B08_Atch_2_-_Drawings.pdf
PDF 5 MB Posted
- Attached to
- LAKE26-0039-PARA FIRE SUPRESSION SYSTEM Federal contract opportunity
- Solicitation number
- 140P8126R0002
About this file
This document is a comprehensive design and construction set of drawings and specifications for a fire suppression system installation at the Dellenbaugh Administration Site within Grand Canyon Parashant National Monument in Arizona. The project encompasses fire alarm detection systems, fire protection sprinkler systems, and electrical/mechanical infrastructure to support these installations across existing cabin structures, car ports, and covered connectors.
The fire alarm system includes addressable manual pull stations, smoke detectors (photoelectric and heat sensors), notification appliances (horns and strobes), waterflow and valve tamper supervisory switches, and a fire alarm control unit with remote annunciator keypads and power booster panels. The system requires installation of conduit, junction boxes with monitor and control modules, and surge suppressors, with all wiring to be red-colored metal jacketed cable or minimum 3/4-inch conduit. Fire protection specifies a complete sprinkler system with 165°F quick-response upright heads, Schedule 40 and Schedule 10 black steel piping (threaded for 2-inch and smaller, grooved for larger), grooved-end fittings, specialty valves including ball and globe valves, and supervisory devices. The system will operate on an antifreeze solution in compliance with NFPA 13 standards. Electrical work includes a 45KW/56KVA generator, 208V/3-phase 10HP pump, disconnects, starters, and associated controls and monitoring equipment. Specifications mandate compliance with NFPA 13, NFPA 14, NFPA 24, NFPA 25, NFPA 70, NFPA 72, NFPA 101, and applicable IBC codes. The contractor must provide complete shop drawings, three sets of as-built documentation, operation and maintenance manuals on CD, system testing and commissioning, one year warranty period with factory-authorized service, and minimum four hours of owner training upon completion.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_Amd_0001_Atch_1_-_Specifications_Revision_0001.pdf | ||
| Sol_140P8126R0002_Amd_0001.pdf | ||
| B08_Atch_4_-_Dellenbaugh_Transportation_Map.pdf | ||
| B08_Atch_9_-_Past_Performance_Questionnaire.docx | DOCX document | |
| B08_Atch_3_-_Product_Data.pdf | ||
| B08_Atch_5_-_Construction_Wage_Determination_5_18_26.pdf | ||
| B08_Atch_6_-_Proposal_Submission_Cover_Page___ToC.docx | DOCX document | |
| Sol_140P8126R0002.pdf | ||
| B08_Atch_10_-_Key_Personnel___Trades_Form.docx | DOCX document | |
| B08_Atch_8_-_Project_Experience_Questionnaire.docx | DOCX document | |
| B08_Atch_14_-_General_References_Form.docx | DOCX document | |
| B08_Atch_15_-_Subcontracting_Percentage_Worksheet.xlsx | XLSX spreadsheet | |
| B08_Atch_7_-_Price_Schedule.xlsx | XLSX spreadsheet | |
| B08_Atch_11_-_SF_24_Bid_Bond.pdf | ||
| B08_Atch_12_-_52_209-7_Response_Form.docx | DOCX document | |
| B08_Atch_13_-_52_209-13_Response_Form.docx | DOCX document | |
| B08_Atch_1_-_Specifications.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E1 G1
DRAWING LIST
DRAWING# :SHEET # : SHEET DESCRIPTION:
410-668-8000 FAX 410-668-8001
BALTIMORE, MARYLAND 21234-5701
8005 HARFORD ROAD
COVER SHEET
ELECTRICAL LEGEND, NOTES, ABBREVIATIONS, DETAILS,
DIVISION OF EBL ENGINEERS, LLC
SITE MAP N
E2 ELECTRICAL SPECIFICATIONS 3 OF 18
E34 OF 18
AND ONE-LINE DIAGRAM
PROJECT LOCATION PROJECT LOCATION
NO SCALE
345 EAST RIVERSIDE DRIVE
ST. GEORGE, UTAH 84790
INSTALL FIRE SUPPRESSION AT
DELLENBAUGH ADMINISTRATION SITE
GRAND CANYON PARASHANT
NATIONAL MONUMENT, ARIZONA
SITE PLAN - ELECTRICAL
LOCATION MAP N
NO SCALE
EBL FIRE
ENGINEERING
M15 OF 18 MECHANICAL LEGEND, NOTES, ABBREVIATIONS, AND DETAILS
FA1
M2
DRAWING LIST (CONTINUED)
DRAWING# :SHEET # : SHEET DESCRIPTION:
SITE PLAN - MECHANICAL
FIRE ALARM GENERAL NOTES8 OF 18
FA3
FA2
FIRE ALARM SPECIFICATIONS
FIRE ALARM LEGEND, ABBREVIATIONS, RISER DIAGRAM, AND MATRIX
13 OF 18 FP1
DRAWING LIST (CONTINUED)
DRAWING# :SHEET # : SHEET DESCRIPTION:
FIRE PROTECTION GENERAL NOTES, LEGEND, AND ABBREVIATIONS
FP517 OF 18
FP618 OF 18
FP2 FIRE PROTECTION SPECIFICATIONS
CABIN FLOOR PLANS - FIRE PROTECTION
CABIN SECTION - FIRE PROTECTION
7 OF 18 M3
MECHANICAL SPECIFICATIONS
FA411 OF 18 FIRE ALARM SPECIFICATIONS
CABIN FLOOR PLANS - FIRE ALARM
15 OF 18 FP3 FIRE PROTECTION SPECIFICATIONS
16 OF 18 FP4 SITE PLAN - FIRE PROTECTION
FA512 OF 18
G1
COVER SHEET
DESIGNED
DRAWN
CHECKED
DATE:
SUB SHEET NO.
TITLE OF PROJECT
SHEET
OF
PMIS/PKG. NO.
DWG.
NO:
LOCATION WITHIN PARK
TITLE OF PROJECT
UNITED STATES
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE - INTERIOR REGION 8
DESIGN AND PROJECT MANAGEMENT
TITLE OF SHEET
FP FIRM
08/02/2024
XXXXXX
XX
209050
Mark REVISION Date Issued by
EBL
JPM
JPM
100% SUBMISSION
GRAND CANYON PARASHANT, NATIONAL MONUMENT, ARIZONA
INSTALL FIRE SUPPRESSION AT DELLENBAUGH CABIN ADMIN SITE 18
ENGINEERS
ESTABLISHED 1972
Mechanical - Electrical - Fire Protection
8005 Harford Road Baltimore, Maryland 21234-5701
Tel: (410) 668-8000 E-mail: ebl@eblengineers.com
INSTALL FIRE SUPPRESSION AT DELLENBAUGH CABIN ADMIN SITE
ELECTRICAL LEGEND ABBREVIATIONS
SYMBOL DESCRIPTION
JUNCTION BOX - CEILING, WALL MOUNTED - SIZE PER NEC
OR AS INDICATED
MOTOR - HORSEPOWER AS NOTED
GENERATOR - SIZE AND TYPE AS NOTED
GFI RECEPTACLE - 20A., 125V. - MOUNTING HEIGHT 18"
UNLESS NOTED OTHERWISE SPECIFIED
HOMERUN TO PANEL - NUMBER OF ARROWS INDICATE
CONDUIT - UNDERGROUND
CONDUIT - IN OR ON CEILING OR WALLS
PANELBOARD - EXISTING
NUMBER OF CIRCUITS AND NUMBER OF CROSSLINES
INDICATES NUMBER OF #12 PHASE & NEUTRAL
CONDUCTORS - WHERE NO CROSSLINES APPEAR
2#12 CONDUCTORS ARE IMPLIED. GROUND WIRE IS
NOT SHOWN BUT REQUIRED. PROVIDE #12 GROUND
WIRE UNLESS OTHERWISE INDICATED.
1. ALL WIRE SIZES SHOWN ARE FOR COPPER CONDUCTORS.
2. DO NOT ROUTE CONDUIT EXPOSED ON BUILDING EXTERIOR. CONDUIT SHALL
ENTER BUILDING AT CLOSEST POINT OF USAGE SERVING EXTERIOR EQUIPMENT
UNLESS OTHERWISE INDICATED.
3. AMPACITY FOR CONDUCTORS 100 AMPS AND LESS SHALL BE BASED ON THE 60
DEGREE C AMPACITY RATING AS DEFINED BY THE NATIONAL ELECTRICAL CODE.
CONDUCTORS FOR AMPACITIES GREATER THAN 100 AMPS SHALL BE BASED ON
THE 75 DEGREE C RATING AS DEFINED BY THE NATIONAL ELECTRICAL CODE.
4. ELECTRICAL EQUIPMENT SUITABLE FOR EXTERIOR USE SHALL BE NEMA 3R RATED
UNLESS OTHERWISE INDICATED.
5. ALL WORK SHALL COMPLY WITH ALL APPLICABLE CODES IN FORCE AT THE TIME OF
CONSTRUCTION.
6. PROVIDE EQUIPMENT REQUIRING AIR CIRCULATION WITH THE CLEARANCE
REQUIRED BY THE MANUFACTURER UNLESS OTHERWISE INDICATED.
7. ELECTRICAL CONTRACTOR SHALL COORDINATE ELECTRICAL EQUIPMENT
INSTALLATION WITH OTHER TRADES.
8. FEEDER TAPS TO PARALLEL CONDUCTORS SHALL TAP ALL PARALLEL
CONDUCTORS.
9. FOR PARALLEL CONDUCTORS, DO NOT RUN ALL OF THE SAME PHASES IN A SINGLE
CONDUIT. EACH PARALLELED CONDUIT SHALL CONSIST OF ALL THREE PHASE
WIRES, NEUTRAL AND GROUND, AS APPLICABLE.
10. THE CONTRACTOR SHALL FIELD CHECK AND VERIFY ALL DIMENSIONS AND
ELEVATIONS OF EXISTING WORK PRIOR TO FABRICATION AND INSTALLATION OF
NEW MATERIAL.
11. THE CONTRACTOR SHALL SATISFY THEMSELVES AS TO THE LOCATION OF
EXISTING UTILITIES. FOR ALL UNDERGROUND WORK AND WHERE DRILLING OR
CUTTING EXISTING CONCRETE FLOORS, CONTRACTOR SHALL USE GROUND
PENETRATING RADAR TO EXAMINE THE CONCRETE FOR UTILITIES AND
STRUCTURAL MEMBERS. IF ANY OBSTRUCTIONS ARE FOUND, THE CONTRACTOR
SHALL MOVE TO ANOTHER LOCATION FREE OF OBSTRUCTIONS.
12. THE CONTRACTOR SHALL EXERCISE CARE WHEN WORKING NEAR AREAS THAT ARE
EXISTING TO REMAIN. IF THE CONTRACTOR DAMAGES ANY OF THOSE AREAS
DURING THE COURSE OF CONSTRUCTION, REPAIR IN-KIND WITHOUT CHARGE TO
THE OWNER.
