This is a Bid Clarification Questions and Answers document for the NIFC 415-MNT Replacement / 320-SGE Construction project, issued on 6/11/26 with government responses provided.

The document addresses two primary clarification requests from bidders. The first question concerns Veolia water work pricing responsibility, where bidders sought confirmation on whether water service, water main, and related water utility work must be included in base bids or handled via change order post-award. The government clarified that the prime contractor is required to contract with a Veolia-approved subcontractor and coordinate with Veolia per sheet C-104 key notes, with no Veolia drawing currently available. The second question addresses duct pressure testing requirements under Section 233113, where bidders questioned whether testing applies to all medium-pressure ductwork fabricated at 4 inches w.g. or only dust collection systems rated at 10 inches w.g. The government confirmed that duct pressure testing is limited to dust collection systems only and does not apply to other ductwork such as fan coils, heat pumps, terminal units, constant-volume air handling units, or ERVs.

View the file

Other files

File Type Posted
Sol_140L0626R0003_Amd_0004.pdf PDF
B08_Att21_NIFC_415_MNT_Bid_Clarification_Questions_-_A_0004.pdf PDF
B08_Att16_NIFC_415_Revised_Drawings_0003.pdf PDF
B08_Att14_140L0626R0003_CP_REV_0003.pdf PDF
Sol_140L0626R0003_Amd_0003.pdf PDF
B08_Att15_NIFC_415_Amendment_Detailed_0003.pdf PDF
B08_Att20_NIFC_415_Q_A_0003.xlsx XLSX spreadsheet
B08_Att17_NIFC_415_Specifications_320_SGE_0003.pdf PDF
B08_Att19_NIFC_415_Furniture_Plan_0003.pdf PDF
B08_Att18_NIFC_415_Specifications_415_MNT_0003.pdf PDF
B08_Att13_SV_Sign-In_Sheet_140L0626R0003_0002.pdf PDF
Sol_140L0626R0003_Amd_0002.pdf PDF
B08_Att12_140L0626R0003_-_Q_A_Partial_Response_0002.xlsx XLSX spreadsheet
Sol_140L0626R0003_Amd_0001.pdf PDF
JOFOC_Brand_Name_AMAG_Signed.pdf PDF
B08_Att6_26R0003_Wage_Determination_ID20260104.pdf PDF
JOFOC_Brand_Name_JCI_Signed.pdf PDF
B08_Att7_26R0003_RFI_Form.xlsx XLSX spreadsheet
B08_Att4_26R0003_NIFC_415-_Duane_Graves__IFC_Specifications_320_SGE.pdf PDF
B08_Att8_26R0003_-_Lim_on_SubK_Breakout.xlsx XLSX spreadsheet
Sol_140L0626R0003.pdf PDF
B08_Att9_26R0003_NIFC_Campus_Map.pdf PDF
B08_Att5_26R0003_NIFC_415-MNT_Replace_-_Bid_Schedule.pdf PDF
B08_Att2_26R0003_NIFC_415_Duane_Graves_NIFC_320-SGE_IFC_Drawings.pdf PDF
B08_Att1_26R0003_NIFC_415_Duane_Graves_IFC__Drawings_415_MNT.pdf PDF
B08_Att3_26R0003_NIFC_415_Duane_Graves__IFC_Specifications_415_MNT.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NIFC 415-MNT Replacement / 320-SGE Construction

Bid Clarification Questions

[6/11/26: Government Responses are shown below in red]

We are requesting confirmation so all bidders can carry the same scope and avoid undefined costs in the bid.

1. Veolia Water Work / Pricing Responsibility

We are requesting clarification regarding the Veolia water work shown or referenced in the project documents.

The documents appear to require certain water service, water main, or related water utility work to be completed by a Veolia-approved contractor and/or in accordance with Veolia drawings. At this time, bidders do not have a firm Veolia price to carry.

Based on prior NIFC projects, Veolia typically needs to review routing plans and the proposed new piping layout before pricing can be provided. Without Veolia reviewing the routing plans and issuing pricing, bidders are unable to reasonably budget a firm number for this scope.

Please clarify whether this work will be handled by change order after contract award once Veolia has reviewed the routing plans and provided pricing.

If bidders are required to include this scope in the base bid, please provide the Veolia drawings, routing requirements, approved contractor requirements, and/or a defined allowance so all bidders can carry the same scope and cost.

[Government Response: See Q&A Item # 91. The wording of the sheet C-104 key notes has additional clarification and responsibilities compared to past projects. The prime contractor “is required to contract with Veolia-approved” subcontractor and coordinate with Veolia. A Veolia drawing is not available at this time]

2. Section 233113 – Duct Pressure Testing Requirements

We are requesting clarification regarding the duct pressure testing requirements under Section 233113.

Section 233113, paragraph 3.10, appears to require duct pressure testing for systems with a pressure class over 3 inches w.g. Section 233113, paragraph 3.13, identifies the duct pressure class schedule.

Based on that schedule, fan coils, heat pumps, terminal units, and constant-volume air handling units appear to fall below the pressure class that would require pressure testing. The ERVs also appear to fall under the same intent, since they are not specifically listed and anything not listed appears to be set at 2 inches w.g.

Based on this reading, the only ductwork that appears to require pressure testing is the dust collection system, which is called out at 10 inches w.g. However, Note 5 on M-001 calls for all medium-pressure ductwork to be fabricated at 4 inches w.g., which creates confusion regarding whether additional ductwork must be tested.

Please clarify whether duct pressure testing is required on this project, and if so, whether it is limited to the dust collection ductwork or applies to other duct systems as well.

[Government Response: Correct, duct pressure testing applies to dust collection systems but not other ductwork.]