B08_Attachment 2 - CDRL_A001_Contractors_Progress_Status_and_Management_Report.pdf
PDF 189 KB Posted
- Attached to
- Amendment 02 - Facilitation professional services for the Morris K. Udall and Stewart L. Udall Foundation
- Solicitation number
- 959006-23-R-0009
- Issued by
-
Morris K. Udall Foundation
About this file
This Contract Data Requirements List (CDRL) outlines reporting requirements for a contractor providing facilitation services to support the U.S. Forest Service's Northwest Forest Plan Advisory Committee and related NEPA analysis. The contractor must submit monthly progress reports no later than the 10th day of each performance period, using the Microsoft Word template provided. Reports shall include a description of progress made and results obtained, problem areas and recommendations, cost curves and expenditures to date, person-hours expended, plans for the next period, and other required details. The contractor will facilitate meetings of the Advisory Committee convened under the Federal Advisory Committee Act to provide advice on landscape management approaches promoting sustainability, climate adaptation, wildfire resilience, and increased public use of National Forest lands in the Northwest Forest Plan area.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Morris K. Udall and Steward L. Udall Foundation, 434 E. University Blvd STE300, Tucson, AZ 85705. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER_X
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
A001 Contractor’s Monthly Progress/Status Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
NA
7. NOT USED 9. DIST STATEMENT 10. FREQUENCY 14. DISTRIBUTION
REQUIRED See Block
12. DATE OF FIRST SUBMISSION
1st reporting period after performance period start date a. ADDRESSEE
b. COPIES
8. NOT USED 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. final See Block 16 draft reg repr
TM 0 1
COR 0 1
KO 0 1
16. REMARKS
The Contractor’s Progress, Status, and Management Report indicates the progress of work and the status of the program and of the assigned tasks, reports costs, and informs of existing or potential problem areas of each contract/task order. The progress report (along with the monthly invoice) is due not later than (NLT) 10 working days following the end of each performance period. The reporting period shall coincide with the contractor’s normal ‘monthly’ accounting and billing cycle. E-Mail addresses for distribution will be provided with the individual contract/task order.
1. Format: All reports will be developed in Microsoft Word and submitted in softcopy to the TM, COR, and KO. The document will not be locked or protected in any fashion that would prevent text to be copied or edited by the government after delivery.
(a) Report shall be written for printing on 8 1/2" X 11" standard letter size paper (Portrait orientation) although necessary attachments, figures, and sketches may be submitted on in a size/orientation that best displays the information being presented.
(b) Font shall be Times New Roman, size 12.
(c) Each page beyond the first page shall have a header identifying the site name or report title and date of report
(d) Report shall be grammatically correct.
(e) All attachments shall be identified and referenced in the text of the report.
2. Content.
(a) Description of the progress made during the reporting period;
(b) Results, positive or negative, obtained related to previously-identified problem areas, with conclusions and recommendations;
(c) Any significant changes to the contractor’s organization or method of operation, to the project management network, or to the period of performance time frame, including necessary revisions to Project Schedule or Engagement Plan;
(d) Problem areas affecting technical or scheduling elements, with background and any recommendations for solutions beyond the scope of the contract;
(e) Problem areas affecting cost elements, with background and any recommendations for solutions beyond the scope of the contract;
(f) If applicable, for Cost-type line items (to include T&M), cost curves showing actual and projected conditions through the contract;
(g) Any cost incurred for the reporting period and total contractual expenditures as of reporting date;
(h) Person-hours expended for the reporting period and cumulatively for the contract;
(i) Any travel/trips and significant results;
(j) If applicable, summary of regular check-in calls;
(k) Contract schedule status;
(l) Plans for activities during the following reporting period;
(m) Name and telephone number of preparer of the report;
(n) If applicable, appendices for any necessary tables, references, photographs, illustrations, and charts.
15. TOTAL --------------- > 0 3
I. APPROVED BY J. DATE G. PREPARED BY
Elisa Baca
H. DATE
4/14/23
UDALL Form 1423-1, FEB 2021 Previous editions are obsolete Page 1 of 1 Pages
File details come from the government source that posted it. Updated .