This document is a Statement of Work (SOW) for a Bureau of Land Management (BLM) contract to construct approximately 17.7 miles of four-strand barbed wire fences and remove existing fencing in the Pecos District in New Mexico. The contractor must furnish all labor, equipment, supplies, and materials required to complete the work. Key details include:

The work consists of removing existing fence, constructing new fence, and building bid items such as angle iron corner/end/stress panels and barbed wire gates in accordance with the specifications, drawings, maps, and data sheets. The contractor must follow requirements for equipment washing, safety, fire prevention, utility location, and disposal. The period of performance is 126 calendar days after the Notice to Proceed. Pricing will be based on linear feet of fence, number of panels/gates, and lump sum for mobilization/demobilization. The related federal contract opportunity is Solicitation Number 140L4024R0004 issued by the Department of the Interior Bureau of Land Management New Mexico Region.

View the file

Other files for this federal contract opportunity

Other files attached to 2024 PECOS DISTRICT FENCE CONSTRUCTION, newest first.
File Type Posted
Sol_140L4024R0004_Amd_0003.pdf PDF
A06_Section_J_Number_8_Stress_Panel_Metal_0002.pdf PDF
A06_Section_J_Number_11_Corner_Panel_Metal_Obtuse_Angle_0002.pdf PDF
A06_Section_J_Number_13_Drainage_Crossing_0002.pdf PDF
A06_Section_J_Number_14_Angle_Iron_fence_posts_ASTMspecA702-89_0002.pdf PDF
Sol_140L4024R0004_Amd_0002.pdf PDF
B08_140L4024R0004_SectionJ_03_Bid_Schedule_20240812_0002.xlsx XLSX spreadsheet
A06_Section_J_Number_7_End_Panel_Metal_0002.pdf PDF
A06_Section_J_Number_9_THREE-BRACE_CORNER-PANEL_0002.pdf PDF
A06_Section_J_Number_10_Wire_Gate_Metal_with_Wood_Gate_Posts_0002.pdf PDF
A06_Section_J_Number_12_Corner_Panel_Metal_0002.pdf PDF
A06_Section_J_Number_15_ASTM-A121-04-Metallic-Coated-Carbon-Steel-Barbed-Wire-28_(1)_0002.pdf PDF
B08_140L4024R0004_Continuation_Document_0002.docx DOCX document
B08_140L4024R0004_20240811_0002.pdf PDF
A16_Section_J_Number_01_2022_CFO_Wild_Pass_3_0001.pdf PDF
B08_140L4024R0004_Section_J_Attachment_05_Limitations_on_Subcontracting_Breakout_0001.xlsx XLSX spreadsheet
Sol_140L4024R0004_Amd_0001.pdf PDF
B08_140L4024R0004_Continuation_Document_0001.docx DOCX document
B08_140L4024R0004_SectionJ_03_Bid_Schedule_20240812_0001.xlsx XLSX spreadsheet
Sol_140L4024R0004.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_10.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_2.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_7.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Passes_Overall_Map_aprx.pdf PDF
A06_Section_J_Number01_2022_CFO_Wild_Pass_1_Netwire.pdf PDF
B03_SectionJ_04_DBA_CHAVES_NM20230010.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_9.pdf PDF
B08_140L4024R0004_Section_J_Attachment_05_Limitations_on_Subcontracting_Breakout.xlsx XLSX spreadsheet
B08_140L4024R0004_Continuation_Document.docx DOCX document
A06_Section_J_Number_01_2022_Hobbs_Canyon_Trout_Fence.pdf PDF
A06_Section_J_Number_01_2022_2023_PDO_RFO_Fence_Construction_Overall_Map_7-5-23.pdf PDF
A06_Section_J_Number_01_2022_CFO_June_Tulk_Fence.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_1-10_Travel_Map_(1).pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_6_7-1-22.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_4___5.pdf PDF
A06_Section_J_02_Legend.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_7.pdf PDF
A06_Section_J_Number_01_2022_RFO_SandCamp_Jolley_Boundary_Fence_5-27-22.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_3.pdf PDF
B03_SectionJ_04_DBA_Eddy_NM20230012.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_1.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_4.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_5_6-27-22.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_6.pdf PDF
B08_140L4024R0004_20240811.pdf PDF
B08_140L4024R0006_SectionJ_03_Bid_Schedule.xlsx XLSX spreadsheet
A06_Section_J_Number_01_0222_CFO_Wild_Pass_8.pdf PDF
A06_Section_J_Number_01_2022_CFO_Seigrest_Draw_Fence.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_2.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUREAU OF LAND MANAGEMENT

