B08_Attachment_1140L4325Q0001_Schedule_of_Items.xlsx
XLSX spreadsheet 20 KB Posted
- Solicitation number
- 140L4325Q0001
About this file
This is a Schedule of Items spreadsheet template for road maintenance services across five field offices in Northwest Oregon (Cascades, Marys Peak, Siuslaw, Tillamook, and Upper Willamette) for the Bureau of Land Management. The template covers a five-year ordering period from March 2025 through February 2030.
The schedule lists 11 main categories of maintenance services required at each field office, including: routine road grading, compaction, snow plowing, pavement sweeping, shoulder maintenance, bridge maintenance, slide removal (for volumes both under and over 200 cubic yards), ditch line and culvert maintenance, hazard removal (including various sizes of boulders, stumps, blowdowns, and hazard trees), and roadside brushing (ranging from mowing to heavy clearing). Units of measure are specified as lane miles, miles, linear feet, each, or cubic yards depending on the service type. The template is structured identically for all five field offices, with items numbered in the 1000s, 2000s, 3000s, 4000s, and 5000s series respectively.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cascades FO
| Cascades Field Office | |||||||
| Item no. | Item Description | Unit of Measure | Ordering Period 03-01-2025 to 02-28-2026 | Ordering Period 03-01-2026 to 02-28-2027 | Ordering Period 03-01-2027 to 02-29-2028 | Ordering Period 03-01-2028 to 02-28-2029 | Ordering Period 03-01-2029 to 02-28-2030 |
| 1001 | Routine Road Grading | LNMI | |||||
| 1002 | Compaction | LNMI | |||||
| 1003 | Snow Plowing | LNMI | |||||
| 1004 | Pavement Sweeping | LNMI | |||||
| 1005 | Shoulder Maintenance | MI | |||||
| 1006 | Bridge Maintenance | EA | |||||
| 1007 | Slide Removal | ||||||
| 1007A | Slide Removal < 200 CY | CY | |||||
| 1007B | Slide Removal > 200 CY | CY | |||||
| 1008 | Maintain/Restore Ditch Lines, Culvert Catch Basins, and Outlet Channels | CY | |||||
| 1009 | Clean Culverts | EA | |||||
| 1010 | Hazard Removal From/Along Roadway | ||||||
| 1010A | Boulder, Stump, etc. < 5 CY | EA | |||||
| 1010B | Boulder, Stump, etc. > 5 CY | EA | |||||
| 1010C | Blowdown < 24” Diameter | EA | |||||
| 1010D | Blowdown > 24” Diameter | EA | |||||
| 1010E | Standing Hazard Tree < 36” DBH | EA | |||||
| 1010F | Standing Hazard Tree > 36” DBH | EA | |||||
| 1011 | Roadside Brushing | ||||||
| 1011A | Mowing | MI | |||||
| 1011B | Light | MI | |||||
| 1011C | Medium | MI | |||||
| 1011D | Heavy | MI | |||||
| UNIT OF MEASURE | |||||||
| MI=Mile (to the nearest 10th) | |||||||
| LNMI=Lane Mile (to the nearest 10th) | |||||||
| LF=Linear Feet | |||||||
| EA=Each | |||||||
| CY=Cubic yard | |||||||
| DBH=Diameter Breast Height |
Marys Peak FO
| Marys Peak Field Office | |||||||
| Item no. | Item Description | Unit of Measure | Ordering Period 03-01-2025 to 02-28-2026 | Ordering Period 03-01-2026 to 02-28-2027 | Ordering Period 03-01-2027 to 02-29-2028 | Ordering Period 03-01-2028 to 02-28-2029 | Ordering Period 03-01-2029 to 02-28-2030 |
