This is a final construction documents specification file for the Whiteriver Hospital replacement project located on the Fort Apache Indian Reservation in Arizona, being constructed for the Indian Health Service (IHS). The document is Volume 3 of the specifications, dated January 23, 2026, prepared by SmithGroup and multiple engineering firms including PK Associates, Dibble & Associates, and Morrison-Maierle, covering divisions 21 through 46 of the construction specifications.
The specifications detail comprehensive requirements for fire suppression systems, plumbing systems, and wastewater treatment plant (WWTP) equipment and installation. Key requirements include fire sprinkler and standpipe systems designed per NFPA 13 and 14 standards with wet-pipe, dry-pipe nitrogen-filled, and preaction system options; fire pump and pressure-maintenance pump installations with controllers and monitoring equipment; domestic water piping using copper tube and fittings with specific joining methods; plumbing equipment insulation and piping insulation requirements for various applications; and detailed WWTP specifications covering membrane bioreactor systems, sludge dewatering, screening, and aeration equipment. The specifications mandate commissioning of systems per IHS requirements, field quality control testing and inspections, operator training, and extensive documentation including as-built record drawings. The 407,000-square-foot hospital project encompasses primary care, emergency services, specialty care, acute care beds, diagnostic imaging, pharmacy, laboratory, and various support services, with the new facility designed to serve a projected user population of 19,088 by 2030 in the White Mountain Apache area.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prepared for: INDIAN HEALTH SERVICE
100% CONSTRUCTION DOCUMENTS
Project No: 14904.000
5 MARCH 2026
VOLUME 3
Prepared by:
SMITHGROUP 14904.000 INDIAN HEALTH SERVICE
WHITERIVER HOSPITAL
FINAL CONSTRUCTION DOCUMENTS
23 JANUARY 2026
SEALS PAGE 000107 - 1
DOCUMENT 000107 - SEALS PAGE
Include on this Seals Page Document the seals of the design professionals of record required by statute to affix their seal to the documents. Where required, include a description of the Specification Sections prepared under the direction of each design professions *EDIT FOR YOUR PROJECT-USE DIVISION AND/OR SECTION NUMBERS*.
If such listing is required, you may alternatively use the MasterSpec seals page instead of this SmithGroup seals page.
Architect SmithGroup, Inc.
Phoenix, AZ Matthew Hess, AIA, NCARB
Responsible for Divisions 01-49 Sections except where indicated as prepared by other design professionals of record.
Structural Engineer PK Associates and Pimara Paul Koehler Scottsdale, Arizona Christa Chau, PE, SE Responsible for: Division 03, Sections 030000 and 032000; Division 04, Section 042000; Division 05, Sections 051200 and 053100; and Division 31, Section 316329
Civil Engineer Dibble & Associates Consulting Engineers, Inc.
Phoenix, Arizona
Christina Shannon Mauck, PE
Responsible for: Division 01, Section 015713, Division 02, Section 024100, Division 09, Section 099713, Division 31, Sections 312213, 312300, 312316.16, 312323.13, 312333, 312500, Division 32, Sections 321123, 321216, 321313, 321315, Division 33, Sections 331000, 331623, 333000, 333213, 333723, 334213
Fire Protection Engineer
Phoenix, AZ Andrew Ochsankehl, PE Responsible for: Division 13, Section 131200*; Division 21, Sections 211300, 213000, 210533; Division 27, Section 273226; Division 28, Section 283111
*Fire Protection Related Requirements Only
SEALS PAGE 000107 - 2
Electrical Engineer
Phoenix, AZ Daniel L. Peterson, PE Responsible for: Division 26, except for those Sections labeled with “WWTP”
Communications (AV, IT, Security) Designer
Washington, DC David K. Glenn, RCDD Responsible for: Division 27, Sections 270413, 270526, 270528, 270536, 270544, 270553, 271100, 271300, 271500, 272100, 273226, 274116, 275113, 275119, 275123, 275223, 275313, 275316 and 275319; and Division 28, Sections 280413, 280513, 280526, 280528, 281300, 281600, 282300 and 285000
Landscape Architect
Phoenix, AZ Richard P. Jones, PLA Responsible for: Division 32, Sections 321316, 321373, 321716, 321723, 323113, 323119, 323213, 324020, 328000, 329100, 329220, 329300
Civil Engineer Dibble & Associates Consulting Engineers, Inc.