STATEMENT OF WORK

PECOS DISTRICT FENCE CONSTRUCTION

Description of Work: Furnishing labor, equipment, supplies, and materials, except for specified Government-furnished property, to construct, maintain, and/or remove rangeland fences and fence features. Area of responsibility to include the Roswell and Carlsbad Field Offices of the BLM- Pecos District. Fence types may include the following: 1. 3-wire all steel fence 2. 3-wire fence, steel posts with wood stays 3. 4-wire all steel fence 4. 4-wire fence, steel posts with wood stays 5. Wildlife enclosure fence (High Fence) Fence features include the following: 1. 3. Figure fours 4. Wire gates 5. Double wire gates 6. Drainage crossings (multiple types) 7. Prefabricated end panels 8. Prefabricated corner panels 9. Steel fence panels (up to 16’-0” length) 10. Steel post brace panels 11. Tie-off points anchored to boulders or trees.

PROJECT TITLE

2024 Pecos District Office (PDO) Fence Construction

PLACE OF PERFORMANCE

Work identified in this contract will be located in Eddy and Chaves Counties in the state of New Mexico.

SCOPE

The Work consists of the following:

The Bureau of Land Management (BLM) requires, for proper administration of rangeland management, the contractor to furnish all labor, equipment, supplies, and materials required to, remove ~17.7 miles of fence, construct approximately ~17.7 miles of four-strand barbed wire fences, and build bid items in accordance with the Specifications, Drawings, Maps, and Work Data Sheets. Vehicle traffic along fence lines is allowed within 15 feet of each side of the fence. No scalping of soil along fence line is allowed, however, brush may be removed with equipment. Contractor is responsible for complete removal and recycle of the old fence wire and twisted wire stays from the public lands. Clearing of fence lines is minimal and does not have a line item, all trees and brush that require cutting shall be cut at ground level and carried 10 to 15 feet of the fence lines and lain down. All equipment shall be washed of soil and vegetative material before mobilization to the construction site. Additionally, all equipment shall be washed clean of all soil and vegetative material between construction locations. This washing and cleaning process is required to prevent the spread of noxious and invasive weeds. The Period of Performance (POP) on this contract is for one hundred twenty six (126) calendar days after the Notice to Proceed (NTP) is issued by the Contracting Officer. The contractor shall provide a written work schedule at the prework meeting, and update it monthly, or as requested by the Contracting Officer Representative (COR). The contractor shall provide a written safety and fire plan acceptable to the Contracting Officer prior to construction. Personal Protective Equipment (PPE) such as hardhats, work gloves, and traffic safety vests shall be used according to OSHA and other safety regulations.

BLM POINT OF CONTACT

New Mexico State Office BLM Contracting Officer Ronald “Dean”Shumate

Email: rshumate@blm.gov

New Mexico State Office BLM Project Inspector Name: Jessie Phone: 575-627-0233 Email: bcrawford@blm.gov

REGULATORY REQUIREMENTS

A. Comply with applicable local regulations for haul routes over public highways, roads, or bridges. Comply with industry standards and applicable laws and regulations of authorities having jurisdiction including following:

1. Building code requirements.

2. Health and safety regulations.

3. Utility company regulations.

4. Police, fire department, and rescue squad rules.

5. Environmental protection regulations.

6. Prevention and control of air pollution.

7. Prevention and control of water pollution.

PROJECT CONDITIONS

A. Explosives: Use will not be permitted, unless otherwise specified when using explosives to prevent scattering rocks, stumps, or other debris outside the work area.

