This is a Final Construction Documents Specification Volume for the Whiteriver Hospital project, specifically addressing electrical systems and process piping for the Tribally-owned and operated Surface Water Treatment Plant (SWTP). The document, prepared by SmithGroup on March 5, 2026, contains detailed technical specifications across multiple divisions including electrical work (Division 26), process interconnections (Division 40), and water/wastewater equipment (Division 46).

The electrical specifications (Division 26) cover basic electrical requirements, raceways, wires and cables rated 600V or less, boxes, wiring devices, electrical identification, grounding, and lighting systems. Key requirements include compliance with the National Electrical Code (NEC), UL listing standards, and installation in accordance with NEMA and IEEE standards. All electrical work must be performed by a licensed Arizona contractor located within 100 miles of the project with minimum five years of experience in similar installations. Electrical equipment must operate at 0°C to 50°C ambient temperatures and be rated for 1,200-foot altitude. Submittals must include manufacturer data, shop drawings, and operation and maintenance manuals in PDF format with character recognition. Record drawings showing final locations of conduit, equipment, and controls are required upon project completion.

The piping specifications (Divisions 40 and 46) detail requirements for process interconnections including ductile iron pipe, PVC, and CPVC piping systems. All piping materials, joints, supports, and coatings must comply with AWWA standards, ASME standards, and NSF 61 requirements for water service. The Piping Schedule identifies specific materials by service, including raw water, finished water, backwash water, drain lines, and chemical lines such as aluminum sulfate, sodium hypochlorite, and polymer. Piping must be color-coded and labeled with stenciling or decals. All newly installed pipelines require hydrostatic or pneumatic testing at pressures specified in the schedule, followed by disinfection using chlorination methods complying with AWWA C651 and NSF/ANSI 60 and 61 standards. Manual valves, magnetic flow meters, and turbidity analyzers are specified for process control and monitoring. The contractor is responsible for coordination with other trades, proper handling and storage of materials, pipe installation according to manufacturer recommendations, support system design for seismic conditions, and final cleaning and flushing of all piping systems prior to acceptance.

View the file

Other files

File Type Posted
Amend10 - WR Construction - 24 Jun 2026.pdf PDF
A10-1d BP1_DWG2026-0618_08_ARCHITECTURAL_IHS-Whiteriver-Hospital_BID-ADD-H.pdf PDF
A10-1e BP1_DWG2026-0618_15_ELECTRICAL_IHS-Whiteriver-Hospital_BID-H.pdf PDF
A10-1f BP1_DWG2026-0618_16_ICT_IHS-Whiteriver-Hospital_BID-ADD-H.pdf PDF
A10-1g BP1_EXH2026-0618_10_MED-EQUIP_IHS-Whiteriver-Hospital_BID-ADD-H.pdf PDF
A10-5 For RFI 154 - Geotech Reports.pdf PDF
A9-1a MEM2026-0612_IHS-Whiteriver-Hospital_BID-Addendum-G.pdf PDF
A8-1a 0_MEM2026-0609_IHS-Whiteriver-Hospital_BID-Addendum-F.pdf PDF
A8-1b 0_SPEC2026-0609_Specifications_IHS-Whiteriver-Hospital_BID-ADD-F.pdf PDF
A8-2 Section B.pdf PDF
A7-1e BP1_DWG2026-0528_16_ICT_IHS-Whiteriver-Hospital_BID-ADD-E.pdf PDF
A7-1h BP4_DWG2026-0528_16_ICT_IHS-Whiteriver-Pump-House_BID-ADD-E.pdf PDF
A7-2b Contact list Service Unit - RFI 109.xlsx XLSX spreadsheet
A7-3 WR Standard Form 1442.pdf PDF
A6-1a 0_MEM2026-0520_IHS-Whiteriver-Hospital_BID-Addendum-D.pdf PDF
A6-1b SPEC2026-0520_Specifications_IHS-Whiteriver-Hospital_BID-ADD-D.pdf PDF
A6-1c BP1_DWG2026-0520_05_CIVIL_IHS-Whiteriver-ADOT-PLANS_BID-ADD-D.pdf PDF
A6-1e BP1_DWG2026-0520_08_ARCHITECTURAL_IHS-Whiteriver-Hospital_BID-ADD-D.pdf PDF
A6-2 WR Pre-Proposal_RFIs 001 - 121.xlsx XLSX spreadsheet
A5-1b SPEC2026-0514_Specifications_IHS-Whiteriver-Hospital_BID-ADD-C.pdf PDF
A5-1d BP1_DWG2026-0514_06_LANDSCAPE_IHS-Whiteriver-Hospital_BID-ADD-C.pdf PDF
A5-2 WR Pre-Proposal_RFIs 001 - 069.xlsx XLSX spreadsheet
A4-1a 0_MEM2026-0430_IHS-Whiteriver-Hospital_BID-Addendum-B.pdf PDF
A4-1f BP1_DWG2026-0430_15_ELECTRICAL_IHS-Whiteriver-Hospital_BID-ADD-B.pdf PDF
A4-1e BP1_DWG2026-0430_08_ARCHITECTURAL_IHS-Whiteriver-Hospital_BID-ADD-B.pdf PDF
A3-1 Section B.pdf PDF
A3-2 Attachment J11 EPA Schedule.xlsx XLSX spreadsheet
A3-3 WR Pre-Proposal_RFIs 001 - 050.xlsx XLSX spreadsheet
Amend3 - WR Construction - 1 May 2026.pdf PDF
A2-1a MEM2026-0416_IHS-Whiteriver-Hospital_BID-Addendum-A.pdf PDF
A2-1b SPEC2026-0416_Specifications_IHS-Whiteriver-Hospital_BID-ADD-A.pdf PDF
A2-1e BP1_DWG2026-0416_08_ARCHITECTURAL_IHS-Whiteriver-Hospital_BID-ADD-A.pdf PDF
A2-1f BP1_DWG2026-0416_15_ELECTRICAL_IHS-Whiteriver-Hospital_BID-ADD-A.pdf PDF
A2-1h BP3_DWG2026-0416_05_CIVIL_IHS-Hon-Dah-UC_BID-ADD-A.pdf PDF
A2-1c BP1_DWG2026-0416_05_CIVIL_IHS-Whiteriver-ADOT-PLANS_BID-ADD-A.pdf PDF
A2-1g BP2_DWG2026-0416_05_CIVIL_IHS-Whiteriver-UC_BID-ADD-A.pdf PDF
A2-3 WR Standard Form 1442.pdf PDF
Amend1 - WR Construction - 14 April 2026.pdf PDF
A1-2a WR Pre-Proposal Mtg Attendee List - Original Written.pdf PDF
A1-1b WR Pre-Proposal Mtg AE Presentation.pdf PDF
A1-2b WR Pre-Proposal Mtg Attendance - Typed.pdf PDF
B01 Attachment J01 BP4_01_GENERAL_IHS-Whiteriver-Pump-House_FINAL-CD.pdf PDF
B01 Attachment J02d Specs (Vol 4).pdf PDF
Attachment J06b - Highway AZ20260033.pdf PDF
Attachment J07 Company Technical Experience Construction Sheet.docx DOCX document
Attachment J08 - Key Personnel Resume Form.docx DOCX document
B01 Attachment J01 BP1_01_GENERAL_IHS-Whiteriver-Hospital_FINAL-CD.pdf PDF
B01 Attachment J01 BP2_01_GENERAL_IHS-Whiteriver-WWTP_FINAL-CD.pdf PDF
B01 Attachment J02a Specs (Vol 1).pdf PDF
Attachment J06c - Heavy AZ20260054.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prepared for: INDIAN HEALTH SERVICE