Phoenix, Arizona
Ian B. Mowry, PE
Responsible for: Division 31, Sections 312213, 312300, 312316, 312323, 312500; Division 32, Sections 321123, 321216, 321315; Division 33, Section 4213; Division 34, Sections 340114, 347113, 347116
SEALS PAGE 000107 - 3
Structural Engineer Morrison-Maierle Phoenix, Arizona
Michael Brennan, PE Responsible for structural specifications for the WWTPs:
Division 03: 033000; Division 05: 051400, 055000, 055200, 055300; Division 13: 133419; Division 41:
413313, 413313.01
Electrical Engineer
Phoenix, Arizona Michael Brandt, PE
Responsible for electrical specifications for the WWTPs:
Division 26: 260400, 260519, 260523, 260526, 260529, 260533, 260536, 260543, 260544, 260548.16, 260553, 260573.13, 260573.16, 260573.19, 260913, 260923, 262213, 262413, 262416, 262419, 262713, 262726, 262813, 262816, 262923, 263213, 263353, 263600, 264313, 265100, 265600
Plumbing Engineer
Phoenix, Arizona Jody Waverek, PE
Responsible for plumbing specifications for the WWTPs:
Division 22: 220517, 220518, 220519, 220523.12, 220523.14, 220529, 220548, 220553, 220719, 221116, 221119, 221123, 221123.13, 221316, 221429, 223300, 224213.13, 224213.16, 224216.13, 224216.16, 224223, 224500
Mechanical Engineer
Phoenix, Arizona Jody Waverek, PE Responsible for mechanical specifications for the WWTPs: Division 23: 230513, 230529, 230548, 230553, 230593, 230713, 230716, 230900, 233113, 233300, 233423, 233713, 237416.11, 238126, 238239
SEALS PAGE 000107 - 4
Environmental Engineer
Phoenix, Arizona Ulrike Lashley, PE
Responsible for the following specifications for the WWTPs: Division 09: 099600; Division 10: 101400.01, 104352; Division 40: 400205, 400510, 400510.03, 400510.04, 400510.09, 400510.12, 400510.13, 400510.30, 400553, 400555, 400557, 406110, 406115, 406116, 406120, 406120.01, 406120.02, 406120.03, 406120.04, 406121, 406124, 406127, 406128, 406140, 406160, 406171, 406176, 406177, 406180, 406181, 406182, 406191; Division 41: 413313.17; Division 43:
431030, 431111, 432256, 432321, 432331, 432331.01, 432358, 433230, 433269, 434010; Division 46: 460754, 460754.01, 460754.02, 460754.03, 460754.04, 460754.05, 460754.06, 460754.07, 460754.08, 460754.09, 460754.10, 461155, 461155.01, 461155.02, 461155.03, 461155.04, 462113, 462113.01, 462113.02, 462113.03, 465035, 465035.01, 465035.02, 465131, 465131.01, 465131.02
Hazardous Building Materials
Mabbett & Associates, Inc.
Stoneham, Massachusetts
Michael Delaney, Asbestos Designer
Responsible for: 028200, 028313
END OF DOCUMENT 000107
TABLE OF CONTENTS TOC - 1
TABLE OF CONTENTS
Volume 1
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 001000 - SOLICITATION, CONTRACT LINE-ITEM NUMBER (CLIN) SCHEDULE
SECTION 002000 - INSTRUCTIONS FOR PROCUREMENT
SECTION 002100 - INSTRUCTIONS
SECTION 002113 - INSTRUCTIONS TO BIDDERS
SECTION 002116 - INSTRUCTIONS TO PROPOSERS
SECTION 002200 - SUPPLEMENTARY INSTRUCTIONS
SECTION 002216 - SUPPLEMENTARY INSTRUCTIONS TO PROPOSERS
SECTION 003000 - AVAILABLE INFORMATION
