- Solicitation number
- 140L4325Q0001
About this file
This is a Schedule of Items spreadsheet template for a road maintenance IDIQ contract covering five Bureau of Land Management field offices in Northwest Oregon (Cascades, Marys Peak, Siuslaw, Tillamook, and Upper Willamette). The contract period spans from March 1, 2025 to February 28, 2030, divided into five one-year ordering periods.
The spreadsheet lists identical line items for each field office, including routine road grading, compaction, snow plowing, pavement sweeping, shoulder maintenance, bridge maintenance, slide removal (categorized by volume), ditch line and culvert maintenance, hazard removal (categorized by size/type), roadside brushing (ranging from mowing to heavy brushing), and subgrade sampling. Units of measure include lane miles (LNMI), miles (MI), cubic yards (CY), each (EA), feet (FT), and diameter breast height (DBH) for tree measurements. This template appears to be designed for vendors to input pricing for each service category across all locations and ordering periods.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cascades FO
| Cascades Field Office | |||||||
| Item no. | Item Description | Unit of Measure | Ordering Period 03-01-2025 to 02-28-2026 | Ordering Period 03-01-2026 to 02-28-2027 | Ordering Period 03-01-2027 to 02-29-2028 | Ordering Period 03-01-2028 to 02-28-2029 | Ordering Period 03-01-2029 to 02-28-2030 |
| 1001 | Routine Road Grading | LNMI | |||||
| 1002 | Compaction | LNMI | |||||
| 1003 | Snow Plowing | LNMI | |||||
| 1004 | Pavement Sweeping | LNMI | |||||
| 1005 | Shoulder Maintenance | MI | |||||
| 1006 | Bridge Maintenance | EA | |||||
| 1007 | Slide Removal | ||||||
| 1007A | Slide Removal < 200 CY | CY | |||||
| 1007B | Slide Removal > 200 CY | CY | |||||
| 1008 | Maintain/Restore Ditch Lines, Culvert Catch Basins, and Outlet Channels | CY | |||||
| 1009 | Clean Culverts | EA | |||||
| 1010 | Hazard Removal From/Along Roadway | ||||||
| 1010A | Boulder, Stump, etc. < 5 CY | EA | |||||
| 1010B | Boulder, Stump, etc. > 5 CY | EA | |||||
| 1010C | Blowdown < 24” Diameter | EA | |||||
| 1010D | Blowdown > 24” Diameter | EA | |||||
| 1010E | Standing Hazard Tree < 36” DBH | EA | |||||
| 1010F | Standing Hazard Tree > 36” DBH | EA | |||||
| 1011 | Roadside Brushing | ||||||
| 1011A | Mowing | MI | |||||
| 1011B | Light | MI | |||||
| 1011C | Medium | MI | |||||
| 1011D | Heavy | MI | |||||
| 1012 | Subgrade Sampling | ||||||
| 1012A | Subgrade Sampling ≤ 10' | FT | |||||
| 1012B | Subgrade Sampling < 10' | MI | |||||
| UNIT OF MEASURE | |||||||
| MI=Mile (to the nearest 10th) | |||||||
| LNMI=Lane Mile (to the nearest 10th) | |||||||
| FT= Feet | |||||||
| EA=Each | |||||||
| CY=Cubic yard | |||||||
| DBH=Diameter Breast Height |
Marys Peak FO
| Marys Peak Field Office | |||||||
| Item no. | Item Description | Unit of Measure | Ordering Period 03-01-2025 to 02-28-2026 | Ordering Period 03-01-2026 to 02-28-2027 | Ordering Period 03-01-2027 to 02-29-2028 | Ordering Period 03-01-2028 to 02-28-2029 | Ordering Period 03-01-2029 to 02-28-2030 |
| 2001 | Routine Road Grading | LNMI | |||||
| 2002 | Compaction | LNMI | |||||