100% CONSTRUCTION DOCUMENTS

Project No: 14904.000

5 MARCH 2026

VOLUME 6

Prepared by:

Specification Volume 6 is part of a larger specification set for the Whiteriver Hospital project. Volume 6 is the portion of the set which applies to the Tribally owned and operated surface water treatment plant and can be viewed as a stand-alone specification for this portion of the project.

SMITHGROUP 14904.000 INDIAN HEALTH SERVICE

WHITERIVER HOSPITAL

FINAL CONSTRUCTION DOCUMENTS

SEALS PAGE 000107 - 1

DOCUMENT 000107 - SEALS PAGE

Civil Engineer Dibble & Associates Consulting Engineers, Inc.

Phoenix, Arizona

Mike Logan, PE

Responsible for civil specifications for the SWTPs:

Division 40: 400205, 400510, 400510.03, 400510.12, 400510.13, 400553, 407113, 407553; Division 46:

460713, 463344

Electrical Engineer DARcor & Associates, Inc.

Phoenix, Arizona

Jorge Gerardo, PE

Responsible for electrical specifications for the SWTPs:

Division 26: 260050, 260110, 260120, 260130, 260140, 260195, 260450, 260500

END OF DOCUMENT 000107

FINAL CONSTRUCTION DOCUMENTS

5 MARCH 2026

TABLE OF CONTENTS TOC

TABLE OF CONTENTS

Volume 6

DIVISION 26 - ELECTRICAL

SECTION 260050 - BASIC ELECTRICAL REQUIREMENTS

SECTION 260110 - RACEWAYS

SECTION 260120 - WIRES AND CABLES

SECTION 260130 - BOXES

SECTION 260140 - WIRING DEVICES

SECTION 260195 - ELECTRICAL IDENTIFICATION

SECTION 260450 - GROUNDING

SECTION 260500 - LIGHTING

DIVISION 40 - PROCESS INTERCONNECTIONS

SECTION 400205 - PIPING SCHEDULE

SECTION 400510 - PIPING GENERAL

SECTION 400510.03 - DPS- DUCTILE IRON PIPE AND FITTINGS

SECTION 400510.12 - DPS- POLYVINYL CHLORIDE (PVC) PIPE AND FITTINGS

SECTION 400510.13 - DPS- CHLORINATED POLYVINYL CHLORIDE (CPVC) PIPE AND

FITTINGS

SECTION 400553 - MANUAL VALVES

SECTION 407113 - MAGNETIC FLOW METERS

SECTION 407553 - TURBIDITY ANALYZERS

DIVISION 46 - WATER AND WASTEWATER EQUIPMENT

SECTION 460713 - PACKAGED WATER TREATMENT EQUIPMENT

SECTION 463344 - PERISTALTIC METERING PUMPS

BASIC ELECTRICAL REQUIREMENTS 260050-1

SECTION 260050 - BASIC ELECTRICAL REQUIREMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes: Electrical general provisions as indicated, specified and required for constructing a complete, ready for use electrical system as described in these Contract Documents.

B. Labor, materials, apparatus, and appliances essential to the complete functioning of systems described and indicated herein, or which may be reasonably implied as essential, whether mentioned in the Contract Documents or not, shall be furnished and installed by the Contractor. In case of doubt as to the work intended, or in the event of need for explanation thereof, Contractor shall refer to the Engineer for supplemental instructions.

C. All items not specifically mentioned in these Specifications or noted on the Drawings, or on shop drawings, but which are necessary to make a complete and satisfactory, working electrical/instrumentation installation, shall be deemed to be included herein.

D. All electrical equipment shall be capable of operating successfully at full-rated load, without failure, at an ambient air temperature of 0C to 50C, and specifically rated for an altitude of 1200 feet. Where these criteria cannot be met, ancillary equipment and/or special derating factors as approved by the Engineer shall be utilized.

E. The Contractor shall perform all necessary saw cutting, core drilling, excavating, removal, shoring, backfilling, etc as required for the proper installation of conduits whether inside or outside of the building(s) and structure(s). The Contractor shall repair and patch where demolition has taken place in a manner to match existing original structure.

F. All electrical equipment under Division 26 shall be furnished and installed by the Electrical Contractor.

1.2 SUBMITTALS

A. Submit documentation for review as described in individual Specification Sections for products requiring submission.

B. Submit Division 26 in one submittal, or at a maximum, the following may be submitted as a separate submittal for this project.

1. Commodities (Sections 26 00 50-26 01 95) and Grounding (Section 26 04 50)

2. Lighting (Section 26 05 00)

C. Documentation must be arranged in numerical sequence corresponding with each Specification Section and article of each Section. Soft copies shall be in “pdf” format with “character recognition” and shall include the following as a minimum:

1. A cover page to identify the Contractor’s name, name of the project, date and description, i.e. “Electrical – Commodities”.

2. An index corresponding to each specification section with all addendum updates included.

3. A copy of each specification section shall be included in the submittal package.

Each paragraph or bulleted item shall be check marked to signify compliance with each item and the information is included in the submittal package. If full compliance is not met for any reason, the non-compliance item shall be

BASIC ELECTRICAL REQUIREMENTS 260050-2

underlined and reference to a detailed written explanation of the deviation or non-compliance shall be provided for consideration.

4. Bookmarks within each section for each major component within.

5. Complete manufacturer name and model number of each item. Listing items “as specified” without both make and model or type designation is not acceptable.

6. Descriptive Data: complete description, information, and performance data covering materials and equipment that are being proposed. Each component shall be clearly identified on each sheet. Refer to individual specification sections for additional submittal requirements.

D. Important Notice:

1. If Contractor's submittal departs from the Contract Documents, the Contractor shall make specific mention thereof on the submittal, otherwise review of such submittal by the Engineer shall not constitute review of such departure(s).

2. The Engineer’s submittal review is for the sole purpose of verifying general conformance with design intent and general compliance with Contract Documents. Approval of a submittal by the Engineer does not relieve the contractor of responsibility for correcting errors which may exist in the submittal or from meeting requirements of Contract Documents.

