B08_Att8_26R0003_-_Lim_on_SubK_Breakout.xlsx
XLSX spreadsheet 92 KB Posted
- Attached to
- NIFC Building 415 Replacement Federal contract opportunity
- Solicitation number
- 140L0626R0003
About this file
This is a Limitations on Subcontracting Breakout template for the NIFC Building 415 Replacement project (Solicitation Number 140L0626R0003), a small business set-aside solicitation issued by the Department of the Interior Bureau of Land Management. The template establishes subcontracting requirements and compliance calculations for contractors responding to this opportunity, which has a performance period of 730 days after contract award.
The template requires contractors to maintain a minimum 15% self-performance threshold for labor costs, as mandated by FAR 52.219-14(e)(3) or (4). Contractors must populate fields for total amount proposed, material costs, self-performed labor, small business subcontractor labor, and large business subcontractor labor to calculate compliance with the limitation on subcontracting percentage. The formula requires that (Total Labor Cost minus Total Amount Paid to Large Business Subcontractors) divided by Total Labor Cost must exceed the required 15% self-performance percentage. The template accommodates tracking of up to six small business subcontractors and six large business subcontractors, with material costs defined to include special tooling, special testing equipment, and construction equipment, while total labor costs encompass all contractual costs other than material.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)
| Solicitation Number | 140L0626R0003 - NIFC 415 Duane Graves Replacement |
| Type of Set-Aside | Small Business |
| Performance Period | 730 Days after NTP |
| Required Self-Performance | 15% |
(A) Total Amount Proposed¹
(B) Total Material Cost2
(C) Self Performed Labor
| (D) Small Business Subcontractor (SSS) Labor3 | ||
| Total Amount Paid to [Insert First SSS Name] | ||
| Total Amount Paid to [Insert Second SSS Name] | ||
| Total Amount Paid to [Insert Third SSS Name] | ||
| Total Amount Paid to [Insert Fourth SSS Name] | ||
| Total Amount Paid to [Insert Fifth SSS Name] | ||
| Total Amount Paid to [Insert Sixth SSS Name] | ||
| Total Amount Paid to SSS Companies | $0.00 |
| (E) Large Business Subcontractor (LBS) Labor | ||
| Total Amount Paid to [Insert First LBS Name] | ||
| Total Amount Paid to [Insert Second LBS Name] | ||
| Total Amount Paid to [Insert Third LBS Name] | ||
| Total Amount Paid to [Insert Fourth LBS Name] | ||
| Total Amount Paid to [Insert Fifth LBS Name] | ||
| Total Amount Paid to [Insert Sixth LBS Name] | ||
| Total Amount Paid to LBS Companies | $0.00 |
(F) Total Labor Cost4 $0.00
| (G) Limitation on Subcontracting Percentage5 | ||
| (Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor Cost | ERROR:#DIV/0! |
| *Note 1: (A) Total Amount Proposed = (B) Total Material Cost + (F) Total Labor Cost |
| *Note 2: Total Material Cost includes special tooling, special testing equipment, and construction equipment. Additional definition of material cost can be found at 13 CFR 125.1. |
| *Note 3: Subcontractors must be first tier and qualify as a small business under the solicitation NAICS. All second tier subcontractors are counted as LBS labor. |
| *Note 4: Total labor costs consist of all contractual costs other than material. |
| *Note 5: To be compliant, limitation percentage must be greater than the required self-performance percentage. |
Sheet2
| Services (except construction) |
| General construction |
| Construction by special trade contractors |
File details come from the government source that posted it. Updated .