B08_ATT_5_Fish_Creek__1_Sundry_Packet_SR.pdf

PDF 1 MB Posted

Attached to
Alaska Legacy and Abandoned Well Remediation IDIQ
Solicitation number
140L0624R0005
Issued by

About this file

This document provides details for an Indefinite Delivery Indefinite Quantity (IDIQ) multiple award contract opportunity for well plugging, abandonment and remediation services on federal lands located in Alaska. The Bureau of Land Management seeks to procure full-range plugging and abandonment services through this vehicle. The solicitation is set aside 100% for Indian Small Business Economic Enterprise entities with a size standard of $47 million. Successful offerors must demonstrate bonding capacity and task orders will require performance and payment bonds. The guaranteed minimum value is $25,000 per awardee and the ceiling is $200 million across all awards. Responses are due as outlined in solicitation section L under the Mountain Daylight Time zone.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Olgoonik Construction Services, LLC.

3201 ‘C’ Street, Suite #700 Anchorage, Alaska 99503

April 23rd, 2021

Bureau of Land Management (BLM) 222 West 7th Ave. #13 Anchorage, Alaska 99513

RE: Sundry Notice (Permanent Abandonment) Well: Fish Creek Test Well #1 Location: LAT: 70°18'38.790"N LONG: 151°52'24.660"W

Dear Ms. Schoessler, Olgoonik Construction Services, LLC. hereby gives Subsequent Abandonment Notice for a Sundry Approval to Temporarily Abandon the Fish Creek #1 Exploration Well.

Operations related to the approved Sundry Noticed dated 1/28/2021 were halted due to unforeseen downhole conditions preventing further well work with the tools available.

Pertinent information attached to this application includes the following:

1) Form 3160-5 Sundry Application

2) Executive Operations Summary

3) Photographic Report

4) Wellbore Schematics

5) Detailed Daily Operations Reports

The following is the OCS designated contact for reporting responsibilities to the BLM:

James Nunley General Manager

(907) 232-9952

If you have any questions or require further information, please don’t hesitate to contact me.

Sincerely, Zach Sayers, P.E.

Petroleum Engineer

Clear Creek Energy, LLC.

(281) 615-1408

Form 3160-5 (June 2015)

UNITED STATES

DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

SUNDRY NOTICES AND REPORTS ON WELLS

Do not use this form for proposals to drill or to re-enter an abandoned well. Use Form 3160-3 (APD) for such proposals.

FORM APPROVED

OMB No. 1004-0137

Expires: January 31, 2018

5. Lease Serial No.

(Instructions on page 2)

6. If Indian, Allottee or Tribe Name

7. If Unit of CA/Agreement, Name and/or No.

8. Well Name and No.

9. API Well No.

10. Field and Pool or Exploratory Area

11. Country or Parish, State

SUBMIT IN TRIPLICATE - Other instructions on page 2

1. Type of Well

2. Name of Operator

3a. Address

4. Location of Well (Footage, Sec., T.,R.,M., or Survey Description)

3b. Phone No. (include area code)

12. CHECK THE APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

Oil Well Gas Well Other

Notice of Intent

Subsequent Report

Final Abandonment Notice

Acidize Alter Casing

Casing Repair Change Plans Convert to Injection

Deepen Hydraulic Fracturing

New Construction Plug and Abandon Plug Back

Production (Start/Resume) Reclamation

Recomplete Temporarily Abandon Water Disposal

Water Shut-Off Well Integrity

Other

13. Describe Proposed or Completed Operation: Clearly state all pertinent details, including estimated starting date of any proposed work and approximate duration thereof. If the proposal is to deepen directionally or recomplete horizontally, give subsurface locations and measured and true vertical depths of all pertinent markers and zones. Attach

THE SPACE FOR FEDERAL OR STATE OFICE USE

14. I hereby certify that the foregoing is true and correct. Name (Printed/Typed)

Title

DateSignature

Approved by

Title Date Conditions of approval, if any, are attached. Approval of this notice does not warrant or certify that the applicant holds legal or equitable title to those rights in the subject lease which would entitle the applicant to conduct operations thereon.

Title 18 U.S.C Section 1001 and Title 43 U.S.C Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the United States

Bureau of Land Management

222 W. 7th Ave, #13 Anchorage, AK 99513

(907) 271-4354

LAT: 70°18'38.790"N LONG: 151°52'24.660"W

N/A

N/A

N/A

Fish Creek Test Well #1

50-103-10001-00-00

National Petroleum Reserve, Alaska

North Slope Borough, AK

Temporarily Abandon the wellbore.

Please see the attached documentation.

Zach Sayers, P.E. Petroleum Engineer

04/23/2021

From: Zach Sayers Date: April 23rd, 2021 RE: Fish Creek Test Well #1 Executive Summary

Well Background Fish Creek Well #1 was drilled by the U.S. Navy in 1949. This well was drilled to a TD of 7,020' MD, then plugged back and side-tracked to 3,018’ MD with a 7" casing string having been set at 3,017' MD. A productive sand was found at 3,000 feet and produced by pumping on the well at ~12BOPD.

Operations Summary:

The existing well was entered on 3/01/2021 with a plumb bob tools and tagged at 60’ Below Ground Level (BGL). No pressure or flow was observed on the wellbore.