B. A staging area will be identified for the Contractor's equipment and supplies.

C. Upon completing the work, the Contractor shall leave the staging area in a clean, neat, and orderly condition.

D. Electricity, water, and phone lines are not available. The Contractor will be responsible for all utility services needed to complete the project.

E. The Contractor shall furnish their own sanitary facilities. Shower facilities are not available.

F. Disposal of waste material to be removed off Bureau of Land Management Land and shall be in compliance with local laws regarding disposal of construction waste.

G. Contractor to locate all utilities in the project area prior to digging. Any utilities that are damaged shall be responsibility of the contractor to repair.

PRECAUTIONARY MEASURES

A. Protection of Work: The Contractor shall take precautions to protect all work during the construction period and shall provide and maintain adequate protection during severe weather conditions to prevent damage to the work and the materials.

B. Preservation: Preserve natural landscape and protect existing vegetation not authorized to be removed. Conduct operations to prevent injury to natural surroundings in vicinity of Work. Move crews and equipment within rights-of-way and over routes provided for access to Work in manner to prevent damage to grazing land, crops, or property. Restore any disturbed area to match prior conditions.

C. Safety: The Contractor is responsible for safeguarding employees, existing facilities and range resources from his operations. The Contractor shall barricade or otherwise make unguarded excavations safe. Signs, lights, barricades and other devices, as necessary, shall be maintained at night and on weekends. Precautions such as lowering tractor blades and safely storing materials shall be practiced preventing injury to others in the area.

D. Security: No security shall be provided by the government. The contractor shall take all precautions deemed necessary to secure the worksite, improvements and equipment.

ACCESS TO SITE

A. General: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section.

B. Use of Site: Limit use of Project site to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

WORK RESTRICTIONS

A. Work Restrictions, General: Comply with restrictions on construction operations. 1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.

B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed without prior consent from the Contracting Officer. Submit requests 72 hours advance of the work to the Contracting Officer for approval.

C. No signs or advertisements (except those specified) shall be displayed on the construction site or within the premises unless approved by the Contracting Officer.

Existing Utilities

1. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.

2. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.

3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.

SMOKING IS NOT PERMNISSTED IN ANY PROJECT LOCATION

FIRE DANGER SEASON

a. Contractor to operate in accordance with all applicable state laws and regulations regarding working during periods of declared fire danger or season and dry conditions.

b. Contractor shall be responsible for taking appropriate precautions to prevent fires and have water trucks on standby if needed. Contractor shall provide a Fire Danger Safety Plan and submit to the COR for approval prior to construction activities taking place. See SECTION 013200 1.3 D. 1 regarding Fire Danger Safety Plan Requirements.

c. No welding to take place on site, welding to be performed at manufacturer's facility or off-site if necessary.

PERIOD OF PERFORMANCE: Contract time begins on the effective date of the Notice to Proceed (NTP) and runs approximately 126 period of calendar days.

EXISTING DESCRIPTION:

Topography

Existing Features

WORK TO BE PERFORMED

The contractor shall furnish all labor, equipment, supplies, and materials required to, remove ~17.7 miles of fence, construct approximately ~17.7 miles of four-strand barbed wire fences, and build bid items in accordance with the Specifications, Drawings, Maps, and Work Data Sheets. Vehicle traffic along fence lines is allowed within 15 feet of each side of the fence. No scalping of soil along fence line is allowed, however, brush may be removed with equipment. Contractor is responsible for complete removal and recycle of the old fence wire and twisted wire stays from the public lands. Contractor may broker their own agreement with the allottee to place old fence materials on the allottee private land instead of taking them to local dumps. Clearing of fence lines is minimal and does not have a line item, all trees and brush that require cutting shall be cut at ground level and carried 10 to 15 feet of the fence lines and lain down. All equipment shall be washed of soil and vegetative material before mobilization to the construction site. Additionally, all equipment shall be washed clean of all soil and vegetative material between construction locations. This washing and cleaning process is required to prevent the spread of noxious and invasive weeds. The period of performance on this contract is for one hundred and twenty-six (126) calendar days after the Notice to Proceed (NTP) is issued by the Contracting Officer Representative or Contracting Officer. The contractor shall provide a written work schedule at the prework meeting, and update it monthly, or as requested by the Contracting Officer Representative (COR). The contractor shall provide a written safety and fire plan acceptable to the Contracting Officer prior to construction. Personal Protective Equipment (PPE) such as hardhats, work gloves, and traffic safety vests shall be used according to OSHA and other safety regulations.