3. After material or equipment has been submitted and approved, no substitutions will be allowed, unless required per Contract Documents. Any equipment installed that is different than the approved shop drawings and submittals will be removed and replaced at the Contractor’s expense.

4. The Contractor may be charged for costs incurred by the Engineer for third and subsequent submittal reviews. Cost for Engineer’s review time shall be billed at the Engineer’s standard hourly rates.

5. Where calculations, sealed by a registered professional engineer, are required to be submitted, they will be reviewed for content and format but may not be reviewed for accuracy.

E. For control panels, motor starters and other equipment requiring multiple terminations of components and devices, the Contractor shall submit detailed shop drawings on 11” x 17” size sheets consisting of point-to-point wiring diagrams, bill of materials, interior and exterior elevations with dimensions prepared by the equipment manufacturer or a UL 508A recognized system integrator.

1.3 RECORD DRAWINGS AND OPERATION AND MAINTENANCE MANUALS

A. Record Drawings: On completion of work, Contractor shall furnish a complete set of Record Drawings and 11” x 17” size Shop Drawings which properly reflect final locations and sizes of conduit, equipment fixtures, controls, etc., as actually installed.

Dimensions shall be included on the Contractor’s as-built Drawings showing exact location of underground conduits.

B. Operation and Maintenance (O&M) Manuals: Contractor shall provide O&M manuals for equipment and materials furnished under this contract. O&M manuals must be submitted and approved before final inspection of the project so that they may be used during startup. Soft copies shall be in “pdf” format with “character recognition” and shall include the following as a minimum:

1. A cover sheet to identify the Contractor’s name, name of the project, date and description, i.e. “Electrical Equipment O&M Manual”.

2. Bookmarks within each section for each major component within.

BASIC ELECTRICAL REQUIREMENTS 260050-3

3. Complete manufacturer name and model number of each item.

4. Descriptive data, component data sheets, wiring diagrams, control panel drawings, etc. from the approved submittals/shop drawings.

5. Complete instructions regarding the installation, operation and maintenance of equipment involved. Instructions and documentation not related to the equipment furnished must be removed or crossed out. O&M manuals must be individually tailored to the project and equipment as furnished.

6. Complete nomenclature of replaceable parts, part numbers, current cost, name and address of nearest vendor of replacement parts. Information on equipment or components not related to equipment furnished must be removed or crossed out. O&M manuals must be individually tailored to the project and equipment as furnished.

7. Copy of warranties issued on the installation, showing dates of expiration.

C. Hard copies, if required, shall be bound in 3-ring binders (2” max) and include all information as described above for soft copies. The binders shall include tabs corresponding to a neatly typewritten index. The binder cover and edge shall clearly identify the Contractor’s name, name of the project, date and identified as “Electrical Equipment O&M Manual”.

1.4 QUALITY ASSURANCE

A. The Contractor performing the electrical construction and installation shall be a reputable licensed Contractor in the State of Arizona to do electrical commercial construction.

B. The Contractor must be located within a 100-mile radius of the project and have been in that vicinity for a minimum of five (5) years.

C. The Contractor must have a minimum of five (5) years experience as a Contractor installing electrical and instrumentation systems for other projects of similar type, size and requirements. If requested, the Contractor must submit documentation and list of references of recent projects similar to this one.

D. All equipment furnished shall be new and of current design. Like equipment shall be of the same manufacturer.

E. Unless otherwise indicated, all equipment and components shall be rated for use in the environment installed. Outdoor equipment shall be weatherproof or rated for outdoor use.

F. All electrical equipment under Division 26 shall be furnished and installed by the Electrical Contractor.

1.5 SPACE REQUIREMENTS

A. Space Requirements: In the preparation of Drawings, a reasonable effort has been made to include equipment manufacturer’s recommendations. Since space requirements and equipment arrangement vary according to manufacturer, the responsibility for initial access and proper fit rests with the Contractor. Final arrangement of equipment and service connections shall allow the unit to be serviced, including space to pull motors, change fuses, and operate switches. Minimum working clearances shall be as required by NEC and local codes.

BASIC ELECTRICAL REQUIREMENTS 260050-4

1.6 COORDINATION

A. Contractor shall coordinate with all other trades to avoid conflicts and interferences. No extra compensation will be allowed for changes made necessary due to interference between work of various trades.

B. Any discrepancies noted in these contract documents or discrepancies between Drawings and actual field conditions shall be promptly brought to the Engineer for a decision. No extra compensation will be allowed for changes made by the Contractor without Engineer’s consent.

C. Carefully check and coordinate each device location and elevation. Also check routing of all conduits for conflicts with structures, mechanical piping, ducts, etc. to avoid conflicts.

1.7 REGULATORY REQUIREMENTS

A. Electrical work, including connection to electrical equipment integral with mechanical equipment, shall be performed in accordance with the latest published regulations of the National Electrical Code (NEC), State and local codes, and according to the latest Institute of Electrical and Electronic Engineers (IEEE); American National Standards Institute (ANSI); American Society for Testing and Materials (ASTM); Insulated Cable Engineers Association (ICEA); National Electrical Manufacturers Association (NEMA) Standards; and the latest published regulations of the Federal Occupational Safety and Health Act (OSHA). When applicable, the material used in the performance of the electrical work shall be listed by the Underwriters’ Laboratories, Inc. (UL) for the class of service for which they are intended.

B. Control panels shall be assembled and wired by a UL 508A recognized panel shop. All control panel components shall be UL recognized or ground fault protected per UL 508A fabrication standards. Each control panel assembly shall be fabricated according to UL 508A Standards and shall bear a serialized UL 508A label.

1.8 WARRANTY

A. In addition to specific warranties required by the Specifications, the Contractor shall leave the entire installation in complete working order and free from defects in materials, workmanship or finish. Contractor shall repair or replace at his own expense any part that may develop defects due to faulty material or workmanship during the tests and within a period of one year after the work is accepted by the Engineer and Owner. Contractor shall repair or replace existing equipment and work that is damaged during the repair of defective apparatus, materials or workmanship.

B. All manufacturer’s warranties shall be filled out in their entirety by the Contractor for the Owner using the Owner’s name and address. Unless otherwise specified, equipment warranty periods will commence on date of final acceptance.

1.9 DRAWINGS

A. Clarity and Legibility: For purposes of clarity and legibility, the Drawings are diagrammatic only. Drawings are not intended to show every fitting, junction, gasket or component necessary, nor every difficulty that may be encountered during installation.

Conduit routing may be adjusted in the field. Size and location of equipment are drawn to scale wherever possible. Contractor shall refer to related data in all Contract Documents and shall verify this information on site.

BASIC ELECTRICAL REQUIREMENTS 260050-5

B. Instrumentation and control drawings are provided to indicate the control strategy intent only. Final circuitry shall be as determined by the Contractor or his vendors. Actual wiring diagrams shall be provided by the Contractor and reviewed by the Engineer for a fully functional system as intended.