Four days were spent nippling down the existing wellhead, fabricating a new wellhead, breaking down the cellar to allow for rig up, and rigging up the rig and BOPs over the well. On 3/05/2021 the well was entered with a tubing workstring and thawed down to 240’. On 3/06/2021 the well was thawed to 383’ BGL and the well took ~9 bbls of brine until loss circulation seized. At 383’ an obstruction was noted that did not allow for the 1.90” workstring to pass. After continuing to thaw the wellbore for an additional 24 hours, the 11-3/4” annulus valve was opened to atmospheric pressure and the fluid level in the 7” casing dropped indicating a u-tubing effect proving that the two annuli were in communication.

On 3/09/2021 E-line tools were rigged up and a 4-1/2” Lead Impressions Block (LIB) was ran in hole and tagged at 230’. A 5” LIB was ran next with the same tag depth of 230’ BGL. A 1-11/16” weight bar was ran next and was able to get to the lower obstruction of 383’. A final run with a 5.75” OD gauge ring was completed and tagged at 230’ BGL. It is noted that all well work operations experienced heavy contamination of the circulated clear brine with heavy oil and tar while circulating and tripping in and out of the well. It was determined that a downhole camera was not practical due to the inability to clean the well to a clear fluid at the collapse point.

Based on the data collected it is concluded that the 7” casing has several collapse zones due to lack of proper freeze protection and presence of water in the 7” x 11-3/4” annulus. The top most partial collapse is noted at 230’ BGL. The 230’ collapse is smaller than 4.50” but larger than 2.20” (1.900” tubing coupler OD).

Additional partial collapse zones are possible from 230’ to 383” of similar magnitude as the 230’ collapse but cannot be verified without a caliper tool. A nearly full collapse (less than 1.6875”) has occurred at 383’ BGL.

The decision was made that the planned scope of work to abandon the lower zones could not be completed with the tools on location and within the time constraints of the snow trail season of 2021.

The well was circulated from 383’ to surface on both the IA and the OA with clean diesel. On

3/12/2021 a dry hole tree was fabricated to the top of the wellhead for future monitoring and inspection. The rig and well equipment was rigged down and mobilized back to Prudhoe Bay.

Sincerely, Zach Sayers, P.E.

Petroleum Engineer

Clear Creek Energy, LLC.

Well Photo Report Well Name & Number: Fish Creek Test Well #1 API Well Number: 50-103-10001-00-00 Field: National Petroleum Reserve, Alaska

Surface prior to plugging activities TA Wellhead Configuration

03/01/2021 3/13/2021

TA Wellhead Configuration Surface photo after rig work activities

3/13/2021 3/13/2021

5' Below Ground Level

National Petroleum Reserve Alaska Alaska

Fish Creek Test Well #1 PBTD: 3017'

RKB – GL: 15.0'

API # 50‐103‐10001

TD: 7,020' MD

Elevation KB: 31.5'

Post Rig Schematic

Drawn By:

Date

4/23/2021PTD # 100‐100

Location of Well Latitude/Longitude: 70.310775198, ‐151.873515704 (WGS84)*

*Planning, only actual location to be verified with site visit

ZJS

Production Casing 7", 23#, J‐55, 8rd CSG to 2,915' MD/TVD (6.366" ID, 6.241" Drift, 4,360 Burst, 3,270 Collapse, 366k yield) Cemented with 245 sx of cmt treated with 2% CaCl Calculated TOC: 2,209 MD*

*assuming 1.18 cu. Ft / sk & 5.2 gal/sk

National Rig 50 122' Ideco Derrick Spud: May 17th, 1949 Completed: September 4th, 1949

15' MD/TVD (Original Ground Level)

Conductor Casing Jacket 20", 48# CSG to 46' MD/TVD

(19.56" ID*)

“Naylor Spiral‐Weld Casing” 15 sx ‘Oil Well Cement + 15 sx sand

Conductor Casing 16", 42#, Slip‐Jt, welded CSG to +/‐193' MD/TVD (15.52" ID*, 1,052 psi Burst*, 120psi Collapse*) *pressures calculated with given steel parameters, not API certified values

Cemented with 90 sx of Hi‐Early Calculated TOC: 88' MD* *assuming 1.22 cu. Ft / sk & 5.2 gal/sk, and 100% OH excess factor for permafrost

Surface Casing 11‐3/4", 47#,J‐55, 8rd CSG to 1,046' MD/TVD (11.00" ID, 10.840" Drift, 3,070 Burst, 1,510 Collapse) Cemented with 125 sx of Hi‐ Early cmt treated with 2% CaCl Calculated TOC: 818' MD*

*assuming 1.22 cu. Ft / sk & 5.2 gal/sk

18‐¾” OH f/ 46' MD to 193' MD/TVD

22" OH to 46' MD/TVD

15‐½” OH f/ 193' MD to 1,046' MD/TVD

10‐5/8" OH f/ 1,046' MD t/ 3,018' MD/TVD

7‐5/8" OH f/ 2,552' MD t/ 7,020' MD/TVD

Production Liner 4‐1/2", 11#, J‐55, 8rd CSG from 3,017' to 2,915' MD/TVD (4.052" ID, 3.927" Drift) perforated from 2,918 to 3,017 ft with 8 rows of ½” drilled holes on 2‐7/8" centers, staggered, and covered with 4‐½” by 6" OD Nelson gravel prepack sleeves

6" OD Brown Pack‐Off Hanger @ 2,891' MD/TVD

Casing Collapse (Drift: >2.20", <4.50") – 261.5' MD

Casing Collapse (Drift: >1.6875") – 414.5' MD

Diesel Freeze Protect placed 3/10/2021 f/414.5' MD t/ Surface

National Rig 50 122' Ideco Derrick Spud: May 17th, 1949 Completed: September 4th, 1949

0.0 in. 18.0 in. 30.0 in. 60.0 in.

