A06_Section_J_Number_01_2022_CFO_Seigrest_Draw_Fence.pdf

PDF 2 MB Posted

Attached to
2024 PECOS DISTRICT FENCE CONSTRUCTION Federal contract opportunity
Solicitation number
140L4024R0004
Issued by
Department of the Interior Bureau of Land Management New Mexico Region

About this file

This document appears to be a location map for a 2022 CFO Siegrest Draw Netwire Fence Replacement project in the Pecos District of the Bureau of Land Management (BLM) New Mexico Region. The map provides the specific geographic coordinates and acreage of the work sites located across Chaves, Eddy, and Otero counties.

The related federal contract opportunity is for the 2024 PECOS DISTRICT FENCE CONSTRUCTION, Solicitation Number 140L4024R0004, issued by the Department of the Interior Bureau of Land Management New Mexico Region. The description indicates this is for fence construction work, but no other details are provided about the specific requirements, response dates, award information, or set asides.

View the file

Other files for this federal contract opportunity

Other files attached to 2024 PECOS DISTRICT FENCE CONSTRUCTION, newest first.
File Type Posted
Sol_140L4024R0004_Amd_0003.pdf PDF
A06_Section_J_Number_8_Stress_Panel_Metal_0002.pdf PDF
A06_Section_J_Number_11_Corner_Panel_Metal_Obtuse_Angle_0002.pdf PDF
A06_Section_J_Number_13_Drainage_Crossing_0002.pdf PDF
A06_Section_J_Number_14_Angle_Iron_fence_posts_ASTMspecA702-89_0002.pdf PDF
A06_Section_J_Number_9_THREE-BRACE_CORNER-PANEL_0002.pdf PDF
A06_Section_J_Number_10_Wire_Gate_Metal_with_Wood_Gate_Posts_0002.pdf PDF
A06_Section_J_Number_12_Corner_Panel_Metal_0002.pdf PDF
A06_Section_J_Number_15_ASTM-A121-04-Metallic-Coated-Carbon-Steel-Barbed-Wire-28_(1)_0002.pdf PDF
B08_140L4024R0004_Continuation_Document_0002.docx DOCX document
B08_140L4024R0004_20240811_0002.pdf PDF
Sol_140L4024R0004_Amd_0002.pdf PDF
B08_140L4024R0004_SectionJ_03_Bid_Schedule_20240812_0002.xlsx XLSX spreadsheet
A06_Section_J_Number_7_End_Panel_Metal_0002.pdf PDF
A16_Section_J_Number_01_2022_CFO_Wild_Pass_3_0001.pdf PDF
Sol_140L4024R0004_Amd_0001.pdf PDF
B08_140L4024R0004_Continuation_Document_0001.docx DOCX document
B08_140L4024R0004_SectionJ_03_Bid_Schedule_20240812_0001.xlsx XLSX spreadsheet
B08_140L4024R0004_Section_J_Attachment_05_Limitations_on_Subcontracting_Breakout_0001.xlsx XLSX spreadsheet
Sol_140L4024R0004.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_10.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_2.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_7.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Passes_Overall_Map_aprx.pdf PDF
A06_Section_J_Number01_2022_CFO_Wild_Pass_1_Netwire.pdf PDF
B03_SectionJ_04_DBA_CHAVES_NM20230010.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_9.pdf PDF
B08_140L4024R0004_Section_J_Attachment_05_Limitations_on_Subcontracting_Breakout.xlsx XLSX spreadsheet
B08_140L4024R0004_Continuation_Document.docx DOCX document
A06_Section_J_Number_01_2022_Hobbs_Canyon_Trout_Fence.pdf PDF
A06_Section_J_Number_01_2022_2023_PDO_RFO_Fence_Construction_Overall_Map_7-5-23.pdf PDF
A06_Section_J_Number_01_2022_CFO_June_Tulk_Fence.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_1-10_Travel_Map_(1).pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_6_7-1-22.pdf PDF
A06_Section_J_Number_01_2022_RFO_SandCamp_Jolley_Boundary_Fence_5-27-22.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_3.pdf PDF
B03_SectionJ_04_DBA_Eddy_NM20230012.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_1.pdf PDF
A04_SOW_2024_PDO_Fence_Construction_RDS.doc DOC document
A06_Section_J_Number_01_2022_CFO_Wild_Pass_4.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_5_6-27-22.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_6.pdf PDF
B08_140L4024R0004_20240811.pdf PDF
B08_140L4024R0006_SectionJ_03_Bid_Schedule.xlsx XLSX spreadsheet
A06_Section_J_Number_01_0222_CFO_Wild_Pass_8.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_2.pdf PDF
A06_Section_J_Number_01_2023_RFO_Rock_House_Wild_Pass_4___5.pdf PDF
A06_Section_J_02_Legend.pdf PDF
A06_Section_J_Number_01_2022_CFO_Wild_Pass_7.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SMP 3WG 3EP 0+00

104°46'54.5"W, 32°36'36.2"N

SP 3+95

104°46'44.77"W, 32°36'36"N

SP 10+82

104°46'39.25"W, 32°36'35.85"N

SP 18+21

104°46'30.12"W, 32°36'35.7"N

SP 31+41

104°46'15.12"W, 32°36'35.53"N

SP 34+05

104°46'12.61"W, 32°36'35.51"N

SP 37+75

104°46'8.42"W, 32°36'35.47"N

SMP 45+14

104°45'59.12"W, 32°36'35.39"N

SMP 50+42

104°45'53.27"W, 32°36'35.37"N

SMP 55+62

104°45'47.53"W, 32°36'35.14"N

SP 59+39

104°45'42.77"W, 32°36'35.29"N

SMP 67+31

104°45'33.75"W, 32°36'35.22"N

SP 69+43

104°45'31.13"W, 32°36'35.13"N

SMP 71+53

104°45'29.11"W, 32°36'35.19"N

SMP 76+29

104°45'22.95"W, 32°36'34.95"N

SP 78+93

104°45'20.18"W, 32°36'34.8"N

SP 92+13

104°45'5.47"W, 32°36'33.47"N

SMP 101+63

104°44'54.98"W, 32°36'29.21"N

3BCP 105+33

104°44'51.04"W, 32°36'28.87"N

SP 107+71

104°44'50.9"W, 32°36'27.1"N

SP 120+95

104°44'49.2"W, 32°36'14.4"N

T19S R21E

T20S R21E

18 17

33 34

15 14 13 18

Collier Tank 78049

Siegrest Draw 78041Acres Lake

79031

Southeast

West Bunting House

Horse

North Bunting

No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of these data for individual use or aggregate use with other data, or for purposes not intended by BLM. Spatial information may not meet National Map Accuracy Standards. This information may be updated without notification.

LOCATION MAP

0 0.55 1.1 Miles UNITED STATES DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

Pecos District Office New Mexico

PROJECT LOCATION MAP

2022 CFO Siegrest Draw Netwire

Fence Replacement

DESIGNED

REVIEWED

APPROVED

DRAWING NO.

SCALE

SHEET 1 OF 1

Russell Fox S. Lerich and J. Loudermilk

Matias Telles 1:50,000DRAWN BY: rfox

DATE: 7/1/2022

Chaves, Eddy, and Otero Co. work sites

Estimate measured with String Chain Fence to be removed=12,095' Fence to be built=12,095' Corner Panel=CP=1 3 Brace Corner Panel=3BCP=1 End Panel=EP=3 Stress Panel=SP=11 Wire Gate=WG=3 Single Metal Post=SMP=8 Tie in old fences at braces. Leave existing pipe fence.

File details come from the government source that posted it. Updated .