1.10 REFERENCES

A. The specifications reference known standards and codes. Each such standard referred to shall be considered a part of the Specifications to the same extent as if reproduced therein in full. The following is a representative list of such Associations, Institutes and Societies, together with the acronym by which each is identified.

AASHTO American Assoc of State Highway and Transportation Officials AIEE American Institute of Electrical Engineers ANSI American National Standards Institute ASTM American Society for Testing and Materials AWWA American Water Works Association ICEA Insulated Cable Engineers Association IEEE Institute of Electrical and Electronics Engineers IES Illumination Engineering Society NEC National Electrical Code NEMA National Electrical Manufacturers Association NETA National Electrical Testing Association NFPA National Fire Protection Association UL Underwriter’s Laboratories, Inc.

B. Every reference in the Specifications shall mean the latest printed edition of each in effect at the Contract Date.

1.11 ABBREVIATIONS

A. References on the Drawings to various abbreviations have been made. The following is a representative list of such abbreviations together with the acronym by which each is identified.

AFF Above finished floor AFG Above finished grade AI Analog input AO Analog output APS Arizona Public Service Company ATS Automatic transfer switch C Conduit C/B Circuit Breaker CKT Circuit CPT Control power transformer Cu Copper DI Digital input DIST Distribution DO Digital output DWG Drawing GND Ground GFCI Ground Fault Circuit Interrupter GFI/GFP Ground Fault Indication/Protection

BASIC ELECTRICAL REQUIREMENTS 260050-6

GRS Galvanized Rigid Steel Conduit HPS High Pressure Sodium IMC Intermediate Metal Conduit INST Instrument LED Light Emitting Diode MBJ Main bonding jumper MCB Main Circuit breaker MCC Motor Control Center MCP Motor Circuit Protector MFR Manufacturer MLO Main Lug Only NC Normally Closed NO Normally Open PC Personal computer PLC Programmable logic controller PR Pair REQ’TS Requirements RTU Remote terminal unit SES Service entrance section SPD Surge Protective Device RMC Rigid Metal Conduit (GRS or IMC) RVSS Reduced Voltage Soft Starter SWBD Switchboard TTB Telephone Terminal Board TSP Twisted Shielded Pair TST Twisted Shielded Triad VFD Variable frequency drive WP Weatherproof

END OF SECTION

RACEWAYS 260110-1

SECTION 260110 - RACEWAYS

1.1 SUMMARY

A. Section Includes: Metallic and non-metallic wiring raceways, including cable tray.

1.2 SUBMITTALS

A. Product Data: Submit manufacturer’s data demonstrating compliance with this specification including couplings, fittings, bushings, and hangers.

B. Submit on the proposed method for separating conduits in underground ductbanks.

1.3 QUALITY ASSURANCE

A. Perform work in accordance with NECA Standard of Installation and NFPA 70.

1.4 RELATED WORK

A. Specification Section 26 01 95, Electrical Identification

PART 2 - PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS

A. Conduit:

1. Rigid metal, intermediate and EMT:

a. Allied

b. Republic

c. Triangle Conduit and Cable Co.

d. Wheatland

2. Galvanized rigid steel:

a. Ocal

b. Robroy

c. Calbond

d. Gafco Green

3. Flexible and flexible water-tight:

a. Alflex Corp.

b. Carlon Products Corp.

c. Carol Cable Co., Inc.

d. Electri-Flex

e. Sealtite

4. Non-metallic PVC:

a. Can-Tex

b. Carlon

c. PW Eagle/JM Eagle

5. Conduit supports and hangers:

a. Caddy

b. Thomas and Betts

c. Appleton

d. Crouse-Hinds

e. B-Line Systems

RACEWAYS 260110-2

6. Supporting Channel:

a. G-Strut

b. Unistrut

c. B-Line

7. Cable tray:

a. Husky Products Incorporated

b. Robroy Industries

c. B-Line Systems

2.2 MATERIALS

A. Metallic Conduit:

1. Rigid steel:

a. Hot dipped galvanized rigid steel; meet ANSI C80.1 and ASTM A153; UL labeled and meet UL Standard No. 6.

b. All conduit bodies and fittings shall be threaded. Threadless couplings shall not be used unless specifically approved by the Engineer.

c. All conduit body covers shall be secured with machine screws threaded onto the conduit body. Covers secured by snaptight or wedge-nuts are unacceptable.

d. Where PVC coated rigid steel conduit is indicated on the Drawings, the conduit shall be galvanized steel with a factory installed PVC coating. All conduit fitting, boxes, connectors, etc. shall also be PVC coated by the factory.

e. No aluminum conduit shall be permitted unless approved by the Engineer.

2. Intermediate: Shall be same as rigid above with thinner wall.

3. Electrical metallic tubing (EMT or Thin-wall) shall be:

a. Galvanized; meet ANSI C80.3; UL labeled; marked with manufacturer’s name.

b. Thin-wall conduit fittings for damp or wet locations shall be of the regular watertight design, with hexagonal nuts and center portions requiring the use of a wrench during installation.

c. Setscrew type fittings are not permitted under any circumstances.

4. Flexible conduit:

a. UL-listed flexible rubber or plastic coated metallic type with watertight ferrule and sleeve type connectors. Standard steel type flexible conduit is unacceptable.

b. ANSI/NEMA FB1 steel connectors. Connectors must be PVC coated where installed in corrosive environments or where PVC conduit or PVC coated GRS conduit is specified.

B. Non-Metallic PVC Conduit:

1. Rigid non-metallic conduit Polyvinyl Chloride (PVC) type II PVC shall be schedule 40, suitable for use with 90 degree rated wire. Conduit shall bear UL labels for above and below ground use.

2. All PVC conduit connections shall be cleaned using primer before applying glue.

3. All PVC conduit 1-1/4 inch and larger with bends greater than 45º shall utilize factory bends.

RACEWAYS 260110-3

4. Where the enclosure or raceway is subject to physical damage, conductors shall be installed in rigid metal conduit, intermediate metal conduit, Schedule 80 rigid nonmetallic conduit or equivalent.

5. Meet UL standard #651.

C. Cable tray:

1. Type: Ladder, rungs welded to side rails.

2. Material: Type 316 stainless steel or non-metallic.

3. Rung spacing: 9-inches on center, minimum.

4. Radius: As required.

5. Width: As indicated on the drawings.

6. Support span: Not to exceed 8-feet, unless otherwise shown on the drawings.

7. Loading capacity: NEMA 8C or greater.

8. Meet NEMA VE 1 or NEMA FG1 Standards.

PART 3 - EXECUTION

3.1 INSTALLATION

A. General:

1. Raceways shall be concealed, where possible, unless otherwise indicated on the

Drawings. When exposed, confirm the exact routing with the Engineer prior to roughing in.

