B08_Att5_26R0003_NIFC_415-MNT_Replace_-_Bid_Schedule.pdf
PDF 79 KB Posted
- Attached to
- NIFC Building 415 Replacement Federal contract opportunity
- Solicitation number
- 140L0626R0003
About this file
This is a Bid Schedule for the NIFC 415-MNT Replacement project. The document provides a pricing template organized into two primary work categories: 320-SGE Construction and 415-MNT Demolition.
The 320-SGE Construction section encompasses 23 line items covering comprehensive building construction work, including general requirements, concrete, masonry, metals, thermal and moisture protection, openings, finishes, specialties, furnishings, fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, earthwork, exterior improvements, utilities, and dust collection. The 415-MNT Demolition section includes 6 line items addressing demolition activities: general requirements, existing conditions, electrical, earthwork, exterior improvements, and utilities. Each line item has a corresponding Cost field for bidders to enter pricing. The schedule concludes with subtotals for each section and a Total Combined Project line, allowing for summary pricing of the complete replacement project. Bidders are required to populate all Cost fields to provide a comprehensive bid for the entire scope of work.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item No. Description Cost $
320-SGE Construction
1 General Requirements
2 Existing Conditions
3 Concrete
4 Masonry
5 Metals
7 Thermal and Moisture Protection
8 Openings
9 Finishes
10 Specialties
12 Furnishings
21 Fire Suppression
22 Plumbing
23 Heating, Ventilating, and Air-Conditioning (HVAC)
26 Electrical
27 Communications
28 Electronic Safety and Security
31 Earthwork
32 Exterior Improvements
33 Utilities
44 Dust Collection
Subtotal
415-MNT Demolition
1 General Requirements
2 Existing Conditions
26 Electrical
31 Earthwork
32 Exterior Improvements
33 Utilities
Subtotal
Total Combined Project
Bid Schedule NIFC 415-MNT Replacement
File details come from the government source that posted it. Updated .