B09_140L4325Q0001_Amendment_002_0002.pdf
PDF 307 KB Posted
- Solicitation number
- 140L4325Q0001
About this file
This is Amendment 002 to solicitation 140L4325Q0001 for Northwest Oregon Roadside Maintenance IDIQ services issued by the BLM Oregon-Washington office in Portland. The amendment makes three key changes: 1) Corrects the unit of measure for Items x012A and x012B Subgrade Sampling to be measured by feet rather than miles, 2) Updates FAR Clause 52.216-19 Order Limitations to establish a minimum order value of $10,000 and maximum order value of $1,000,000, and 3) Provides answers to vendor questions.
The Q&A section addresses 12 questions covering topics like subgrade sampling specifications, mobilization costs, flagging requirements, culvert cleaning methods, snow plowing, and brush clearing distances. Key clarifications include that work will primarily be on remote, low-volume timber access roads, typical task orders will include multiple maintenance tasks in a given area, and contractors are not obligated to accept orders below $10,000. The amendment does not change the quotation due date and requires vendors to use the updated Schedule of Items Excel document for quote submission. The period of performance is April 1, 2025 to March 31, 2030.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140L4325Q0001 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
LHA
PORTLAND OR 97204
1220 SW 3rd Avenue, 12th Floor
BLM OR-ST OFC PROC MGMT BR(OR952)
01/13/20250002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
01/13/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Northwest Oregon Roadside Maintenance IDIQ, Salem, Oregon
Amendment 0002 corrects the schedule of items and provides additional clause correction and vendor questions and answers. See attached. This amendment does not change the quote due date. Quotations must be submitted using the most recent version of Attachment 1, Excel
Document, Schedule of Items.
Period of Performance: 04/01/2025 to 03/31/2030
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Matthew Duane
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
SOLICITATION NO. 140L4325Q0001 Amendment 001
NWOD Roadside Maintenance IDIQ, BLM Oregon Page 2 of 5
Solicitation 140L4325Q0001
Amendment 001
This amendment provides the following corrections and information regarding Solicitation
140L4325Q0001:
1. Updated Attachment 1: Excel Document: Schedule of Items
a. Corrects Unit of Measure for Items x012A and x012B Subgrade Sampling, both are measured by feet.
b. An updated version of the excel document has been released on SAM.gov with this amendment. Please use the most updated version to submit your quote.
2. FAR Clause 52.216-19 - Order Limitations (OCT 1995) has been updated, see Attachment 1:
Updated Section I – Contract Clauses
a. Attached as a page within this amendment
3. Vendor Questions and Answers, see Attachment 2: Vendor Questions and Answers.
a. Attached as multiple pages to this amendment.
Quotations must be submitted using the most recent version of Attachment 1, Excel Document, Schedule of Items.
This amendment does not change the quotation due date.
NWOD Roadside Maintenance IDIQ, BLM Oregon Page 3 of 5
Attachment 1: Updated Section I – Contract Clauses
SECTION I – CONTRACT CLAUSES
52.216-19 – ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $10,000.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor --
(1) Any order for a single item in excess of $1,000,000.00;
(2) Any order for a combination of items in excess of $1,000,000.00; or
(3) A series of orders from the same ordering office within 60 days that together call for quantities exceeding the limitation in subparagraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal
Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the
Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 5 days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of Clause)
(End of Section I)
NWOD Roadside Maintenance IDIQ, BLM Oregon Page 4 of 5
Attachment 2: Vendor Questions and Answers
1. Items 5.12-5.12B [subgrade sampling], do you have an ASTM #? Or any testing specifications? The description does not give enough information for the geo for us to know what equipment or work will be needed.
a. Subgrade sampling is intended to provide a low cost method of ascertaining what materials are present beneath the road grade. Testing specifications are not required by the contractor. The contractor shall provide the means to auger or core holes to depths up to fifty feet (50’) and refill each with the required backfill material. The COR shall direct the operation, collect the samples, record and interpret the data. Data collected may include aspects of the drilling equipment to document the energy exerted at various depths. There is no requirement for any specific piece of equipment other than what is described in Section C, Statement of Work, Sub Section 5.12, A, and B, page 12 of the solicitation..