2. Sizing: Minimum conduit sizes are indicated on the Drawings. The Contractor may choose to install larger conduit for ease of installation or wiring pulling at no additional cost to the Owner. If conduit or raceway size is not indicated on the Drawings, raceways shall be sized per NEC. Unless otherwise indicated, minimum conduit size shall be ¾ - inches.

3. Unless otherwise indicated, all exposed conduits to be rigid metal conduit GRS or IMC. All direct buried or concrete encased conduits to be Schedule 40 PVC.

B. Cable tray:

1. Install cable trays in conformance with manufacturer’s instructions and recommendations as complete systems prior to the installation of cables. In addition, cables trays shall be installed per NEMA VE2 Standards.

2. Ground all steel cable tray system components.

3. Furnish all required fittings and transitions.

4. Furnish barrier strips in all required trays to isolate UV lamp cables from hydraulic cables.

5. All supports and support hardware shall be Type 316 stainless steel or non-metallic.

C. Conduit:

1. Conduit shall: Have openings temporarily plugged, using “pennies” or equal to exclude plaster or other foreign materials; be reamed after cutting; have joints cut square; have field-cut threads be coated with an approved electrically conductive , corrosion resistant compound and butt solidly into fittings; have the ends terminated in a proper bushed fitting, be rigidly supported so as to prevent undue stress or strain on the couplings and connectors; be swabbed before conductors are pulled in.

2. After installation, seal the openings of all conduits in all enclosures using Type DC duct sealing compound/putty as manufactured by O-Z/Gedney or equal.

RACEWAYS 260110-4

3. Concealed conduits shall be run in a direct line with long sweep bends and offsets. Horizontal runs shall be run with a slight incline, to prevent low spots or pockets (for drainage).

4. Conduits shall be continuous from outlet to outlet, from outlets to cabinets, pull or junction boxes and shall be secured to boxes with lock nuts and bushings in such a manner that each system shall be electrically continuous throughout. Three-piece “Erickson” couplings shall be used where required. No running threads shall be cut.

5. Install conduit systems completely before conductors are pulled. Conduits shall be securely supported at proper intervals to structures with steel clamps, or conduit hangers or by special supporting assemblies when indicated on the Drawings.

6. Conduit terminations shall contain insulated bushings. Provide grounding type bushings where steel conduit is stubbed into nonmetallic enclosures, stubbed up in the base of freestanding enclosures or where locknuts cannot assure proper ground continuity between metallic enclosures and the steel conduit. Provide service entrance and transformer connection conduits with grounding type bushings.

7. Exposed conduits shall be installed parallel to walls, floor and ceilings or at right angles to the building lines. Exposed bends shall be used only where approved.

Covers shall be secured to bodies with machine screws.

8. IMC: May be used in lieu of heavy wall rigid, unless otherwise indicated.

9. Electrical metallic tubing (EMT) or “Thin-wall” shall not be used except where specifically indicated on the Drawings or as directed by the Engineer.

10. Hickey bends shall not be used for 1-inch and larger conduits. Either manufactured elbows or bends fabricated in a bending machine shall be used.

The radius of the inner edge of bends shall be six times the internal diameter of the conduit for conduit sizes up to 2 ½-inches and 12 times internal diameter for 3-inches conduits and larger. A run of conduit between outlet and outlet, between fitting and fitting, or between outlet and fitting shall not contain more than 360º of total bends.

11. Conduit shall not be run above or below water piping, and must be individually supported.

12. In wet locations, and in locations where walls are frequently washed, the entire conduit system, including boxes and fittings used, shall be installed and equipped to prevent water from entering conduit. Conduit shall be so mounted so that there is at least ¼-inch air space between conduit and wall or similar supporting surface.

13. On surfaces exposed to direct sunlight (such as storage tanks and reservoirs), the conduits shall be installed such that there is at least 7/8-inch air space between the conduit and surface.

14. Schedule 40 PVC conduit may be used for buried conduit installations as permitted by the NEC and local codes except where galvanized rigid steel is specified. Couplings, transition fittings, adhesives, primer and installation procedures recommended by the conduit manufacturer and all applicable codes must be strictly followed.

15. Install liquid-tight flexible metal conduit at motors, transformers and equipment which are subject to vibration or require movement for maintenance purposes.

RACEWAYS 260110-5

Provide necessary reducer where equipment furnished cannot accept 3/4-inch size flexible conduit. Limit flexible conduit length to 3-foot maximum.

D. Conduit Supports and Hangers:

1. Conduits shall be individually fastened securely in place on maximum of 8-feet intervals for 1-inch conduit or less and 5-feet intervals for conduits over 1-inch and within 3-feet of each conduit run termination. Use only supports, hangers and fasteners specifically designed for supporting electrical conduits.

2. Where two or more conduits 1-inch or larger run parallel, trapeze hangers may be used consisting of concrete inserts, threaded solid rods, washers, nuts and galvanized “L” angle iron, or 1-5/8” strut cross members. Such conduits shall be individually fastened to the cross member of every other trapeze hangers with galvanized cast two hole straps, clamp backs, bolted with proper size cadmium machine bolts, washers and nuts. If adjustable trapeze hangers are used to support groups of parallel conduits, U-bolt type clamps shall be used at the end of a conduit run and at each elbow. J-bolts, or approved clamps, shall be installed on each third intermediate trapeze hanger to fasten each conduit.

3. Hangers shall be made of durable materials suitable for the application involved and shall be painted with two coats of oil paint. Where excessive corrosive conditions are encountered, hanger and strut assemblies shall be protected after fabrication by sherardizing or galvanizing, special paint or other suitable preservative methods.

4. For mounting on concrete or brick construction, insert anchors shall be installed with round head machine screws. In wood construction, round head wood screws shall be used. In brick, inserts shall be near center of brick, not near edge or in joint. Where steel members occur, drill and tap, and use round head machine screws.

E. Sleeves, Inserts, etc.: Prior to concrete floors being poured and walls being erected, install sleeves, inserts, etc. for conduit penetrations and supports as necessary. Any cutting or drilling through finished floors, walls, roofs, etc. as a result of not installing the necessary sleeves and inserts, shall be done at the Contractor’s expense include patching, sealing and painting to the satisfaction of the Engineer and Owner.

F. Installation of Underground Conduits:

1. Install underground conduit as indicated on the Drawings. Backfill material around the conduits must be clean-fill (dirt with rocks no larger than ½-inch).

2. Conduit bends shall have long sweep radius curves instead of standard elbows where indicated on the Drawings. All PVC conduit bends greater than 45° shall be factory-made for conduits larger than 1-inch.

3. All underground PVC conduit shall be buried a minimum of 24-inches below finished grade, except when located below a concrete slab or freestanding electrical equipment. Conduit shall be installed deeper than 24-inches wherever required to avoid existing piping, tunnels, or other obstructions.