13. A SEPARATE GROUND AND NEUTRAL WIRE SHALL BE RUN WITH EACH FEEDER AND
BRANCH CIRCUIT. GROUND WIRE SHALL BE SIZED AS REQUIRED BY THE NATIONAL
ELECTRICAL CODE, UNLESS OTHERWISE INDICATED.
14. WHERE CIRCUIT BREAKERS ARE ADDED TO EXISTING PANELBOARDS, CIRCUIT
BREAKERS SHALL MATCH THE PANELBOARD'S AIC RATING.
15. COORDINATE EXACT LOCATION AND MOUNTING HEIGHTS OF ALL DEVICES WITH
NATIONAL PARK SERVICES PRIOR TO INSTALLATION.
16. WHERE ITEMS ARE REMOVED OR REPLACED, CONTRACTOR SHALL PATCH AND
PAINT REMAINING EXPOSED SURFACES TO MATCH EXISTING ADJACENT
SURFACES.
17. ALL INTERIOR AND EXTERIOR PENETRATIONS CREATED BY REMOVAL OR CREATED
BY INSTALLATION SHALL BE SEALED AND/OR REPAIRED TO MATCH ADJACENT
CONSTRUCTION AND FIRE RATINGS.
18. ALL ABANDONED PIPING, CONDUIT, ETC., SHALL BE REMOVED TO A POINT OF
CONCEALMENT AND CAPPED. WIRING SHALL BE REMOVED TO SOURCE OR
NEAREST POINT OF USAGE OUTSIDE THE SCOPE OF WORK.
GENERAL NOTES: (APPLY TO ALL ELECTRICAL DRAWINGS)
A
AC
AFF
AFG
AIC
BKR
C
CB
CLG
CU
DISC
DWG
EMT
EX
F
FLA
GEN
GFI
HP
JB
KV
KVA
KW
LRA
MAX
MIN
MLO
NEC
NF
NO.,#
P
PVC
RX
S/N
SPD
SPECS
TYP
UG
V W W/
WP
AMPERE
ALTERNATING CURRENT
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AMPERES INTERRUPTING CAPACITY
BREAKER
CONDUIT
CIRCUIT BREAKER
CEILING
COPPER
DISCONNECT
DRAWING
ELECTRICAL METALLIC TUBING
EXISTING
FUSED OR FUSIBLE
FULL LOAD AMPERES
GENERATOR
GROUND FAULT INTERRUPTER
HORSEPOWER
JUNCTION BOX
KILO-VOLTS
KILO-VOLTS-AMPERES
KILOWATTS
LOCKED ROTOR AMPERES
MAXIMUM
MINIMUM
MAIN LUGS ONLY
NATIONAL ELECTRICAL CODE
NON-FUSED
NUMBER
POLE (1P., 2P., 3P.)
POLYVINYL CHLORIDE
REMOVE EXISTING
SOLID NEUTRAL
SURGE PROTECTIVE DEVICE
SPECIFICATIONS
TYPICAL
UNDERGROUND
VOLTS
WATTS
WITH
WEATHERPROOF
G GROUND
M
G 3P-60A
ONE-LINE DIAGRAM
NOT TO SCALE
PUMP-1, 208V,
3Ø, 10HP
PV PHOTOVOLTAIC
45KW/56KVA GENERATOR 2, 208/120V, 3Ø, 4W.
PROVIDE 200AF ADJUSTABLE CIRCUIT
BREAKER AND SET TRIP SETTING AT 60A.
BOND NEUTRAL AND GROUND AT GENERATOR
3#8 & 1#10 G IN 3/4"C
3#8 & 1#10 G IN 3/4" UNGERGROUND
SCHEDULE 80 PVC CONDUIT. MAKE TRANSITION
TO EMT CONDUIT FOR BUILDING INTERIOR
NO NORMALLY OPENED
NC NORMALLY CLOSED
ETR EXISTING TO REMAIN
MTS MANUAL TRANSFER SWITCH
3/4" x 10' COPPER-CLAD
STEEL GROUND ROD
#8 - 3/4"C
LEAN-TO STRUCTURE
EXAMPLE
NOT TO SCALE
GROUND ROD
NO SCALE
RESTORE TO ORIGINAL
CONDITION AND MOUND
FOR ANTICIPATED
SETTLEMENT
TRENCHING DETAIL
(FOR UNPAVED AREAS)
YELLOW TRACEABLE TAPE (6"
WIDE) MARKED "CAUTION -
BURIED ELECTRIC LINE
BELOW" FOR POWER CONDUIT
DISCONNECT SWITCH - FUSED, NON-FUSED - TYPE AND
RATING AS INDICATED
CONTACTOR, RELAY - TYPE AS INDICATED OR REQUIRED
3P-60A, 240V DISCONNECT SWITCH
IN NEMA 3R ENCLOSURE
18"
GRADE
GALVANIZED STEEL
STRUT (TYPICAL)
PUMP-1 NON-FUSED
DISCONNECT SWITCH, 3P-60A,
240V IN NEMA 3R ENCLOSURE
NO SCALE
PUMP-1 DISCONNECT
MOUNTING DETAIL
12"
18"
12"
3000 PSI CONCRETE
, MAGNETIC STARTER, COMBINATION TYPE STARTER - TYPE
AND RATING AS INDICATED
120V PRESSURE SWITCH
3P-60A, 240V COMBINATION TYPE
STARTER/DISCONNECT SWITCH W/ NEMA
2 SOFT STARTER IN NEMA 1 ENCLOSURE
120V RELAY, SPDT WITH 1 NO, 1 NC
CONTACTS FOR GENERATOR
START SIGNAL AS REQUIRED
SPDT SINGLE-POLE DOUBLE-THROW
3#4 & 1#8 G IN 1-1/4"C. MAKE TRANSITION
FROM EMT TO SCHEDULE 80 PVC
CONDUIT FOR OUTDOOR BURIAL
2#10 & 1#10 G IN 3/4" SCHEDULE
80, UNDERGROUND PVC CONDUIT
12"
3"
6"
SAND
SOD
WIDTH AS
REQUIRED
FINISHED
GRADE
COMPACTED BACKFILL,
COMPACTION EQUAL
TO THE ADJACENT
UNDISTURBED SOIL
30" MINIMUM
PVC CONDUIT WITH
PULL STRING
2#12 & 1#12 G - 3/4"C FOR
ENGINE START CIRCUIT
4"
ADDITIONAL CONDUIT
AS REQUIRED
KEY SWITCH - SINGLE POLE - MOUNTING HEIGHT 4'-0"
TIME DELAY CONTACT BLOCK. SET TO 15
SECONDS. CONNECT TO CONTACTOR IN
COMBINATION STARTER
2#12 & 1#12 G - 3/4"C
HANDHOLE - POLYMER CONCRETE ENCASED AND RATED FOR
#8 COPPER (IF REQUIRED FOR
ADDITIONAL GROUND ROD)
ADDITIONAL GROUND
ROD IF REQUIRED
TIER 22 TRAFFIC LOADING - SIZE AS PER NEC
NOTES:
1. CONTRACTOR SHALL MEASURE RESISTANCE TO EARTH OF GROUND ROD. IF
RESISTANCE IS GREATER THAN 25 OHMS, CONTRACTOR SHALL PROVIDE ADDITIONAL
GROUND ROD AS PER NEC 250.53 (A)(2). PROVIDE MINIMUM 10' DISTANCE BETWEEN
GROUND RODS.
2. 120V PRESSURE SWITCH TO START GENERATOR ENGINE IMMEDIATELY UPON LOSS
OF PRESSURE IN FIRE SPRINKLER ASSEMBLY. PUMP-1 SHALL START WITH A 15
SECOND DELAY AFTER GENERATOR.
TIME DELAY AUXILIARY CONTACT BLOCK - TYPE TELEMECANIQUE
LADT2 OR APPROVED EQUAL
J
2#12 & 1#12 G - 3/4"C
2#12 & 1#12 G - 3/4"C
ELECTRICAL LEGEND, NOTES, ABBREVIATIONS, DETAILS &
ONE-LINE DIAGRAM 2
E1
DESIGNED
DRAWN
CHECKED
DATE:
SUB SHEET NO.
TITLE OF PROJECT
SHEET
OF
PMIS/PKG. NO.
DWG.
NO:
LOCATION WITHIN PARK
TITLE OF PROJECT
UNITED STATES
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE - INTERIOR REGION 8
DESIGN AND PROJECT MANAGEMENT
TITLE OF SHEET
FP FIRM
08/02/2024
XXXXXX
XX
209050
Mark REVISION Date Issued by
EBL
JPM
JPM
100% SUBMISSION
GRAND CANYON PARASHANT, NATIONAL MONUMENT, ARIZONA
INSTALL FIRE SUPPRESSION AT DELLENBAUGH CABIN ADMIN SITE 18
ENGINEERS
ESTABLISHED 1972
Mechanical - Electrical - Fire Protection
8005 Harford Road Baltimore, Maryland 21234-5701
Tel: (410) 668-8000
SECTION 260000 - GENERAL ELECTRICAL REQUIREMENTS
1. PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, SUPERVISION, SERVICES, ETC. NECESSARY FOR AND INCIDENTAL TO THE COMPLETE INSTALLATION OF ALL ELECTRICAL WORK AND RELATED SYSTEMS AS SHOWN ON THE DRAWINGS, SPECIFIED HEREIN, AND/OR REQUIRED TO DELIVER TO THE OWNER A COMPLETE INSTALLATION READY FOR CONTINUOUS AND SATISFACTORY
OPERATION.
2. THE CONTRACTOR SHALL EXAMINE THE PREMISES PRIOR TO SUBMITTING HIS BID AND OBSERVE THE CONDITIONS UNDER WHICH THE WORK WILL BE DONE OR OTHER CIRCUMSTANCES WHICH WILL AFFECT THE CONTEMPLATED WORK. NO ALLOWANCE WILL BE MADE SUBSEQUENTLY IN THIS CONNECTION FOR ANY ERROR OR NEGLIGENCE ON THE CONTRACTOR'S PART.
3. THE CONTRACTOR SHALL SECURE AND PAY FOR ALL REQUIRED PERMITS.
4. THE CONTRACTOR SHALL SECURE AND PAY FOR ALL REQUIRED INSPECTIONS.
5. CERTIFICATES OF FINAL INSPECTION AND APPROVAL REQUIRED BY AGENCIES OR AUTHORITIES HAVING JURISDICTION SHALL
COVER ALL ELECTRICAL WORK.
6. ALL ELECTRICAL EQUIPMENT AND SYSTEMS SHALL BE GUARANTEED BY THE CONTRACTOR FOR TWO (2) YEARS AFTER DATE OF
ACCEPTANCE.
7. CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ALL REPAIRS AND ADJUSTMENTS TO EQUIPMENT AND SYSTEMS DURING THIS GUARANTEE PERIOD. CONTRACTOR SHALL BE RESPONSIBLE FOR SERVICING THE MANUFACTURERS WARRANTIES DURING THE
WARRANTY PERIOD.
8. COMPLETE SHOP DRAWINGS AND MATERIAL LISTS SHALL BE SUBMITTED BY THE CONTRACTOR FOR THE APPROVAL OF THE ENGINEER IN ACCORDANCE WITH THE REQUIREMENTS OF THE GENERAL CONDITIONS. NO WORK SHALL BE FABRICATED OR
ORDERED BY THE CONTRACTOR UNTIL APPROVAL HAS BEEN GIVEN BY THE ENGINEER.