| 2003 | Snow Plowing | LNMI | |||||
| 2004 | Pavement Sweeping | LNMI | |||||
| 2005 | Shoulder Maintenance | MI | |||||
| 2006 | Bridge Maintenance | EA | |||||
| 2007 | Slide Removal | ||||||
| 2007A | Slide Removal < 200 CY | CY | |||||
| 2007B | Slide Removal > 200 CY | CY | |||||
| 2008 | Maintain/Restore Ditch Lines, Culvert Catch Basins, and Outlet Channels | CY | |||||
| 2009 | Clean Culverts | EA | |||||
| 2010 | Hazard Removal From/Along Roadway | ||||||
| 2010A | Boulder, Stump, etc. < 5 CY | EA | |||||
| 2010B | Boulder, Stump, etc. > 5 CY | EA | |||||
| 2010C | Blowdown < 24” Diameter | EA | |||||
| 2010D | Blowdown > 24” Diameter | EA | |||||
| 2010E | Standing Hazard Tree < 36” DBH | EA | |||||
| 2010F | Standing Hazard Tree > 36” DBH | EA | |||||
| 2011 | Roadside Brushing | ||||||
| 2011A | Mowing | MI | |||||
| 2011B | Light | MI | |||||
| 2011C | Medium | MI | |||||
| 2011D | Heavy | MI | |||||
| 2012 | Subgrade Sampling | ||||||
| 2012A | Subgrade Sampling ≤ 10' | FT | |||||
| 2012B | Subgrade Sampling < 10' | MI | |||||
| UNIT OF MEASURE | |||||||
| MI=Mile (to the nearest 10th) | |||||||
| LNMI=Lane Mile (to the nearest 10th) | |||||||
| LF=Linear Feet | |||||||
| EA=Each | |||||||
| CY=Cubic yard | |||||||
| DBH=Diameter Breast Height |
Siuslaw FO
| Siuslaw Field Office | |||||||
| Item no. | Item Description | Unit of Measure | Ordering Period 03-01-2025 to 02-28-2026 | Ordering Period 03-01-2026 to 02-28-2027 | Ordering Period 03-01-2027 to 02-29-2028 | Ordering Period 03-01-2028 to 02-28-2029 | Ordering Period 03-01-2029 to 02-28-2030 |
| 3001 | Routine Road Grading | LNMI | |||||
| 3002 | Compaction | LNMI | |||||
| 3003 | Snow Plowing | LNMI | |||||
| 3004 | Pavement Sweeping | LNMI | |||||
| 3005 | Shoulder Maintenance | MI | |||||
| 3006 | Bridge Maintenance | EA | |||||
| 3007 | Slide Removal | ||||||
| 3007A | Slide Removal < 200 CY | CY | |||||
| 3007B | Slide Removal > 200 CY | CY | |||||
| 3008 | Maintain/Restore Ditch Lines, Culvert Catch Basins, and Outlet Channels | CY | |||||
| 3009 | Clean Culverts | EA | |||||
| 3010 | Hazard Removal From/Along Roadway | ||||||
| 3010A | Boulder, Stump, etc. < 5 CY | EA | |||||
| 3010B | Boulder, Stump, etc. > 5 CY | EA | |||||
| 3010C | Blowdown < 24” Diameter | EA | |||||
| 3010D | Blowdown > 24” Diameter | EA | |||||
| 3010E | Standing Hazard Tree < 36” DBH | EA | |||||
| 3010F | Standing Hazard Tree > 36” DBH | EA | |||||
| 3011 | Roadside Brushing | ||||||
| 3011A | Mowing | MI | |||||
| 3011B | Light | MI | |||||
| 3011C | Medium | MI | |||||
| 3011D | Heavy | MI | |||||
| 3012 | Subgrade Sampling | ||||||
| 3012A | Subgrade Sampling ≤ 10' | FT | |||||
| 3012B | Subgrade Sampling < 10' | MI | |||||
| UNIT OF MEASURE | |||||||
| MI=Mile (to the nearest 10th) | |||||||
| LNMI=Lane Mile (to the nearest 10th) | |||||||
| LF=Linear Feet | |||||||
| EA=Each | |||||||
| CY=Cubic yard | |||||||
| DBH=Diameter Breast Height |
Tillamook FO
| Tillamook Field Office | |||||||
| Item no. | Item Description | Unit of Measure | Ordering Period 03-01-2025 to 02-28-2026 | Ordering Period 03-01-2026 to 02-28-2027 | Ordering Period 03-01-2027 to 02-29-2028 | Ordering Period 03-01-2028 to 02-28-2029 | Ordering Period 03-01-2029 to 02-28-2030 |