Existing Ground Level (Tundra Level)

DRAWN BY

ZACH SAYERS

REVISED

4/23/2021

SCALE

1: 24

TITLE

Fish Creek #1 As Built Wellhead

REV. DESCRIPTION DATE BY Company:

Under

Contract To:

A ORIGINAL DRAWING 4/23/21 ZJS

API #:

50‐103‐10001

PTD #:

100‐100

NPRA, Alaska

Location of Well Latitude/Longitude: 70.310775198, ‐151.873515704 (WGS84)*

*Planning, only actual location to be verified with site visit

2", 1,000 psi, Threaded Ball Valve w/ 2" fNPT threads psi

11‐¾” x 7" Weld‐On Annulus Isolator Plate

11‐¾” 47#, J‐55, 8Rd, casing (1,046')

7" 23# J‐55 Casing 8Rd casing (2,915')

3‐1/8" Neck

3‐1/8", 3,000 psi, Flanged Ball Valve w/ 3‐1/8" 3M Flanges

7‐1/16" 3M Flange

3‐1/8" 3M Flange

3‐1/8" 3M Flange

2" NPT Reducing Sage w/ 2" mNPT

2" NPT Coupler

2" mNPT x ½” fNPT reducer bushing

2", 1,000 psi, Threaded Ball Valve w/ 2" fNPT threads

DOR Fish Creek Test Well 1

Well Name: Operator: BLM Report #: 12 Well Type: API #: 50-103-10001 Report Date: 12-Mar-21 Field: PTD #: 100-100 Contract #: 140L0618F0246

Supervisor: Shane McGeehan Phone #: 801- 556-0946 Gen. Conditions:

Petr. Eng.: Zach Sayers Phone #: 281-615-1408 Wind Direction:

BLM PM: Allie Schoessler Wind Gusts (mph):

BLM PI: Quinn Sawyer Temp. (Low, High): -35 -15

TD: GL, ft: 15 Planned Days: 20 PBTD: RKB, ft: 31.5 Start Date: 1-Mar-21 Fluid in Well: OH ID, in: Operation Days: 12 Last BOP Test: Last Safety Mtg: 3/12/2021 Last Evac Drill: 3/3/2021

Csg String OD (in) Depth (ft) Weight (#/ft) Conductor: 16'' 1036 47 Surface: 11.75'' 1036 42 Production: 7'' 2915 23

Pump # Model Rate (BPM) Pressure (psi)

Weight (ppg) Volume (bbls.)

Weight (ppg) Daily Volume (bbls.)

9.6 40.00

7 9.00 49.00

24 Hour Summary:

24 Hour Forecast:

HSE Summary:

From To Hours 6:00 6:30 0:30 6:30 16:00 9:30

16:00 18:00 2:00

12:00 18:00 6:00

18:00 Remarks:

Daily Operations Report Fish Creek Test Well #1

Gas Well Exploration

NPRA

Contacts Weather Overcast

South west

Well Status 3,018 3,018

Integrity Issues

CLASS I: Cement Rinsate

Pump Parameters Type

Mud / Brine Properties Fluid Type

Cumulative Volume (bbls):

Waste Fluids Fluid Type

Class 11: brine

Nipple down BOPS, Install well cap, Build cellar cover

CLASS II: Crude oil Cumulative Volume (bbls):

Operations Report

Clean up equipment, Remove cement and pilings from well site

No Accidents, No Incidents, No Spills.

Rigging Down

Operational Details (6:00 - 6:00) Hold PJSM. Rigging down equipment Remove pilings and cement from well site area, Clean equipment and load out Weld 3'' flange to 7 1/16'' flange , Weld top flange to gauge fitting, Assemble 3'' valve assembly Pump brine from return tank, Clean oil from tank, clean up pumps, Rig down divert line, Choke and divert tank, Clean up

1.9 tubing place in rack, Secure well

Total Hours:

Well Name: Operator: BLM Report #: 11 Well Type: API #: 50-103-10001 Report Date: 11-Mar-21 Field: PTD #: 100-100 Contract #: 140L0618F0246

Supervisor: Shane McGeehan Phone #: 801- 556-0946 Gen. Conditions:

Petr. Eng.: Zach Sayers Phone #: 281-615-1408 Wind Direction:

BLM PM: Allie Schoessler Wind Gusts (mph):

BLM PI: Quinn Sawyer Temp. (Low, High): -18 -15

TD: GL, ft: 15 Planned Days: 20 PBTD: RKB, ft: 31.5 Start Date: 2-Mar-21 Fluid in Well: OH ID, in: Operation Days: 11 Last BOP Test: Last Safety Mtg: 3/10/2021 Last Evac Drill: 3/3/2021

Csg String OD (in) Depth (ft) Weight (#/ft) Conductor: 16'' 1036 47 Surface: 11.75'' 1036 42 Production: 7'' 2915 23

Pump # Model Rate (BPM) Pressure (psi)

Weight (ppg) Volume (bbls.)

Weight (ppg) Daily Volume (bbls.)