9. THE ELECTRICAL WORK COVERED UNDER THE SPECIFICATIONS AND DRAWINGS SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE (N.E.C), THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA 70), (NFPA 72), (NFPA 90A), (NFPA 101), (NFPA 1221), THE AMERICANS WITH DISABILITIES ACT (ADA), AND UL LABORATORIES (UL 1971).
10. THE CONTRACTOR SHALL PROVIDE TESTS AND ADJUSTMENTS FOR THE DISTRIBUTION SYSTEM (600 VOLTS AND BELOW)
INCLUDING:
A. THAT ALL LIGHTING, POWER AND CONTROL CIRCUITS ARE CONTINUOUS AND FREE FROM SHORT CIRCUITS.
B. THAT ALL CIRCUITS ARE FREE FROM UNSPECIFIED GROUNDS.
C. THAT THE RESISTANCE TO GROUND OF ALL NON-GROUNDED CIRCUITS IS LESS THAN ONE MEGOHM.
D. THAT ALL CIRCUITS ARE PROPERLY CONNECTED IN ACCORDANCE WITH THE APPLICABLE WIRING DIAGRAMS.
E. THAT ALL CIRCUITS ARE OPERABLE WHICH DEMONSTRATION SHALL INCLUDE FUNCTIONING OF EACH CONTROL NOT LESS THAN TEN TIMES AND CONTINUOUS OPERATION OF EACH LIGHTING AND POWER CIRCUIT FOR NOT LESS THAN 1/2 HOUR.
11. THE CONTRACTOR SHALL PROVIDE THE OWNER, UPON COMPLETION AND ACCEPTANCE OF THE WORK, WITH A SET OF REPRODUCIBLE RECORD DRAWINGS, CLEARLY SHOWING THE PATH OF THE UNDERGROUND SYSTEMS, LOCATIONS OF EQUIPMENT, AND ANY DIMENSIONAL CHANGES.
12. ALL EQUIPMENT (DISCONNECTS, PANELBOARDS, STARTERS, RELAYS, SWITCHES WITH PILOT LIGHTS, PUSHBUTTON STATIONS, ETC.) SHALL BE IDENTIFIED AS TO ITS FUNCTION, EQUIPMENT, OR AREA SERVED, ETC.
13. ON THE COMPLETION OF THE WORK, THE SYSTEMS AND EQUIPMENT SHALL BE CAREFULLY TESTED BY THE CONTRACTOR FOR ACTUAL OPERATION, AND THE VARIOUS PIECES OF EQUIPMENT MADE TO FUNCTION AS INTENDED. THE ENTIRE INSTALLATION WILL
NOT BE READY FOR ACCEPTANCE UNTIL IT IS FUNCTIONING SMOOTHLY AND SATISFACTORILY.
14. ELECTRICAL CONTRACTOR SHALL COORDINATE ALL ELECTRICAL REQUIREMENTS FOR THE SUPPLIED MECHANICAL EQUIPMENT WITH THE MECHANICAL CONTRACTOR. ANY ELECTRICAL CHANGES OF THE MECHANICAL EQUIPMENT FROM THE BASIS OF DESIGN
SHALL BE MADE BY THE ELECTRICAL CONTRACTOR AT NO ADDITIONAL CHARGES.
SECTION 260519 - WIRE (600 VOLTS)
1. ALL WIRING SHALL BE SOFT DRAWN COPPER, 98% CONDUCTIVITY, 600 VOLT INSULATION, N.E.C. TYPE THWN-2 (90°C INSULATION).
TYPE USE-2 TO BE USED FOR DIRECT BURIED CABLE.
2. ALL WIRING SHALL HAVE IDENTIFICATION MARKINGS ALONG THEIR OUTER BRAID DENOTING CONDUCTOR SIZE, TYPE OF INSULATION, AND MANUFACTURER'S TRADE NAME. ALL WIRING SHALL BE COLOR CODED THROUGHOUT BRANCH CIRCUITS AS
FOLLOWS:
PHASE 208/120 VOLTS
A BLACK
B RED
C BLUE
NEUTRAL WHITE
GROUND GREEN
3. WIRE PULLING COMPOUNDS SHALL BE AS REQUIRED BY THE MANUFACTURER. THE USE OF OILS AND GREASES SHALL NOT BE
PERMITTED.
4. ALL WIRING FOR 120 VOLTS GENERAL BRANCH CIRCUITS SHALL BE SIZED AS FOLLOWS, UNLESS OTHERWISE INDICATED:
HOME RUN LENGTH WIRE SIZE
0 - 75' #12 75 - 150' #10
OVER 150' #8
CIRCUIT LENGTH WIRE SIZE
0 - 100' #12
OVER 150' #10
5. ALL SPLICING IN BRANCH CIRCUIT AND FEEDERS SHALL BE MADE IN OUTLET BOXES, JUNCTION BOXES, AND OUTLET ENCLOSURES
APPROVED FOR THE PURPOSE. ALL SPLICES SHALL BE ACCESSIBLE.
6. ALL SPLICES IN COPPER FEEDERS AND BRANCH CIRCUIT WIRING FOR SIZES #12-#10 SHALL BE MADE WITH NON-TOOL, SELF-INSULATED, APPLIED WIRE CONNECTIONS WITH INTEGRAL SELF-LOCKING SPRING GRIP, IDEAL "WINGNUTS" OR APPROVED
EQUIVALENT.
7. ALL SPLICES IN FEEDERS WITH BRANCH CIRCUIT WIRING FOR SIZES #8 AND LARGER SHALL BE MADE WITH MECHANICAL
COMPRESSION TYPE CONNECTORS BY BURNDY, O-Z, T&B OR EQUAL.
8. WIRING FOR ENGINE START CIRCUIT SHALL BE STRANDED.
SECTION 260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
1. ALL WIRING SHALL BE INSTALLED IN CONDUIT AS HEREINAFTER SPECIFIED, UNLESS INDICATED OTHERWISE.
2. RIGID METAL CONDUITS AND COUPLINGS SHALL BE FULL WEIGHT, HEAVY WALL STEEL, GALVANIZED, WITH THREADED CONNECTIONS CONFORMING TO THE LATEST EDITIONS AND REVISIONS OF ANSI STANDARD C-80.1, FEDERAL SPECIFICATION WW-C-581E AND LISTED BY UNDERWRITERS' LABORATORIES AS CONFORMING TO STANDARD UL 6.
3. ELECTRICAL METALLIC TUBING (E.M.T.) SHALL BE GALVANIZED, CONFORMING TO THE LATEST EDITIONS AND REVISIONS OF ANSI STANDARD C80.3, FEDERAL SPECIFICATION WW-C-563, AND LISTED BY UNDERWRITER'S LABORATORIES AS CONFORMING TO
STANDARD 797.
4. POLYVINYL CHLORIDE (PVC) CONDUIT SHALL BE HEAVY WALL (TYPE 80) CONFORMING TO THE LATEST EDITIONS AND REVISIONS OF FEDERAL SPECIFICATION WC-1094, UNDERWRITER'S LABORATORIES, AND NEMA STANDARD TC-2.
5. FLEXIBLE METAL CONDUIT (FMC) SHALL BE STEEL, METAL STRIP INTERLOCKED CONSTRUCTION, ZINC-COATED, CONFORMING TO THE LATEST EDITIONS AND REVISIONS OF FEDERAL SPECIFICATION WW-C566B AND UNDERWRITERS' LABORATORIES STANDARD FOR FLEXIBLE STEEL CONDUIT, UL 1. LIQUID TYPE FLEXIBLE METAL CONDUIT SHALL BE "SEALTITE" TYPE UA WITH PVC COVER BY
ANACONDA, OR APPROVED EQUAL, WITH LIQUID TYPE BOX CONNECTORS.
6. EMT CONDUIT SHALL BE USED FOR INDOOR APPLICATIONS, EXCEPT WHERE FLEXIBLE METAL CONDUIT IS PERMITTED. RIGID METAL CONDUIT SHALL BE USED IN EXTERIOR LOCATIONS. PVC SHALL BE USED FOR UNDERGROUND. MAKE TRANSITION FROM PVC TO
RIGID GALVANIZED STEEL CONDUIT BELOW GRADE AT ELBOW TURNING UP.
7. FLEXIBLE METAL CONDUIT (FMC) SHALL BE USED:
A. FOR CONNECTIONS TO MOTOR TERMINAL BOXES, DRY TYPE TRANSFORMERS, ENGINE GENERATORS AND OTHER VIBRATION
PRODUCING EQUIPMENT, IN 18"-36" LENGTHS, LIQUID-TIGHT ONLY.
8. ALL CONDUITS INSTALLED EXPOSED SHALL BE RIGIDLY SUPPORTED AND SHALL CLOSELY FOLLOW CEILING AND BUILDING
STRUCTURE CONTOURS.
9. CONDUITS PASSING FROM HEATED TO UNHEATED SPACES, EXTERIOR SPACES, REFRIGERATED SPACES, COLD AIR PLENUMS, ETC., SHALL BE SUITABLY SEALED WITH "DUXSEAL" BY JOHNS MANVILLE OR SEALING FITTINGS TO PREVENT ACCUMULATION OF
CONDENSATION.
10. PROVIDE PULL ROPE IN ALL EMPTY CONDUITS.
11. ALL BOXES HEREIN SPECIFIED SHALL BE GALVANIZED STEEL OR CAST MALLEABLE IRON AND OF A TYPE SUITABLE FOR THE
INTENDED USE.
12. MANUFACTURED BOXES SHALL BE APPLETON, RACO, STEEL CITY, CROUSE-HINDS, OR AN APPROVED EQUIVALENT.
13. BOXES IN EXTERIOR, DAMP OR WET LOCATIONS SHALL BE EQUIPPED WITH COVER GASKETS.
14. HANDHOLE BOXES SHALL BE POLYMER CONCRETE ENCASED AND DESIGNED TO MEET ANSI/SCTE 77 SPECIFICATIONS. HANDHOLE BOXES SHALL BE RATED FOR TIER 22 TRAFFIC LOADING. INSTALL HANDHOLE BOXES AS PER MANUFACTURER'S STANDARD FOR
TIER 22 TRAFFIC LOADING.
SECTION 262726 - WIRING DEVICES
1. WIRING DEVICES SHALL BE PASS & SEYMOUR, ARROW-HART, HUBBELL, BRYANT, OR GENERAL ELECTRIC. DEVICE CATALOG
NUMBERS LISTED BELOW ARE PASS & SEYMOUR UNLESS INDICATED OTHERWISE.
2. GROUND FAULT INTERRUPTING (GFI) TYPE RECEPTACLES SHALL BE POLARIZED, GROUNDING TYPE, 15 AMPERE, 120 VOLT, 2 POLE, 3 WIRE, DUPLEX, NEMA CONFIGURATION 5-15R, CATALOG NUMBER 1591-F1 (IVORY) WITH #93061 PLATE. PROVIDE WITH IN-USE, WEATHERPROOF COVER.
