Questions_and_Answers_for_Solicitation_140P2024R0150_0004.xlsx
XLSX spreadsheet 21 KB Posted
- Solicitation number
- 140P2024R0150
About this file
This document contains Questions and Answers related to Solicitation 140P2024R0150 for the ORPI 240821 - Water System project. The solicitation is for water distribution system improvements at a national park, as the existing system was constructed using asbestos-cement pipe. Key details include:
The Superintendent, SSHO, and QC Manager can be the same individual, but the QC Manager cannot perform quality control responsibilities. The period of performance may be extended after award if material/equipment lead times require it. Geotechnical information is provided in an attachment, but no existing soil boring reports are available. There is no existing SCADA system, so this will be a new system using either Wonderware or FactoryTalk software. The contractor shall verify the existing workstation and server infrastructure can support the new SCADA software during construction.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140P2024R0010 Solicitation# 140P2024R0150 ORPI 240821 - Water System Questions and Answers
| Q | Questions | Contrator | |||||||
| Prime / Sub | Question Date | DSC CO/CS | DSC PM/PS | Park | AJC | Draft Response | Requires Team Reivew / Approval | Approved Response (CO/CS) | Ammendment # Issued |
| Q-1 | Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals? | For this project the Onsite-Superintendent cannot be responsible for or perform the Quality Control responsibilities. The person responsible for Quality Control can perform other duties such as On-Site Safety Manager. | |||||||
| Q-2 | Can the period of performance be extended after award once the material/equipment lead times are confirmed due to current market conditions for the equipment for this project? | Any request to extend the period of performance after award would need to follow the instructions in specification section 01 32 16 Construction Progress Schedule Paragraph 3.2, 01 26 00 Contract Modification Procedures Paragraph 1.3, and FAR 52.249-10 (b). | |||||||
| Q-3 | Are soil boring reports available? If not, it will be assumed that excavation will be clear of rocks and obstructions. | Attachment 07 to the solicitation provides the extent of geotechnical information available for the project. This attachment is specific to the water tank sites. | |||||||
| Q-4 | Please provide the site visit attendee sign in sheet. | ||||||||
| Q-5 | Do we need to provide any computer hardware or are there existing workstations and/or servers? | Response rcvd 10/31/24 - See response in Draft | After discussion with NPS during design, there are existing workstations and server infrastructure located at the maintenance facility. It is assumed that the existing equipment can support the installation of the SCADA software. The contractor shall verify this assumption during construction and provide recommendations to NPS and engineer if they feel the existing equipment will not support the SCADA software. | ||||||
| Q-6 | For the SCADA Software both Wonderware and FactoryTalk are listed. Is there any existing software that is being used or will this be a new system entirely? | Response rcvd 10/31/24 - See response in Draft | There is not an existing SCADA system. Therefore, it will be an entirely new system. | ||||||
| Q-7 | |||||||||
| Q-8 | |||||||||
| Q-9 | |||||||||
| Q-10 | |||||||||
| Q-11 | |||||||||
| Q-12 | |||||||||
| Q-13 | |||||||||
| Q-14 | |||||||||
| Q-15 | |||||||||
| Q-16 | |||||||||
| Q-17 | |||||||||
| Q-18 | |||||||||
| Q-19 | |||||||||
| Q-20 | |||||||||
| Q-21 | |||||||||
| Q-22 | |||||||||
| Q-23 | |||||||||
| Q-24 | |||||||||
| Q-25 | |||||||||
| Q-26 | |||||||||
| Q-27 | |||||||||
| Q-28 | |||||||||
| Q-29 | |||||||||
| Q-30 | |||||||||
| Q-31 | |||||||||
| Q-32 | |||||||||
| Q-33 | |||||||||
| Q-34 | |||||||||
| Q-35 | |||||||||
| Q-36 | |||||||||
| Q-37 | |||||||||
| Q-38 | |||||||||
| Q-39 | |||||||||
| Q-40 | |||||||||
| Q-41 | |||||||||
| Q-42 | |||||||||
| Q-43 | |||||||||
| Q-44 |
File details come from the government source that posted it. Updated .