9.6 40.00

7 9.00 49.00

24 Hour Summary:

24 Hour Forecast:

HSE Summary:

From To Hours 6:00 6:30 0:30 6:30 10:00 3:30 8:00 12:00 2:00

12:00 14:00 2:00

14:00 18:00 4:00

12:00 Remarks:

Daily Operations Report Fish Creek Test Well #1

Gas Well Exploration

NPRA

Contacts Weather Overcast

South west

Well Status 3,018 3,018

Integrity Issues

CLASS I: Cement Rinsate

Pump Parameters Type

Mud / Brine Properties Fluid Type

Cumulative Volume (bbls):

Waste Fluids Fluid Type

Class 11: brine

Nipple down BOPS, Install well cap, Build cellar cover

CLASS II: Crude oil Cumulative Volume (bbls):

Operations Report

Clean up equipment, Rig down rig, Build cellar wall

No Accidents, No Incidents, No Spills.

Rigging Down

Operational Details (6:00 - 6:00) Hold PJSM. Rigging down equipment Continue clean return tank, Clean up flow pan, slip bowl slips elevators Remove tarp, Rig down scaffolding Lay derrick over, Back rig off rig mats, Pull rig mat over return box, Remove return tank Cut 12'' by 12'' beams fit in place bracing the cement walls on either side and completing the cellar enclosure. Secure well

Well Name: Operator: BLM Report #: 10 Well Type: API #: 50-103-10001 Report Date: 10-Mar-21 Field: PTD #: 100-100 Contract #: 140L0618F0246

Supervisor: Shane McGeehan Phone #: 801- 556-0946 Gen. Conditions:

Petr. Eng.: Zach Sayers Phone #: 281-615-1408 Wind Direction:

BLM PM: Allie Schoessler Wind Gusts (mph):

BLM PI: Quinn Sawyer Temp. (Low, High): -2 3

TD: GL, ft: 15 Planned Days: 20 PBTD: RKB, ft: 31.5 Start Date: 2-Mar-21 Fluid in Well: OH ID, in: Operation Days: 10 Last BOP Test: Last Safety Mtg: 3/9/2021 Last Evac Drill: 3/3/2021

Csg String OD (in) Depth (ft) Weight (#/ft) Conductor: 16'' 1036 47 Surface: 11.75'' 1036 42 Production: 7'' 2915 23

Pump # Model Rate (BPM) Pressure (psi)

Weight (ppg) Volume (bbls.)

Weight (ppg) Daily Volume (bbls.)

9.6 40.00

7 9.00 49.00

24 Hour Summary:

24 Hour Forecast:

HSE Summary:

From To Hours 6:00 6:30 0:30 6:30 8:00 1:30

8:00 12:00 4:00

12:00 18:00 6:00

12:00 Remarks:

Daily Operations Report Fish Creek Test Well #1

Gas Well Exploration

NPRA

Contacts Weather Clear Skies

South west 10-25

Well Status 3,018 3,018

Integrity Issues

CLASS I: Cement Rinsate

Pump Parameters Type

Mud / Brine Properties Fluid Type

Cumulative Volume (bbls):

Waste Fluids Fluid Type

Class 11: brine

Rig down rig

CLASS II: Crude oil Cumulative Volume (bbls):

Operations Report

Freeze protect , Rig down wireline

No Accidents, No Incidents, No Spills.

Rigging Down

Operational Details (6:00 - 6:00) Hold PJSM. Pumping diesel, Rigging down equipment Rig down wireline Rig up to cement pump, Displace well to Diesel at 2bpm 50 psi, Pump 42bbls down 7'' Annulus, Take returns 11 3/4'' by 7'' annulus, 35 bbls back in return tank, 7 bbls bullheaded away Pump brine from return tank, Clean oil from tank, clean up pumps, Rig down divert line, Choke and divert tank, Clean up

1.9 tubing place in rack, Secure well

Well Name: Operator: BLM Report #: 9 Well Type: API #: 50-103-10001 Report Date: 9-Mar-21 Field: PTD #: 100-100 Contract #: 140L0618F0246

Supervisor: Shane McGeehan Phone #: 801- 556-0946 Gen. Conditions:

Petr. Eng.: Zach Sayers Phone #: 281-615-1408 Wind Direction:

BLM PM: Allie Schoessler Wind Gusts (mph):

BLM PI: Quinn Sawyer Temp. (Low, High): 10 21

TD: GL, ft: 15 Planned Days: 20 PBTD: RKB, ft: 31.5 Start Date: 2-Mar-21 Fluid in Well: OH ID, in: Operation Days: 9 Last BOP Test: Last Safety Mtg: 3/9/2021 Last Evac Drill: 3/3/2021

Csg String OD (in) Depth (ft) Weight (#/ft) Conductor: 16'' 1036 47 Surface: 11.75'' 1036 42 Production: 7'' 2915 23

Pump # Model Rate (BPM) Pressure (psi)

Weight (ppg) Volume (bbls.)

Weight (ppg) Daily Volume (bbls.)

7 9.00 9.00

24 Hour Summary:

24 Hour Forecast:

HSE Summary:

From To Hours 6:00 6:30 0:30

6:30 8:00 1:30

8:00 8:30 0:30

8:30 9:00 0:30 9:00 12:00 3:00

12:00 18:00 6:00 12:00

Remarks:

Daily Operations Report Fish Creek Test Well #1

Gas Well Exploration

NPRA

Contacts Weather Clear Skies

South

Well Status 3,018 3,018

Integrity Issues

CLASS I: Cement Rinsate

Pump Parameters Type

Mud / Brine Properties Fluid Type

Cumulative Volume (bbls):

Waste Fluids Fluid Type

Freeze protect well

CLASS II: Crude oil Cumulative Volume (bbls):

Operations Report

Run wireline to see statics of well

No Accidents, No Incidents, No Spills.

