This is a Schedule of Items pricing template spreadsheet for road maintenance services across five Bureau of Land Management field offices in Northwest Oregon (Cascades, Marys Peak, Siuslaw, Tillamook, and Upper Willamette). The template covers a 5-year ordering period from March 1, 2025 through February 28, 2030, broken into five 12-month periods.
The pricing template lists 12 categories of road maintenance services for each field office, including routine road grading, compaction, snow plowing, pavement sweeping, shoulder maintenance, bridge maintenance, slide removal, ditch/culvert maintenance, hazard removal, roadside brushing, and subgrade sampling. Units of measure include lane miles, miles, cubic yards, feet, and each. Several line items have size-based subcategories, such as slide removal above/below 200 CY and hazard tree removal above/below 36" diameter at breast height. The template requires vendors to input pricing for each service category across all periods and field offices.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cascades FO
| Cascades Field Office | |||||||
| Item no. | Item Description | Unit of Measure | Ordering Period 03-01-2025 to 02-28-2026 | Ordering Period 03-01-2026 to 02-28-2027 | Ordering Period 03-01-2027 to 02-29-2028 | Ordering Period 03-01-2028 to 02-28-2029 | Ordering Period 03-01-2029 to 02-28-2030 |
| 1001 | Routine Road Grading | LNMI | |||||
| 1002 | Compaction | LNMI | |||||
| 1003 | Snow Plowing | LNMI | |||||
| 1004 | Pavement Sweeping | LNMI | |||||
| 1005 | Shoulder Maintenance | MI | |||||
| 1006 | Bridge Maintenance | EA | |||||
| 1007 | Slide Removal | ||||||
| 1007A | Slide Removal < 200 CY | CY | |||||
| 1007B | Slide Removal > 200 CY | CY | |||||
| 1008 | Maintain/Restore Ditch Lines, Culvert Catch Basins, and Outlet Channels | CY | |||||
| 1009 | Clean Culverts | EA | |||||
| 1010 | Hazard Removal From/Along Roadway | ||||||
| 1010A | Boulder, Stump, etc. < 5 CY | EA | |||||
| 1010B | Boulder, Stump, etc. > 5 CY | EA | |||||
| 1010C | Blowdown < 24” Diameter | EA | |||||
| 1010D | Blowdown > 24” Diameter | EA | |||||
| 1010E | Standing Hazard Tree < 36” DBH | EA | |||||
| 1010F | Standing Hazard Tree > 36” DBH | EA | |||||
| 1011 | Roadside Brushing | ||||||
| 1011A | Mowing | MI | |||||
| 1011B | Light | MI | |||||
| 1011C | Medium | MI | |||||
| 1011D | Heavy | MI | |||||
| 1012 | Subgrade Sampling | ||||||
| 1012A | Subgrade Sampling ≤ 10' | FT | |||||
| 1012B | Subgrade Sampling < 10' | FT | |||||
| UNIT OF MEASURE | |||||||
| MI=Mile (to the nearest 10th) | |||||||
| LNMI=Lane Mile (to the nearest 10th) | |||||||
| FT= Feet | |||||||
| EA=Each | |||||||
| CY=Cubic yard | |||||||
| DBH=Diameter Breast Height |
Marys Peak FO
| Marys Peak Field Office | |||||||
| Item no. | Item Description | Unit of Measure | Ordering Period 03-01-2025 to 02-28-2026 | Ordering Period 03-01-2026 to 02-28-2027 | Ordering Period 03-01-2027 to 02-29-2028 | Ordering Period 03-01-2028 to 02-28-2029 | Ordering Period 03-01-2029 to 02-28-2030 |
| 2001 | Routine Road Grading | LNMI | |||||
| 2002 | Compaction | LNMI | |||||
