOR RECONNECTION OF NEW ROOF DRAINS FROM NEW CANOPY. 7. REMOVE EX PAVEMENT, PORTIONS OF CURB & GUTTER, RAISED CONCRETE ISLAND, UNDERGROUND FUEL STORAGE TANKS, FUEL ATTENDANT BUILDING, & ASSOCIATED UTILITIES AS INDICATED ON THE DEMOLITION PLAN. PROVIDE EXCAVATION SUPPORT & PROTECTION IN ACCORDANCE WITH SPECIFICATION SECTION 31 50 00 EXCAVATION SUPPORT & PROTECTION. PERFORM NECESSARY GEOTECHNICAL INVESTIGATION TO CONFIRM SOILS SURROUNDING UNDERGROUND FUEL STORAGE TANKS ARE NOT CONTAMINATED & DECOMMISSION TANKS AS REQUIRED BY SPECIFICATION SECTION 01 11 00 SUMMARY OF WORK. 8. CONSTRUCT CONCRETE EQUIPMENT PAD TO ACCOMMODATE NEW FUEL STORAGE TANKS & CONSTRUCT VEHICULAR CONCRETE PAVEMENT, CURB & GUTTER, & CANOPY AS INDICATED ON THE SITE & GRADING PLAN. CONNECT NEW CANOPY ROOF DRAINS TO EX STORM SEWER AS INDICATED ON THE UTILITY PLAN. 9. CONSTRUCT FUEL CONTROL BUILDING & PROVIDE UTILITY CONNECTIONS PER THE MECHANICAL & ELECTRICAL SITE PLANS & THE UTILITY PLAN.

HARD - SURFACE INSTALLATION

PLAN VIEW

FILTER SOCK - 2

CONSTRUCTION SPECIFICATIONS

HARD SURFACE INSTALLATION SECTION

CURB INLET PROTECTION

STORM DRAIN INLET PROTECTION

CONSTRUCTION SPECIFICATIONS

ISOMETRIC

SECTION A-A

SUMP PIT

CONSTRUCTION SPECIFICATIONS

ELEVATION

* THESE NUMBERS SHALL BE USED FOR PERMIT PURPOSES ONLY

AND NOT FOR BIDDING.

AREA LOCATION

OFFSITE WASTE/BORROW

TOTAL FILL

TOTAL CUT

AREA DISTURBED

CUBIC YARDS FILL

CUBIC YARDS *

CUBIC YARDS *

AC0.111

N/A

TOTAL AREA OF SITE 373

WARNING - EROSION &

SEDIMENT CONTROL

SHALL BE STRICTLY

ENFORCED !

AC

PROJECT ADDRESS: 500 BUCKEYE DRIVE, SW, WASHINGTON, DC 20024

BCIV2100102

HPRB Review - Andrew Lewis - 08-19-2021 DOEE FP Review - Victor Ukpolo - 08-19-2021 DOEE SE-SW Review - Saba Gharavi - 08-19-2021 CFA Review - Andrew Lewis - 08-19-2021

08/19/21

AutoCAD SHX Text: REHABILITATION OF THE FUEL SYSTEMS AutoCAD SHX Text: NATIONAL MALL AND MEMORIAL PARKS (NAMA) AutoCAD SHX Text: OF AutoCAD SHX Text: SHEET AutoCAD SHX Text: DWG. NO.

AutoCAD SHX Text: DATE AutoCAD SHX Text: SUB SHEET NUMBER AutoCAD SHX Text: TITLE OF DRAWING AutoCAD SHX Text: Mark AutoCAD SHX Text: Sheet AutoCAD SHX Text: Initial AutoCAD SHX Text: Date AutoCAD SHX Text: REVISION AutoCAD SHX Text: DESIGNED AutoCAD SHX Text: DRAWN AutoCAD SHX Text: CHECKED AutoCAD SHX Text: TITLE OF PROJECT AutoCAD SHX Text: NAME OF PARK AutoCAD SHX Text: 165425 AutoCAD SHX Text: 802 AutoCAD SHX Text: PMIS# AutoCAD SHX Text: 254579 AutoCAD SHX Text: LOCATION WITHIN PARK AutoCAD SHX Text: EAST POTOMAC MAINTENANCE YARD AutoCAD SHX Text: 15 AutoCAD SHX Text: NATIONAL PARK SERVICE - INTERIOR REGION 1 - NATIONAL CAPITAL AREA AutoCAD SHX Text: DESIGN AND PROJECT MANAGEMENT AutoCAD SHX Text: UNITED STATES AutoCAD SHX Text: DEPARTMENT OF THE INTERIOR AutoCAD SHX Text: 21000 ATLANTIC BOULEVARD,SUITE 400 DULLES, VA 20166 (703) 450-0800 www.alphacorporation.com AutoCAD SHX Text: 06.15.2021 AutoCAD SHX Text: NOT FOR CONSTRUCTION AutoCAD SHX Text: 100% SUBMISSION AutoCAD SHX Text: C-302 AutoCAD SHX Text: E&S NARRATIVE & DETAILS AutoCAD SHX Text: 9 AutoCAD SHX Text: JCH AutoCAD SHX Text: JCH AutoCAD SHX Text: DQ AutoCAD SHX Text: DATE AutoCAD SHX Text: APPR AutoCAD SHX Text: REVISED AutoCAD SHX Text: ISSUED:

AutoCAD SHX Text: REFERENCE AutoCAD SHX Text: DISTRICT OF COLUMBIA AutoCAD SHX Text: DEPARTMENT OF ENERGY & ENVIRONMENT AutoCAD SHX Text: 1. BEFORE INSTALLING, CLEAR ALL OBSTRUCTIONS INCLUDING ROCKS, CLODS, AND DEBRIS GREATER THAN 1-INCH THAT MAY INTERFERE WITH PROPER FUNCTION BEFORE INSTALLING, CLEAR ALL OBSTRUCTIONS INCLUDING ROCKS, CLODS, AND DEBRIS GREATER THAN 1-INCH THAT MAY INTERFERE WITH PROPER FUNCTION OF THE FILTER SOCK. 2. FILL SOCK UNIFORMLY WITH COMPOST OR ALTERNATE FILTER MEDIA TO DESIRED LENGTH, WITH ENOUGH MATERIAL THAT THE SOCKS DO NOT DEFORM. FILL SOCK UNIFORMLY WITH COMPOST OR ALTERNATE FILTER MEDIA TO DESIRED LENGTH, WITH ENOUGH MATERIAL THAT THE SOCKS DO NOT DEFORM. 3. PLACE SOCKS ALONG CONTOURS, WITH THE ENDS TURNED UPSLOPE AT 30 TO 45 DEGREES FOR A LENGTH OF AT LEAST 5 FEET TO PREVENT RUNOFF PLACE SOCKS ALONG CONTOURS, WITH THE ENDS TURNED UPSLOPE AT 30 TO 45 DEGREES FOR A LENGTH OF AT LEAST 5 FEET TO PREVENT RUNOFF BYPASS. 4. FOR UNTRENCHED INSTALLATION, BACKFILL MULCH OR COMPOST ON THE UPSTREAM SIDE OF THE SOCK AND TAMP TO PREVENT UNDERCUTTING AND PIPING. FOR UNTRENCHED INSTALLATION, BACKFILL MULCH OR COMPOST ON THE UPSTREAM SIDE OF THE SOCK AND TAMP TO PREVENT UNDERCUTTING AND PIPING. 5. ANCHORING MUST CONFORM TO THE FOLLOWING LIST: (a) MINIMUM 2-INCH SQUARE CROSS SECTION HARDWOOD; (b) DRIVEN AT LEAST 12 INCHES BELOW ANCHORING MUST CONFORM TO THE FOLLOWING LIST: (a) MINIMUM 2-INCH SQUARE CROSS SECTION HARDWOOD; (b) DRIVEN AT LEAST 12 INCHES BELOW GRADE, OR 8 INCHES IF IN DENSE CLAY SOILS; (c) PROTRUDE ABOVE FILTER SOCKS AT LEAST 3 INCHES; (d) DRIVEN IN AT 45-DEGREE ANGLE UPSLOPE; (e) SPACED AT NO MORE THAN 4 FEET APART, OR 8 FEET APART IF THE FILTER SOCK IS ENTRENCHED 4 INCHES INTO THE GROUND. 6. DO NOT USE ENTRENCHED INSTALLATION ON FILTER SOCKS SMALLER THAN 12 INCHES IN DIAMETER. DO NOT USE ENTRENCHED INSTALLATION ON FILTER SOCKS SMALLER THAN 12 INCHES IN DIAMETER. 7. FOR HARD SURFACE INSTALLATION, SUCH AS ON PAVEMENT, ANCHORING MAY BE NECESSARY WHERE STRAIGHT SECTIONS EXCEED 4 FEET. SEE DETAIL ABOVE, FOR HARD SURFACE INSTALLATION, SUCH AS ON PAVEMENT, ANCHORING MAY BE NECESSARY WHERE STRAIGHT SECTIONS EXCEED 4 FEET. SEE DETAIL ABOVE, AND GREATER INSTRUCTION IN THE FILTER SOCK SPECIFICATION. WHEN NO ANCHORING IS USED, THE PRACTICE MUST BE CHECKED DAILY, REGARDLESS OF WHETHER RAINFALL OCCURS. ANCHORED INSTALLATION IS ALWAYS PREFERRED TO NON-ANCHORED INSTALLATION, IF POSSIBLE. 8. FOR AT-GRADE INLET PROTECTION, FILTER SOCKS MUST COMPLETELY ENCLOSE THE DRAIN. IF USED AS CURB INLET PROTECTION, THE EFFECTIVE HEIGHT OF FOR AT-GRADE INLET PROTECTION, FILTER SOCKS MUST COMPLETELY ENCLOSE THE DRAIN. IF USED AS CURB INLET PROTECTION, THE EFFECTIVE HEIGHT OF THE FILTER SOCK MUST NOT BE HIGHER THAN THE HEIGHT OF THE CURB; USE 8-INCH DIAMETER FILTER SOCK FOR STANDARD HIGHWAY APPLICATIONS. 9. IF MULTIPLE SECTIONS OF FILTER SOCK ARE NEEDED FOR A CONTINUOUS RUN, OVERLAP ENDS OF SEPARATE SECTIONS A MINIMUM OF 2 FEET AND STAKE IF MULTIPLE SECTIONS OF FILTER SOCK ARE NEEDED FOR A CONTINUOUS RUN, OVERLAP ENDS OF SEPARATE SECTIONS A MINIMUM OF 2 FEET AND STAKE ENDS. 10. TO REACH TALLER HEIGHTS, IT IS POSSIBLE TO STACK FILTER SOCKS. SEE SPECIFICATION FOR MORE DETAIL. TO REACH TALLER HEIGHTS, IT IS POSSIBLE TO STACK FILTER SOCKS. SEE SPECIFICATION FOR MORE DETAIL. 11. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO A DEPTH OF HALF THE EXPOSED HEIGHT OF SOCK AND REPLACE SOCK. REPLACE FILTER SOCK IF TORN. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO A DEPTH OF HALF THE EXPOSED HEIGHT OF SOCK AND REPLACE SOCK. REPLACE FILTER SOCK IF TORN. REINSTALL FILTER SOCK IF UNDERMINING OR DISLODGING OCCURS. REPLACE CLOGGED FILTER SOCKS. 12. FOR VEGETATED, PERMANENT OR SEMI-PERMANENT INSTALLATIONS, MAINTAIN THE PLANTS AS IS APPROPRIATE FOR THE SPECIES USED.FOR VEGETATED, PERMANENT OR SEMI-PERMANENT INSTALLATIONS, MAINTAIN THE PLANTS AS IS APPROPRIATE FOR THE SPECIES USED.