Well control, Wireline operations

Operational Details (6:00 - 6:00) Hold PJSM. Working with wireline Make up 4 1/2'' impression block, Run in hole, Tag at 230', Pull out of hole, Dent on side. Make up 5'' impression block, Run in hole, Tag up at 230', Pull out hole, Same dent on side Run in hole with 1 11/16'' weight bar, Work up and down on obstruction at 383', Unable to work through, Pull out of hole

Run in hole with 5.75 gauge ring, Tag up at 230', Pull out of hole Pump oil from return tank Clean up equipment and well site, Secure well

Well Name: Operator: BLM Report #: 8 Well Type: API #: 50-103-10001 Report Date: 8-Mar-21 Field: PTD #: 100-100 Contract #: 140L0618F0246

Supervisor: Shane McGeehan Phone #: 801- 556-0946 Gen. Conditions:

Petr. Eng.: Zach Sayers Phone #: 281-615-1408 Wind Direction:

BLM PM: Allie Schoessler Wind Gusts (mph):

BLM PI: Quinn Sawyer Temp. (Low, High): -24 -13

TD: GL, ft: 15 Planned Days:

PBTD: RKB, ft: 31.5 Start Date: 1-Mar-21 Fluid in Well: OH ID, in: Operation Days: 8 Last BOP Test: Last Safety Mtg: 3/3/2021 Last Evac Drill: 3-3-2-21

Csg String OD (in) Depth (ft) Weight (#/ft) Conductor: 16'' 1036 47 Surface: 11.75'' 1036 42 Production: 7'' 2915 23

Pump # Model Rate (BPM) Pressure (psi)

Weight (ppg) Volume (bbls.)

Weight (ppg) Daily Volume (bbls.)

0.00

24 Hour Summary:

24 Hour Forecast:

HSE Summary:

From To Hours 6:00 6:30 0:30 6:30 8:00 1:30

8:00 14:00 3:00

14:00 17:00 3:00 17:00 18:00 1:00

9:00 Remarks:

Total Hours:

No Accidents, No Incidents, No Spills.

Well control, Handling tubing

Operational Details (6:00 - 6:00) Hold PJSM. Laying down tubing, Working with oily tubing Heat up well Open 11 3/4'' 2'' valve, fill 7''by 11 3/4'annulus' with 2 bbls, Circulate well and heat up 100 degree in, 80 degree return from 7'' by 11 3/4'' annulus Pull tubing out of hole slow cleaning thick oil off tubing Clean up equipment from pulling oily pipe, Secure well

Run impression block on Wireline

CLASS II: Cement Returns Cumulative Volume (bbls):

Operations Report

Heat up well 100 degree in, 80 degree returns 9.6 # brine, Open 11 3/4'', Take returns out 11 3/4'', Pull out hole tubing

CLASS I: Cement Rinsate

Pump Parameters Type

Mud / Brine Properties Fluid Type

Cumulative Volume (bbls):

Waste Fluids Fluid Type

Clear Skies South

Well Status 3,018 3,018

Integrity Issues

Daily Operations Report Fish Creek Test Well #1

Gas Well Exploration

NPRA

Contacts Weather

Well Name: Operator: BLM Report #: 7 Well Type: API #: 50-103-10001 Report Date: 7-Mar-21 Field: PTD #: 100-100 Contract #: 140L0618F0246

Supervisor: Shane McGeehan Phone #: 801- 556-0946 Gen. Conditions:

Petr. Eng.: Zach Sayers Phone #: 281-615-1408 Wind Direction:

BLM PM: Allie Schoessler Wind Gusts (mph):

BLM PI: Quinn Sawyer Temp. (Low, High): -24 -13

TD: GL, ft: 15 Planned Days: 20 PBTD: RKB, ft: 31.5 Start Date: 1-Mar-21 Fluid in Well: OH ID, in: Operation Days: 7 Last BOP Test: Last Safety Mtg: 3/3/2021 Last Evac Drill: 3/3/2021

Csg String OD (in) Depth (ft) Weight (#/ft) Conductor: 16'' 1036 47 Surface: 11.75'' 1036 42 Production: 7'' 2915 23

Pump # Model Rate (BPM) Pressure (psi)

Weight (ppg) Volume (bbls.)

Weight (ppg) Daily Volume (bbls.)

0.00

24 Hour Summary:

24 Hour Forecast:

HSE Summary:

From To Hours 6:00 6:30 0:30 6:30 9:00 2:30 9:00 12:00 3:00

12:00 12:30 0:30

12:30 18:00 5:30 12:00

Remarks:

Daily Operations Report Fish Creek Test Well #1

Gas Well Exploration

NPRA

Contacts Weather Clear Skies

South

Well Status 3,018 3,018

Integrity Issues

CLASS I: Cement Rinsate

Pump Parameters Type

Mud / Brine Properties Fluid Type

Cumulative Volume (bbls):

Waste Fluids Fluid Type

Heat up well, Attempt to circulate up 11 3/4'' Annulus

CLASS II: Cement Returns Cumulative Volume (bbls):

Operations Report

Heat up well 100 degree in, 80 degree returns 9.6 # brine, Open 11 3/4'', Communication between 7'' and 11 3/4''

No Accidents, No Incidents, No Spills.