4. Underground conduits in ductbanks shall be separated and supported with pre-manufactured plastic chairs, unless submitted and approved otherwise, installed at 5-foot intervals in the trench.

5. After duct is in place, notify the Engineer prior to backfill for inspection.

Failure to do so will result in removal of all backfill material to expose the conduits for inspection.

RACEWAYS 260110-6

6. Contractor shall label all conduits in underground ductbanks with a black marker before calling for an inspection.

7. During backfill, provide plastic warning tape at 12-inches below finished grade over underground electrical installations which reads, “Caution - Buried Electrical Line Below”.

8. PVC conduits are permitted to be stubbed up into freestanding electrical enclosures. Where conduit stubs up out of the earth and is exposed, the buried elbow and riser shall be PVC coated rigid metal conduit up to 6” above finished grade, minimum.

9. Where terminating PVC conduit in a freestanding enclosure, underground junction box, manhole/handhole or other similar locations, provide each termination with a bell end.

10. Rigid metal conduit terminations shall contain insulated bushings. Provide grounding type bushings where steel conduit is stubbed into nonmetallic enclosures, stubbed up in the base of freestanding enclosures or where locknuts cannot assure proper ground continuity between metallic enclosures and the steel conduit. Install grounding type bushings on all service entrance and utility transformer connection conduits.

11. Spare conduits shall be capped with an approved plug.

12. Before pulling cables into underground conduits, pull a mandrel ¼-inch smaller than the conduit inside diameter and pulled through each conduit, and if any concrete or obstructions are found, the Contractor shall remove them and clear the conduits. Underground conduits shall be swabbed before cables are pulled in.

13. After duct runs are completed and set, backfill the trenches and tamp thoroughly to 90 percent compaction. Tamp to 95 percent compaction where conduits are located under a roadway. Compaction shall be witnessed by the Engineer.

3.2 CONDUIT MARKERS

A. All conduits with conduit designations indicated on the Drawings shall be identified at each termination. See Section 26 01 95 - Electrical Identification for conduit tag requirements.

WIRE AND CABLES 260120-1

SECTION 260120 - WIRE AND CABLES (600V OR LESS)

1.1 SUMMARY

A. Section Includes: Wire and cables rated 600 volts or less, as specified, including wiring of all devices.

1.2 SUBMITTALS

A. Product Data: Submit manufacturer’s data on all power, signal and communication cables demonstrating compliance with this Specification.

1.3 QUALITY ASSURANCE

A. Comply with the following Codes and Standards:

1. NFPA 70 (NEC)

2. UL listing for materials.

3. ICEA S-66-524

4. NEMA WC-7

5. ASTM B-3 or B-8

PART 2 - PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS

A. Cable:

1. General Cable

2. Okonite

3. Southwire

4. Encore

5. Belden

6. South Wire

B. Connectors:

1. Ideal

2. Burndy Corp.

3. Thomas and Betts Co.

4. O.Z. Gedney

5. Minnesota Mining & Manufacturing (3M)

2.2 MATERIALS

A. Conductors for wire and cable shall be stranded copper with 98 percent conductivity and shall be tinned or untinned in accordance with established standards for the type of insulation around the conductors. Solid conductors are not acceptable.

B. Wire and cable shall be stamped approximately every two feet to indicate voltage, type, temperature rating, and other significant data or warnings.

C. Conductors for general purpose wiring shall meet the following requirements:

1. Power: Type XHHW-2. Minimum conductor size for power shall be No.12 AWG.

2. Power (direct buried): PVC outer jacket with individual copper conductors with

XHHW-2 insulation. Conductor sizes shall be as indicated on the Drawings.

WIRE AND CABLES 260120-2

3. Control: Type XHHW-2 for conductors run in conduit, minimum size No.14 AWG.

Type MTW for conductors contained in control panels, minimum size No.14 AWG or No.16 AWG when protected by an overcurrent device of 10A or less.

4. Analog Signal: Twisted shielded pair (TSP) or triad (TST) with #18 AWG drain wire and an overall PVC jacket rated 600V and rated for wet locations, minimum conductor size No.16 AWG. Where required, analog signal cables shall be Type TC-ER for exposed cables installed in cable tray in outdoor locations.

5. FIBER OPTIC CABLES

a. Fiber optic cables shall meet the following specifications:

1) Fiber Type: Multimode

2) Core Diameter: 50 μm or 62.5 μm

3) Cladding Diameter: 125 μm

4) Maximum Attenuation: 3.5 dB/km at 850 nm, 1.0 dB/km at 1300nm

5) Buffer Type: Loose tube

6) Quantity of Fibers: 6 fibers minimum with 2-fibers spare

7) Operating Temperature Range: -40°C to 70°C

8) All fiber optic cables installed in underground ductbanks shall be rated for wet locations. Fiber optic cables shall be of sufficient length to be installed between patch panels without splicing.

9) All fiber connectors utilized on this project shall be the same. This includes terminations to fiber patch panels and Ethernet/Fiber switches.

10) Fiber optic jumpers and pigtails shall meet the specifications listed above and shall include factory installed connectors.

D. Wire Pulling Lubricant: Lubricant shall be UL listed and be of a consistency that will not leave an obstruction or tackiness that prevents pulling out wires in the future. No soap flakes or vegetable soaps will be permitted. Lubricant in shall be Ideal Wire Lube or equal.

E. Cable Ties: Wiring in panels, cabinets, etc. shall be neat and tied with “Ty-Rap” T&B “TY-5418” series, or Panduit Co. “Cable Wrap”. Cable ties used in outdoor locations shall be UV stabilized.

F. Terminations:

1. 3-M Scotchlok lugs and connectors - copper.

2. O-Z solderless connectors, grounding devices, power connectors, armored cable fittings, and cable terminations.

3. Burndy - copper - all types as appropriate for cable size and configuration.

G. Connector material shall be compatible with conductor material to prevent corroding, differences in coefficients of expansion or electrolysis.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install wires and cables in NEC approved raceways (Section 26 01 10). All wire and cable must be installed in a raceway, unless otherwise indicated on the Drawings.

B. Branch circuit and feeder conductors shall have insulation with the following color.

Phase tape is unacceptable.

1. Grounding conductor-Green

WIRE AND CABLES 260120-3

2. 120VAC Neutral - White

3. 120/208VAC Phase A - Black

4. 120/208VAC Phase B - Red

5. 120/208VAC Phase C - Blue

6. 277VAC Neutral – Gray

7. 277/480VAC Phase A - Brown

8. 277/480VAC Phase B - Orange

9. 277/480VAC Phase C - Yellow

C. 6-inch minimum loops shall be provided at each outlet, device or luminaire. Unused wires in outlet boxes, shall be rolled up, connected together and taped or capped with wire nuts. Mark bundled, unused spare wires as “SPARE FROM [origination]”.