AutoCAD SHX Text: AREA TO BE PROTECTED AutoCAD SHX Text: WORK AREA AutoCAD SHX Text: SHEET FLOW AutoCAD SHX Text: DWG. NO 303.2 AutoCAD SHX Text: STANDARD SYMBOL AutoCAD SHX Text: SOURCE: 2011 MARYLAND STANDARDS & SPECIFICATIONS AutoCAD SHX Text: DESIGNATION FS-18 REFERS TO 18 INCH DIAMETER FILTER SOCK.

AutoCAD SHX Text: FLOW AutoCAD SHX Text: AREA TO BE PROTECTED AutoCAD SHX Text: 4 FT.

AutoCAD SHX Text: FS-18 AutoCAD SHX Text: DATE AutoCAD SHX Text: APPR AutoCAD SHX Text: REVISED AutoCAD SHX Text: ISSUED:

AutoCAD SHX Text: REFERENCE AutoCAD SHX Text: DISTRICT OF COLUMBIA AutoCAD SHX Text: DEPARTMENT OF ENERGY & ENVIRONMENT AutoCAD SHX Text: DWG. NO 307.3 AutoCAD SHX Text: STANDARD SYMBOL AutoCAD SHX Text: SOURCE: 2011 MARYLAND STANDARDS AND SPECIFICATIONS AutoCAD SHX Text: CIP AutoCAD SHX Text: 6 FT MAX. SPACING OF 2 IN. x 4 IN. SPACERS AutoCAD SHX Text: 14 IN. WIRE IN. WIRE MESH AutoCAD SHX Text: A AutoCAD SHX Text: 34 TO 1- IN. 12 IN. SIZED STONE AutoCAD SHX Text: 1. ATTACH A CONTINUOUS PIECE OF 1/2 INCH x 1/2 INCH WIRE MESH, (30 INCHES MINIMUM WIDTH BY THROAT LENGTH, PLUS 4 FEET) TO THE 2-INCH x 4-INCH ATTACH A CONTINUOUS PIECE OF 1/2 INCH x 1/2 INCH WIRE MESH, (30 INCHES MINIMUM WIDTH BY THROAT LENGTH, PLUS 4 FEET) TO THE 2-INCH x 4-INCH INCH x 1/2 INCH WIRE MESH, (30 INCHES MINIMUM WIDTH BY THROAT LENGTH, PLUS 4 FEET) TO THE 2-INCH x 4-INCH WEIR (MEASURING THROAT LENGTH PLUS 2 FEET) AS SHOWN ON THE STANDARD DRAWING. 2. PLACE A CONTINUOUS PIECE OF GEOTEXTILE CLASS E OF THE SAME DIMENSIONS AS THE WIRE MESH OVER THE WIRE MESH AND SECURELY ATTACH TO THE 2-INCH PLACE A CONTINUOUS PIECE OF GEOTEXTILE CLASS E OF THE SAME DIMENSIONS AS THE WIRE MESH OVER THE WIRE MESH AND SECURELY ATTACH TO THE 2-INCH x 4-INCH WEIR. 3. SECURELY NAIL THE 2-INCH x 4-INCH WEIR TO A 9-INCH LONG VERTICAL SPACER TO BE LOCATED BETWEEN THE WEIR AND THE INLET FACE (MAXIMUM 4 FEET APART). 4. PLACE THE ASSEMBLY AGAINST THE INLET THROAT AND NAIL (MINIMUM 2-FOOT LENGTHS OF 2-INCHES x 4-INCHES TO THE TOP OF THE WEIR AT SPACER PLACE THE ASSEMBLY AGAINST THE INLET THROAT AND NAIL (MINIMUM 2-FOOT LENGTHS OF 2-INCHES x 4-INCHES TO THE TOP OF THE WEIR AT SPACER LOCATIONS). EXTEND THESE 2-INCH x 4-INCH ANCHORS ACROSS THE INLET TOP AND BE HELD IN PLACE BY SANDBAGS OR ALTERNATE WEIGHT. 5. PLACE THE ASSEMBLY SO THAT THE END SPACERS ARE 1 FOOT BEYOND BOTH ENDS OF THE THROAT OPENING. PLACE THE ASSEMBLY SO THAT THE END SPACERS ARE 1 FOOT BEYOND BOTH ENDS OF THE THROAT OPENING. 6. FORM THE 1/2-INCH x 1/2-INCH WIRE MESH AND THE GEOTEXTILE FABRIC TO THE CONCRETE GUTTER AND AGAINST THE FACE OF THE CURB ON BOTH SIDES OF FORM THE 1/2-INCH x 1/2-INCH WIRE MESH AND THE GEOTEXTILE FABRIC TO THE CONCRETE GUTTER AND AGAINST THE FACE OF THE CURB ON BOTH SIDES OF THE INLET. PLACE CLEAN 3/4 TO 1-1/2 INCH STONE OVER THE WIRE MESH AND GEOTEXTILE IN SUCH A MANNER AS TO PREVENT WATER FROM ENTERING THE INLET UNDER OR AROUND THE GEOTEXTILE. 7. THIS TYPE OF PROTECTION MUST BE INSPECTED FREQUENTLY AND THE GEOTEXTILE FABRIC AND STONE REPLACED WHEN CLOGGED WITH SEDIMENT. THIS TYPE OF PROTECTION MUST BE INSPECTED FREQUENTLY AND THE GEOTEXTILE FABRIC AND STONE REPLACED WHEN CLOGGED WITH SEDIMENT. 8. ASSURE THAT STORM FLOWS DO NOT BYPASS THE INLET BY INSTALLING A TEMPORARY EARTH OR ASPHALT DIKE TO DIRECT THE FLOW TO THE INLET. ASSURE THAT STORM FLOWS DO NOT BYPASS THE INLET BY INSTALLING A TEMPORARY EARTH OR ASPHALT DIKE TO DIRECT THE FLOW TO THE INLET. 9. IF THERE ARE ANY SIGNS OF STREET FLOODING OR WATER PONDING, THIS STRUCTURE MUST BE CLEANED OR REPLACED, OR REDESIGNED WITH A VIABLE IF THERE ARE ANY SIGNS OF STREET FLOODING OR WATER PONDING, THIS STRUCTURE MUST BE CLEANED OR REPLACED, OR REDESIGNED WITH A VIABLE ALTERNATIVE SUCH AS 3.3 FILTER SOCK. *NOTE: FILTER SOCK IS AN ALTERNATIVE WHICH IS EASIER TO INSTALL AND MAINTAIN THAN THIS STANDARD DESIGN.