3. DEVICE PLATES SHALL BE AS FOLLOWS: FOR GENERAL USE, PLASTIC IVORY, WEATHERPROOF, CATALOG #4500 FOR SWITCH BOX
OR #4510 FOR FS BOX.
SECTION 262816 - ENCLOSED SAFETY SWITCHES AND CIRCUIT BREAKERS
1. SAFETY SWITCHES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE LATEST EDITIONS AND REVISIONS OF NEMA STANDARD KS-1, FEDERAL SPECIFICATION W-S-865C AND UNDERWRITER'S LABORATORIES STANDARD 98. SAFETY SWITCHES USED FOR SERVICE ENTRANCE SHALL BE SERVICE ENTRANCE RATED AND BEAR THE UL SERVICE ENTRANCE LABEL.
2. SWITCHES SHALL BE FUSIBLE OR NON-FUSIBLE AS INDICATED ON THE DRAWINGS OR AS REQUIRED BY THE EQUIPMENT SERVED, HORSEPOWER RATED (U.L. LISTED), QUICK-MAKE, QUICK-BREAK, HEAVY-DUTY TYPE WITH INTEGRAL ARC SUPPRESSORS AND HANDLE AS PART OF ENCLOSURE, NOT COVER. WHERE THE FAULT CURRENT EXCEEDS 10,000 AMPS AT A NON-FUSED SAFETY SWITCH, PROVIDE A FUSED SAFETY SWITCH AND FUSE BASED ON THE SWITCH RATING UNLESS OTHERWISE INDICATED. ENCLOSED CIRCUIT BREAKER AMPERE INTERRUPTING CAPACITY SHALL EQUAL OR EXCEED THE AVAILABLE FAULT CURRENT AT THE
ENCLOSED CIRCUIT BREAKER LOCATION.
3. SWITCHES ON 208/120 VOLTS SERVICE SHALL BE RATED 240 VOLTS.
4. SWITCHES SHALL BE MANUFACTURED BY GENERAL ELECTRIC, SQUARE D, CUTLER-HAMMER, OR SIEMENS.
SECTION 262913 - MOTOR STARTERS
1. ALL STARTERS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE LATEST EDITION AND REVISION OF NEMA STANDARDS.
2. PROVIDE REDUCED VOLTAGE SOFT STARTERS WHERE INDICATED ON THE DRAWINGS, IN SURFACE-MOUNTED N.E.M.A. 1 ENCLOSURES, UNLESS OTHERWISE INDICATED. MAGNETIC-STARTERS SHALL BE GENERAL ELECTRIC TYPE CR306, OR EQUAL, BY
SQUARE D, CUTLER-HAMMER OR SIEMENS. EACH STARTER SHALL INCLUDE THE FOLLOWING:
A. MANUAL RESET-TYPE OVERLOAD HEATERS, ONE IN EACH PHASE, WITH EXTERNAL RESET BUTTON, PROPERLY SIZED FOR THE
MOTOR PROVIDED IN ACCORDANCE WITH THE MOTOR NAMEPLATE DATA.
B. SOLID STATE OVERLOAD WITH ADJUSTABLE TRIP CURRENT, PHASE LOSS AND UNBALANCE PROTECTION. RELAYS SHALL BE AMBIENT INSENSITIVE AND SELF-POWERED. RELAY SHALL HAVE SELECTABLE 10/20 TRIP CLASS AND CLASS II GROUND FAULT
DETECTION.
C. A 120 VOLT CONTROL COIL AND CONTROL TRANSFORMER WITH 120 VOLT SECONDARY AND SECONDARY FUSED PROTECTION.
SIZE FOR THE LOAD PLUS 50% SPARE CAPACITY.
D. PROVIDE CONTROL (H-O-A) SWITCHES WITH EACH STARTER.
E. PROVIDE RED "RUNNING" PILOT LIGHT.
F. PROVIDE 1-30 SECOND ADJUSTABLE TIME DELAY CONTACT BLOCK WITH 1NO, 1NC CONTACT. PROVIDE ADDITIONAL AUXILIARY
CONTROL CONTACTS AS REQUIRED BY THE CONTROL SEQUENCE.
G. PROVIDE TIME DELAY CONTACTS OR RELAY TO START PUMP-1 15 SECONDS AFTER RECEIVING PUMP START SIGNAL FROM
PRESSURE SWITCH.
SECTION 263213 - ENGINE GENERATORS
1. PROVIDE 45KW/56KVA, 208/120V, 3Ø, 4W, PACKAGED ENGINE - GENERATOR SET FOR STANDBY POWER SUPPLY. ENGINE SHALL BE PROPANE FUELED. GENERATOR SHALL BE CONNECTED TO THE EXISTING PROPANE LINES/TANK. COOLING SYSTEM AND CONTROL
AND MONITORING PANEL SHALL BE UNIT MOUNTED.
2. PROVIDE WEATHER PROTECTIVE ENCLOSURE. PROVIDE MANUFACTURER'S STANDARD MUFFLER.
3. COMPLY WITH APPLICABLE STATE AND LOCAL GOVERNMENT REQUIREMENTS FOR ENGINE EXHAUST EMISSIONS.
4. PROVIDE VIBRATION ISOLATORS OF ENGINE SKID MOUNTS RECOMMENDED BY EQUIPMENT MANUFACTURER.
5. EQUIPMENT SHALL OPERATE WITHIN AN AMBIENT TEMPERATURE RANGE OF 0°-104°F AND FROM SEA LEVEL TO 2,200 FEET WITHOUT
DE-RATING.
6. CONTRACTOR TO RE-USE EXISTING CONCRETE PAD FOR MOUNTING AND EXPAND EXISTING CONCRETE PAD AS REQUIRED. CAST
ANCHOR-BOLT INSERT INTO BASES.
7. EQUIPMENT MANUFACTURER SHALL BE BY CATERPILLAR; KOHLER CO.; ONAN/CUMMINS POWER GENERATORS; SPECTRUM DETROIT DIESEL. BASIS OF DESIGN IS SPARK-IGNITED GENERATOR SET MODEL C45N6 BY CUMMINS POWER GENERATION.
8. NOMINAL POWER OUTPUT RATING AND VOLTAGE CHARACTERISTICS SHALL BE AS INDICATED ON THE DRAWINGS.
9. PROVIDE BATTERY CHARGER CURRENT LIMITING, AUTOMATIC EQUALIZING AND FLOAT CHARGING FOR BATTERY. BATTERY
CHARGER SHALL BE 192 WATTS AT 120V.
10. GOVERNOR REGULATION CLASS SHALL BE ISO 8528 PART 1 CLASS G3. FREQUENCY REGULATION SHALL BE ISOCHRONOUS.
11. BATTERY CAPACITY SHALL BE 850 AMPS AT AMBIENT TEMPERATURE OF 0°F TO 32°F. BATTERY CHARGING ALTERNATOR SHALL BE
52 AMPS.
12. ENGINE GENERATOR SHALL SHUT DOWN ON OVERSPEED, HIGH AND LOW TEMPERATURE COOLANT, LOW OIL PRESSURE AND
GENERATOR OVERLOAD.
13. GENERATOR SHALL BE CAPABLE OF MEETING NFPA 110 REQUIREMENTS WITHOUT ADDITIONAL ACCESSORIES.
14. PROVIDE ENGINE EXERCISER. PROVIDE COOLANT/BLOCK HEATER OF 1500 WATTS AT 120V.
ELECTRICAL SPECIFICATIONS
ELECTRICAL SPECIFICATIONS 3
E2
DESIGNED
DRAWN
CHECKED
DATE:
SUB SHEET NO.
TITLE OF PROJECT
SHEET
OF
PMIS/PKG. NO.
DWG.
NO:
LOCATION WITHIN PARK
TITLE OF PROJECT
UNITED STATES
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE - INTERIOR REGION 8
DESIGN AND PROJECT MANAGEMENT
TITLE OF SHEET
FP FIRM
08/02/2024
XXXXXX
XX
209050
Mark REVISION Date Issued by
EBL
JPM
JPM
100% SUBMISSION
GRAND CANYON PARASHANT, NATIONAL MONUMENT, ARIZONA
INSTALL FIRE SUPPRESSION AT DELLENBAUGH CABIN ADMIN SITE 18
ENGINEERS
ESTABLISHED 1972
Mechanical - Electrical - Fire Protection
8005 Harford Road Baltimore, Maryland 21234-5701
Tel: (410) 668-8000
EXISTING
CABIN
EXISTING
CAR PORT
EXISTING
CABIN
EXISTING
CAR PORT
AC
C
ES
S
R O
AD
EXISTING
ELECTRICAL/PV
BUILDINGEXISTING
STRUCTURE
EXISTING
STRUCTURE
EXISTING
STRUCTURE
EXISTING ELEVATED
WATER STORAGE TANK
EXISTING
FREEZER
BUILDING
EXISTING
UNDERGROUND
WATER LINE
(TYPICAL)
EXISTING
DRY WELL
EXISTING
UNDERGROUND
ELECTRICAL
LINE (TYPICAL)
EXISTING
UNDERGROUND
SANITARY
LINE (TYPICAL)
X
X
X
X
DW
DW
DW
DW
DW
D W
DW
DW
DW
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
SS
SS
SS
SS
X
X
X
X
X
X
D W
UG
E
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
UGE UGE UGE
UGE
UGE UGE
UGE
UGE
DW
DW
DW
D W
D W
D W
DW
DW
D W
EXISTING
PROPANE
TANK
EXISTING
UNDERGROUND
WATER STORAGE
TANKS
M
PUMP-1, 208V,
3Ø, 10HP
SEE PART PLAN ON THIS
DRAWING FOR WORK IN
THIS AREA
SEE PART PLAN ON THIS
DRAWING FOR CONTINUATION
3#8 & 1#10 G - 3/4"C
EXISTING
UNDERGROUND
WATER STORAGE
TANK SITE
EXISTING
STRUCTURE
EXISTING
STRUCTURE
EXISTING
CONCRETE
SIDEWALK
SEE PART PLAN ON THIS
DWG FOR CONTINUATION
3#4 & 1#8 G IN 1-1/4" UNDERGROUND,
SCHEDULE-80 PVC CONDUIT FOR PUMP-1 FEEDER
& 2#10 & 1#10 G IN 3/4" CONDUIT FOR GENERATOR
2 ENGINE START CIRCUIT & TIME DELAY CONTACT
BLOCK FOR PUMP-1 STARTER. MINIMUM CONDUIT
DEPTH SHALL BE 30" BELOW GRADE
SEE PART PLAN ON THIS
DRAWING FOR WORK IN
THIS AREA
H
H
2#10 & 1#10 G IN 3/4" CONDUIT FOR
GENERATOR 2 ENGINE START CIRCUIT & TIME
DELAY CONTACT BLOCK FOR PUMP-1
STARTER. MINIMUM CONDUIT DEPTH SHALL
BE 30" BELOW GRADE
GENERAL NOTES:
DRAWING NOTES:
(APPLIES TO THIS SHEET ONLY)
1. SEE ONE-LINE DIAGRAM AND DETAILS ON
DRAWING E1 FOR MORE INFORMATION.