Well control, Mixing chemicals, Trapped pressure

Operational Details (6:00 - 6:00) Hold PJSM. Running Tubing, Well control, Mixing chemicals, Trapped pressure Rig up Cement pump to circulate at high rate Circulate at 1 bpm 200psi, Work pipe on obstruction at 383' Open valve on 11 3/4'' fluid level dropped down in 7'' Annulus, Air blowing out of 11 3/4'', communication between 7'' and 11 3/4'' Annulus Continue circulate heat up well bore 100 degree in 80 degree returns, Shut down, secure well

Well Name: Operator: BLM Report #: 6 Well Type: API #: 50-103-10001 Report Date: 6-Mar-21 Field: PTD #: 100-100 Contract #: 140L0618F0246

Supervisor: Shane McGeehan Phone #: 801- 556-0946 Gen. Conditions:

Petr. Eng.: Zach Sayers Phone #: 281-615-1408 Wind Direction:

BLM PM: Allie Schoessler Wind Gusts (mph):

BLM PI: Quinn Sawyer Temp. (Low, High): -18 -9

TD: GL, ft: 15 Planned Days: 20 PBTD: RKB, ft: 31.5 Start Date: 1-Mar-21 Fluid in Well: OH ID, in: Operation Days: 6 Last BOP Test: Last Safety Mtg: 3/3/2021 Last Evac Drill: 3/3/2021

Csg String OD (in) Depth (ft) Weight (#/ft) Conductor: 16'' 1036 47 Surface: 11.75'' 1036 42 Production: 7'' 2915 23

Pump # Model Rate (BPM) Pressure (psi)

Weight (ppg) Volume (bbls.)

Weight (ppg) Daily Volume (bbls.)

0.00

24 Hour Summary:

24 Hour Forecast:

HSE Summary:

From To Hours 6:00 6:30 0:30 6:30 12:00 5:30

12:00 17:00 5:00 17:00 17:30 0:30 17:30 22:00 4:30

16:00 Remarks:

Daily Operations Report Fish Creek Test Well #1

Gas Well Exploration

NPRA

Contacts Weather Clear Skies

South

Well Status 3,018 3,018

Integrity Issues

CLASS I: Cement Rinsate

Pump Parameters Type

Mud / Brine Properties Fluid Type

Cumulative Volume (bbls):

Waste Fluids Fluid Type

Work through obstruction at 383', Continue to RIH

CLASS II: Cement Returns Cumulative Volume (bbls):

Operations Report

Continue RIH circulating out oil, Tag up at 383'

No Accidents, No Incidents, No Spills.

Well control, Mixing chemicals

Operational Details (6:00 - 6:00) Hold PJSM. Running Tubing, Well control, Mixing chemicals Continue RIH circulating out thick crude oil to 383' Heat up 9.6 brine to 100 degree in , 70 degree brine returns, Work pipe on tight spot Lost returns, Pump 5 bbls brine, No returns Build 15 bbls 9.6 brine and pump, Fill well 3.5 bbls brine.

Well Name: Operator: BLM Report #: 5 Well Type: API #: 50-103-10001 Report Date: 5-Mar-21 Field: PTD #: 100-100 Contract #: 140L0618F0246

Supervisor: Shane McGeehan Phone #: 801- 556-0946 Gen. Conditions:

Petr. Eng.: Zach Sayers Phone #: 281-615-1408 Wind Direction:

BLM PM: Allie Schoessler Wind Gusts (mph):

BLM PI: Quinn Sawyer Temp. (Low, High): -28 -24

TD: GL, ft: 15 Planned Days: 20 PBTD: RKB, ft: 31.5 Start Date: 1-Mar-21 Fluid in Well: OH ID, in: Operation Days: 5 Last BOP Test: Last Safety Mtg: 3/3/2021 Last Evac Drill: 3/3/2021

Csg String OD (in) Depth (ft) Weight (#/ft) Conductor: 16'' 1036 47 Surface: 11.75'' 1036 42 Production: 7'' 2915 23

Pump # Model Rate (BPM) Pressure (psi)

Weight (ppg) Volume (bbls.)

Weight (ppg) Daily Volume (bbls.)

0.00

24 Hour Summary:

24 Hour Forecast:

HSE Summary:

From To Hours 6:00 6:30 0:30 6:30 9:00 2:30 9:00 12:00 3:00

12:00 13:30 1:30 13:30 17:00 3:30 17:00 18:00 1:00

12:00 Remarks:

Total Hours:

No Accidents, No Incidents, No Spills.

