A06_Section_J_Number_01_2022_CFO_Wild_Pass_1-10_Travel_Map_(1).pdf

PDF 2 MB Posted

Attached to
2024 PECOS DISTRICT FENCE CONSTRUCTION Federal contract opportunity
Solicitation number
140L4024R0004
Issued by
Department of the Interior Bureau of Land Management New Mexico Region

About this file

This document appears to be a project location map for the "2022 CFO Wild Passes 1-10 Netwire Fence Replacement" in Chaves, Eddy, and Otero Counties, New Mexico. It provides detailed GPS coordinates for 10 specific passes along the project route. The related federal contract opportunity is Solicitation Number 140L4024R0004, titled "2024 PECOS DISTRICT FENCE CONSTRUCTION" issued by the Department of the Interior Bureau of Land Management New Mexico Region. The project involves the removal of 13,200 feet of existing fence and the construction of 13,200 feet of new netwire fence, including 3 brace corner panels, 7 end panels, 15 stress panels, and 4 wire gates. The project location map is part of the documentation for this federal contract opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to 2024 PECOS DISTRICT FENCE CONSTRUCTION, newest first.
File Type Posted
Sol_140L4024R0004_Amd_0003.pdf PDF
A06_Section_J_Number_8_Stress_Panel_Metal_0002.pdf PDF
A06_Section_J_Number_11_Corner_Panel_Metal_Obtuse_Angle_0002.pdf PDF
A06_Section_J_Number_13_Drainage_Crossing_0002.pdf PDF
A06_Section_J_Number_14_Angle_Iron_fence_posts_ASTMspecA702-89_0002.pdf PDF
Sol_140L4024R0004_Amd_0002.pdf PDF
B08_140L4024R0004_SectionJ_03_Bid_Schedule_20240812_0002.xlsx XLSX spreadsheet
A06_Section_J_Number_7_End_Panel_Metal_0002.pdf PDF
B08_140L4024R0004_Continuation_Document_0002.docx DOCX document
B08_140L4024R0004_20240811_0002.pdf PDF
A06_Section_J_Number_9_THREE-BRACE_CORNER-PANEL_0002.pdf PDF
A06_Section_J_Number_10_Wire_Gate_Metal_with_Wood_Gate_Posts_0002.pdf PDF
A06_Section_J_Number_12_Corner_Panel_Metal_0002.pdf PDF
A06_Section_J_Number_15_ASTM-A121-04-Metallic-Coated-Carbon-Steel-Barbed-Wire-28_(1)_0002.pdf PDF
A16_Section_J_Number_01_2022_CFO_Wild_Pass_3_0001.pdf PDF
B08_140L4024R0004_Section_J_Attachment_05_Limitations_on_Subcontracting_Breakout_0001.xlsx XLSX spreadsheet
Sol_140L4024R0004_Amd_0001.pdf PDF
B08_140L4024R0004_Continuation_Document_0001.docx DOCX document
B08_140L4024R0004_SectionJ_03_Bid_Schedule_20240812_0001.xlsx XLSX spreadsheet
Sol_140L4024R0004.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_10.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_2.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_7.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Passes_Overall_Map_aprx.pdf PDF
A06_Section_J_Number01_2022_CFO_Wild_Pass_1_Netwire.pdf PDF
B03_SectionJ_04_DBA_CHAVES_NM20230010.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_9.pdf PDF
B08_140L4024R0004_Section_J_Attachment_05_Limitations_on_Subcontracting_Breakout.xlsx XLSX spreadsheet
B08_140L4024R0004_Continuation_Document.docx DOCX document
A06_Section_J_Number_01_2022_Hobbs_Canyon_Trout_Fence.pdf PDF
A06_Section_J_Number_01_2022_2023_PDO_RFO_Fence_Construction_Overall_Map_7-5-23.pdf PDF
A06_Section_J_Number_01_2022_CFO_June_Tulk_Fence.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_6_7-1-22.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_4___5.pdf PDF
A06_Section_J_02_Legend.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_7.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_6.pdf PDF
B08_140L4024R0004_20240811.pdf PDF
B08_140L4024R0006_SectionJ_03_Bid_Schedule.xlsx XLSX spreadsheet
A06_Section_J_Number_01_0222_CFO_Wild_Pass_8.pdf PDF
A06_Section_J_Number_01_2022_CFO_Seigrest_Draw_Fence.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_2.pdf PDF
A06_Section_J_Number_01_2022_RFO_SandCamp_Jolley_Boundary_Fence_5-27-22.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_3.pdf PDF
B03_SectionJ_04_DBA_Eddy_NM20230012.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_1.pdf PDF
A04_SOW_2024_PDO_Fence_Construction_RDS.doc DOC document
A06_Section_J_Number_01_2022_CFO_Wild_Pass_4.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_5_6-27-22.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pass 5 Use exisitng brace 0+00 104°42'47.78"W, 32°36'34.76"N