2. ALL UNDERGROUND CONDUITS SHALL BE
PVC SCHEDULE 80, BURIED 30" BELOW
GRADE.
3. ALL EXPOSED EXTERIOR ABOVE GRADE
CONDUITS SHALL BE RIGID GALVANIZED
STEEL.
4. ALL INTERIOR CONDUITS IN DRY LOCATION
SHALL BE EMT.
5. AREAS COVERED IN STONE SURFACE SHALL
BE RESTORED AND GRADED UPON
COMPLETION OF TRENCHING.
PROVIDE 3P-60A, 240V DISCONNECT SWITCH IN
NEMA 3R ENCLOSURE. MOUNT ON KINDORF RACK.
SEE DETAIL ON DRAWING E1 FOR MORE
INFORMATION.
2#10 & 1#10 G - 3/4" C TO 120V PRESSURE SWITCH
LOCATED IN MAIN CABIN. SEE SITE PLAN ON THIS
DRAWING FOR CONTINUATION.
3 2#12 & 1#12 GROUND IN 3/4" PVC SCHEDULE 80
CONDUIT TO 1P-20A CIRCUIT BREAKER IN
EXISTING SUB-PANEL.
4 120V PRESSURE SWITCH MOUNTED TO FIRE
SPRINKLER RISER ASSEMBLY. SUPPLIED BY
MECHANICAL CONTRACTOR, INSTALLED AND
WIRED BY ELECTRICAL CONTRACTOR.
5 3#4 & 1#8 G IN 1-1/4" UNDERGROUND SCHEDULE-80
PVC CONDUIT TO COMBINATION
STARTER/DISCONNECT SWITCH LOCATED IN THE
EXISTING ELECTRICAL/PV BUILDING. SEE PART PLAN
ON THIS DRAWING FOR CONTINUATION. MINIMUM
CONDUIT DEPTH SHALL BE 30" BELOW GRADE.
6 PROVIDE TELEMECANIQUE LADT2 OR EQUAL TIME
DELAY AUXILIARY CONTACT BLOCK, 600V RATING,
10A, 1NO-1NC CONTACT AND BUILT-IN 0.1-30
SECOND ADJUSTABLE 'ON' DELAY FUNCTION. SET
TIME DELAY CONTACT BLOCK TO 15 SECONDS.
CONTRACTOR TO FIELD COORDINATE EXACT
LOCATION WITH OWNER IN THE FIELD.
7 PROVIDE 3P-60A, 240V COMBINATION
STARTER/DISCONNECT SWITCH WITH NEMA 2
SOFT STARTER IN NEMA 1 ENCLOSURE.
CONTRACTOR TO FIELD COORDINATE EXACT
LOCATION WITH OWNER IN THE FIELD.
EX 20KW GENERATOR 1,
120/240V, 1Ø, 3W
G
EX MAIN SERVICE PANEL,
120/240V, 1Ø, 3W, 80A MCB
EX PV DISCONNECT
EX SUB-PANEL, 120/240V, 1Ø, 3W,
40A MLO. PROVIDE TWO (1) 1P-20A
CIRCUIT BREAKERS FOR GFI
RECEPTACLE AND GENERATOR 2
BATTERY CHARGER/BLOCK HEATER.
MATCH EXISTING DEVICE TYPES
EX MASTER
INVERTER
45KW/56KVA GENERATOR 2,
208/120V, 3Ø, 4W
G
MOUNT GENERATOR ON
EXISTING CONCRETE PAD.
EXTEND CONCRETE PAD AS
REQUIRED
J
JUNCTION BOX FOR
BATTERY CHARGER AND
BLOCK HEATER
PROVIDE PRE-FABRICATED
LEAN-TO/CANOPY TYPE METALLIC
STRUCTURE. SEE DRAWING E1
FOR A GENERAL EXAMPLE
3/4"x10' GROUND ROD
R
GENERATOR 120V
START RELAY
J
3 GFI, WP
TO PUMP-1
DISCONNECT B
J TO GENERATOR 2
ENGINE START RELAY
& PUMP-1 STARTER
S K
1P-20A, 120V KEY
SWITCH. CONTRACTOR
TO FIELD COORDINATE
LOCATION WITH
OWNER IN FIELD
2#12 & 1#12 G - 3/4" TO
NEAREST RECEPTACLE
CIRCUIT
DESIGNED
DRAWN
CHECKED
DATE:
SUB SHEET NO.
TITLE OF PROJECT
SHEET
OF
PMIS/PKG. NO.
DWG.
NO:
LOCATION WITHIN PARK
TITLE OF PROJECT
UNITED STATES
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE - INTERIOR REGION 8
DESIGN AND PROJECT MANAGEMENT
TITLE OF SHEET
FP FIRM
08/02/2024
XXXXXX
XX
209050
Mark REVISION Date Issued by
EBL
JPM
JPM
100% SUBMISSION
GRAND CANYON PARASHANT, NATIONAL MONUMENT, ARIZONA
INSTALL FIRE SUPPRESSION AT DELLENBAUGH CABIN ADMIN SITE 18
ENGINEERS
ESTABLISHED 1972
Mechanical - Electrical - Fire Protection
8005 Harford Road Baltimore, Maryland 21234-5701
Tel: (410) 668-8000 E-mail: ebl@eblengineers.com
INSTALL FIRE SUPPRESSION AT DELLENBAUGH CABIN ADMIN SITE
1"=20'-0"
CAUTION:
IF THIS PLAN IS A REDUCTION,
GRAPHIC SCALES MUST BE USED.
SITE PLAN - ELECTRICAL
SITE PLAN - ELECTRICAL
SCALE: APPROX. 1"=20'-0"
N
E3
10' 60'40'20'0
PART PLAN - EXISTING ELECTRICAL/PV
BUILDING - ELECTRICAL
SCALE: 1/4"=1'-0"
N
0 2' 4' 8' 12'
1/4"=1'-0"
GRAPHIC SCALE
GRAPHIC SCALE
EXISTING CABIN PART PLAN - ELECTRICAL
SCALE: 1/4"=1'-0"
N
PUMP SCHEDULE
UNIT NO. SERVICE GPM
HEAD
(PSI)
ELECTRICAL
HP-V/PH/HZ NOTES REMARKS
PUMP-1 192 51.5 10-208/3/60 1 -
TYPE:
IL
BM
CC
SB
BASE-MOUNTED
SUBMERSIBLE
CLOSE-COUPLED
IN-LINE CIRCULATOR
OPERATES TO MAINTAIN PRESSURE IN PIPE AT ENTRANCE TO CABINS
NOTES:
1.
LOCATION
WATER TANK
FIRE
SUPRESSION
FLUID
WATER
SB
TYPE
PUMP INSTALLATION DETAIL
NO SCALE
BOTTOM
OF TANK
DRAWING NOTES:
WEATHER TIGHT JUNCTION BOX.
FFFFFFFF
(APPLY TO THIS DRAWING ONLY)
ELECTRICAL SUPPLY TO JUNCTION BOX.2
PUMP ELECTRICAL CONNECTIONS PER MANUFACTURER'S
RECOMMENDATIONS
LOW AND HIGH WATER LEVEL ELECTRICAL CONNECTIONS PER
MANUFACTURER'S RECOMMENDATIONS.
2" PRESSURE RATED STAINLESS FLEX WITH BRAIDED JACKET.5
FEMALE ADAPTER FOR HDPE WATER LINE.6
BRASS PITLESS ADAPTER WITH RELIEF VALVE.7
SCHEDULE 80 NPT ADAPTER.8
2" DIAMETER SCHEDULE 80 PIPE.9
SUBMERSIBLE PUMP-110
PUMP HAS INLET SECTION AT BOTTOM OF HOUSING.11
SINGLE FLOAT; LOW WATER LEVEL PUMP SHUTDOWN.12
FLOAT TREE MOUNT.13
ADJUSTABLE FLOAT TREE, FIELD INSTALLED.14
LOCKING CLAMP FOR FLOAT TREE.15
T HANDLE, FIELD INSTALLED.16
TORQUE ARRESTOR.17
SINGLE FLOAT; HIGH WATER ALARM.18
"OFF" ELEVATION AT
TOP OF MOTOR
6"
MECHANICAL LEGEND
SYMBOL ABBREV DESCRIPTION
CW COLD WATER; DOMESTIC
MECHANICAL ABBREVIATIONS
ABBREVIATION DESCRIPTION
Ø OR DIA DIAMETER
@ AT
CX CONNECT TO EXISTING
EX EXISTING
FLA FULL LOAD AMPS
GPM GALLONS PER MINUTE
HD HEAD
HP HORSE POWER
POD POINT OF DISCONNECT
RLX RELOCATE EXISTING
RX REMOVE EXISTING
TYP TYPICAL
V/PH/HZ VOLTS/PHASE/HERTZ
PRV PRESSURE REDUCING VALVE
SOLENOID VALVE
FLEXIBLE PIPE CONNECTOR
BACKFLOW PREVENTER; DIRECTION
OF FLOW INDICATED
SHUT OFF VALVE (SEE
SPECIFICATION FOR TYPE)
SHUT OFF VALVE IN VERTICAL (SEE
SPECIFICATION FOR TYPE)
CHECK VALVE; DIRECTION OF FLOW
INDICATED
BALL VALVE
BUTTERFLY VALVE
CX CONNECT TO EXISTING
POD POINT OF DISCONNECT
1. ALL WORK SHALL BE NEW, PROVIDED AND INSTALLED UNDER THIS CONTRACT
UNLESS SPECIFICALLY MARKED EXISTING, EX, EXISTING TO REMAIN, OR ETR.
2. THE LOCATION OF EXISTING UTILITIES IS SHOWN IN AN APPROXIMATE WAY ONLY.
DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING
WORK. REPAIR ALL DAMAGES OCCASIONED BY FAILURE TO EXACTLY LOCATE AND
PRESERVE ANY AND ALL UNDER GROUND UTILITIES.
3. MAINTAIN MINIMUM OF 4'-0" COVER OVER UNDERGROUND WATER MAINS.
4. COORDINATE ALL MECHANICAL WORK WITH ELECTRICAL WORK, ETC., SHOWN ON
OTHER DRAWINGS.
5. CERTAIN ITEMS SUCH AS ACCESS DOORS, CLEANOUTS, RISE AND DROPS IN
DUCTWORK AND PIPING, ETC., ARE INDICATED ON THE DRAWINGS FOR CLARITY OR A
SPECIFIC LOCATION REQUIREMENT AND SHALL NOT BE INTERPRETED AS THE EXTENT
OF THE REQUIREMENTS FOR THESE ITEMS. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR THESE ITEMS AS REQUIRED ELSEWHERE IN THE CONTRACT
DOCUMENTS.