MATERIALS

A. Barbed Wire: A strand of two 12‑1/2-gauge galvanized wires twisted together with 2‑point barbs of 14-gauge wire spaced 4” apart. Wire and barbs shall be zinc‑coated steel, with a zinc coating of at least 0.28 oz/ft2 of coated surface area. The minimum breaking strength of each wire shall be 950 lb‑force. The barbed wire shall conform to American Society for Testing Materials (ASTM) A 121.

B. Barbless Wire: A strand of two 12‑1/2-gauge, galvanized wires twisted together. Wire shall be zinc coated steel wire of at least 0.28 oz per square foot of coated surface area. The minimum breaking strength of each wire shall be 950 lb.‑force. The barbless wire shall conform to ASTM A 121

C. Fence Stays: 36” twisted wire fence stays manufactured from smooth galvanized 9‑1/2-gauge (minimum) wire. ASTM A 121.

D. Steel Angle Iron Upright Post: Uprights shall consist of angles with a nominal size 2 ½” by 2 ½” by ¼” weighing approximately 4.10 lb/ft prior to fabrication. Total length shall be 7’ per post. Uprights shall be furnished with the necessary holes and galvanized hardware for the required assembly (See section 2. MATERIALS F. Fasteners). All posts shall be cleaned of all loose scale prior to finishing and painted solid green (Federal Standard 595B with one or more coats of weather resistant, air drying or baking paint or enamel. The steel posts shall be in conformance with ASTM, "Specification for Steel Fence Posts and Assemblies, Hot Wrought," ASTM A36/A36M.

E. Steel Angle Iron Brace Post: Braces shall be factory new and consist of angles nominal size 2” by 2” by ¼” weighing approximately 3.19 lb/ft prior to fabrication. Total length shall be 7’ per post. Braces shall be furnished with the necessary holes and galvanized hardware for the required assembly (See section 2. MATERIALS F. Fasteners). All posts shall be cleaned of all loose scale prior to finishing and painted solid green (Federal Standard 595B with one or more coats of weather resistant, air drying or baking paint or enamel. The steel posts shall be in conformance with ASTM, "Specification for Steel Fence Posts and Assemblies, Hot Wrought," ASTM A36/A36M.

F. Fasteners: 0.50” Nuts, and 0.50 by 1.5” bolts required. All bolts and nuts shall be new and conform to grade 5 American Society of Mechanical Engineers (ASME) B 18 2 1, ASME B 18 2 2, and ASME B 18 21 1 respectively.

G. Steel Fence SPEC Posts: All t-posts shall be factory new 5’6”, or 7’0” for the Sand Dune fence, steel fence posts, 8” silver painted top with the remainder being green “T” bar type, with a welded or riveted anchor plate. Furnish with clip type wire fasteners (punched tabs for fastening wires are not acceptable). Steel posts shall be manufactured from wrought, rail, or new billet steel, and shall have a minimum weight of 1.33 lb./linear ft. The anchor plates shall weigh a minimum of 0.67 pounds +5 percent and be a minimum of 18 square inches in area. The steel fence posts shall conform to ASTM A 702. SPEC t-post.

H. Steeples/Staples: New bright‑finish or galvanized 9 gauge with slash-cut points 1‑1/2” long designed for outdoor use and shall conform to ASTM F1667.