SECTION 004000 - PROCUREMENT FORMS AND SUPPLEMENTS
SECTION 004300 - BID BOND FORM
SECTION 004373 - PROPOSED CONSTRUCTION SCHEDULE FORM
SECTION 004500 - REPRESENTATIONS AND CERTIFICATIONS
SECTION 005000 - CONTRACTING FORMS AND SUPPLEMENTS
SECTION 005100 - NOTICE OF AWARD
SECTION 005200 - AGREEMENT FORMS
SECTION 006000 - PROJECT FORMS
SECTION 006100 - BOND FORMS
SECTION 006200 - CERTIFICATES
SECTION 007000 - CONDITIONS OF THE CONTRACT
SECTION 007100 - CONTRACTING DEFINITIONS
SECTION 007200 - GENERAL CONDITIONS
SECTION 007300 - SUPPLEMENTAL CONDITIONS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 011000 - SUMMARY
SECTION 012300 - OPTIONS
SECTION 012500 - SUBSTITUTION PROCEDURES
SECTION 012510 - SUBSTITUTION REQUEST FORM
SECTION 012600 - CONTRACT MODIFICATION PROCEDURES
SECTION 012614 - REQUESTS FOR INFORMATION
SECTION 012900 - PAYMENT PROCEDURES
SECTION 012973 - SCHEDULE OF VALUES
SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION
TABLE OF CONTENTS TOC - 2
SECTION 013200 - CONSTRUCTION PROGRESS DOCUMENTATION
SECTION 013233 - PHOTOGRAPHIC DOCUMENTATION
SECTION 013300 - SUBMITTAL PROCEDURES
SECTION 013330 - SUBMITTAL COMPLIANCE FORM
SECTION 013526 - GOVERNMENT SAFETY REQUIREMENTS
SECTION 013573 - DELEGATED DESIGN REQUIREMENTS AND PROCEDURES
SECTION 014200 - REFERENCES
SECTION 014339 - EXTERIOR WALLS MOCKUPS
SECTION 014500.00 10 - QUALITY CONTROL
SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS
SECTION 015713 - TEMPORARY EROSION AND SEDIMENT CONTROL
SECTION 015731 - INDOOR AIR QUALITY (IAQ) MANAGEMENT
SECTION 016000 - PRODUCT REQUIREMENTS
SECTION 017300 - EXECUTION
SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
SECTION 017700 - CLOSEOUT PROCEDURES
SECTION 017823 - OPERATION AND MAINTENANCE DATA
SECTION 017839 - PROJECT RECORD DOCUMENTS
SECTION 017900 - DEMONSTRATION AND TRAINING
SECTION 018113 - SUSTAINABLE DESIGN REQUIREMENTS
SECTION 018900 - SITE CONSTRUCTION PERFORMANCE REQUIREMENTS
SECTION 019113 - GENERAL COMMISSIONING REQUIREMENTS
SECTION 019119 - BUILDING ENCLOSURE COMMISSIONING
SECTION 019200 - FACILITY OPERATION, MAINTENANCE, AND TROUBLESHOOTING
MOBILE GRAPHICAL INFORMATION MANAGEMENT PLATFORM
DIVISION 02 - EXISTING CONDITIONS
SECTION 024100 - SITE DEMOLITION
SECTION 028200 - ASBESTOS ABATEMENT
SECTION 028313 - LEAD HAZARD CONTROL
TABLE OF CONTENTS TOC - 3
DIVISION 03 – CONCRETE
SECTION 032000 - CONCRETE REINFORCEMENT
SECTION 033000 - CAST-IN-PLACE CONCRETE
SECTION 033000 - CAST-IN-PLACE CONCRETE - WWTP
SECTION 033543 - POLISHED CONCRETE FINISHING
SECTION 035400 - CAST UNERLAYMENT
DIVISION 04 – MASONRY
SECTION 042000 - UNIT MASONRY ASSEMBLIES
SECTION 042500 - TERRA COTTA RAINSCREEN SYSTEM
SECTION 042505 - STABILIZED RAMMED EARTH
SECTION 042613 - MASONRY VENEER
DIVISION 05 – METALS
SECTION 051200 - STRUCTURAL STEEL FRAMING
SECTION 051400 - STRUCTURAL ALUMINUM
SECTION 053100 - STEEL DECKING
SECTION 054000 - COLD FORMED METAL FRAMING
SECTION 054300 - SLOTTED CHANNEL FRAMING
