B08_Atch_8_-_Project_Experience_Questionnaire.docx

DOCX document 40 KB Posted

Attached to
LAKE26-0039-PARA FIRE SUPRESSION SYSTEM Federal contract opportunity
Solicitation number
140P8126R0002
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This is a Project Experience Questionnaire attachment for Solicitation 140P8126R0002, a construction project to upgrade fire suppression systems at two National Park Service log cabins located at the Dellenbaugh Admin Site at Grand Canyon-Parashant National Monument. The questionnaire is a template used to evaluate offerors' relevant experience on similar projects and requires submission of responses demonstrating successful completion of comparable work in nature and scope per Section L of the solicitation.

The questionnaire requests offerors to identify referenced projects and provide contractor information, including prime and subcontractor roles, pricing, and performance schedules for the original and final contract values and durations. Respondents must address seven project experience questions: describing work performed by all listed contractors; identifying which Project Experience elements each contractor's work addresses; explaining price and schedule changes with supporting reasons; detailing problems encountered and their resolutions; discussing successful means and methods and their applicability to the proposed project; and providing any additional relevant project information. The template includes fields for project title, location, period of performance, project owner information, and a contractor list with designated spaces for multiple contractors' roles, trades, pricing, and performance periods. This questionnaire serves as an evaluation tool for assessing offerors' qualifications for the fire suppression system installation work, which encompasses plumbing and electrical installations required to bring the two cabins into compliance with current fire code.

View the file

Other files for this federal contract opportunity

Other files attached to LAKE26-0039-PARA FIRE SUPRESSION SYSTEM, newest first.
File Type Posted
B09_Amd_0001_Atch_1_-_Specifications_Revision_0001.pdf PDF
Sol_140P8126R0002_Amd_0001.pdf PDF
B08_Atch_14_-_General_References_Form.docx DOCX document
B08_Atch_15_-_Subcontracting_Percentage_Worksheet.xlsx XLSX spreadsheet
B08_Atch_2_-_Drawings.pdf PDF
B08_Atch_7_-_Price_Schedule.xlsx XLSX spreadsheet
B08_Atch_4_-_Dellenbaugh_Transportation_Map.pdf PDF
B08_Atch_9_-_Past_Performance_Questionnaire.docx DOCX document
B08_Atch_3_-_Product_Data.pdf PDF
B08_Atch_5_-_Construction_Wage_Determination_5_18_26.pdf PDF
B08_Atch_6_-_Proposal_Submission_Cover_Page___ToC.docx DOCX document
Sol_140P8126R0002.pdf PDF
B08_Atch_10_-_Key_Personnel___Trades_Form.docx DOCX document
B08_Atch_11_-_SF_24_Bid_Bond.pdf PDF
B08_Atch_12_-_52_209-7_Response_Form.docx DOCX document
B08_Atch_13_-_52_209-13_Response_Form.docx DOCX document
B08_Atch_1_-_Specifications.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Experience Questionnaire Solicitation: 140P8126R0002

Submit responses to the questions below that demonstrate your relevant experience successfully completing projects of a similar nature and scope as this requirement per the instructions provided in Section L of the Solicitation. Limit submittals to the quantity of projects and timeframes required in the solicitation. Expand the response sections shown below as needed to adequately address each question (this questionnaire may be expanded to multiple pages if needed).

Offeror
Company Name

REFERENCED PROJECT INFORMATION

Project Title
Title
Project Location
City, State
Period of Performance:
MM/DD/YYYY – MM/DD/YYYY
Brief Project Description
Description
Project Owner
Company Name
POC:
First & Last Name
Phone:
(XXX) XXX-XXXX

CONTRACTOR LIST

List Contractor(s) whose experience on the referenced project is being submitted for evaluation on this proposed project. If more than one contractor is listed (i.e. prime and subcontractors), provide information specific to that contractor.

Contractor Name
Role on Referenced Project

(Prime or Sub)

Trade
Price

(list for each contractor’s specific work) Performance Period (calendar days) (list for each contractor’s specific work)

Original
Final
Original
Final
Sparky’s Electrical Company
Prime
Prime
$XXX,XXX
$X,XXX,XXX
XX
XX
ABC Plumbing & Heating, Co
Subcontractor
Plumbing & Mechanical
$X,XXX,XXX
$X,XXX,XXX
XXX
XXX

Subcontractor

PROJECT EXPERIENCE QUESTIONS

1. Describe the project work performed by all contractors listed above.

Response

2. Identify which Project Experience elements listed in section L of the solicitation each contractor’s work addresses.

Response

3. Describe & provide reasons for any changes to the original price for the work described in question 2 above.

Response

4. Describe and provide reasons for any changes to the original schedule for the work described in question 2 above.

Response

5. Describe problems, associated with the work described in question 2 above, which were encountered and how they were resolved. Describe how the offeror’s proposal accounts for similar issues.

Response

6. Describe the means and methods, associated with the work described in question 2 above, which were successful. Would you implement the same means and methods on the proposed project? Why or why not?

Response

7. Provide any other additional project information you believe should be presented.

Response

File details come from the government source that posted it. Updated .