6. WHERE THE INSTALLATION OF NEW SERVICES OR THE EXTENSION OF EXISTING
SERVICES REQUIRE CUTTING OF EXISTING FLOORS, WALLS, PARTITIONS, ETC., IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK FOR THE PRESENCE
OF EXISTING MECHANICAL AND/OR ELECTRICAL SERVICES WITHIN OR IMMEDIATELY
BENEATH CONSTRUCTION AND EXERCISE NECESSARY PRECAUTIONS TO PREVENT
DAMAGE TO THE SERVICES OR INJURY TO PERSONNEL DUE TO CONTACT WITH SAME.
WHERE PRACTICAL, SUCH EXISTING SERVICES SHALL BE TEMPORARILY
DISCONNECTED DURING THE CUTTING OPERATION. SUCH OUTAGES IN SERVICE
SHALL BE SCHEDULED IN ADVANCE WITH THE OWNER.
7. FLOW SCHEMATIC AND RISER DIAGRAMS INDICATE FLOW AND OPERATION CONCEPT
AS WELL AS GENERAL ARRANGEMENT OF EQUIPMENT. VALVES, PRESSURE GAUGES,
ETC. ARE INDICATED FOR THIS PURPOSE. ADDITIONAL VALVES, PRESSURE GAUGES,
ETC. SHALL BE PROVIDED AS SHOWN ON VARIOUS EQUIPMENT DETAILS. SEE PLANS
AND DETAILS FOR PIPE SIZES NOT INDICATED ON FLOW SCHEDULE AND RISER
DIAGRAMS.
8. ALL INTERIOR AND EXTERIOR PENETRATIONS CREATED BY REMOVAL OR CREATED BY
INSTALLATION SHALL BE SEALED AND/OR REPAIRED TO MATCH ADJACENT
CONSTRUCTION AND FIRE RATINGS.
GENERAL NOTES: (APPLY TO ALL DRAWINGS)
2" TO CABINS
ONCE CLEAR OF
TANK, PIPE SHALL
HAVE A MINIMUM OF
48" OF COVER
SYSTEM WINTERIZATION DETAIL
NO SCALE
2" UNDERGROUND
TO EXISTING TANK
REFER TO FIRE
PROTECTION DRAWINGS
FOR FINAL DESIGN OF
VALVES, ACCESSORIES,
ETC. WITHIN THIS AREA
SHUTOFF VALVE
4" COMPRESSED AIR
QUICK CONNECT FITTING
4" WINTERIZATION LINE USED TO
BLOW STANDING WATER BACK
TO UNDERGROUND TANK DURING
WINTERIZATION OF CABINS
EXISTING
TANK
TANK WATER LEVEL INDICATOR GAUGE, 24" ABOVE GRADE.19
2" SCH 40 STEEL
PIPE FOR FLOAT
CABLE
WATER LEVEL
FLOAT
10 GALLON
EXPANSION TANK
P
PRESSURE SWITCH
TO CONTROL
OPERATION OF PUMP
NO SCALE
PIPE TRENCH DETAIL
SELECT BORROW AT A MIN. OF 95%
DENSITY COMPACTION
DIAMETER
"D"
6" TO 16"
MAXIMUM
"A"
8"
BEDDING
THICKNESS
VARIES
6" MIN
MAXIMUM TRENCH WIDTH "W"
TAKEN AT TOP OF PIPE
W
A OD A
D
NOTE:
1. PROVIDE BEDDING IN ACCORDANCE
WITH SPECIFICATIONS
PUMP POWER/CONTROL SCHEMATIC
NO SCALE
PUMP
WATER TANK
CABIN
FROM EXISTING 120 V
POWER IN CABIN (REFER
TO ELECTRICAL
DRAWINGS FOR DETAILS)
WATER PIPE
WATER PIPE
GENERATOR
PUMP PRESSURE
SWITCH 120V
40-65 PSI
GENERATOR
STARTING RELAY
208V TO PUMP
120 V
NOTE: REFER TO ELECTRICAL DRAWINGS FOR DETAILS. ALL DEVICES
TO BE PROVIDED BY ELECTRICAL CONTRACTOR.
120 V
TIME DELAY
CONTACT BLOCK
MECHANICAL LEGEND, NOTES, ABBREVIATIONS & DETAILS 5
M1
DESIGNED
DRAWN
CHECKED
DATE:
SUB SHEET NO.
TITLE OF PROJECT
SHEET
OF
PMIS/PKG. NO.
DWG.
NO:
LOCATION WITHIN PARK
TITLE OF PROJECT
UNITED STATES
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE - INTERIOR REGION 8
DESIGN AND PROJECT MANAGEMENT
TITLE OF SHEET
FP FIRM
08/02/2024
XXXXXX
XX
209050
Mark REVISION Date Issued by
EBL
JPM
JPM
100% SUBMISSION
GRAND CANYON PARASHANT, NATIONAL MONUMENT, ARIZONA
INSTALL FIRE SUPPRESSION AT DELLENBAUGH CABIN ADMIN SITE 18
ENGINEERS
ESTABLISHED 1972
Mechanical - Electrical - Fire Protection
8005 Harford Road Baltimore, Maryland 21234-5701
Tel: (410) 668-8000
SECTION 01000 - GENERAL REQUIREMENTS
1. THE FOLLOWING DRAWINGS SHALL BE CONSIDERED BIDDING DOCUMENTS TO RELAY THE DESIGN INTENT TO THE INSTALLING CONTRACTOR(S). THE CONTRACTOR(S) SHALL BE RESPONSIBLE TO PROVIDE AND INSTALL SYSTEMS WHICH MEET THE INTENT OF THE DOCUMENTS. THE CONTRACTOR(S) SHALL BE RESPONSIBLE FOR THE FINAL DESIGN, INSTALLATION AND COORDINATION OF THE SYSTEMS. LIMITS OF WORK, FINAL SCOPE, INCLUSIONS, EXCLUSIONS SHALL BE COORDINATED WITH THE COR AND CLEARLY
DEFINED IN CONTRACTOR'S BID.
2. RELATED DOCUMENTS: THE GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS AND GENERAL REQUIREMENTS APPLY TO THE WORK SPECIFIED IN THIS SECTION AND ARE HEREBY MADE A PART OF
THIS SECTION.
3. PLUMBING SYSTEM:
DESCRIPTION OF WORK: (PLUMBING WORK SHALL INCLUDE., BUT IS NOT LIMITED TO; INSTALLATION OF SUBMERSIBLE PUMP, ACCESSORIES AND PIPING TO SUPPORT FIRE PROTECTION WATER SYSTEM)
THIS SECTION REQUIRES THE FURNISHING AND INSTALLING OF COMPLETE FUNCTIONING SYSTEMS,IN ACCORDANCE WITH THE DESIGN DOCUMENTS AND REGULATING PLUMBING CODE. PROVIDE WATER CONNECTIONS TO ALL FIXTURES AND EQUIPMENT (INCLUDING EQUIPMENT PROVIDED BY OTHERS), DEVICES OR ACCESSORIES (WHETHER OR NOT SPECIFICALLY CALLED FOR BY ITEM) REASONABLY NECESSARY TO FACILITATE EACH SYSTEM FUNCTIONING AS INDICATED BY THE DESIGN AND EQUIPMENT
SPECIFIED.
4. MEASUREMENTS AND LAYOUTS: THE DRAWINGS ARE INTENDED TO COVER THE LAYOUT AND DESIGN OF THE WORK AND ARE NOT TO BE SCALED FOR EXACT MEASUREMENTS. WHERE SPECIFIC DETAIL AND DIMENSION FOR MECHANICAL WORK ARE NOT SHOWN ON THE DRAWINGS, THE MECHANICAL CONTRACTOR SHALL TAKE MEASUREMENTS AND MAKE LAYOUTS AS REQUIRED FOR THE PROPER INSTALLATION OF THE MECHANICAL WORK IN COORDINATION WITH ALL OTHER WORK ON THE PROJECT.
5. PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, SUPERVISION, SERVICES, ETC. NECESSARY FOR AND INCIDENTAL TO THE COMPLETE INSTALLATION OF ALL MECHANICAL WORK AND RELATED SYSTEMS AS SHOWN ON THE DRAWINGS, SPECIFIED HEREIN, AND/OR REQUIRED TO DELIVER TO THE GOVERNMENT A COMPLETE INSTALLATION READY FOR CONTINUOUS AND SATISFACTORY OPERATION. ALL ITEMS, SYSTEMS, ETC. NECESSARY OR REQUIRED TO MAKE THE MECHANICAL AND ELECTRICAL INSTALLATION COMPLETE AND OPERABLE SHALL BE UNDERSTOOD AS PART OF THE WORK. THE CONTRACTOR SHALL EXAMINE THE PREMISES
PRIOR TO SUBMITTING HIS BID.
6. THE CONTRACTOR SHALL SECURE AND PAY FOR ALL REQUIRED PERMITS BEYOND THE GENERAL BUILDING PERMIT AND
INSPECTIONS. FURNISH ALL APPLICABLE CERTIFICATES.
7. ALL MECHANICAL EQUIPMENT AND SYSTEMS SHALL BE GUARANTEED BY THE CONTRACTOR FOR TWO (2) YEARS AFTER DATE OF
ACCEPTANCE OR AS NOTED.
8. THE CONTRACTOR SHALL SUBMIT COMPLETE ELECTRONIC COPIES OF SUBMITTALS AND EQUIPMENT LISTS FOR ALL PRODUCTS FOR REVIEW AND APPROVAL BY ARCHITECT AND/OR ENGINEER. SUBMITTALS SHALL INCLUDE CONTRACTOR'S TRANSMITTAL AND COVER LETTER INDICATING CONFORMANCE TO SPECIFICATIONS, SPECIFICATION SECTION, SPECIFIC APPLICATION AS RELATED TO DESIGN DOCUMENTS, MANUFACTURER'S SELECTION SHEETS, SPECIFIC PRODUCT INFORMATION, MODEL NUMBERS, CAPACITIES, MATERIALS, AND INCLUDED ACCESSORIES.
9. ALL MATERIALS AND EQUIPMENT SHALL BE PROPERLY AND EFFECTIVELY PROTECTED BY THE CONTRACTOR DURING THE
EXECUTION OF THE WORK.
10. THE MECHANICAL WORK COVERED UNDER THE SPECIFICATIONS AND DRAWINGS SHALL BE PERFORMED IN STRICT ACCORDANCE WITH: STATE AND LOCAL CODES, LATEST EDITION, APPROPRIATE STANDARDS OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA); APPLICABLE LOCAL CODES; AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI); AMERICAN SOCIETY FOR TESTING AND
MATERIALS (ASTM); AND THE OCCUPATIONAL SAFETY & HEALTH ACT (OSHA).
11. THE CONTRACTOR SHALL HAVE COMPETENT SUPERVISION ON THE SITE AT ALL TIMES TO LAYOUT, CHECK, COORDINATE AND SUPERVISE THE INSTALLATION OF ALL MECHANICAL WORK AND BE RESPONSIBLE FOR THE ACCURACY THEREOF. HE SHALL PLAN THE INSTALLATION OF ALL MECHANICAL WORK, GIVING CONSIDERATION TO THE WORK OF OTHER TRADES, TO PREVENT
INTERFERENCE.