SECTION 055000 - METAL FABRICATIONS
SECTION 055000 - METAL FABRICATIONS-WWTP
SECTION 055113 - METAL PAN STAIRS
SECTION 055119 - METAL GRATING STAIRS
SECTION 055200 - HANDRAILS AND RAILIINGS
SECTION 055300 - FABRICATED GRATING
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
SECTION 061053 - MISCELLANEOUS ROUGH CARPENTRY
SECTION 061600 - SHEATHING
SECTION 064116 - PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
SECTION 066119 - QUARTZ SURFACING FABRICATIONS
SECTION 066400 - PLASTIC PANELING
SECTION 068300 - COMPOSITE PANELING
TABLE OF CONTENTS TOC - 4
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 071113 - BITUMINOUS DAMPPROOFING
SECTION 071326 - SELF-ADHERING SHEET WATERPROOFING
SECTION 071413 - HOT FLUID-APPLIED RUBBERIZED ASPHALT WATERPROOFING
SECTION 071900 - WATER REPELLENTS
SECTION 072100 - THERMAL INSULATION
SECTION 072600 - VAPOR RETARDERS
SECTION 072726 - FLUID-APPLIED MEMBRANE AIR BARRIERS
SECTION 074213.13 - FORMED METAL WALL PANELS
SECTION 074213.23 - METAL COMPOSITE MATERIAL WALL PANELS
SECTION 074213.33 - FORMED METAL SCREENWALL PANELS
SECTION 074293 - SOFFIT PANELS
SECTION 075419 - POLYVINYL-CHLORIDE (PVC) ROOFING
SECTION 076200 - SHEET METAL FLASHING AND TRIM
SECTION 077129 - MANUFACTURED ROOF EXPANSION JOINTS
SECTION 077200 - ROOF ACCESSORIES
SECTION 077273 - VEGETATED ROOF SYSTEMS
SECTION 078100 - APPLIED FIREPROOFING
SECTION 078123 - INTUMESCENT FIREPROOFING
SECTION 078413 - PENETRATION FIRESTOPPING
SECTION 078443 - JOINT FIRESTOPPING
SECTION 079200 - JOINT SEALANTS
SECTION 079219 - ACOUSTICAL JOINT SEALANTS
SECTION 079513.13 - INTERIOR EXPANSION JOINT COVER ASSEMBLIES
SECTION 079513.16 - EXTERIOR EXPANSION JOINT COVER ASSEMBLIES
Volume 2
DIVISION 08 – OPENINGS
SECTION 081113 - HOLLOW METAL DOORS AND FRAMES
SECTION 081216 - ALUMINUM FRAMES
SECTION 081416 - FLUSH WOOD DOORS
SECTION 081473 - SLIDING WOOD DOORS
SECTION 083113 - ACCESS DOORS AND FRAMES
SECTION 083313 - COILING COUNTER DOORS
SECTION 083323 - OVERHEAD COILING DOORS
SECTION 083343 - OVERHEAD COILING SMOKE CURTAINS
TABLE OF CONTENTS TOC - 5
SECTION 083516 - SIDE-FOLDING SECURITY GRILLES
SECTION 084123 - INTERIOR ALUMINUM-FRAMES ENTRANCES AND STOREFRONTS
SECTION 084126 - ALL-GLASS ENTRANCES
SECTION 084229.23 - SLIDING AUTOMATIC ENTRANCES
SECTION 084243 - INTENSIVE CARE UNIT/CRITICAL CARE UNIT (ICU/CCU)
ENTRANCES
SECTION 084313 - ALUMINUM-FRAMED STOREFRONTS
SECTION 084413 - GLAZED ALUMINUM CURTAIN WALLS
SECTION 085619 - PASS WINDOWS
SECTION 086200 - UNIT SKYLIGHTS
SECTION 087100 - DOOR HARDWARE
SECTION 088000 - GLAZING
SECTION 088113 - DECORATIVE GLASS GLAZING
SECTION 088300 - MIRRORS
SECTION 088813 - FIRE-RATED GLAZING
DIVISION 09 – FINISHES
SECTION 090561.13 - MOISTURE VAPOR EMISSION CONTROL
SECTION 092116.23 - GYPSUM BOARD SHAFT WALL ASSEMBLIES
SECTION 092216 - NON-STRUCTURAL METAL FRAMING
SECTION 092900 - GYPSUM BOARD
SECTION 093013 - CERAMIC TILING
SECTION 095113 - ACOUSTICAL PANEL CEILINGS
SECTION 095423 - LINEAR METAL CEILINGS