| 2003 | Snow Plowing | LNMI | |||||
| 2004 | Pavement Sweeping | LNMI | |||||
| 2005 | Shoulder Maintenance | MI | |||||
| 2006 | Bridge Maintenance | EA | |||||
| 2007 | Slide Removal | ||||||
| 2007A | Slide Removal < 200 CY | CY | |||||
| 2007B | Slide Removal > 200 CY | CY | |||||
| 2008 | Maintain/Restore Ditch Lines, Culvert Catch Basins, and Outlet Channels | CY | |||||
| 2009 | Clean Culverts | EA | |||||
| 2010 | Hazard Removal From/Along Roadway | ||||||
| 2010A | Boulder, Stump, etc. < 5 CY | EA | |||||
| 2010B | Boulder, Stump, etc. > 5 CY | EA | |||||
| 2010C | Blowdown < 24” Diameter | EA | |||||
| 2010D | Blowdown > 24” Diameter | EA | |||||
| 2010E | Standing Hazard Tree < 36” DBH | EA | |||||
| 2010F | Standing Hazard Tree > 36” DBH | EA | |||||
| 2011 | Roadside Brushing | ||||||
| 2011A | Mowing | MI | |||||
| 2011B | Light | MI | |||||
| 2011C | Medium | MI | |||||
| 2011D | Heavy | MI | |||||
| 2012 | Subgrade Sampling | ||||||
| 2012A | Subgrade Sampling ≤ 10' | FT | |||||
| 2012B | Subgrade Sampling < 10' | FT | |||||
| UNIT OF MEASURE | |||||||
| MI=Mile (to the nearest 10th) | |||||||
| LNMI=Lane Mile (to the nearest 10th) | |||||||
| FT= Feet | |||||||
| EA=Each | |||||||
| CY=Cubic yard | |||||||
| DBH=Diameter Breast Height |
Siuslaw FO
| Siuslaw Field Office | |||||||
| Item no. | Item Description | Unit of Measure | Ordering Period 03-01-2025 to 02-28-2026 | Ordering Period 03-01-2026 to 02-28-2027 | Ordering Period 03-01-2027 to 02-29-2028 | Ordering Period 03-01-2028 to 02-28-2029 | Ordering Period 03-01-2029 to 02-28-2030 |
| 3001 | Routine Road Grading | LNMI | |||||
| 3002 | Compaction | LNMI | |||||
| 3003 | Snow Plowing | LNMI | |||||
| 3004 | Pavement Sweeping | LNMI | |||||
| 3005 | Shoulder Maintenance | MI | |||||
| 3006 | Bridge Maintenance | EA | |||||
| 3007 | Slide Removal | ||||||
| 3007A | Slide Removal < 200 CY | CY | |||||
| 3007B | Slide Removal > 200 CY | CY | |||||
| 3008 | Maintain/Restore Ditch Lines, Culvert Catch Basins, and Outlet Channels | CY | |||||
| 3009 | Clean Culverts | EA | |||||
| 3010 | Hazard Removal From/Along Roadway | ||||||
| 3010A | Boulder, Stump, etc. < 5 CY | EA | |||||
| 3010B | Boulder, Stump, etc. > 5 CY | EA | |||||
| 3010C | Blowdown < 24” Diameter | EA | |||||
| 3010D | Blowdown > 24” Diameter | EA | |||||
| 3010E | Standing Hazard Tree < 36” DBH | EA | |||||
| 3010F | Standing Hazard Tree > 36” DBH | EA | |||||
| 3011 | Roadside Brushing | ||||||
| 3011A | Mowing | MI | |||||
| 3011B | Light | MI | |||||
| 3011C | Medium | MI | |||||
| 3011D | Heavy | MI | |||||
| 3012 | Subgrade Sampling | ||||||
| 3012A | Subgrade Sampling ≤ 10' | FT | |||||
| 3012B | Subgrade Sampling < 10' | FT | |||||
| UNIT OF MEASURE | |||||||
| MI=Mile (to the nearest 10th) | |||||||
| LNMI=Lane Mile (to the nearest 10th) | |||||||
| FT= Feet | |||||||
| EA=Each | |||||||
| CY=Cubic yard | |||||||
| DBH=Diameter Breast Height |
Tillamook FO
| Tillamook Field Office | |||||||
| Item no. | Item Description | Unit of Measure | Ordering Period 03-01-2025 to 02-28-2026 | Ordering Period 03-01-2026 to 02-28-2027 | Ordering Period 03-01-2027 to 02-29-2028 | Ordering Period 03-01-2028 to 02-28-2029 | Ordering Period 03-01-2029 to 02-28-2030 |