D. Branch circuit sizing: Where wire size is not indicated on the Drawings, NEC and local codes shall govern. However, minimum branch circuit conductor size shall be No. 12

AWG.

E. Pulling Cables: Wires and cables shall be carefully handled during installation.

Lubricant used for pulling in wires and cables shall be used. Use a dynamometer when pulling conductors by mechanical means.

F. Communication and signal cables shall be run in separate raceways from power wiring.

Keep separated from power wiring in control panels, wireways and junction boxes.

Keep separated from power wiring raceways by a minimum of 12-inches.

G. Bending radius: Do not exceed the manufacturer’s maximum bending radius.

H. Direct buried conductors and cables emerging from the ground shall be protected by enclosures or raceways extending from the minimum cover distance 24-inches below grade to a point at least 8-feet above finished grade.

3.2 SPLICES AND TERMINATIONS

A. Splices:

1. Splices in conductors shall not be used unless otherwise indicated on the

Drawings or approved by the Engineer.

2. Where splices are allowed or necessary, they shall be mechanically strong and well made so that the electrical resistance of a joint shall not exceed that of 2-feet of the conductor.

3. Splices shall be made only in junction boxes and never in conduit.

4. Shielded analog conductor splices shall utilize Raytech Soldershield splice kit or equal.

5. Above Grade Splices:

a. Utilize wing nut solderless connectors for splicing No. 8 AWG and smaller conductors. Follow manufacturer’s recommendations for sizing, stripping, twisting, etc.

b. Utilize insulated butt connectors crimped end-to-end for splicing No. 6 AWG and larger conductors. Follow manufacturer’s recommendations for sizing, stripping and crimping.

6. Below Grade Splices:

a. Utilize listed splice kits or listed wing nut solderless connectors with cast-resin waterproofing for splicing No. 8 AWG and smaller conductors. Splices shall be listed for direct burial applications and identified as “sealed wire

WIRE AND CABLES 260120-4

connector system”. Follow manufacturer’s recommendations for sizing, stripping, twisting, etc.

b. Utilize insulated butt connectors crimped end-to-end with cast-resin waterproofing for splicing No. 6 AWG and larger conductors. Splice kits shall be listed for direct burial applications and identified as “sealed wire connector system”. Follow manufacturer’s recommendations for sizing, stripping and crimping.

I. Motor terminations: Ring type, crimped connectors shall be installed on all conductors and bolted together back-to-back. For terminations with No.6 and smaller wire, use 10- 24 bolts. Use bolts that match the connector bolthole size for all other motor terminations. Apply one layer of cambric tape followed by three layers of rubber tape and finally, top with one layer of black vinyl tape.

J. Non-motor terminations: Use ring or fork type, crimped connectors for all screw-on terminations. Wrapping wire around a binding post is unacceptable.

K. Where special tools are required to properly install the particular connector the special tools must be used.

3.3 WIRE MARKERS

A. All conductors shall be labeled at each termination and splice. See Section 26 01 95 - Electrical Identification for wire marker requirements.

SMITHGROUP 14904.000

INDIAN HEALTH SERVICE

BOXES 260130-1

SECTION 260130 - BOXES

1.1 SUMMARY

A. Section Includes: Outlet boxes, pull and junction boxes and underground junction boxes.

1.2 SUBMITTALS

A. Product Data: Submit manufacturer’s data for standard outlet boxes up to six gang, including floor type demonstrating compliance with specification requirements and Drawings.

B. Shop Drawings: Submit drawings for special pull, outlet, and junction boxes demonstrating compliance with NEC and specification requirements. Drawings shall indicate box dimensions and locations in building.

1.3 QUALITY ASSURANCE

A. Comply with the following Codes and Standards:

1. NEMA 250

2. NFPA 70

3. UL listing for materials.

PART 2 - PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS

A. Appleton Electric

B. Crouse-Hinds

C. Killark

D. Raco

E. Hoffman Engineering Co.

F. O.Z. Gedney Co.

G. Steel City

H. Hubbell

I. Rittal

2.2 MATERIALS

A. Outlet boxes for concealed conduits and flush-mounted wiring devices shall meet the following requirements:

1. Stamped, one piece, galvanized steel.

2. Proper size and shape for conduits entering them.

3. UL listed for their application.

4. ANSI/NEMA OS-1 for galvanized steel; ANSI/NEMA OS-2 for non-metallic.

B. Outlet boxes for exposed conduit systems and exterior locations shall be of the threaded-hub, cast-metal, conduit type fitting suitable for the wiring devices to be installed. Covers (blank, switch, receptacle, etc.) shall be the type specifically designed to fit the specified boxes.

BOXES 260130-2

C. Above grade electrical junction and pull boxes shall be sheet metal with an ANSI 61 gray color with size and type as indicated on the Drawings. NEMA rating shall be as indicated on the Drawings. Where a NEMA rating is not indicated, outdoor boxes shall be NEMA 3R. Box sizes shall be as indicated on the Drawings. Where sizes are not indicated or larger size is required to meet code, the box size shall be increased as required by the National Electrical Code.

D. Wireways and troughs:

1. Wireways shall be sized as indicated on the Drawings or as required by the

National Electrical Code. Where sizes are not indicated or larger size is required to meet code, the wireway shall be sized such that the cross-sectional area of the wireway at any one point does not exceed 40% per the National Electrical Code.

2. Cover: Hinged with removable latches where feasible.

3. UL listed for steel enclosed wireway or auxiliary gutter.

4. Furnished complete with covers, elbows, tees, junction boxes, end covers, connectors and hangers.

5. Unless otherwise indicated, wireways shall be NEMA 1 for indoor applications and NEMA 3R for outdoor and NEMA 4X for corrosive atmospheres.

6. Wireways in outdoor locations shall be fully gasketed.

E. Underground junction boxes:

1. Construction: Electric underground junction boxes shall be precast concrete and size as indicated on the Drawings. Underground junction boxes shall have precast concrete extensions.

2. Covers: Covers shall be rectangular, reinforced concrete and have the text “ELECTRIC” cast into the cover.

3. Approved Manufacturer: Christy, or equal.

F. Fittings, hangers, fastenings, etc., shall be of material that will prevent chemical reaction between itself and conduit or device it is fastening or supporting.

PART 3 - EXECUTION

3.1 BOX LOCATIONS

A. Location of Boxes: In order that boxes may be placed in proper locations, the Contractor shall familiarize himself with the details of these spaces and carefully lay out boxes so that the equipment or piping of other trades passing under, over, across or in close proximity to same, will not cause these boxes to be inaccessible for use or maintenance. Contractor shall consult with other Contractors and trades on the project and obtain details of the project to locate outlet boxes properly.

B. Contractor shall be responsible for the exact and proper location of the various portions of his work. Consult the Drawing and details.