Pass 6 EP 0+00 104°42'44.14"W, 32°34'26.69"N

Pass 7 3BCP 0+00 104°43'16.93"W, 32°33'30.61"N

Pass 8 SP 0+00 104°42'5.6"W, 32°32'37.78"N

Pass 9 3BCP 0+00 104°38'9.13"W, 32°32'36.86"N

Pass 10 SP WG EP 0+00 104°43'57.605"W 32°29'11.549"N

Pass 1 EP 0+00 104°50'35.31"W, 32°38'4.73"NPass 2 SP 0+00

104°52'35.75"W, 32°36'25.95"N

Pass 3 SP 0+00 104°52'35.5"W, 32°34'57.82"N

Pass 4 3BCP 0+00 104°52'9.78"W, 32°33'53.29"N

30 T20S R21E T20S

R23E

T19S R21E T19S

R23E

T21S R21E

T21S R22E

T20S R20E

T19S R20E

T21S R23E

T21S R20E

T19S R24E

T20S R24E

T18S R21E

T18S R23E

T18S R20E

T18S R24E

T22S R21E

T22S R22E

T22S R23E

T22S R20E

T20S R22E

T20S

R23ET20S

R21E T20S R20E

Texas Hill 78050

Siegrest Draw 78041

Burro Hill 78063

Deer Canyon 78048

Acres Lake 79031

Encino Draw 79030

Collier Tank 78049

Box Canyon 78051

Indian Basin 78061

Gardener Draw 78042

Cawley Draw 78064

Antelope Sink 78026

Sinkhole Flat 78040

Cottontail 78020

Hope Hill 78028

Dayton 78025

Black Muhley 78052

Rock Tank 78027

Little Box Canyon 78062

Sixteen Mile Draw 79040

Seven Rivers North 78046

Indian Hills 78065

Upper Segrest Draw 79048

Upper Packsaddle Canyon 79049

Black Muhley 78052

No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of these data for individual use or aggregate use with other data, or for purposes not intended by BLM. Spatial information may not meet National Map Accuracy Standards. This information may be updated without notification.

LOCATION MAP

0 2 4 Miles UNITED STATES DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

Pecos District Office New Mexico

PROJECT LOCATION MAP

2022 CFO Wild Passes 1-10 Netwire

Fence Replacement

DESIGNED

REVIEWED

APPROVED

DRAWING NO.

SCALE

SHEET 1 OF 1

Russell Fox S. Lerich and J. Loudermilk

Matias Telles 1:200,000DRAWN BY: rfox

DATE: 3/14/2022

Chaves, Eddy, and Otero Co. work sites

Estimate measured with String Chain Fence to be removed=13,200' Fence to be built=13,200' Corner Panel=CP=0 3 Brace Corner Panel=3BCP=3 End Panel=EP=7 Stress Panel=SP=15 Wire Gate=WG=4 Single Metal Post=SMP=1 Tie in old fences at braces.

File details come from the government source that posted it. Updated .