SECTION 095446 - ACOUSTICAL BAFFLE SYSTEM
SECTION 096513 - RESILIENT BASE AND ACCESSORIES
SECTION 096516 - RESILIENT SHEET FLOORING
SECTION 096519 - RESILIENT TILE FLOORING
SECTION 096566 - RESILIENT ATHLETIC FLOORING
SECTION 096623 - RESINOUS MATRIX TERRAZZO FLOORING
SECTION 096723 - RESINOUS FLOORING
SECTION 096813 - TILE CARPETING
SECTION 097200 - WALL COVERINGS
SECTION 097723 - FABRIC-WRAPPED PANELS
SECTION 098316 - ACOUSTICAL CEILING INSULATION
SECTION 098433 - SOUND ABSORBING WALL UNITS
SECTION 099113 - EXTERIOR PAINTING
TABLE OF CONTENTS TOC - 6
SECTION 099123 - INTERIOR PAINTING
SECTION 099600 - HIGH-PERFORMANCE COATINGS
SECTION 099600 - HIGH-PERFORMANCE COATINGS - WWTP
SECTION 099713 - COATINGS FOR WELDED STEEL WATER STORAGE TANK
DIVISION 10 – SPECIALTIES
SECTION 101100 - VISUAL DISPLAY UNITS
SECTION 101400 - SIGNAGE
SECTION 101400.01 - IDENTIFYING DEVICES
SECTION 102113.14 - STAINLESS-STEEL TOILET COMPARTMENTS
SECTION 102123 - CUBICLE CURTAINS AND TRACK
SECTION 102239 - FOLDING PANEL PARTITIONS
SECTION 102600 - WALL AND DOOR PROTECTION
SECTION 102800 - TOILET, BATH, AND LAUNDRY ACCESSORIES
SECTION 103100 - MANUFACTURED FIREPLACES
SECTION 104352 - FIRST AID AND SAFETY EQUIPMENT
SECTION 104413 - FIRE PROTECTION CABINETS
SECTION 104416 - FIRE EXTINGUISHERS
SECTION 105113 - METAL LOCKERS
SECTION 107516 - GROUND-SET FLAGPOLES
SECTION 108219 - EXTERIOR SOUND PANELS
DIVISION 11 – EQUIPMENT
SECTION 110800 - EQUIPMENT COMMISSIONING
SECTION 111313 - LOADING DOCK BUMPERS
SECTION 111316 - LOADING DOCK SEALS
SECTION 111319 - STATIONARY LOADING DOCK EQUIPMENT
SECTION 111326 - LOADING DOCK LIGHTS
SECTION 114000 - FOODSERVICE EQUIPMENT
SECTION 117000 - HEALTHCARE EQUIPMENT
SECTION 117100 - MEDICAL STERILIZING EQUIPMENT
SECTION 117311 - PATIENT LIFTS
SECTION 118129 - FACILITY FALL PROTECTION
SECTION 118201 - HYDRAULIC CART TIPPER
SECTION 118226 - FACILITY WASTE COMPACTORS
TABLE OF CONTENTS TOC - 7
DIVISION 12 – FURNISHINGS
SECTION 122413 - ROLLER WINDOW SHADES
SECTION 123553 - GENERAL REQUIREMENTS FOR LABORATORY CASEWORK AND
FUME HOODS
SECTION 123553.03 - ADAPTABLE LABORATORY CASEWORK SYSTEMS
SECTION 123553.19 - WOOD LABORATORY CASEWORK
SECTION 123570 - HEALTHCARE CASEWORK
SECTION 123623.13 - PLASTIC-LAMINATE-CLAD COUNTERTOPS
SECTION 123661.16 - SOLID SURFACING COUNTERTOPS
SECTION 123661.19 - QUARTZ AGGLOMERATE COUNTERTOPS
SECTION 124816 - ENTRANCE FLOOR GRILLES
SECTION 126100 - FIXED UPHOLSTERED SEATING
DIVISION 13 - SPECIAL CONSTRUCTION
SECTION 131200 - ALUMINUM ROOFTOP HELISTOPS
SECTION 131224 - EXTERIOR WATER FEATURE
SECTION 133419 - METAL BUILDING SYSTEMS
SECTION 134900 - RADIATION PROTECTION
SECTION 134920 - RFI/EMI SHIELDING
DIVISION 14 - CONVEYING EQUIPMENT
SECTION 142100 - ELECTRIC TRACTION ELEVATORS
SECTION 149200 - PNEUMATIC TUBE SYSTEM – 6 INCH
Volume 3
DIVISION 21 - FIRE SUPPRESSION
SECTION 210533 - HEAT TRACING FOR FIRE-SUPPRESSION PIPING
SECTION 210800 - FIRE SUPPRESSION SYSTEMS COMMISSIONING