AutoCAD SHX Text: 34 TO 1- IN. STONE12 IN. STONE AutoCAD SHX Text: 2 IN. x 4 IN. ANCHORS 2 FT MIN. LENGTH AutoCAD SHX Text: 2 IN. x 4 IN. SPACER AutoCAD SHX Text: 2 IN. x 4 IN. WEIR AutoCAD SHX Text: EDGE OF GUTTER PAN AutoCAD SHX Text: NONWOVEN GEOTEXTILE AutoCAD SHX Text: A AutoCAD SHX Text: NONWOVEN GEOTEXTILE AutoCAD SHX Text: 2 IN. x 4 IN. WEIR AutoCAD SHX Text: 2 FT. MIN. LENGTH OF 2 IN. x 4 IN.

AutoCAD SHX Text: SANDBAG OR OTHER APPROVED ANCHORING METHOD AutoCAD SHX Text: 2 IN. x 4 IN. SPACER AutoCAD SHX Text: WIRE MESH AutoCAD SHX Text: MAXIMUM DRAINAGE AREA = ACRE14 ACRE AutoCAD SHX Text: DATE AutoCAD SHX Text: APPR AutoCAD SHX Text: REVISED AutoCAD SHX Text: ISSUED:

AutoCAD SHX Text: REFERENCE AutoCAD SHX Text: DISTRICT OF COLUMBIA AutoCAD SHX Text: DEPARTMENT OF ENERGY & ENVIRONMENT AutoCAD SHX Text: DWG. NO 702.1 AutoCAD SHX Text: STANDARD SYMBOL AutoCAD SHX Text: SOURCE: 2011 MARYLAND STANDARDS AND SPECIFICATIONS AutoCAD SHX Text: SP AutoCAD SHX Text: SUCTION LINE TO PUMP AutoCAD SHX Text: 6 IN MIN.

AutoCAD SHX Text: 6 IN BASE OF STONE BELOW STANDPIPE AutoCAD SHX Text: SET TOP OF PIPE MIN. OF 12 IN ABOVE OF 12 IN ABOVE ANTICIPATED HIGHWATER LEVEL AutoCAD SHX Text: MIN. 3 x PIPE 3 x PIPE DIAMETER AutoCAD SHX Text: 4 FT MIN.