| 4001 | Routine Road Grading | LNMI | |||||
| 4002 | Compaction | LNMI | |||||
| 4003 | Snow Plowing | LNMI | |||||
| 4004 | Pavement Sweeping | LNMI | |||||
| 4005 | Shoulder Maintenance | MI | |||||
| 4006 | Bridge Maintenance | EA | |||||
| 4007 | Slide Removal | ||||||
| 4007A | Slide Removal < 200 CY | CY | |||||
| 4007B | Slide Removal > 200 CY | CY | |||||
| 4008 | Maintain/Restore Ditch Lines, Culvert Catch Basins, and Outlet Channels | CY | |||||
| 4009 | Clean Culverts | EA | |||||
| 4010 | Hazard Removal From/Along Roadway | ||||||
| 4010A | Boulder, Stump, etc. < 5 CY | EA | |||||
| 4010B | Boulder, Stump, etc. > 5 CY | EA | |||||
| 4010C | Blowdown < 24” Diameter | EA | |||||
| 4010D | Blowdown > 24” Diameter | EA | |||||
| 4010E | Standing Hazard Tree < 36” DBH | EA | |||||
| 4010F | Standing Hazard Tree > 36” DBH | EA | |||||
| 4011 | Roadside Brushing | ||||||
| 4011A | Mowing | MI | |||||
| 4011B | Light | MI | |||||
| 4011C | Medium | MI | |||||
| 4011D | Heavy | MI | |||||
| 4012 | Subgrade Sampling | ||||||
| 4012A | Subgrade Sampling ≤ 10' | FT | |||||
| 4012B | Subgrade Sampling < 10' | FT | |||||
| UNIT OF MEASURE | |||||||
| MI=Mile (to the nearest 10th) | |||||||
| LNMI=Lane Mile (to the nearest 10th) | |||||||
| FT= Feet | |||||||
| EA=Each | |||||||
| CY=Cubic yard | |||||||
| DBH=Diameter Breast Height |
Upper Willamette FO
| Upper Willamette Field Office | |||||||
| Item no. | Item Description | Unit of Measure | Ordering Period 03-01-2025 to 02-28-2026 | Ordering Period 03-01-2026 to 02-28-2027 | Ordering Period 03-01-2027 to 02-29-2028 | Ordering Period 03-01-2028 to 02-28-2029 | Ordering Period 03-01-2029 to 02-28-2030 |
| 5001 | Routine Road Grading | LNMI | |||||
| 5002 | Compaction | LNMI | |||||
| 5003 | Snow Plowing | LNMI | |||||
| 5004 | Pavement Sweeping | LNMI | |||||
| 5005 | Shoulder Maintenance | MI | |||||
| 5006 | Bridge Maintenance | EA | |||||
| 5007 | Slide Removal | ||||||
| 5007A | Slide Removal < 200 CY | CY | |||||
| 5007B | Slide Removal > 200 CY | CY | |||||
| 5008 | Maintain/Restore Ditch Lines, Culvert Catch Basins, and Outlet Channels | CY | |||||
| 5009 | Clean Culverts | EA | |||||
| 5010 | Hazard Removal From/Along Roadway | ||||||
| 5010A | Boulder, Stump, etc. < 5 CY | EA | |||||
| 5010B | Boulder, Stump, etc. > 5 CY | EA | |||||
| 5010C | Blowdown < 24” Diameter | EA | |||||
| 5010D | Blowdown > 24” Diameter | EA | |||||
| 5010E | Standing Hazard Tree < 36” DBH | EA | |||||
| 5010F | Standing Hazard Tree > 36” DBH | EA | |||||
| 5011 | Roadside Brushing | ||||||
| 5011A | Mowing | MI | |||||
| 5011B | Light | MI | |||||
| 5011C | Medium | MI | |||||
| 5011D | Heavy | MI | |||||
| 5012 | Subgrade Sampling | ||||||
| 5012A | Subgrade Sampling ≤ 10' | FT | |||||
| 5012B | Subgrade Sampling < 10' | FT | |||||
| UNIT OF MEASURE | |||||||
| MI=Mile (to the nearest 10th) | |||||||
| LNMI=Lane Mile (to the nearest 10th) | |||||||
| FT= Feet | |||||||
| EA=Each | |||||||
| CY=Cubic yard | |||||||
| DBH=Diameter Breast Height |