SECTION 211300 - FIRE SPRINKLER AND STANDPIPE SYSTEMS
SECTION 213000 - FIRE PUMPS, PUMP CONTROLLERS, AND
OTHER APPURTENANCES
TABLE OF CONTENTS TOC - 8
DIVISION 22 – PLUMBING
SECTION 220513 - COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT
SECTION 220516 - EXPANSION FITTINGS AND LOOPS FOR PLUMBING PIPING
SECTION 220517 - SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING
SECTION 220517 - SLEEVES AND SLEEVE SEALS PLUMBING PIPING-WWTP
SECTION 220518 - ESCUTCHEONS FOR PLUMBING PIPING
SECTION 220518 - ESCUTCHEONS FOR PLUMBING PIPING - WWTP
SECTION 220519 - METERS AND GAGES FOR PLUMBING PIPING
SECTION 220519 - METERS AND GAGES FOR PLUMBING PIPING - WWTP
SECTION 220523.12 - BALL VALVES FOR PLUMBING PIPING
SECTION 220523.12 - BALL VALVES FOR PLUMBING PIPING - WWTP
SECTION 220523.13 - BUTTERFLY VALVES FOR PLUMBING PIPING
SECTION 220523.14 - CHECK VALVES FOR PLUMBING PIPING
SECTION 220523.14 - CHECK VALVES FOR PLUMBING PIPING - WWTP
SECTION 220523.15 - GATE VALVES FOR PLUMBING PIPING
SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND
EQUIPMENT
SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND
EQUIPMENT - WWTP
SECTION 220533 - HEAT TRACING FOR PLUMBING PIPING
SECTION 220548 - VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND
EQUIPMENT
SECTION 220548 - VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND
EQUIPMENT - WWTP
SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT–
SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT - WWTP
SECTION 220716 - PLUMBING EQUIPMENT INSULATION
SECTION 220719 - PLUMBING PIPING INSULATION
SECTION 220719 - PLUMBING PIPING INSULATION - WWTP
SECTION 220800 - PLUMBING SYSTEMS COMMISSIONING
SECTION 221113 - FACILITY WATER DISTRIBUTION PIPING
SECTION 221116 - DOMESTIC WATER PIPING
SECTION 221116 - DOMESTIC WATER PIPING - WWTP
SECTION 221117 - RECLAIMED-WATER PIPING
SECTION 221119 - DOMESTIC WATER PIPING SPECIALTIES
SECTION 221119 - DOMESTIC WATER PIPING SPECIALTIES - WWTP
SECTION 221123 - DOMESTIC WATER PUMPS
SECTION 221123 - DOMESTIC WATER PUMPS - WWTP
SECTION 221123.13 - DOMESTIC-WATER PACKAGED BOOSTER PUMPS
TABLE OF CONTENTS TOC - 9
SECTION 221123.13 - DOMESTIC-WATER PACKAGED BOOSTER PUMPS - WWTP
SECTION 221316 - SANITARY WASTE AND VENT PIPING
SECTION 221316 - SANITARY WASTE AND VENT PIPING - WWTP
SECTION 221323 - SANITARY WASTE INTERCEPTORS
SECTION 221413 - FACILITY STORM DRAINAGE PIPING
SECTION 221423 - STORM DRAINAGE PIPING SPECIALTIES
SECTION 221429 - SUMP PUMPS
SECTION 221429 - SUMP PUMPS - WWTP
SECTION 223100 - DOMESTIC WATER SOFTENERS
SECTION 223200 - DOMESTIC WATER FILTRATION EQUIPMENT
SECTION 223300 - ELECTRIC, DOMESTIC-WATER HEATERS
SECTION 223300 - ELECTRIC, DOMESTIC-WATER HEATERS - WWTP
SECTION 224213.13 - COMMERCIAL WATER CLOSETS
SECTION 224213.13 - COMMERCIAL WATER CLOSETS - WWTP
SECTION 224213.16 - COMMERCIAL URINALS
SECTION 224213.16 - COMMERCIAL URINALS - WWTP
SECTION 224216.13 - COMMERCIAL LAVATORIES
SECTION 224216.13 - COMMERCIAL LAVATORIES - WWTP