AutoCAD SHX Text: 1. WRAP THE PIPE WITH INCH GALVANIZED HARDWARE CLOTH AND THEN GEOTEXTILE OVER THE HARDWARE CLOTH. WRAP THE PIPE WITH INCH GALVANIZED HARDWARE CLOTH AND THEN GEOTEXTILE OVER THE HARDWARE CLOTH. 14 INCH GALVANIZED HARDWARE CLOTH AND THEN GEOTEXTILE OVER THE HARDWARE CLOTH. 2. EXCAVATE THE PIT TO 3 TIMES THE PIPE DIAMETER AND 4 FEET IN DEPTH. PLACE CLEAN TO 1- INCH STONE OR EQUIVALENT RECYCLED EXCAVATE THE PIT TO 3 TIMES THE PIPE DIAMETER AND 4 FEET IN DEPTH. PLACE CLEAN TO 1- INCH STONE OR EQUIVALENT RECYCLED 34 TO 1- INCH STONE OR EQUIVALENT RECYCLED 12 INCH STONE OR EQUIVALENT RECYCLED CONCRETE, 6 INCHES IN DEPTH PRIOR TO PIPE PLACEMENT. 3. SET THE TOP OF PIPE A MINIMUM OF 12 INCHES ABOVE THE ANTICIPATED WATER SURFACE ELEVATION. 4. BACKFILL PIT AROUND THE OUTER PIPE WITH TO 1- INCH CLEAN STONE OR EQUIVALENT RECYCLED CONCRETE AND EXTEND STONE A MINIMUM 34 TO 1- INCH CLEAN STONE OR EQUIVALENT RECYCLED CONCRETE AND EXTEND STONE A MINIMUM 12 INCH CLEAN STONE OR EQUIVALENT RECYCLED CONCRETE AND EXTEND STONE A MINIMUM OF 6 INCHES ABOVE ANTICIPATED WATER SURFACE ELEVATION. 5. PLACE THE SUCTION HOSE FROM THE PUMP INSIDE THE PIPE TO BEGIN DEWATERING. PLACE THE DISCHARGE HOSE IN A STABILIZED AREA DOWNSLOPE OF UNSTABILIZED AREAS TO PREVENT EROSION. MEADOW OR WOODED AREAS ARE PREFERRED DISCHARGE LOCATIONS BUT STORM DRAINS AND PAVED AREAS ARE ACCEPTABLE.

AutoCAD SHX Text: NOTE: ANY DISCHARGE TO COMBINED SEWERS REQUIRES A TEMPORARY DISCHARGE AUTHORIZATION PERMIT FROM DC WATER. ANY DISCHARGE TO THE DISTRICT MS4 OR TO A SURFACE WATER BODY FROM AN ELIGIBLE PROJECT, AS REGULATED BY THE CONSTRUCTION GENERAL PERMIT (CGP), REQUIRES A NOTICE OF INTENT (NOI) FROM EPA. ONCE DETERMINED THAT THE PROJECT HAS STORMWATER RUNOFF THAT MUST BE DISCHARGED ON A TEMPORARY BASIS, CONTACT DC WATER OR EPA FOR PERMIT INFORMATION.

AutoCAD SHX Text: SEDIMENT CONTROL FOR UTILITY CONSTRUCTION: 1. PLACE EXCAVATED TRENCH MATERIAL ON THE HIGH SIDE OF THE TRENCH. PLACE EXCAVATED TRENCH MATERIAL ON THE HIGH SIDE OF THE TRENCH. 2. IMMEDIATELY FOLLOWING PIPE INSTALLATION, BACK FILL, COMPACT AND STABILIZE THE IMMEDIATELY FOLLOWING PIPE INSTALLATION, BACK FILL, COMPACT AND STABILIZE THE TRENCH AT THE END OF EACH WORKING DAY. 3. WHEN DEWATERING OF TRENCHES IS REQUIRED, USE PORTABLE SEDIMENT TANKS. WHEN DEWATERING OF TRENCHES IS REQUIRED, USE PORTABLE SEDIMENT TANKS. PUMP SEDIMENT LADEN WATER FROM THE TRENCHES INTO A SEDIMENT TANK BEFORE DISCHARGE OFF THE SITE OR TO A STORM DRAINAGE SYSTEM PROTECTED BY AN APPROVED INLET PROTECTION DEVICE. 4. MAINTAIN ALL EROSION AND SEDIMENT CONTROL DEVICES. DO NOT REMOVE EROSION AND MAINTAIN ALL EROSION AND SEDIMENT CONTROL DEVICES. DO NOT REMOVE EROSION AND SEDIMENT CONTROL DEVICES UNTIL THE CONTRIBUTING AREAS ARE STABILIZED AND THE REMOVAL HAS BEEN APPROVED BY THE EROSION & SEDIMENT CONTROL INSPECTOR. 5. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING ACCESS TO ALL EROSION THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING ACCESS TO ALL EROSION & SEDIMENT CONTROL DEVICES UNTIL THE DEVICES ARE REMOVED. 6. THE EROSION & SEDIMENT CONTROL SEQUENCES PRESENTED ON THE SHEET C-301 SHOULD BE USED THE EROSION & SEDIMENT CONTROL SEQUENCES PRESENTED ON THE SHEET C-301 SHOULD BE USED FOR GUIDANCE ONLY. COORDINATE THE INSTALLATION AND REMOVAL OF EROSION & SEDIMENT CONTROL DEVICES WITH THE EROSION & SEDIMENT CONTROL INSPECTOR.