I. Wooden gate posts: Juniper (Cedar) wood posts 48” length and 3” minimum diameter. Acceptable Wood Gate Posts: A slight bend in one plane is acceptable. Basis for Rejection: Posts are not acceptable when sweep causes a straight line joining the center of the top to the center of the butt to fall outside the body of the post, or at a point 2 inches or more from the center of the post. Posts that are charred, twisted, rotted, or excessively bent are not acceptable. Seasoning checks are not acceptable.

J. Sacked concrete: 80 lbs. sacks ASTM C 404.

EXAMINATION

K. The contactors shall examine all areas and conditions for site clearing, construction layout, and other conditions affecting performance of the Work.

L. The contractor shall proceed with installation only after unsatisfactory conditions have been corrected as addressed by the Contracting Officer Representative (COR).

PREPARATION

M. Prior to fence construction activities, the Contractor shall attend a site meeting with the COR to discuss extents of ground disturbance on site. The contractor shall stake locations of fence lines, gates, and terminal posts. The contractor shall not exceed intervals of 1320 feet or line of sight between stakes. The Contractor shall be responsible for ensuring adequate access to the site to facilitate earthwork, hauling of materials, and proper fence construction. Extents of allowable ground disturbance will be indicated by the COR prior to commencing earthwork activities. Indicate locations of utilities, underground structures, benchmarks, and property monuments. Contractor is solely responsible for completing the One Call process and utility locates and protection of existing utility resources. No construction will be allowed on site until the One Call process is complete and the Contracting Officer’s Representative (COR) has an email verifying the One Call process is complete.

1.2 FENCE INSTALLATION

A. Install fences according to contract maps and drawings.

B. Post Excavation for brace panels: Drill or hand-excavate holes for posts in firm, undisturbed soil. Excavate holes to a diameter of not less than 10” and a depth of not less than 39”, with 3” of concrete below the bottom of the post. Angle iron posts may be drilled to a diameter of approximately 3” excavated into solid rock to a depth of 36” and then the rock and debris packed back into the excavation hole with concrete. Angle iron posts and braces may not be cut less than the 7’ prescribed amount. All above ground portions of brace posts shall be no more than 48” with 36” below ground. Concrete for braces must be poured at least equal with existing soil surface. All brace angle iron posts shall be constructed with a 16” by 16” by 16” cube of concrete. All brace bolts and nuts shall be tightened with a mechanical advantage such as wrenches or socket and driver. Pipe and wood braces are not allowed.

C. Post Setting: Set posts plumb and at indicated spacing and depth into firm, undisturbed soil, see 4.3 B .

1. Verify that structure posts are set plumb, aligned, and at correct height and spacing, and hold in position during setting with mechanical devices while setting in concrete.

D. Line posts (t-posts)

1. Mechanically Driven Posts (t-posts): Drive into soil to a depth of 18”. Protect post top to prevent distortion. Twisted or bent t-posts are not acceptable. Where conditions prohibit the mechanical driving of t-posts, it shall be permissible to drill a hole 18” deep and 1 ½” to 3” in diameter to receive the t-post without spade. In this instance the post hole must be securely packed with cutting material that was excavated by drilling. In situations where the prescribed wire height is greater than 4” from lengths designated in the work data sheet, due to topography between t-posts, a “Deadman” shall be used to maintain proper wire height and to prevent t-posts from being pulled out and suspended in midair and be installed at no additional cost. A “Deadman” is properly constructed when a rock of 50 lbs. or greater is hung from the four strands of barbed and barbless wire or t-posts driven in at a 45-degree angle greater than 24” depth and the four strands of barbed and barbless wire are attached to the t-post used as a “Deadman”. “Deadmen” are not bid items and should be included in the cost per foot of fence. In hill top or sand dune top situations where the prescribed wire height is not maintained, an additional t-post must be installed at no additional cost. Additional hill and dune top t-posts are not bid items and should be included in the cost per foot of fence.

2. Space line posts uniformly at 16’-6” on center. Curved t-post lines between braces are not acceptable. Additionally, t-posts more than 12” out of straight line between braces will not be accepted and must be placed back into a straight line..