2. The only way to cover ourselves is to include a "Mobe" on every unit. We don't know if we'll be called out to go 3.5 hrs out in the country for 1 'LNMI' or 1 down tree or 10 of them. The cost of getting the labor and equipment there is way more that it costs to do any 1 unit of any bid item. Therefore your unit cost is going to be astronomical if more than 1 unit is required. There really needs to be a mobe bid item (per each mobe or per mile etc).
a. A typical Task Order will include multiple tasks to be performed within a particular Field Office. The intent is to mobilize equipment to the area and perform a predetermined number of certain tasks over a reasonable period of time. The tasks most likely will include items of annual maintenance such as Routine Road Grading, Compaction, Shoulder Maintenance, Cleaning Bridge Decks, Maintaining Ditchlines, etc., Clean Culverts, Roadside Brushing, and possibly removing slides and hazards.
b. The contractor is not obligated to accept Task Orders that are below $10,000 under clause 52.216-19 Order Limitations, to protect them from expending more effort than the cited contract price provides. Updated in Amendment 0002, see previous pages.
c. See section L.2.2 Format and Content of Price Section, section L.2.2.1 Evaluation Factor 3, Price.
3. The Schedule of Items lists the description of the different types of work that is to be performed, how do we account for mobilization expenses.
a. See question 2, above.
4. My concern is the [mobilization] cost could effect the unit pricing far more than the actual work. We have seen mob broken out separately or excluded from these types of unit price contracts. Please let me know if this is something you may consider on this solicitation or have any other direction how to handle the costs of moving equipment to the jobsite.
a. See question 2, above.
NWOD Roadside Maintenance IDIQ, BLM Oregon Page 5 of 5
5. There's no way of knowing for sure if you'll need flagging so to be safe, I'd have to assume anything on the shoulder using any sort of equipment larger than a skid steer, as well as any tree removal will need flaggers.
a. The majority of work to be performed under a Task Order from this contract will be located in remote areas on very low volume timber access roads. Typical work zones have been posted with signage alone. Additional communications are used via a posted CB radio channel on active haul routes for industry traffic. The use of flaggers has not been an active requirement.
6. Is there a required distance that culverts must be placed off the road, and what is the elevation difference downhill?
a. Culvert Installation is not a requirement of this contract.
7. Are there specific marked sites along the roads that we will be working on? If so, is this information included in the complete bid package?
a. All sites will be identified in future Task Order(s) that will be placed in accordance with the parent IDIQ contract.
8. Do you have any details regarding snow plowing and sweeping requirements? Since the work is on ODOT roads, we want to clarify our potential snow plowing capabilities and associated liabilities.
a. These are all BLM roads. See PART 5 SPECIFIC TASKS, 5.3 Snow Plowing (Page 9 of the solicitation)
9. The culvert detail provided does not indicate any material inside the culvert. Can we assume that a vac truck is not within our scope of work?
a. See PART 5, SPECIFIC TASKS, 5.9 Clean Culverts (page 10 of the solicitation).
Cross-drains and Stream Crossing culverts shall be cleared of debris as described in 5.9. The Contractor shall determine the methods necessary to perform all work unless otherwise dictated.
10. Can you please clarify the requirements for the line item concerning subgrade samples?
a. See Question 1, above.
11. How far off the road or shoulders are we expected to clear brush?
a. See ROADSIDE BRUSHING DETAIL SHEET in the Specifications (Attachment 2, Specifications for Work) and section 5.11. 5.11A, B, C, and D, pages 11 and 12 of the solicitation.
12. On Subgrade Sampling: 1012A, is this cost for each foot that is drilled and 1012B, unit of measure is Mile. What quantity are you looking for, hole per mile or was this a typo and should be cost per foot?
a. The unit measure for x012B should be cost per foot and has been updated in the Schedule of Items.