B08_140L4024R0004_Section_J_Attachment_05_Limitations_on_Subcontracting_Breakout.xlsx

XLSX spreadsheet 90 KB Posted

Attached to
2024 PECOS DISTRICT FENCE CONSTRUCTION
Solicitation number
140L4024R0004
Issued by

About this file

This document is a limitations on subcontracting breakout worksheet related to a federal contract opportunity for 2024 PECOS DISTRICT FENCE CONSTRUCTION. The opportunity has a 126-calendar day performance period and a 15% self-performance requirement for the contractor. The worksheet provides a template for the contractor to break out the total proposed amount, material costs, self-performed labor, small business subcontractor labor, and large business subcontractor labor. The key details are the required self-performance percentage, the solicitation number 140L4024R0004, and the set-aside type of small business. The document indicates that to be compliant, the limitation on subcontracting percentage must be greater than the 15% self-performance requirement.

View the file

Other files

File Type Posted
Sol_140L4024R0004_Amd_0003.pdf PDF
A06_Section_J_Number_7_End_Panel_Metal_0002.pdf PDF
B08_140L4024R0004_SectionJ_03_Bid_Schedule_20240812_0002.xlsx XLSX spreadsheet
B08_140L4024R0004_20240811_0002.pdf PDF
A06_Section_J_Number_15_ASTM-A121-04-Metallic-Coated-Carbon-Steel-Barbed-Wire-28_(1)_0002.pdf PDF
A06_Section_J_Number_14_Angle_Iron_fence_posts_ASTMspecA702-89_0002.pdf PDF
A06_Section_J_Number_9_THREE-BRACE_CORNER-PANEL_0002.pdf PDF
A06_Section_J_Number_10_Wire_Gate_Metal_with_Wood_Gate_Posts_0002.pdf PDF
Sol_140L4024R0004_Amd_0002.pdf PDF
A06_Section_J_Number_12_Corner_Panel_Metal_0002.pdf PDF
A06_Section_J_Number_11_Corner_Panel_Metal_Obtuse_Angle_0002.pdf PDF
A06_Section_J_Number_8_Stress_Panel_Metal_0002.pdf PDF
A06_Section_J_Number_13_Drainage_Crossing_0002.pdf PDF
B08_140L4024R0004_Continuation_Document_0002.docx DOCX document
B08_140L4024R0004_Section_J_Attachment_05_Limitations_on_Subcontracting_Breakout_0001.xlsx XLSX spreadsheet
A16_Section_J_Number_01_2022_CFO_Wild_Pass_3_0001.pdf PDF
B08_140L4024R0004_Continuation_Document_0001.docx DOCX document
Sol_140L4024R0004_Amd_0001.pdf PDF
B08_140L4024R0004_SectionJ_03_Bid_Schedule_20240812_0001.xlsx XLSX spreadsheet
A06_Section_J_Number_01_2022_CFO_Wild_Pass_1-10_Travel_Map_(1).pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_2.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_4___5.pdf PDF
A04_SOW_2024_PDO_Fence_Construction_RDS.doc DOC document
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_3.pdf PDF
A06_Section_J_02_Legend.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_2.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_7.pdf PDF
B03_SectionJ_04_DBA_CHAVES_NM20230010.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_4.pdf PDF
B03_SectionJ_04_DBA_Eddy_NM20230012.pdf PDF
A06_Section_J_Number_01_2022_RFO_SandCamp_Jolley_Boundary_Fence_5-27-22.pdf PDF
Sol_140L4024R0004.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_6_7-1-22.pdf PDF
A06_Section_J_Number_01_2022_2023_PDO_RFO_Fence_Construction_Overall_Map_7-5-23.pdf PDF
A06_Section_J_Number_01_2022_CFO_June_Tulk_Fence.pdf PDF
A06_Section_J_Number_01_2022_Hobbs_Canyon_Trout_Fence.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_7.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Passes_Overall_Map_aprx.pdf PDF
A06_Section_J_Number01_2022_CFO_Wild_Pass_1_Netwire.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_10.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_9.pdf PDF
B08_140L4024R0004_Continuation_Document.docx DOCX document
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_1.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_5_6-27-22.pdf PDF
B08_140L4024R0006_SectionJ_03_Bid_Schedule.xlsx XLSX spreadsheet
A06_Section_J_Number_01_0222_CFO_Wild_Pass_8.pdf PDF
A06_Section_J_Number_01_2022_CFO_Seigrest_Draw_Fence.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_6.pdf PDF
B08_140L4024R0004_20240811.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)

Solicitation Number140L4024R0006
Type of Set AsideSmall Business
Performance Period126 calendar days after issuance of the NTP
Required Self-Performance15%

(A) Total Amount Proposed*

(B) Total Material Cost

(C) Self Performed Labor

(D) Small Business Subcontractor (SSS) Labor
Total Amount Paid to [Insert First SSS Name]
Total Amount Paid to [Insert Second SSS Name]
Total Amount Paid to [Insert Third SSS Name]
Total Amount Paid to [Insert Fourth SSS Name]
Total Amount Paid to [Insert Fifth SSS Name]
Total Amount Paid to [Insert Sixth SSS Name]
Total Amount Paid to SSS Companies$0.00
(E) Large Business Subcontractor (LBS) Labor
Total Amount Paid to [Insert First LBS Name]
Total Amount Paid to [Insert Second LBS Name]
Total Amount Paid to [Insert Third LBS Name]
Total Amount Paid to [Insert Fourth LBS Name]
Total Amount Paid to [Insert Fifth LBS Name]
Total Amount Paid to [Insert Sixth LBS Name]
Total Amount Paid to LBS Companies$0.00

(F) Total Labor Cost $0.00

(G) Limitation on Subcontracting Percentage*
(Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor CostERROR:#DIV/0!
*Note 1: (A) = (B) + (F)
*Note 2: To be compliant, limitation percentage must be greater than the required self-performance percentage.

Sheet2

Services (except construction)
General construction
Construction by special trade contractors

File details come from the government source that posted it. Updated .