E. Wire

1. Wire: Stretch wire tightly and securely attach to steel posts with standard wire clips after the concrete has properly cured over 24 hours. Wire is correctly stretched when it is springy to the touch and does not sag more than 2” from a straight line between clips on t-posts, stay thread area, or braces wire wraps. Minimum wire tension per double wire strand is 150 pounds. Clips are properly installed when both ends wrap a minimum of one (1) time around each strand of wire at the t-post. Terminate wire at each end panel, corner post, stress panel, or single metal posts. Wrap wire around the post two times and tie off by wrapping around the incoming wire a minimum of four times. Kinked wire is not acceptable and must be spliced. Wire may be spliced with the terminal ends wrapped around the opposing strand a minimum of four times. Breakaways for drainage crossing shall be constructed from a single strand of 12‑1/2-gauge galvanized wire per strand of barbed or barbless wire.

1.3 GATE INSTALLATION

A. Install gates according to contract drawings. The default gate width is always 16.5’. Juniper wood posts, 3” minimum diameter, shall be placed at each end of the wire gate and the wire shall be attached to the stays in the same manner as terminating wire at an angle iron upright post and shall be galvanized steel steepled. Operating gate side posts loop fasteners shall be constructed of barbless wire. A wire gate shall have a minimum of two twisted wire stays between the two juniper wood posts at either end. The wire loop used to hold the gate to provide articulation and access shall be held firmly in place by galvanized wire.

1.4 ADJUSTING

A. Gates: Adjust gates to operate smoothly, free of binding, warp, excessive deflection, distortion, nonalignment, misplacement, disruption, or malfunction, throughout entire operational range. Confirm that gate has enough tension to operate accurately and securely without forcing or binding. Gates that cannot be closed and fastened without mechanical advantage or any one strand sag beyond 6”, shall be rejected for payment.

PART 2 - MEASUREMENT AND PAYMENT

2.1 METHOD OF MEASUREMENT

A. Units: The work described in this section will be paid by the foot for each type of fence as measured along the ground surface next to the completed fence using Global Positioning Systems (GPS) and Geographic information System (GIS), including distance across gate openings. If a discrepancy of more than 10% is suspected between the as built fence distances and the amounts listed on the maps, the contractor and COR may measure the distance by chain steel, measuring tape, or hip (string) chain. The quantities of end panels, stress panels, corner panels, and gates will be paid for by the actual number of each item constructed and shall include cost for material and labor of required amount of concrete. Note: Gates do not include adjacent end panels, corner panels, or single metal posts. These are separate items.

B. BASIS OF PAYMENT

1. Payment: Prices and payment will be full compensation for all the work described in this section. Payment will be made under:

Pay Item installed
Description

Pay Unit

1
Fence Removal
Linear Foot
2
Barbed Wire Fence (4 strand)
Linear Foot
3
Angle Iron Corner Panel
Each
4
Angle Iron 3 Brace Corner Panel
Each
5
Angle Iron End Panel
Each
6
Angle Iron Stress Panel
Each
7
Barbed Wire Gate (4 Wire)
Each
8
Single Angle Iron Metal Post
Each
9
Mobilization/Demobilization
Lump Sum

ALL FENCES

Fence type: 4-Twisted Strand Wire Fence

Type of top wire: Barbed Wire Type of intermediate wires: Barbed Wire Type of bottom wire: Barbless Wire Wire locations/dimensions in inches (spacing):

D: 12"

C: 8"

B: 6"

A: 16"

Total fence wire height: 42” Line post (t-post) spacing (L): 16’6” Type of Stays: 36” twisted wire fence stays Stay spacing (l): 16’6” Brace Panels (corner, stress, and end panels): see drawings.

Length of wire gate wood posts (H1): 3” minimum diameter juniper species 48” tall Length of steel posts (H2): 5’6” Depth of steel posts in ground (h2): 1’6” All gates: 16’6” (Unless otherwise noted on maps or drawings.)