12. THE CONTRACTOR SHALL CONNECT TO BUILDING UTILITIES AS SHOWN ON THE DRAWINGS.
13. ALL CUTTING OF WALLS, FLOORS, ROOFS, CEILINGS AND/OR PARTITIONS FOR THE PASSAGE OF CONDUITS, ETC., AND CLOSING UP OF SUPERFLUOUS OPENINGS AROUND THEM IN CONNECTION WITH THE WORK UNDER THIS CONTRACT, INCLUDING THE REMOVAL
OF ALL DEBRIS CAUSED THEREBY, SHALL BE PERFORMED BY THE CONTRACTOR.
14. COORDINATE THE WORK TO MINIMIZE PENETRATION OF WATERPROOF CONSTRUCTION INCLUDING ROOFS, EXTERIOR WALLS AND INTERIOR WATERPROOF CONSTRUCTION. WHERE SUCH PENETRATIONS ARE NECESSARY, PROVIDE ALL NECESSARY CURBS, SEWER, SHIELDS, FLASHINGS, PATE BOXES, FITTINGS AND CAULKING TO MAKE THE PENETRATIONS ABSOLUTELY WATERTIGHT.
15. THE CONTRACTOR SHALL PROVIDE NECESSARY EXCAVATION AND BACKFILL FOR THE INSTALLATION OF MECHANICAL WORK.
16. ALL MATERIALS AND EQUIPMENT SHALL BE NEW, THE BEST OF THEIR RESPECTIVE KINDS AND SUITABLE FOR THE CONDITIONS
AND DUTIES IMPOSED ON THEM.
17. WHERE A CONTRACTOR PROPOSES TO USE AN ITEM OF EQUIPMENT OTHER THAN THAT SPECIFIED OR DETAILED ON THE DRAWINGS, WHICH REQUIRES ANY REDESIGN OF THE STRUCTURE, PARTITIONS, FOUNDATIONS, PIPING, DUCTWORK, WIRING, OR ANY OTHER PART OF THE MECHANICAL, ELECTRICAL, OR ARCHITECTURAL LAYOUT, ALL SUCH REDESIGN, AND ALL NEW DRAWINGS PRODUCT SUBMITTALS, AND DETAILING REQUIRED THEREFORE SHALL, WITH THE APPROVAL OF THE ENGINEER AND
GOVERNMENT, BE PREPARED BY THE CONTRACTOR AT HIS OWN EXPENSE.
18. ALL SYSTEMS SHALL BE TESTED FOR THE PROPER INSTALLATION AND OPERATION.
19. DURING CONSTRUCTION THE CONTRACTOR SHALL MAINTAIN AN ACCURATE, UP TO DATE SET OF DRAWINGS. THE CONTRACTOR SHALL PROVIDE THE GOVERNMENT, UPON COMPLETION AND ACCEPTANCE OF THE WORK, WITH A SET OF RED LINED AS-BUILT DRAWINGS, CLEARLY SHOWING THE PATH OF THE UNDERGROUND SYSTEMS, LOCATIONS OF EQUIPMENT, AND ANY DIMENSIONAL
CHANGES.
20. UPON COMPLETION OF ALL WORK, THE CONTRACTOR SHALL GENERATE OPERATION AND MAINTENANCE (O&M) MANUALS FOR ALL EQUIPMENT AND SYSTEMS. MANUALS SHALL INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING CONTENT:
A. MANUALS SHALL INCLUDE FOR EACH PIECE OF EQUIPMENT:
A.1. OPERATION MANUALS.
A.2. MAINTENANCE MANUALS.
A.3. LUBRICATION CHART & SCHEDULE
A.4. PARTS LISTS.
A.5. CUT SHEETS WITH DIMENSIONS.
A.6. WIRING DIAGRAMS (WHERE APPLICABLE)
A.7. INSTALLING CONTRACTOR'S CONTACT INFORMATION
A.8. MANUFACTURER'S REPRESENTATIVE CONTACT INFORMATION
B. VALVE CHART(S) AND PIPING DIAGRAM(S) LOCATING ALL TAGGED VALVES.
C. QUANTITY AND FORMAT:
C.1. PROVIDE THREE (3) SETS OF O&M MANUAL IN HEAVY DUTY 81
2"x11 LOOSE LEAF RING BINDERS. BOUND COPY SHALL
INCLUDE TABLE OF CONTENTS, DATA TABBED BY EQUIPMENT.
C.2. PROVIDE ONE (1) COPY IN .PDF FORMAT ON COMPACT DISC (CD). ELECTRONIC .PDF O&M MANUAL SHALL BE SEARCHABLE, TABBED AND INCLUDE A TABLE OF CONTENTS WITH AUTOMATIC LINKS TO SPECIFIC PAGES/SECTIONS
WITHIN THE FILE.
21. UPON COMPLETION OF ALL WORK, THE CONTRACTOR SHALL THOROUGHLY INSTRUCT THE OWNER'S REPRESENTATIVES IN THE PROPER OPERATION AND MAINTENANCE OF ALL MECHANICAL EQUIPMENT AND SYSTEMS. INSTRUCTION/TRAINING SHALL BE FOR NO LESS THAN ONE (1) FOUR (4) HOUR DAY AND INCLUDE WRITTEN COURSE DATA AND VIDEO RECORDING OF TRAINING.
SECTION 15101 - PRESSURE TESTS
1. ALL PIPING SHALL BE TESTED AND PROVEN TIGHT PRIOR TO COVERING WITH INSULATION OR
CONCEALING.
2. TEST PRESSURES SHALL BE 11
2 TIMES THE SYSTEM WORKING PRESSURE UNLESS
OTHERWISE INDICATED. PRESSURE TESTS SHALL NOT EXCEED MAXIMUM ALLOWABLE
WORKING PRESSURE OF PIPING AND/OR SYSTEM COMPONENTS. TEST HYDRONIC PIPING
(HYDROSTATICALLY). TEST PRESSURE SHALL BE MAINTAINED FOR A MINIMUM OF EIGHT (8)
HOURS, WITNESSED AND APPROVED BY PIPING SYSTEM MANUFACTURER'S REPRESENTATIVE
AND GOVERNMENT REPRESENTATIVE AND INSTALLING CONTRACTOR. PROVIDE TEST
REPORT DOCUMENT WITH GOVERNMENT REPRESENTATIVE AND CONTRACTOR'S
SIGNATURES.
3. DIRECT BURIED PIPING SYSTEM CONDUIT SHALL BE PNEUMATICALLY PRESSURE TESTED TO
15 PSIG. AFTER COMPLETION AND BEFORE BACKFILL. TEST PRESSURE SHALL BE MAINTAINED
FOR A MINIMUM OF FOUR (4) HOURS, WITNESSED AND APPROVED BY GOVERNMENT
REPRESENTATIVE AND CONTRACTOR. PROVIDE TEST REPORT DOCUMENT WITH
MANUFACTURER'S REPRESENTATIVE, GOVERNMENT REPRESENTATIVE AND CONTRACTOR'S
SIGNATURES.
SECTION 15111 - PIPE, FITTINGS AND JOINTS
FIRE PROTECTION WATER:
1. PUMPED LINE 21
2" AND LARGER (BELOW GRADE): ASTM A53, SCHEDULE 80 BLACK STEEL, 250 LB, OUTER ASPHALT
COATING, STEEL BUTT WELDED FITTINGS WITH HEAT APPLIED TAPECOAT, ASTM A234.
PROPANE:
1. SCHEDULE 40, STEEL PIPE WITH WROUGHT-STEEL FITTINGS AND WELDED JOINTS, OR MECHANICAL COUPLINGS.
COAT PIPE AND FITTINGS WITH PROTECTIVE COATING FOR STEEL PIPING.
SECTION 15310 - PUMPS
1. PUMPS SHALL BE OF THE TYPE, SIZE AND CAPACITY AS SCHEDULED ON THE DRAWINGS.
2. SUBMERSIBLE SUMP PUMPS
A. PUMPS SHALL BE SUBMERSIBLE TYPE WITH STAINLESS STEEL HOUSING, IMPELLER, SHAFT SLEEVE AND PUMP SHAFT, WITH SILICONE/CARBON SEALS. PROVIDE WITH INTEGRAL CHECK VALVE AND TUNGSTEN CARBIDE BEARINGS. INCLUDE MANUFACTURER'S FLOAT ASSEMBLY WITH HIGH LEVEL ALARM OUTPUT AND SUBMERSION TEMPERATURE SENSOR FOR HIGH WATER TEMPERATURE PUMP CUTOUT. PUMP SHALL OPERATE TO MAINTAIN PRESSURE SETPOINT IN WATER SUPPLY MAIN AT
ENTRANCE TO CABINS.
SECTION 15112- VALVES
1. BALL VALVES: TWO PIECE WITH THREADED OR SOLDERED ENDS. 600 PSI CWP RATING, FORGED BRASS BODY, PTFE
SEATS, CHROME-PLATED BRASS BALL, FULL PORT.
SECTION 15320 - TANK ACCESSORIES
1. TANK WATER LEVEL GAUGE
A. PROVIDE MECHANICAL CLOCK-TYPE GAUGE TO MEASURE WATER LEVEL IN UNDERGROUND TANK VIA POLYETHYLENE FLOAT.
GAUGE HOUSING TO BE ABS WITH 1-1/2" MALE SCREW THREAD CONNECTION.
MECHANICAL SPECIFICATIONS 6
M2
DESIGNED
DRAWN
CHECKED
DATE:
SUB SHEET NO.
TITLE OF PROJECT
SHEET
OF
PMIS/PKG. NO.
DWG.
NO:
LOCATION WITHIN PARK
TITLE OF PROJECT
UNITED STATES
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE - INTERIOR REGION 8
DESIGN AND PROJECT MANAGEMENT
TITLE OF SHEET
FP FIRM
08/02/2024
XXXXXX
XX
209050
Mark REVISION Date Issued by
EBL
JPM
JPM
100% SUBMISSION
GRAND CANYON PARASHANT, NATIONAL MONUMENT, ARIZONA
INSTALL FIRE SUPPRESSION AT DELLENBAUGH CABIN ADMIN SITE 18
ENGINEERS
ESTABLISHED 1972
Mechanical - Electrical - Fire Protection
8005 Harford Road Baltimore, Maryland 21234-5701
Tel: (410) 668-8000
GENERAL NOTES:
ACCESS ROAD AND PARKING LOTS ARE COVERED
IN 1.5" MINUS WASHED RIVER STONE. STONE
SURFACE SHALL BE RESTORED AND GRADED
UPON COMPLETION OF TRENCHING.
1.
