B08_Attachment_5D_ORPI_240821_ContractPriceSchedule.xlsx
XLSX spreadsheet 23 KB Posted
- Solicitation number
- 140P2024R0150
About this file
This document is a Price Schedule Template for a federal contract opportunity issued by the National Park Service (NPS) - Denver Service Center (DSC) under Solicitation Number 140P2024R0150 for the ORPI 240821 project to Replace Well and Water System Components for Maintenance and Housing at Organ Pipe Cactus National Monument.
The contract includes a base bid for a 100,000 gallon potable water tank and associated water system improvements, as well as four options for additional work: a new well and well house, a 50,000 gallon tank and distribution system, campground water system replacement, and campground electrical work. Offerors are required to submit pricing for the base bid and all optional line items. The contract will be awarded on a lump-sum basis, with unit prices governing in case of calculation errors. The agency requires the work to be completed at the Organ Pipe Cactus National Monument.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| Contract Price Schedule Template | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | 140P2024R0150 | ||||
| PARK - PMIS: | ORPI 240821 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Organ Pipe Cactus National Monument | ||||
| Project Title: | Replace Well and Water System Components for Maintenance and Housing | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| CLIN 1 | Base bid – 100K tank, Water system for maintenance and residential areas: • 100,000 gallon potable water tank and associated piping and demolition |
• Replacement of water distribution system for the residential area and maintenance facility including water mains, water laterals, water service, hydrants, truck fill station and associated demolition, trenching, asphalt removal and patching. •Well house piping replacements and control panel replacement including associated demolition and removals.
• SCADA system, power and fiber connections and associated demolition, trenching, asphalt removal and patching. 1 LS
| TOTAL BASE PRICE (Contract Line Item Number 1 & 2) --------------------------------------------------------------------------------- | ||||
| CLIN 2 | Option 1: New well and well house project elements: • Domestic well and associated well pump and supply line to the well house. | 1 | LS | |
| CLIN 3 | Option 2: 50K tank project elements: • 50,000 gallon potable water tank and associated piping and demolition. • Replacement of water distribution system from the 50k tank to the start of the campground water system including water mains, services, hydrants, and associated demolition, trenching, asphalt removal and patching. | |||
| • Power and fiber to 50K tank. | 1 | LS | ||
| CLIN 4 | Option 3: Campground water system: • Replacement of Twin Peaks Campground water distribution system starting at the entrance to the campground including water mains, water laterals, water service, hydrants, truck fill station and associated demolition, trenching, asphalt removal and patching. | 1 | LS | |
| CLIN 5 | Option 4: Campground electrical (to be funded separately from LRF project): (Bid Option 4 will not be selected unless Bid Option 3 is also funded, therefore contractor can assume trenching will be shared between water and electrical conduit- note to be added to Spec 012700) | |||
| • | Install Twin Peaks Campground electrical conduit | |||
| 1 | LS | |||
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 2-5) ----------------------------------------------------------- | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 5) -------------------------- |