A16_Section_J_Number_01_2022_CFO_Wild_Pass_3_0001.pdf
PDF 1 MB Posted
- Attached to
- 2024 PECOS DISTRICT FENCE CONSTRUCTION Federal contract opportunity
- Solicitation number
- 140L4024R0004
About this file
This document appears to be a project location map for the 2022 CFO Wild Pass 3 Netwire Fence Replacement project. It provides details on the geographic coordinates and location of the work sites in Chaves, Eddy, and Otero counties in New Mexico. The map includes measurements for the fence to be removed (1,320 linear feet) and the new fence to be constructed (1,320 linear feet), as well as the quantities of various fence components such as corner panels, brace corner panels, end panels, stress panels, wire gates, and single metal posts. The related federal contract opportunity is for the 2024 Pecos District Fence Construction, solicitation number 140L4024R0004, issued by the Department of the Interior Bureau of Land Management New Mexico Region.
View the file
Other files for this federal contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pass 3 SMP WG 0+00 104°52'35.58"W, 32°34'51.3"N
Pass 3 SP 13+20 104°52'35.657"W 32°35'4.743"N
30T20S R20E 1110
Collier Tank 78049
Acres Lake 79031
WestAcres Lake
Little Big Trap
No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of these data for individual use or aggregate use with other data, or for purposes not intended by BLM. Spatial information may not meet National Map Accuracy Standards. This information may be updated without notification.
LOCATION MAP
0 0.03 0.06 Miles UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
Pecos District Office New Mexico
PROJECT LOCATION MAP
2022 CFO Wild Pass 3 Netwire
Fence Replacement
DESIGNED
REVIEWED
APPROVED
DRAWING NO.
SCALE
SHEET 1 OF 1
Russell Fox S. Lerich and J. Loudermilk
Matias Telles 1:2,851DRAWN BY: rfox
DATE: 5/27/2022
Chaves, Eddy, and Otero Co. work sites
Estimate measured with String Chain Fence to be removed=1,320' Fence to be built=1,320' Corner Panel=CP=0 3 Brace Corner Panel=3BCP=0 End Panel=EP=0 Stress Panel=SP=1 Wire Gate=WG=1 Single Metal Post=SMP=1 Tie in old fences at braces.
File details come from the government source that posted it. Updated .