EXISTING
CABIN
EXISTING
CAR PORT
EXISTING
CABIN
EXISTING
CAR PORT
AC
C
ES
S
R O
AD
EXISTING
ELECTRICAL/PV
BUILDING
EXISTING
UNDERGROUND
WATER STORAGE
TANK SITE
EXISTING ELEVATED
WATER STORAGE TANK
EXISTING
FREEZER
BUILDING
EXISTING
UNDERGROUND
WATER LINE
(TYPICAL)
EXISTING
DRY WELL
EXISTING
UNDERGROUND
ELECTRICAL
LINE (TYPICAL)
EXISTING
UNDERGROUND
SANITARY
LINE (TYPICAL)
X
X
X
X
DW
DW
DW
DW
DW
D W
DW
DW
DW
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
SS
SS
SS
SS
X
X
X
X
X
X
D W
UG
E
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
UGE UGE UGE
UGE
UGE UGE
UGE
UGE
DW
DW
DW
D W
D W
D W
DW
DW
D
W
EXISTING
STRUCTURE
EXISTING
PROPANE
TANK
EXISTING
UNDERGROUND
WATER STORAGE
TANKS
2" WATER
SUPPLY (MIN
48" COVER)
REFER TO FIRE
PROTECTION DRAWINGS
FOR PIPING WITHIN CABINS
EXISTING WATER
FILTRATION/PRESSURE
SYSTEM AND
CONTROLS BUILDING
EXISTING
STRUCTURE
EXISTING
STRUCTURE
EXISTING
STRUCTURE
EXISTING
STRUCTURE
24"Ø MANWAY WITH LID TO BE
INSTALLED ON EXISTING TANK FOR
PUMP AND WATER CONNECTION.
CUT INTO EXISTING TANK AND
WELD WATERTIGHT.
NEW GENERATOR PROVIDED BY
ELECTRICAL CONTRACTOR.
REFER TO ELECTRICAL
DRAWINGS FOR DETAILS.
2" PROPANE
(MIN. 12" COVER)
EXISTING WOODEN FENCE.
CONTRACTOR MAY REMOVE FENCE
AS NECESSARY DURING
CONSTRUCTION. FENCE SHALL BE
STORED AND REINSTALLED AT
COMPLETION OF PROJECT.
DESIGNED
DRAWN
CHECKED
DATE:
SUB SHEET NO.
TITLE OF PROJECT
SHEET
OF
PMIS/PKG. NO.
DWG.
NO:
LOCATION WITHIN PARK
TITLE OF PROJECT
UNITED STATES
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE - INTERIOR REGION 8
DESIGN AND PROJECT MANAGEMENT
TITLE OF SHEET
FP FIRM
08/02/2024
XXXXXX
XX
209050
Mark REVISION Date Issued by
EBL
JPM
JPM
100% SUBMISSION
GRAND CANYON PARASHANT, NATIONAL MONUMENT, ARIZONA
INSTALL FIRE SUPPRESSION AT DELLENBAUGH CABIN ADMIN SITE 18
ENGINEERS
ESTABLISHED 1972
Mechanical - Electrical - Fire Protection
8005 Harford Road Baltimore, Maryland 21234-5701
Tel: (410) 668-8000 E-mail: ebl@eblengineers.com
INSTALL FIRE SUPPRESSION AT DELLENBAUGH CABIN ADMIN SITE
1"=20'-0"
CAUTION:
IF THIS PLAN IS A REDUCTION,
GRAPHIC SCALES MUST BE USED.
GRAPHIC SCALE
SITE PLAN - MECHANICAL
SITE PLAN - MECHANICAL
SCALE: APPROX. 1"=20'-0"
N
M3
10' 60'40'20'0
CODES AND STANDARDS
REFERENCES:
ALL REFERENCES TO IBC SHALL MEAN THE MOST RECENT EDITION AT THE TIME OF AWARD.
ALL REFERENCES TO NFPA 17A SHALL MEAN THE MOST RECENT EDITION AT THE TIME OF AWARD.
ALL REFERENCES TO NFPA 25 SHALL MEAN THE MOST RECENT EDITION AT THE TIME OF AWARD.
ALL REFERENCES TO NFPA 70 SHALL MEAN THE MOST RECENT EDITION AT THE TIME OF AWARD.
ALL REFERENCES TO NFPA 72 SHALL MEAN THE MOST RECENT EDITION AT THE TIME OF AWARD.
ALL REFERENCES TO NFPA 90A SHALL MEAN THE MOST RECENT EDITION AT THE TIME OF AWARD.
ALL REFERENCES TO NFPA 96 SHALL MEAN THE MOST RECENT EDITION AT THE TIME OF AWARD.
ALL REFERENCES TO NFPA 101 SHALL MEAN THE MOST RECENT EDITION AT THE TIME OF AWARD.
ALL REFERENCES TO NFPA 170 SHALL MEAN THE MOST RECENT EDITION AT THE TIME OF AWARD.
ALL REFERENCES TO NFPA 241 SHALL MEAN THE MOST RECENT EDITION AT THE TIME OF AWARD.
ALL REFERENCES TO NFPA 720 SHALL MEAN THE MOST RECENT EDITION AT THE TIME OF AWARD.
CONDUCTORS FOR THE FIRE ALARM SYSTEM SHALL BE INSTALLED IN ACCORDANCE
WITH NFPA 70. THE CONDUCTORS SHALL NOT BE INSTALLED WITH CONDUCTORS OF
LIGHTING OR POWER SYSTEMS. THE SUM OF THE CROSS-AREA OF INDIVIDUAL
CONDUCTORS SHALL NOT EXCEED 40 PERCENT OF THE INTERIOR CROSS-SECTION OF
THE CONDUIT. ALL FIRE ALARM SYSTEM WIRING SHALL BE RED COLORED METAL
JACKETED CABLE OR SHALL BE INSTALLED IN MINIMUM 3/4-INCH CONDUIT.
7.
ALL DEVICES SHALL BE MOUNTED AND SECURED TO THE BUILDING STRUCTURE.
CONDUIT SHALL BE ROUTED PARALLEL OR PERPENDICULAR TO BUILDING LINES.
6.
THE FIRE ALARM/ELECTRICAL INSTALLER(S) SHALL SUBMIT COMPLETE LAYOUT
SHOP DRAWINGS, CALCULATIONS, AND ANNOTATED MANUFACTURER'S DATA
INFORMATION TO THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) FOR
REVIEW AND APPROVAL. APPROVALS SHALL BE OBTAINED PRIOR TO THE
PURCHASE OR INSTALLATION OF ANY PART OF THE FIRE ALARM SYSTEM.
THE FIRE ALARM/ELECTRICAL INSTALLER(S) SHALL BE RESPONSIBLE FOR ALL
APPLICABLE TRADE PERMITS, REQUESTS FOR INSPECTION, AND TESTING AS
REQUIRED BY THE APPROVING AHJ.
2.
1.
THE FIRE ALARM/ELECTRICAL INSTALLER(S) SHALL COORDINATE THE EXACT LOCATION
OF CEILING/WALL MOUNTED FIRE ALARM SYSTEM DEVICES INCLUDING THE ROUTING
OF NEW CONDUIT IN EXISTING WALLS WITH EXISTING AND NEW LIGHT FIXTURES,
CONDUITS, DUCTWORK, DIFFUSERS, PIPING AND ANY OTHER OBSTRUCTIONS.
5.
THE INSTALLER(S) SHALL REPAIR OR REPLACE ANY NEW OR EXISTING ITEM, WALL,
FLOOR, CEILING, CEILING TILE, ETC. DAMAGED IN CONJUNCTION WITH ALL WORK.
REPAIR OR REPLACEMENT SHALL BE AT THE INSTALLER'S COST. THE INSTALLER(S)
SHALL PROVIDE ALL CUTTING, PATCHING AND REFINISHING OF EXISTING PLASTER
WALLS, PLASTER CEILINGS OR FLOORS AS REQUIRED IN THE CONTRACT
SPECIFICATIONS AND DRAWINGS. THE INSTALLER(S) SHALL REPLACE ALL CEILING
TILES DAMAGED IN CONJUNCTION WITH ALL WORK. AT LEAST 10 PERCENT OF THE
EXISTING CEILING TILES HANDLED MAY NEED TO BE REPLACED DUE TO DAMAGE FROM
ALL NEW WORK.
10.
EFFORT SHALL BE MADE TO REUSE ALL EXISTING FLOOR AND WALL PENETRATIONS TO
THE EXTENT POSSIBLE. IF REQUIRED, ALL FLOOR PENETRATIONS SHALL BE CORE
DRILLED AND SHALL BE COORDINATED WITH EXISTING STRUCTURAL SYSTEMS.
9.
PROVIDE ACCEPTANCE TESTING OF ENTIRE SYSTEM TO THE SATISFACTION OF THE
CONTRACTING REPRESENTATIVE. TESTING OF ALL INDIVIDUAL SYSTEMS, DEVICES,
WIRING, ETC. IS REQUIRED. PUNCHLIST ITEMS SHALL BE COMPLETED IN A TIMELY
MANNER TO THE SATISFACTION OF THE CONTRACTING OFFICER'S REPRESENTATIVE
(COR). THE CALENDAR WARRANTY PERIOD SHALL COMMENCE UPON THE
CONTRACTING REPRESENTATIVE'S ACCEPTANCE OF ALL REFERENCED SYSTEMS
AND COMPLETION OF ALL PUNCHLIST ITEMS.
3.
A WARRANTY PERIOD OF ONE (1) YEAR SHALL BE PROVIDED, EFFECTIVE AFTER
SYSTEM ACCEPTANCE TESTING. WARRANTY SHALL COVER ALL MATERIALS,
EQUIPMENT, SOFTWARE, AND INSTALLATION PROVIDED BY THE CONTRACTOR OR
SUBCONTRACTORS. A ONE (1) YEAR RENEWABLE CONTRACT FOR NFPA 72
COMPLIANT FIRE ALARM SYSTEM INSPECTION AND TESTING SERVICES SHALL ALSO
BE PROVIDED.
4.
8.
FIRE PROTECTION (FIRE ALARM)
GENERAL NOTES:
SPACING OF SMOKE SENSORS AND HEAT SENSORS SHALL BE IN ACCORDANCE WITH
NFPA 72 AND AS INDICATED ON THE CONTRACT DOCUMENTS. THE FIRE
ALARM/ELECTRICAL INSTALLER(S) SHALL CONFIRM AND IF NECESSARY, REDUCE
SPACING AS APPLICABLE, BASED ON CEILING HEIGHT, CONSTRUCTION, AND/OR AIR
CHANGE RATES, AT NO ADDITIONAL COST TO THE GOVERNMENT.
11.
ALL FIRE ALARM SYSTEM WIRING SHALL BE INSTALLED IN 3/4-INCH CONDUIT MINIMUM
OR OTHERWISE PROTECTED WHERE REMOVED BY NFPA 70 AND NFPA 72.
CONDUCTORS FOR THE FIRE ALARM SYSTEM DEVICES SHALL BE INSTALLED IN
ACCORDANCE WITH NFPA 70. THE CONDUCTORS SHALL NOT BE INSTALLED IN CONDUIT,
JUNCTION BOXES, OR OUTLET BOXES WITH CONDUCTORS OF LIGHTING OR POWER
SYSTEMS. THE SUM OF THE CROSS-AREAS OF INDIVIDUAL CONDUCTORS SHALL NOT
EXCEED 40 PERCENT OF THE INTERIOR CROSS-SECTIONAL AREA OF THE CONDUIT. ALL
FIRE ALARM NON-POWER LIMITED CIRCUITS (WIRING) SHALL BE:
LOW-VOLTAGE CIRCUITS:…
This is the start of the file's text. The full file is on GovTribe.