AutoCAD SHX Text: EROSION & SEDIMENT CONTROL NARRATIVE: EXISTING CONDITIONS THE SITE IS LOCATED AT THE EAST POTOMAC MAINTENANCE YARD AT 500 BUCKEYE DRIVE, SW, WASHINGTON DC 20024. THE SW, WASHINGTON DC 20024. THE SW, WASHINGTON DC 20024. THE SITE CURRENTLY CONTAINS A FUEL STATION CONSISTING OF A 5,000 GALLON UNDERGROUND FUEL STORAGE TANK FOR GASOLINE AND A 2,000 GALLON UNDERGROUND FUEL STORAGE TANK FOR DIESEL FUEL ALONG WITH THE ASSOCIATED FUEL DISPENSERS, FUEL INVENTORY CONTROL UNIT, CANOPY, AND FUEL ATTENDANT BUILDING. THE FUEL STATION IS CONSTRUCTED IN AN AREA OF CONCRETE PAVEMENT AND IS BOUNDED BY CURB AND GUTTER ON THE NORTH AND SOUTH SIDES AND TRENCH DRAINS ON THE EAST AND WEST SIDES TO WHICH THE CONCRETE PAVEMENT DRAINS. THE TRENCH DRAINS CONVEY STORMWATER RUNOFF FROM THE CONCRETE PAVEMENT AT THE FUEL STATION TO AN EXISTING SAND & OIL INTERCEPTOR AT THE SOUTHEAST SIDE OF THE FUEL STATION. A SMALL FUEL ATTENDANT BUILDING IS LOCATED IN A CONCRETE ISLAND SURROUNDED BY CURB AND GUTTER LOCATED SOUTH OF THE FUEL STATION. AN APPROXIMATE 1,400 SF MAINTENANCE BUILDING IS ALSO PRESENT AT THE SITE AND IS LOCATED SOUTHEAST OF THE FUEL STATION. ASPHALT PAVEMENT SURROUNDS THE MAINTENANCE BUILDING. GRADES SLOPE GRADUALLY AWAY FROM THE BUILDING IN THE NORTHEAST AND NORTHWEST DIRECTIONS TO TWO EXISTING CURB INLETS AT THE SOUTHEAST AND SOUTHWEST CORNER OF THE CONCRETE ISLAND ON WHICH THE FUEL ATTENDANT BUILDING RESIDES. PROJECT DESCRIPTION SITE WORK ASSOCIATED WITH THIS PROJECT INCLUDES REPLACEMENT OF THE EXISTING UNDERGROUND FUEL STORAGE TANKS WITH TWO ABOVE GROUND FUEL STORAGE TANKS ON A CONCRETE EQUIPMENT PAD INCLUDING ALL ASSOCIATED DEMOLITION, EXCAVATION, PAVEMENT REMOVAL AND REPLACEMENT, AND UTILITY WORK. THE EXISTING CANOPY COVERING THE EXISTING FUEL STATION WILL ALSO BE REMOVED & REPLACED. THE EXISTING CANOPY ROOF DRAINS WILL BE TEMPORARILY CAPPED BELOW GRADE UNTIL RECONNECTION OF THE NEW CANOPY ROOF DRAINS. THE PROJECT ALSO INCLUDES RENOVATION OF THE NORTHWEST SERVICE BAY OF THE EXISTING MAINTENANCE BUILDING TO CONVERT THE NORTHWEST BAY TO SUPPORT VEHICLE AND EQUIPMENT WASHING. SITE WORK ASSOCIATED WITH THE MAINTENANCE BUILDING RENOVATION INCLUDES CONSTRUCTION OF A NEW OIL-WATER SEPARATOR OUTSIDE THE MAINTENANCE BUILDING, ASSOCIATED UTILITY WORK, AND PAVEMENT RESTORATION. A NEW OUTDOOR WASH STATION (HOSE BIB) WILL ALSO BE PROVIDED ON THE NORTHWEST SIDE OF THE MAINTENANCE BUILDING. SITE WORK ASSOCIATED WITH THE NEW OUTDOOR WASH STATION INCLUDES CONSTRUCTION OF A NEW TRENCH DRAIN AT THE NORTH CORNER OF THE MAINTENANCE BUILDING TO INTERCEPT FLOW FROM THE OUTDOOR WASH STATION. THE NEW TRENCH DRAIN WILL DISCHARGE TO A NEW DRAIN BASIN. THE NEW DRAIN BASIN WILL HAVE AN OUTLET PIPE TO THE STORM SEWER AND AN OUTLET PIPE TO THE SANITARY SEWER AS SHOWN ON THE UTILITY PLAN. BOTH OUTLET PIPES WILL BE CONSTRUCTED WITH A NEW GATE VALVE IMMEDIATELY AFTER THE CONNECTION TO THE DRAIN BASIN WHICH WILL ALLOW CONTROL OF THE DISCHARGE TO THE APPROPRIATE UTILITY SYSTEM AS FOLLOWS: WHEN THE OUTDOOR WASH STATION IS NOT NOT IN USE, THE GATE VALVE IN THE STORM SEWER WILL BE SET IN THE OPEN POSITION & THE GATE VALVE IN THE SANITARY SEWER WILL BE SET IN THE CLOSED POSITION TO DIVERT RAINFALL TO THE STORM SEWER SYSTEM & PREVENT IT FROM ENTERING THE SANITARY SEWER/OIL-WATER SEPARATOR. WHEN THE OUTDOOR WASH STATION IS IN USE, THE GATE VALVE IN THE STORM SEWER WILL BE SET IN THE CLOSED POSITION & THE GATE VALVE IN THE SANITARY SEWER WILL BE SET IN THE OPEN POSITION TO DIVERT FLOW FROM VEHICLE WASHING OPERATIONS TO THE SANITARY SEWER/OIL-WATER SEPARATOR. SOIL TYPE SOILS TYPES IN THE PROJECT AREA, AS DESCRIBED BY SOIL SURVEY INFORMATION AVAILABLE AT USDA NATURAL SOILS TYPES IN THE PROJECT AREA, AS DESCRIBED BY SOIL SURVEY INFORMATION AVAILABLE AT USDA NATURAL RESOURCES CONSERVATION SERVICE (NCRS) ARE AS SHOWN ON THE SOILS INFORMATION MAP AND SOILS DATA TABLE PROVIDED ON SHEET C-301. SHEET C-301. SHEET C-301.