Well control, Running work string

Operational Details (6:00 - 6:00) Hold PJSM. Running Tubing, Well control, Overhead loads Tarp in rig Build 14 bbls 9.6 brine RIH to 55', Fill hole with 5.3 bbls 9.6 Brine Continue RIH to 240' Breaking circulation Build brine, Close pipe rams secure well

Continue RIH circulating out oil

CLASS II: Cement Returns Cumulative Volume (bbls):

Operations Report

Tarp in rig, Build brine, RIH breaking circulation

CLASS I: Cement Rinsate

Pump Parameters Type

Mud / Brine Properties Fluid Type

Cumulative Volume (bbls):

Waste Fluids Fluid Type

Clear Skies South

Well Status 3,018 3,018

Integrity Issues

Daily Operations Report Fish Creek Test Well #1

Gas Well Exploration

NPRA

Contacts Weather

Well Name: Operator: BLM Report #: 4 Well Type: API #: 50-103-10001 Report Date: 4-Mar-21 Field: PTD #: 100-100 Contract #: 140L0618F0246

Supervisor: Shane McGeehan Phone #: 801- 556-0946 Gen. Conditions:

Petr. Eng.: Zach Sayers Phone #: 281-615-1408 Wind Direction:

BLM PM: Allie Schoessler Wind Gusts (mph):

BLM PI: Quinn Sawyer Temp. (Low, High): -28 -24

TD: GL, ft: 15 Planned Days: 20 PBTD: RKB, ft: 31.5 Start Date: 1-Mar-21 Fluid in Well: OH ID, in: Operation Days: 4 Last BOP Test: Last Safety Mtg: 3/3/2021 Last Evac Drill: 3/3/2021

Csg String OD (in) Depth (ft) Weight (#/ft) Conductor: 16'' 1036 47 Surface: 11.75'' 1036 42 Production: 7'' 2915 23

Pump # Model Rate (BPM) Pressure (psi)

Weight (ppg) Volume (bbls.)

Weight (ppg) Daily Volume (bbls.)

0.00

24 Hour Summary:

24 Hour Forecast:

HSE Summary:

From To Hours 6:00 6:30 0:30 6:30 9:00 2:30 9:00 10:00 1:00

10:00 12:00 2:00 12:00 13:00 1:00 13:00 14:30 1:30 14:30 15:30 1:00 15:30 17:00 1:30 17:00 18:00 1:00

12:00 Remarks:

Daily Operations Report Fish Creek Test Well #1

Gas Well Exploration

NPRA

Contacts Weather Clear Skies

South 5 to 25

Well Status 3,018 3,018

Integrity Issues

CLASS I: Cement Rinsate

Pump Parameters Type

Mud / Brine Properties Fluid Type

Cumulative Volume (bbls):

Waste Fluids Fluid Type

Build brine, Tarp in rig, Rig up to run work string, Run in hole work string

CLASS II: Cement Returns Cumulative Volume (bbls):

Operations Report

Excavate for return tank, Set tank, Rig up diverter and test, Function test BOPs, Raise derrick, Move in cement unit

No Accidents, No Incidents, No Spills.

Setting up scaffolding, Raising Derrick

Operational Details (6:00 - 6:00) Hold PJSM. Working around scaffolding, Proper tie off, Use buddy system.

Excavate for return tank, Set tank, Heat up BOPs, Set air compressor, Heat up Set choke, Run diverter line to divert tank Function test BOPs, Blind rams, Pipe rams, HCR Test diverter line with air Raise derrick Set up scaffolding around rig Move cement unit place and heat up. Heat up return tank

Well Name: Operator: BLM Report #: 3 Well Type: API #: 50-103-10001 Report Date: 3-Mar-21 Field: PTD #: 100-100 Contract #: 140L0618F0246

Supervisor: Shane McGeehan Phone #: 801- 556-0946 Gen. Conditions:

Petr. Eng.: Zach Sayers Phone #: 281-615-1408 Wind Direction:

BLM PM: Allie Schoessler Wind Gusts (mph):

BLM PI: Quinn Sawyer Temp. (Low, High): -28 -24

TD: GL, ft: 15 Planned Days: 20 PBTD: RKB, ft: 31.5 Start Date: 1-Mar-21 Fluid in Well: OH ID, in: Operation Days: 3 Last BOP Test: Last Safety Mtg: 3/3/2021 Last Evac Drill: 3/3/2021

Csg String OD (in) Depth (ft) Weight (#/ft) Conductor: 16'' 1036 47 Surface: 11.75'' 1036 42 Production: 7'' 2915 23

Pump # Model Rate (BPM) Pressure (psi)

Weight (ppg) Volume (bbls.)

Weight (ppg) Daily Volume (bbls.)

0.00

24 Hour Summary:

24 Hour Forecast:

HSE Summary:

From To Hours 6:00 6:30 0:30 6:30 8:00 1:30

8:00 10:00 2:00

10:00 12:00 2:00 12:00 14:00 2:00 14:00 16:00 2:00 16:00 18:00 2:00

12:00 Remarks:

Daily Operations Report Fish Creek Test Well #1

Gas Well Exploration

NPRA

Contacts Weather Clear Skies

South

2-7 MPH

Well Status 3,018 3,018

Integrity Issues

CLASS I: Cement Rinsate

Pump Parameters Type

Mud / Brine Properties Fluid Type

Cumulative Volume (bbls):

Waste Fluids Fluid Type

Raise derrick, Build enclosure around rig, Set return tank, Function test BOPs, Build Brine, Run Diverter line to divert tank.

CLASS II: Cement Returns Cumulative Volume (bbls):

Operations Report

Cut off conductor, Weld on starting head flange, Nipple up Bops, Hook up Accumulator lines, Set rig mats, Move rig in place

No Accidents, No Incidents, No Spills.