C. Mounting Heights: The exact mounting height of each switch, receptacle, light fixture outlet, etc., shall be confirmed on the premises in conference with the Engineer. Unless otherwise indicated, receptacles to be mounted at 18-inches and light switches to be mounted at 42-inches above finished floor/grade.

3.2 INSTALLATION

A. No thru-boxes shall be permitted.

B. Boxes shall meet the following requirements:

BOXES 260130-3

1. Proper size and shape for conduits entering them.

2. Installed so that device and/or cover plates shall be tight and plumb with wall finish.

3. Have unused openings closed with knock-out closures.

4. Securely fastened to building or structure.

C. Surface-mounted outlet boxes shall meet the following requirements:

1. Outdoor boxes shall be cast steel or cast aluminum with threaded hubs.

a. Fastened with not less than two Paine, Phillips, Ackermann-Johnson, or equivalent, screw anchors and round head machine screws on brick and concrete walls or ceilings.

b. Under no circumstances will drilling of cast boxes be allowed.

c. PVC coated boxes shall be used for installations with PVC coated rigid steel conduit.

d. Be provided with a vapor-proof gasket in wet locations or where indicated as “WP” (weatherproof) on the Drawings.

e. Install a weatherproof-while-in-use cover on all outdoor receptacles.

2. Bell boxes may be used for indoor applications where rigid steel or IMC conduit is required.

D. Bracket outlets shall be level and centered on columns or above doors when installed in these locations.

E. Flush-mounted outlet boxes shall:

1. Be solid ganged boxes for more than two devices.

2. Contain a plaster ring to bring the wiring device attachment points within ¼-inch of the finished wall surface.

3. Be installed so that device covers are tight and plumb with wall finish.

4. Be installed as close as possible to the lock side of door trim for light switches.

F. Pull boxes and junction boxes shall be:

1. Installed in runs of conduit more than 100-feet in length or the equivalent of four

90-degree bends.

2. Entirely accessible.

3. Securely mounted to building structure independent of the conduits connected to them.

WIRING DEVICES 260140-1

SECTION 260140 - WIRING DEVICES

1.1 SUMMARY

A. Section Includes: Wiring devices such as but not necessarily limited to power receptacles and light switches.

1.2 SUBMITTALS

A. Product Data: Submit manufacturer’s data for each wiring device including device covers demonstrating compliance with these Specifications and UL labeling.

1.3 QUALITY ASSURANCE

A. Comply with the following Codes and standards:

1. NEMA

2. UL listing

3. NFPA 70

PART 2 - PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS

A. Hubbell

B. Leviton

C. Bryant

D. Crouse-Hinds

E. Pass & Seymour

2.2 MATERIALS

A. Light switches and receptacles shall meet NEMA WD1 and WD6 standards, be UL listed and be Heavy Duty, Industrial Specification grade. Commercial specification grade wiring devices are not acceptable.

B. Amperage rating of each wiring device shall match the circuit’s overcurrent device amperage rating to which it is connected.

C. Wiring devices shall have an ivory finish unless otherwise specified.

D. Power receptacles shall be the grounded type. Furnish ground fault circuit interrupter (GFCI) type where indicated on the Drawings or as required by the NEC.

E. All GFCI receptacles shall be listed weather-resistance (WR) type receptacles.

F. Light switches shall be the quiet type.

G. Wiring Device Coverplates:

1. Unless otherwise indicated, coverplates installed indoors or in control panels shall be brushed anodized aluminum.

2. Weatherproof locations: Wiring devices installed outdoors or where identified on

Drawings with “WP” shall contain a gasketed coverplate UL approved for wet locations.

3. Where weatherproof-while-in-use coverplates are indicated on the Drawings or required by NEC, power receptacles shall be provided with a metallic cover that

WIRING DEVICES 260140-2

is listed for “extra duty” and maintains UL approval for wet locations when a cord is plugged into the receptacle. Non-metallic covers are not acceptable.

PART 3 - EXECUTION

3.1 INSTALLATION/APPLICATION

A. Devices and coverplates shall be plumb and parallel to adjacent surfaces or trim.

Flush-mounted devices must be flush with finished wall surfaces and the coverplates must be tight to surfaces over which they are installed.

B. Receptacles identified as GFCI or when required by the NEC shall have individual GFCI receptacles installed for each outlet. Installing a single GFCI receptacle and standard receptacles connected to the load side of the single GFCI receptacle is unacceptable.

3.2 FIELD QUALITY CONTROL

A. Contractor shall verify that the openings have been properly patched around devices without damage to devices.

B. Damaged or painted devices shall be replaced or cleaned as directed by the Engineer.

ELECTRICAL IDENTIFICATION 260195-1

SECTION 260195 - ELECTRICAL IDENTIFICATION

1.1 SECTION INCLUDES

A. Nameplates and labels

B. Wire and cable markers

C. Conduit markers

1.2 REFERENCES

A. ANSI/NFPA 70 - National Electrical Code.

1. NEC 110-22 Identification of Disconnecting Means

2. NEC 200-6 Means of Identifying Grounded Conductors

3. NEC 200-10 Identification of Terminals

4. NEC 210-5 Identification for Branch Circuits

5. NEC 215-8 Means of Identifying Conductor with the Higher Voltage to Ground

6. NEC 230-70, (B) Service Equipment, Marking

7. NEC 310-11 Marking

8. NEC 310-12 Conductor Identification

9. NEC 400-22 Grounded-Conductor Identification

10. NEC 400-23 Equipment Grounding Conductor Identification

11. NEC 408-13 Panelboard circuit identification

B. UL standard 224- Standard for Extruded Thermoplastic Insulating Tubing.

1.3 SUBMITTALS

A. Product Data: Provide catalog data for the following:

1. Wire and cable marking system

2. Nameplate materials and fasteners

3. Conduit markers

1.4 REGULATORY REQUIREMENTS

A. Conform to requirements of ANSI/NFPA 70.

B. Furnish products listed and classified by Underwriters Laboratories, Inc. as suitable for purpose specified and shown.

PART 2 - PRODUCTS

2.1 NAMEPLATES AND LABELS

A. Engraved laminated plastic nameplates with black letters on white background shall be installed on the following as a minimum:

1. Electrical distribution equipment enclosures

2. Disconnect switches and motor controllers

3. Control panels and cabinets

4. Each motor controller or control panel door mounted device

5. Major components, control relays and terminal block strips mounted on the backpanel of control panels

ELECTRICAL IDENTIFICATION 260195-2

B. Letter Size:

1. Use 3/8-inch letters for identifying electrical distribution equipment enclosures and other large control panels and cabinets. Use 3/16-inch letters for identifying individual control panel components (inside or out) and small control panels/enclosures.

2.2 WIRE MARKERS

A. Manufacturer: Raychem Corporation Model ShrinkMark or equal.

B. Description: heat shrinkable radiation cross-linked, thermally stabilized, modified polyolefin sleeves with 3:1 shrink ratio.