AutoCAD SHX Text: %%UGENERAL EROSION & SEDIMENT CONTROL NOTES AutoCAD SHX Text: 1. ALL SEDIMENT & EROSION CONTROL MEASURES SHALL BE INSTALLED DOWNSTREAM OF DISTURBED AREAS PRIOR TO THE START ALL SEDIMENT & EROSION CONTROL MEASURES SHALL BE INSTALLED DOWNSTREAM OF DISTURBED AREAS PRIOR TO THE START OF ANY LAND DISTURBING ACTIVITY PER THE STANDARDS & SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL FOR THE DISTRICT OF COLUMBIA. FURTHER EROSION & SEDIMENTAL CONTROL MEASURES AND PRACTICES IN ADDITION TO THOSE SHOWN ON THIS PLAN SHALL BE PROVIDED AS NECESSARY AT THE DIRECTION OF THE EROSION & SEDIMENT CONTROL INSPECTOR. 2. INSTALL THE APPROPRIATE TYPE OF STORM DRAIN INLET PROTECTION AS REQUIRED BY THE EROSION CONTROL DETAILS. INSTALL THE APPROPRIATE TYPE OF STORM DRAIN INLET PROTECTION AS REQUIRED BY THE EROSION CONTROL DETAILS. 3. DO NOT ALLOW TRACKED MUD AND DEBRIS TO ACCUMULATE ON STREETS. CLEAN STREETS ON A DAILY BASIS WITH A VACUUM DO NOT ALLOW TRACKED MUD AND DEBRIS TO ACCUMULATE ON STREETS. CLEAN STREETS ON A DAILY BASIS WITH A VACUUM SWEEPER TRUCK TO THE SATISFACTION OF THE SEDIMENT CONTROL OFFICER. 4. EQUIPMENT WORKING ON DISTURBED AREAS SHALL NOT ENTER ADJACENT ROADWAYS UNTIL IT HAS BEEN INSPECTED AND CLEANED EQUIPMENT WORKING ON DISTURBED AREAS SHALL NOT ENTER ADJACENT ROADWAYS UNTIL IT HAS BEEN INSPECTED AND CLEANED TO THE SATISFACTION OF THE SEDIMENT CONTROL OFFICER. 5. ALL INLET PROTECTION SHALL BE INSPECTED AFTER EACH RAIN EVENT TO ENSURE THAT THE GEOTEXTILE AND/OR THE FILTER ALL INLET PROTECTION SHALL BE INSPECTED AFTER EACH RAIN EVENT TO ENSURE THAT THE GEOTEXTILE AND/OR THE FILTER STONE IS NOT CLOGGED. WHEN CLOGGED THE GEOTEXTILE SHALL BE REPLACED AND THE STONE CLEANED. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING ANY INLET OR DRAIN PIPE THAT BECOMES FILLED OR CLOGGED AS A THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING ANY INLET OR DRAIN PIPE THAT BECOMES FILLED OR CLOGGED AS A RESULT OF CONSTRUCTION. 7. ALL DEBRIS SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN ACCORDANCE WITH APPLICABLE LAWS AND REGULATIONS. ALL DEBRIS SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN ACCORDANCE WITH APPLICABLE LAWS AND REGULATIONS. 8. CONTRACTOR SHALL PROPERLY DISPOSE OF ANY SEDIMENT CLEANED OUT OF TRAPS OR PIPES IN ACCORDANCE WITH ALL CONTRACTOR SHALL PROPERLY DISPOSE OF ANY SEDIMENT CLEANED OUT OF TRAPS OR PIPES IN ACCORDANCE WITH ALL APPLICABLE LAWS & REGULATIONS. 9. ALL DEWATERING SHALL BE DISCHARGED THROUGH AN APPROVED DEWATERING STRUCTURE PRIOR TO DISCHARGE INTO THE ALL DEWATERING SHALL BE DISCHARGED THROUGH AN APPROVED DEWATERING STRUCTURE PRIOR TO DISCHARGE INTO THE EXISTING STORM DRAIN.