| 2001 | Routine Road Grading | LNMI | |||||
| 2002 | Compaction | LNMI | |||||
| 2003 | Snow Plowing | LNMI | |||||
| 2004 | Pavement Sweeping | LNMI | |||||
| 2005 | Shoulder Maintenance | MI | |||||
| 2006 | Bridge Maintenance | EA | |||||
| 2007 | Slide Removal | ||||||
| 2007A | Slide Removal < 200 CY | CY | |||||
| 2007B | Slide Removal > 200 CY | CY | |||||
| 2008 | Maintain/Restore Ditch Lines, Culvert Catch Basins, and Outlet Channels | CY | |||||
| 2009 | Clean Culverts | EA | |||||
| 2010 | Hazard Removal From/Along Roadway | ||||||
| 2010A | Boulder, Stump, etc. < 5 CY | EA | |||||
| 2010B | Boulder, Stump, etc. > 5 CY | EA | |||||
| 2010C | Blowdown < 24” Diameter | EA | |||||
| 2010D | Blowdown > 24” Diameter | EA | |||||
| 2010E | Standing Hazard Tree < 36” DBH | EA | |||||
| 2010F | Standing Hazard Tree > 36” DBH | EA | |||||
| 2011 | Roadside Brushing | ||||||
| 2011A | Mowing | MI | |||||
| 2011B | Light | MI | |||||
| 2011C | Medium | MI | |||||
| 2011D | Heavy | MI | |||||
| UNIT OF MEASURE | |||||||
| MI=Mile (to the nearest 10th) | |||||||
| LNMI=Lane Mile (to the nearest 10th) | |||||||
| LF=Linear Feet | |||||||
| EA=Each | |||||||
| CY=Cubic yard | |||||||
| DBH=Diameter Breast Height |
Siuslaw FO
| Siuslaw Field Office | |||||||
| Item no. | Item Description | Unit of Measure | Ordering Period 03-01-2025 to 02-28-2026 | Ordering Period 03-01-2026 to 02-28-2027 | Ordering Period 03-01-2027 to 02-29-2028 | Ordering Period 03-01-2028 to 02-28-2029 | Ordering Period 03-01-2029 to 02-28-2030 |
| 3001 | Routine Road Grading | LNMI | |||||
| 3002 | Compaction | LNMI | |||||
| 3003 | Snow Plowing | LNMI | |||||
| 3004 | Pavement Sweeping | LNMI | |||||
| 3005 | Shoulder Maintenance | MI | |||||
| 3006 | Bridge Maintenance | EA | |||||
| 3007 | Slide Removal | ||||||
| 3007A | Slide Removal < 200 CY | CY | |||||
| 3007B | Slide Removal > 200 CY | CY | |||||
| 3008 | Maintain/Restore Ditch Lines, Culvert Catch Basins, and Outlet Channels | CY | |||||
| 3009 | Clean Culverts | EA | |||||
| 3010 | Hazard Removal From/Along Roadway | ||||||
| 3010A | Boulder, Stump, etc. < 5 CY | EA | |||||
| 3010B | Boulder, Stump, etc. > 5 CY | EA | |||||
| 3010C | Blowdown < 24” Diameter | EA | |||||
| 3010D | Blowdown > 24” Diameter | EA | |||||
| 3010E | Standing Hazard Tree < 36” DBH | EA | |||||
| 3010F | Standing Hazard Tree > 36” DBH | EA | |||||
| 3011 | Roadside Brushing | ||||||
| 3011A | Mowing | MI | |||||
| 3011B | Light | MI | |||||
| 3011C | Medium | MI | |||||
| 3011D | Heavy | MI | |||||
| UNIT OF MEASURE | |||||||
| MI=Mile (to the nearest 10th) | |||||||
| LNMI=Lane Mile (to the nearest 10th) | |||||||
| LF=Linear Feet | |||||||
| EA=Each | |||||||
| CY=Cubic yard | |||||||
| DBH=Diameter Breast Height |
Tillamook FO
| Tillamook Field Office | |||||||
