This is a Limitations on Subcontracting Breakout template for the NIFC Building 415 Replacement project (Solicitation Number 140L0626R0003), a small business set-aside solicitation issued by the Department of the Interior Bureau of Land Management. The template establishes subcontracting requirements and compliance calculations for contractors responding to this opportunity, which has a performance period of 730 days after contract award.

The template requires contractors to maintain a minimum 15% self-performance threshold for labor costs, as mandated by FAR 52.219-14(e)(3) or (4). Contractors must populate fields for total amount proposed, material costs, self-performed labor, small business subcontractor labor, and large business subcontractor labor to calculate compliance with the limitation on subcontracting percentage. The formula requires that (Total Labor Cost minus Total Amount Paid to Large Business Subcontractors) divided by Total Labor Cost must exceed the required 15% self-performance percentage. The template accommodates tracking of up to six small business subcontractors and six large business subcontractors, with material costs defined to include special tooling, special testing equipment, and construction equipment, while total labor costs encompass all contractual costs other than material.

View the file

Other files for this federal contract opportunity

Other files attached to NIFC Building 415 Replacement, newest first.
File Type Posted
Sol_140L0626R0003_Amd_0004.pdf PDF
B08_Att22_NIFC_415_MNT_Bid_Clarification_Questions_-_B_0004.pdf PDF
B08_Att21_NIFC_415_MNT_Bid_Clarification_Questions_-_A_0004.pdf PDF
Sol_140L0626R0003_Amd_0003.pdf PDF
B08_Att15_NIFC_415_Amendment_Detailed_0003.pdf PDF
B08_Att16_NIFC_415_Revised_Drawings_0003.pdf PDF
B08_Att19_NIFC_415_Furniture_Plan_0003.pdf PDF
B08_Att14_140L0626R0003_CP_REV_0003.pdf PDF
B08_Att20_NIFC_415_Q_A_0003.xlsx XLSX spreadsheet
B08_Att17_NIFC_415_Specifications_320_SGE_0003.pdf PDF
B08_Att18_NIFC_415_Specifications_415_MNT_0003.pdf PDF
Sol_140L0626R0003_Amd_0002.pdf PDF
B08_Att13_SV_Sign-In_Sheet_140L0626R0003_0002.pdf PDF
B08_Att12_140L0626R0003_-_Q_A_Partial_Response_0002.xlsx XLSX spreadsheet
Sol_140L0626R0003_Amd_0001.pdf PDF
Sol_140L0626R0003.pdf PDF
B08_Att7_26R0003_RFI_Form.xlsx XLSX spreadsheet
B08_Att9_26R0003_NIFC_Campus_Map.pdf PDF
JOFOC_Brand_Name_JCI_Signed.pdf PDF
B08_Att6_26R0003_Wage_Determination_ID20260104.pdf PDF
B08_Att5_26R0003_NIFC_415-MNT_Replace_-_Bid_Schedule.pdf PDF
B08_Att4_26R0003_NIFC_415-_Duane_Graves__IFC_Specifications_320_SGE.pdf PDF
JOFOC_Brand_Name_AMAG_Signed.pdf PDF
B08_Att2_26R0003_NIFC_415_Duane_Graves_NIFC_320-SGE_IFC_Drawings.pdf PDF
B08_Att1_26R0003_NIFC_415_Duane_Graves_IFC__Drawings_415_MNT.pdf PDF
B08_Att3_26R0003_NIFC_415_Duane_Graves__IFC_Specifications_415_MNT.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)

Solicitation Number140L0626R0003 - NIFC 415 Duane Graves Replacement
Type of Set-AsideSmall Business
Performance Period730 Days after NTP
Required Self-Performance15%

(A) Total Amount Proposed¹

(B) Total Material Cost2

(C) Self Performed Labor

(D) Small Business Subcontractor (SSS) Labor3
Total Amount Paid to [Insert First SSS Name]
Total Amount Paid to [Insert Second SSS Name]
Total Amount Paid to [Insert Third SSS Name]
Total Amount Paid to [Insert Fourth SSS Name]
Total Amount Paid to [Insert Fifth SSS Name]
Total Amount Paid to [Insert Sixth SSS Name]
Total Amount Paid to SSS Companies$0.00
(E) Large Business Subcontractor (LBS) Labor
Total Amount Paid to [Insert First LBS Name]
Total Amount Paid to [Insert Second LBS Name]
Total Amount Paid to [Insert Third LBS Name]
Total Amount Paid to [Insert Fourth LBS Name]
Total Amount Paid to [Insert Fifth LBS Name]
Total Amount Paid to [Insert Sixth LBS Name]
Total Amount Paid to LBS Companies$0.00

(F) Total Labor Cost4 $0.00

(G) Limitation on Subcontracting Percentage5
(Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor CostERROR:#DIV/0!
*Note 1: (A) Total Amount Proposed = (B) Total Material Cost + (F) Total Labor Cost
*Note 2: Total Material Cost includes special tooling, special testing equipment, and construction equipment. Additional definition of material cost can be found at 13 CFR 125.1.
*Note 3: Subcontractors must be first tier and qualify as a small business under the solicitation NAICS. All second tier subcontractors are counted as LBS labor.
*Note 4: Total labor costs consist of all contractual costs other than material.
*Note 5: To be compliant, limitation percentage must be greater than the required self-performance percentage.