AutoCAD SHX Text: 1. OVERNIGHT STORAGE OF SUPPLIES OR MATERIALS ON-SITE SHALL BE APPROVED BY THE COR. SEE OVERNIGHT STORAGE OF SUPPLIES OR MATERIALS ON-SITE SHALL BE APPROVED BY THE COR. SEE SPECIFICATION 01 50 00 FOR ADDITIONAL STORAGE REQUIREMENTS. 2. LOCATION OF CONTRACTOR STAGING AREA TO BE DESIGNATED BY THE COR. LOCATION OF CONTRACTOR STAGING AREA TO BE DESIGNATED BY THE COR. 3. CONTRACTOR'S STAGING AREA MUST BE KEPT NEAT AND THE FENCE FREE OF SIGNS AND GRAFFITI AT CONTRACTOR'S STAGING AREA MUST BE KEPT NEAT AND THE FENCE FREE OF SIGNS AND GRAFFITI AT ALL TIMES. 4. ANY DAMAGE RESULTING FROM ESTABLISHING THE STAGING AREA SHALL BE RESTORED UPON ANY DAMAGE RESULTING FROM ESTABLISHING THE STAGING AREA SHALL BE RESTORED UPON DEMOLITION. 5. A JOB TRAILER, IF REQUIRED, SHALL BE WITHIN THE FENCED AREA ALONG WITH ALL MACHINES, A JOB TRAILER, IF REQUIRED, SHALL BE WITHIN THE FENCED AREA ALONG WITH ALL MACHINES, EQUIPMENT AND MATERIALS USED SPECIFICALLY FOR THIS PROJECT, AND SHALL ALSO INCLUDE THE DUMPSTER. 6. CONTRACTOR SHALL RESTORE CONSTRUCTION STAGING AREA (TEMPORARY STOCKYARD) TO PRE-WORK CONTRACTOR SHALL RESTORE CONSTRUCTION STAGING AREA (TEMPORARY STOCKYARD) TO PRE-WORK CONDITIONS. 7. STOCKPILING OF SOILS MATERIALS IS PROHIBITED ON SITE. REMOVE AND LEGALLY DISPOSE OF IN STOCKPILING OF SOILS MATERIALS IS PROHIBITED ON SITE. REMOVE AND LEGALLY DISPOSE OF IN ACCORDANCE WITH SPECIFICATION 31 20 00 EARTH MOVING.

AutoCAD SHX Text: MATERIALS STORAGE & STAGING NOTES AutoCAD SHX Text: DUST CONTROL STANDARDS & SPECIFICATIONS 1. THE CONTRACTOR SHALL CONDUCT OPERATIONS AND MAINTAIN THE PROJECT SITE SO AS TO MINIMIZE THE CREATION AND DISPERSION OF DUST. DUST CONTROL SHALL BE USED THROUGHOUT THE WORK AT THE SITE. 2. THE CONTRACTOR MUST PROVIDE CLEAN WATER, FREE FROM SALT, OIL AND OTHER DELETERIOUS MATERIAL TO BE USED FOR ON-SITE DUST CONTROL.

AutoCAD SHX Text: 3. THE CONTRACTOR SHALL SUPPLY WATER SPRAYING EQUIPMENT CAPABLE OF ACCESSING ALL WORK AREAS. 4. THE CONTRACTOR SHALL IMPLEMENT STRICT DUST CONTROL MEASURES DURING ACTIVE CONSTRUCTION PERIODS ON-SITE. THESE CONTROL MEASURES WILL GENERALLY CONSIST OF WATER APPLICATIONS THAT SHALL BE APPLIED A MINIMUM OF ONCE PER DAY DURING DRY WEATHER OR MORE OFTEN AS REQUIRED TO PREVENT DUST EMISSIONS. 5. FOR WATER APPLICATION TO UNDISTURBED SOIL SURFACES, THE CONTRACTOR SHALL: A. APPLY WATER WITH EQUIPMENT CONSISTING OF TANK, SPRAY BAR, PUMP WITH DISCHARGE PRESSURE GAUGE. B. ARRANGE SPRAY BAR HEIGHT, NOZZLE SPACING AND SPRAY PATTERN TO PROVIDE COMPLETE COVERAGE OF GROUND WITH WATER. C. DISPERSE WATER THROUGH NOZZLES ON SPRAY BAR AT 20 PSI (137.8kPa), MINIMUM. KEEP AREAS DAMP WITHOUT CREATING NUISANCE CONDITIONS SUCH AS PONDING. 6. FOR WATER APPLICATION TO TOPSOIL SURFACES DURING DEMOLITION AND/OR EXCAVATION, THE CONTRACTOR SHALL: A. APPLY WATER WITH EQUIPMENT CONSISTING OF A TANK, PUMP WITH DISCHARGE GAUGE, HOSES AND MIST NOZZLES. B. LOCATE TANK AND SPRAYING EQUIPMENT SO THAT THE ENTIRE EXCAVATION AREA CAN BE MISTED WITHOUT INTERFERING WITH DEMOLITION AND/OR EXCAVATION EQUIPMENT OR OPERATIONS. KEEP AREAS DAMP WITHOUT CREATING NUISANCE CONDITIONS SUCH AS PONDING. C. APPLY WATER SPRAY IN A MANNER TO PREVENT MOVEMENT OF SPRAY BEYOND THE SITE BOUNDARIES.

C-301 [E&S PLAN]
C-302 [E&S DETAILS]