Hot work permit, Working in cellar area, Overhead loads

Operational Details (6:00 - 6:00) Hold PJSM. Use proper rigging on loads, Inspect straps before use, one person giving hand signals Cut 20'' and 16'' at cellar floor Cut 11 3/4'' casing at 6' , Weld isolation plate on 11 3/4'' by 7'' casing, Weld 2'' nipple on 11 3/4'', Install valve

Cut 7'' casing at 5', Weld starting head on 7'' casing, Weld 2'' nipple on 7'' casing, Install valve Nipple up 7 1/16'' BOPs, Flow pan, Run accumulator lines Level pad area, Set rig mats Move rig in set over well, Cover rig, Heat up to raise derrick

Well Name: Operator: BLM Report #: 2 Well Type: API #: 50-103-10001 Report Date: 2-Mar-21 Field: PTD #: 100-100 Contract #: 140L0618F0246

Supervisor: Shane McGeehan Phone #: 801- 556-0946 Gen. Conditions:

Petr. Eng.: Zach Sayers Phone #: 281-615-1408 Wind Direction:

BLM PM: Allie Schoessler Wind Gusts (mph):

BLM PI: Quinn Sawyer Temp. (Low, High): -32 -22

TD: GL, ft: 15 Planned Days: 20 PBTD: RKB, ft: 31.5 Start Date: 1-Mar-21 Fluid in Well: OH ID, in: Operation Days: 2 Last BOP Test: Last Safety Mtg: 3/2/2021 Last Evac Drill:

Csg String OD (in) Depth (ft) Weight (#/ft) Conductor: 16'' 1036 47 Surface: 11.75'' 1036 42 Production: 7'' 2915 23

Pump # Model Rate (BPM) Pressure (psi)

Weight (ppg) Volume (bbls.)

Weight (ppg) Daily Volume (bbls.)

0.00

24 Hour Summary:

24 Hour Forecast:

HSE Summary:

From To Hours 6:00 6:30 0:30 6:30 12:00 5:30

12:00 18:00 6:00

12:00 Remarks:

Daily Operations Report Fish Creek Test Well #1

Gas Well Exploration

NPRA

Contacts Weather Clear Skies

North and South

2-7 MPH

Well Status 3,018 3,018

Integrity Issues

CLASS I: Cement Rinsate

Pump Parameters Type

Mud / Brine Properties Fluid Type

Cumulative Volume (bbls):

Waste Fluids Fluid Type

Cut off conductor, Weld on starting head flange, Nipple up BOPs, Set return tank, Set rig mats

CLASS II: Cement Returns Cumulative Volume (bbls):

Operations Report

Cut off wellhead, Excavate cellar area down 7', Assemble BOPs

No Accidents, No Incidents, No Spills.

Hot work permit, Working in cellar area

Operational Details (6:00 - 6:00) Hold PJSM. Over head loads, hand placement, Trapped pressure Remove Tubbing Head and casing head, Cut off starting head Excavate cellar area down to 7' around 20'' conductor, Assemble BOPs, Fill and test boiler, Heat up and Test Accumulator, Casing between 7'' and 11 3/4'' open air space

Well Name: Operator: BLM Report #: 1 Well Type: API #: 50-103-10001 Report Date: 1-Mar-21 Field: PTD #: 100-100 Contract #: 140L0618F0246

Supervisor: Shane McGeehan Phone #: 801- 556-0946 Gen. Conditions:

Petr. Eng.: Zach Sayers Phone #: 281-615-1408 Wind Direction:

BLM PM: Allie Schoessler Wind Gusts (mph):

BLM PI: Quinn Sawyer Temp. (Low, High): -42 -25

TD: GL, ft: Planned Days: 20 PBTD: RKB, ft: Start Date: 1-Mar-21 Fluid in Well: OH ID, in: Operation Days: 1 Last BOP Test: Last Safety Mtg: 3/1/2021 Last Evac Drill:

Csg String OD (in) Depth (ft) Weight (#/ft) Conductor: 16'' 1036 47 Surface: 11.75'' 1036 42 Production: 7'' 2915 23

Pump # Model Rate (BPM) Pressure (psi)

Weight (ppg) Volume (bbls.)

Weight (ppg) Daily Volume (bbls.)

0.00

24 Hour Summary:

24 Hour Forecast:

HSE Summary:

From To Hours 6:00 6:30 0:30

6:30 18:00 11:30

12:00 Remarks:

Daily Operations Report Fish Creek Test Well #1

Gas Well Exploration

NPRA

Contacts Weather Clear Skies

North and South

2-7 MPH

Well Status 3,018 3,018

Integrity Issues

CLASS I: Cement Rinsate

Pump Parameters Type

Mud / Brine Properties Fluid Type

Cumulative Volume (bbls):

Waste Fluids Fluid Type

Continue remove debris from around well cellar area, Dig cellar down to cut off well head

CLASS II: Cement Returns Cumulative Volume (bbls):

Operations Report

Unload Equipment heat up and start up, spot work Conex's heat up and power up. Remove Cement, Crane mats, posts from around well cellar area

No Accidents, No Incidents, No Spills.

Good communication, Unloading trailers, Pinch points, Stay clear of moving equipment, Operational Details (6:00 - 6:00) Hold PJSM. Hand placement, Shifting loads on trailers, spotters stay in line of sight Unload equipment, heat up, start up, Spot work Conex's Heat up and power up ,Remove cement, Crane mats, Posts from Around well cellar area, Heat up wellhead open master valve, No pressure , Open Annuals valve no pressure.

Plumb bob well to 60' tag up. Secure well

5.0 Fish Creek #1 DOR-Composit.pdf
3-12-2021
3-11-2021
3-10-2021
3-9-2021
3-8-2021
3-7-2021
3-6-2021
3-5-2021
3-4-2021
3-3-2021
3-2-2021
3-1-2021