| Item no. | Item Description | Unit of Measure | Ordering Period 03-01-2025 to 02-28-2026 | Ordering Period 03-01-2026 to 02-28-2027 | Ordering Period 03-01-2027 to 02-29-2028 | Ordering Period 03-01-2028 to 02-28-2029 | Ordering Period 03-01-2029 to 02-28-2030 |
| 4001 | Routine Road Grading | LNMI | |||||
| 4002 | Compaction | LNMI | |||||
| 4003 | Snow Plowing | LNMI | |||||
| 4004 | Pavement Sweeping | LNMI | |||||
| 4005 | Shoulder Maintenance | MI | |||||
| 4006 | Bridge Maintenance | EA | |||||
| 4007 | Slide Removal | ||||||
| 4007A | Slide Removal < 200 CY | CY | |||||
| 4007B | Slide Removal > 200 CY | CY | |||||
| 4008 | Maintain/Restore Ditch Lines, Culvert Catch Basins, and Outlet Channels | CY | |||||
| 4009 | Clean Culverts | EA | |||||
| 4010 | Hazard Removal From/Along Roadway | ||||||
| 4010A | Boulder, Stump, etc. < 5 CY | EA | |||||
| 4010B | Boulder, Stump, etc. > 5 CY | EA | |||||
| 4010C | Blowdown < 24” Diameter | EA | |||||
| 4010D | Blowdown > 24” Diameter | EA | |||||
| 4010E | Standing Hazard Tree < 36” DBH | EA | |||||
| 4010F | Standing Hazard Tree > 36” DBH | EA | |||||
| 4011 | Roadside Brushing | ||||||
| 4011A | Mowing | MI | |||||
| 4011B | Light | MI | |||||
| 4011C | Medium | MI | |||||
| 4011D | Heavy | MI | |||||
| UNIT OF MEASURE | |||||||
| MI=Mile (to the nearest 10th) | |||||||
| LNMI=Lane Mile (to the nearest 10th) | |||||||
| LF=Linear Feet | |||||||
| EA=Each | |||||||
| CY=Cubic yard | |||||||
| DBH=Diameter Breast Height |
Upper Willamette FO
| Upper Willamette Field Office | |||||||
| Item no. | Item Description | Unit of Measure | Ordering Period 03-01-2025 to 02-28-2026 | Ordering Period 03-01-2026 to 02-28-2027 | Ordering Period 03-01-2027 to 02-29-2028 | Ordering Period 03-01-2028 to 02-28-2029 | Ordering Period 03-01-2029 to 02-28-2030 |
| 5001 | Routine Road Grading | LNMI | |||||
| 5002 | Compaction | LNMI | |||||
| 5003 | Snow Plowing | LNMI | |||||
| 5004 | Pavement Sweeping | LNMI | |||||
| 5005 | Shoulder Maintenance | MI | |||||
| 5006 | Bridge Maintenance | EA | |||||
| 5007 | Slide Removal | ||||||
| 5007A | Slide Removal < 200 CY | CY | |||||
| 5007B | Slide Removal > 200 CY | CY | |||||
| 5008 | Maintain/Restore Ditch Lines, Culvert Catch Basins, and Outlet Channels | CY | |||||
| 5009 | Clean Culverts | EA | |||||
| 5010 | Hazard Removal From/Along Roadway | ||||||
| 5010A | Boulder, Stump, etc. < 5 CY | EA | |||||
| 5010B | Boulder, Stump, etc. > 5 CY | EA | |||||
| 5010C | Blowdown < 24” Diameter | EA | |||||
| 5010D | Blowdown > 24” Diameter | EA | |||||
| 5010E | Standing Hazard Tree < 36” DBH | EA | |||||
| 5010F | Standing Hazard Tree > 36” DBH | EA | |||||
| 5011 | Roadside Brushing | ||||||
| 5011A | Mowing | MI | |||||
| 5011B | Light | MI | |||||
| 5011C | Medium | MI | |||||
| 5011D | Heavy | MI | |||||
| UNIT OF MEASURE | |||||||
| MI=Mile (to the nearest 10th) | |||||||
| LNMI=Lane Mile (to the nearest 10th) | |||||||
| LF=Linear Feet | |||||||
| EA=Each | |||||||
| CY=Cubic yard | |||||||
| DBH=Diameter Breast Height |
File details come from the government source that posted it. Updated .