This task order statement of work describes requirements for plugging and abandonment of an oil well located in Alaska. The Bureau of Land Management will award a firm fixed price task order under an existing IDIQ contract to a Native American-owned small business. Services will include plugging the Cape Halkett #1 well according to regulatory standards, cleaning debris within 150 feet of the wellhead, and optionally conducting additional remediation. The performance period is August 2024 to December 2025 with an estimated budget over $10 million. The parent IDIQ was set aside for Indian Small Business Economic Enterprises with a guaranteed minimum of $25,000 and total ceiling of $200 million for plugging, abandonment, and remediation of wells on federal lands in Alaska.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAMPLE TASK ORDER #2

Cape Halkett #1

Type of Contract: Firm Fixed Priced (FFP), Single Award Task Order Place of Performance: National Petroleum Reserve-Alaska (NPR-A), Cape Halkett #1 is in the northeast portion of the NPR-A, approximately 51 miles northwest of Nuiqsut and 105 miles east/southeast of Utqiaġvik.

Anticipated Period of Performance: August 2024-December 2025 Order of Magnitude: Over $10,000,000

1. Background The BLM anticipates awarding a Task Order (TO) for Plugging and Abandonment of Cape Halkett #1 with cleanup/remediation of surrounding area.

2. Task Order Basic Requirements

Perform remediation services in accordance with the IDIQ Alaska Legacy and Orphaned Wells Statement of Work (SOW) (Contract Attachment 1) for one legacy well. In accordance with the SOW Section 3.8, alternate equipment will be considered for all wells listed in this task order.

Cape Halkett #1:

· Complete all performance objectives outlined in the SOW.

· Provide a plan to plug in accordance with 43 CFR 3172:

· Confirm cement to surface

· Install marker plate

· Remove any remaining wellhead and cellar components

Surface Requirements:

Suggested site access for Cape Halkett will be provided, similar access routes may be found on the ePlanning website.

A summer site visit shall be conducted to confirm a full debris inventory, conduct debris clean-up and stage debris in super sacks or similar (if needed) for removal during winter work season. A recent BLM Inspection report or similar may be provided upon request.

The Contractor shall provide a Surface Cleanup Plan meeting section 3.6 of the SOW, specifically sections 3.6.1 A & C. Additionally any pilons safely accessible shall be cut at or below ground level. The extent of clean-up will be a minimum of seventy-five (75) feet and a maximum of one hundred-fifty (150) feet radial circumference from the well head, except for on water/ice. The perimeter of clean-up should extend to cover debris within the Cape Halkett area.

3. Legacy Well Site Description and History A general site description and history for the well identified in this Task Order can be found in the BLM Legacy Wells Summary Report, 2013. Site location coordinates provided in the Summary Report are approximate. Updated coordinates from are provided in the Wellbore diagram.

The U.S. Navy drilled Cape Halkett #1 in 1975. No drilling pad appears to have been established. Instead, wooden pilings supported an elevated platform above the water for camp and overall support for drilling operations. There are an extensive number of pilings at Cape Halkett #1 extending west from the well. An open casing extends 2 feet above ground level. It is located inside a steel framed and sheeted cellar that has been sheared on the east side and is completely rusted at the base. The cellar contains minor amounts of metal debris inside and broken cement blocks outside. There is no reserve pit present. However, two low gravel bermed areas were constructed, one around the fuel area and the other for discharge of drilling waste. The Cape Halkett #1 well was plugged back with three cement plugs set at 8,800 feet, 8,200 feet, and 7,830 feet. The final plug was set with a mix of ArcticSet and Class G cement from 1,425 feet to the surface of the well.

4. Well Bore Diagrams The graphic provided representation of the “current state” based upon the known well history. Documentation may not be complete and subsurface conditions may have changed in the time that has elapsed since the well was shut-in/plugged. The government makes no guarantees about the condition of the wells.

5. References Additional information regarding the wells may be found in:

Tetra Tech, 1975. Well History, U.S.N. Cape Halkett 16N-2W-1, Navel Petroleum Reserve No. 4, Alaska https://ePlanning.blm.gov https://pubs.usgs.gov/of/1991/0458/report.pdf

Attachments:

Cape Halkett Wellbore Diagram Cape Halkett Drilling History (Zip Folder) Cape Halkett Site Inspection

6. Optional Task – Additional Clean-up & Remediation The option for additional clean-up and remediation of the Cape Halkett site may be exercised. This would include removal of any contaminated soil beyond the minimum 75-foot/ maximum 150-foot radial area around the wellhead specified in section 2 of this Task Order. Additional information can be found in the Cape Halkett Site Inspection report.

The following clause will be included in any resultant Task Order:

OPTION FOR ADDITIONAL SERVICES—SEPARATELY PRICED LINE ITEMS

The Government may require the delivery of the numbered line items identified in the Schedule as option items at the price stated in the Schedule. The Contracting Officer may unilaterally exercise the option by written notice to the Contractor within 90 days after contract award. Performance of added line-item tasks shall be at the price negotiated in the contract Schedule.