B08_Attachment_4A_Solit_VOLUME_I_PSP_Cover.pdf

PDF 112 KB Posted

Attached to
ORPI 240841 Replace Primary Water System for Maint
Solicitation number
140P2024R0150
Issued by

About this file

This document is a Request for Proposal (RFP) for the replacement of the primary waterline for the maintenance and housing area at Organ Pipe Cactus National Monument. The solicitation number is 140P2024R0150, and it is being issued by the National Park Service Denver Service Center.

The key details are:

  • The existing water distribution system utilizes asbestos-cement (AC) pipe and requires replacement.
  • The RFP requests a technical proposal package that includes a Project Experience Questionnaire, Key Personnel Qualifications, and Past Performance Questionnaire.
  • No additional information is provided about the specific products, services, or requirements in this document. The full scope of work and other solicitation details would need to be reviewed in the complete RFP package.

View the file

Other files

File Type Posted
Questions_and_Answers_for_Solicitation_140P2024R0150_0004.xlsx XLSX spreadsheet
Sol_140P2024R0150_Amd_0004.pdf PDF
ORPI_Sign_0003.jpeg JPEG file
Sol_140P2024R0150_Amd_0003.pdf PDF
Sol_140P2024R0150_Amd_0002.pdf PDF
Answered_Clarification_Questions_0002.pdf PDF
Sol_140P2024R0150_Amd_0001.pdf PDF
B08_Attachment_4B_Project_Experience_Questionnaire__.pdf PDF
B08_Attachment_5E_LmtOnSubconRpt_REQD.xlsx XLSX spreadsheet
B08_Attachment_5A_Solit_VOLUME_II_PSP_Cover.pdf PDF
B08_Attachment_10_ORPI_Water_System_Replace_Permit_Plan.xlsx XLSX spreadsheet
B08_Attachment_8_Hydrogeologic_Assessment.pdf PDF
B08_Attachment_6_Construction_Contract_Administration.pdf PDF
B08_Attachment_5C_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attachment_5D_ORPI_240821_ContractPriceSchedule.xlsx XLSX spreadsheet
B08_P2024R0150__ORPI_240841_SF1442_Clauses_9_30_24.pdf PDF
B08_Attachment_1a_ORPI_Final_CDs_DIV_1_Specifications1.pdf PDF
B08_Attachment_1b_ORPI_Final_CDs_Division_2_Specifications.pdf PDF
B08_Attachment_5B_SF24-23a.pdf PDF
B08_Attachment_3_Wage_Determination.pdf PDF
Sol_140P2024R0150.pdf PDF
B08_Attachment_4C__Key_Personnel_Resume_Form.pdf PDF
B08_Attachment_4D_Solit_PSP_Vol_I_PastPerf_REQD(1).pdf PDF
B08_Attachment_2b_ORPI_CD_SHEETSET-100__Final_CDs_STAMPED-2.pdf PDF
B08_Attachment_7_Geotech_Replace_Primary_Park_Water_Systems_FINAL.pdf PDF
B08_Attachment_9__Water_System_Basis_Design_Report_SD_Submittal.pdf PDF
B08_Attachment_2a_ORPI_CD_SHEETSET-100__Final_CDs_STAMPED.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ORGAN PIPE CACTUS

NATIONAL MONUMENT

Solicitation #140P2024R0150

REPLACE PRIMARY WATERLINE FOR

MAITENANCE AND HOUSING AREA

VOLUME I - TECHNICAL

ORPI 240821

REQUEST FOR PROPOSAL

(RFP)

Proposal Submission Package

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

Revise the list below per the specific solicitation’s sections L and M.

For Technical Volume I:

(Include the following questionnaires if they are specifically required by section L or M of the solicitation)

1. Project Experience Questionnaire

2. Key Personnel Qualifications

3. Past Performance Questionnaire

File details come from the government source that posted it. Updated .