| 4001 | Routine Road Grading | LNMI | |||||
| 4002 | Compaction | LNMI | |||||
| 4003 | Snow Plowing | LNMI | |||||
| 4004 | Pavement Sweeping | LNMI | |||||
| 4005 | Shoulder Maintenance | MI | |||||
| 4006 | Bridge Maintenance | EA | |||||
| 4007 | Slide Removal | ||||||
| 4007A | Slide Removal < 200 CY | CY | |||||
| 4007B | Slide Removal > 200 CY | CY | |||||
| 4008 | Maintain/Restore Ditch Lines, Culvert Catch Basins, and Outlet Channels | CY | |||||
| 4009 | Clean Culverts | EA | |||||
| 4010 | Hazard Removal From/Along Roadway | ||||||
| 4010A | Boulder, Stump, etc. < 5 CY | EA | |||||
| 4010B | Boulder, Stump, etc. > 5 CY | EA | |||||
| 4010C | Blowdown < 24” Diameter | EA | |||||
| 4010D | Blowdown > 24” Diameter | EA | |||||
| 4010E | Standing Hazard Tree < 36” DBH | EA | |||||
| 4010F | Standing Hazard Tree > 36” DBH | EA | |||||
| 4011 | Roadside Brushing | ||||||
| 4011A | Mowing | MI | |||||
| 4011B | Light | MI | |||||
| 4011C | Medium | MI | |||||
| 4011D | Heavy | MI | |||||
| 4012 | Subgrade Sampling | ||||||
| 4012A | Subgrade Sampling ≤ 10' | FT | |||||
| 4012B | Subgrade Sampling < 10' | MI | |||||
| UNIT OF MEASURE | |||||||
| MI=Mile (to the nearest 10th) | |||||||
| LNMI=Lane Mile (to the nearest 10th) | |||||||
| LF=Linear Feet | |||||||
| EA=Each | |||||||
| CY=Cubic yard | |||||||
| DBH=Diameter Breast Height |
Upper Willamette FO
| Upper Willamette Field Office | |||||||
| Item no. | Item Description | Unit of Measure | Ordering Period 03-01-2025 to 02-28-2026 | Ordering Period 03-01-2026 to 02-28-2027 | Ordering Period 03-01-2027 to 02-29-2028 | Ordering Period 03-01-2028 to 02-28-2029 | Ordering Period 03-01-2029 to 02-28-2030 |
| 5001 | Routine Road Grading | LNMI | |||||
| 5002 | Compaction | LNMI | |||||
| 5003 | Snow Plowing | LNMI | |||||
| 5004 | Pavement Sweeping | LNMI | |||||
| 5005 | Shoulder Maintenance | MI | |||||
| 5006 | Bridge Maintenance | EA | |||||
| 5007 | Slide Removal | ||||||
| 5007A | Slide Removal < 200 CY | CY | |||||
| 5007B | Slide Removal > 200 CY | CY | |||||
| 5008 | Maintain/Restore Ditch Lines, Culvert Catch Basins, and Outlet Channels | CY | |||||
| 5009 | Clean Culverts | EA | |||||
| 5010 | Hazard Removal From/Along Roadway | ||||||
| 5010A | Boulder, Stump, etc. < 5 CY | EA | |||||
| 5010B | Boulder, Stump, etc. > 5 CY | EA | |||||
| 5010C | Blowdown < 24” Diameter | EA | |||||
| 5010D | Blowdown > 24” Diameter | EA | |||||
| 5010E | Standing Hazard Tree < 36” DBH | EA | |||||
| 5010F | Standing Hazard Tree > 36” DBH | EA | |||||
| 5011 | Roadside Brushing | ||||||
| 5011A | Mowing | MI | |||||
| 5011B | Light | MI | |||||
| 5011C | Medium | MI | |||||
| 5011D | Heavy | MI | |||||
| 5012 | Subgrade Sampling | ||||||
| 5012A | Subgrade Sampling ≤ 10' | FT | |||||
| 5012B | Subgrade Sampling < 10' | MI | |||||
| UNIT OF MEASURE | |||||||
| MI=Mile (to the nearest 10th) | |||||||
| LNMI=Lane Mile (to the nearest 10th) | |||||||
| LF=Linear Feet | |||||||
| EA=Each | |||||||
| CY=Cubic yard | |||||||
| DBH=Diameter Breast Height |