SECTION 224216.16 - COMMERCIAL SINKS
SECTION 224216.16 - COMMERCIAL SINKS - WWTP
SECTION 224223 - COMMERCIAL SHOWER
SECTION 224223 - COMMERCIAL SHOWER - WWTP
SECTION 224300 - HEALTHCARE PLUMBING FIXTURES
SECTION 224500 - EMERGENCY PLUMBING FIXTURES
SECTION 224500 - EMERGENCY PLUMBING FIXTURES - WWTP
SECTION 224700 - DRINKING FOUNTAINS AND WATER COOLERS
SECTION 226113 - COMPRESSED-AIR PIPING FOR LABORATORY AND HEALTHCARE
FACILITIES
SECTION 226119 - COMPRESSED-AIR EQUIPMENT FOR LABORATORY AND
HEALTHCARE FACILITIES
SECTION 226213 - VACUUM PIPING FOR LABORATORY AND HEALTHCARE
FACILITIES
SECTION 226219 - VACUUM EQUIPMENT FOR LABORATORY AND HEALTHCARE
FACILITIES
SECTION 226313 - GAS PIPING FOR LABORATORY AND HEALTHCARE FACILITIES
TABLE OF CONTENTS TOC - 10
SECTION 226400 - MEDICAL GAS ALARMS
SECTION 226713 - PROCESSED WATER PIPING FOR LABORATORY AND
HEALTHCARE FACILITIES
SECTION 226719 - PROCESSED WATER EQUIPMENT FOR LABORATORY AND
HEALTHCARE FACILITIES
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
SECTION 230130.51 - HVAC AIR-DISTRIBUTION SYSTEM CLEANING
SECTION 230513 - COMMON MOTOR REQUIREMENTS FOR HVAC AND PLUMBING
EQUIPMENT
SECTION 230513 - COMMON MOTOR REQUIREMENTS FOR HVAC AND PLUMBING
EQUIPMENT - WWTP
SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING
SECTION 230517 - SLEEVES AND SLEEVE SEALS FOR HVAC AND PLUMBING PIPING
SECTION 230518 - ESCUTCHEONS FOR HVAC PIPING
SECTION 230519 - METERS AND GAGES FOR HVAC PIPING
SECTION 230523 - GENERAL-DUTY VALVES FOR HVAC PIPING
SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT -
WWTP
SECTION 230548 - VIBRATION AND SEISMIC CONTROLS FOR HVAC
SECTION 230548 - VIBRATION AND SEISMIC CONTROLS FOR HVAC - WWTP
SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT - WWTP
SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC
SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC - WWTP
SECTION 230713 - DUCT INSULATION
SECTION 230713 - DUCT INSULATION - WWTP
SECTION 230716 - HVAC EQUIPMENT INSULATION
SECTION 230716 - HVAC EQUIPMENT INSULATION - WWTP
SECTION 230719 - HVAC PIPING INSULATION
SECTION 230800 - HVAC SYSTEMS COMMISSIONING
SECTION 230900 - INSTRUMENTATION AND CONTROL FOR HVAC
SECTION 231113 - FACILITY FUEL-OIL PIPING
SECTION 231126 - FACILITY LIQUEFIED-PETROLEUM GAS PIPING
SECTION 232113 - HYDRONIC PIPING
SECTION 232116 - HYDRONIC PIPING SPECIALTIES
SECTION 232123 - HYDRONIC PUMPS
SECTION 2323000 - REFRIGERANT PIPING
TABLE OF CONTENTS TOC - 11
SECTION 232513 - WATER TREATMENT FOR CLOSED-LOOP HYDRONIC SYSTEMS
SECTION 233113 - METAL DUCTS
SECTION 233113 - METAL DUCTS - WWTP
SECTION 233300 - AIR DUCT ACCESSORIES
SECTION 233300 - AIR DUCT ACCESSORIES - WWTP
SECTION 233416 - CENTRIFUGAL HVAC FANS
SECTION 233423 - HVAC POWER VENTILATORS
SECTION 233423 - HVAC POWER VENTILATORS - WWTP
SECTION 233433 - AIR CURTAINS
SECTION 233600 - AIR TERMINAL UNITS
SECTION 233713 - DIFFUSERS, REGISTERS, AND GRILLES
SECTION 233713 - DIFFUSERS, REGISTERS, AND GRILLES - WWTP
SECTION 233723 - HVAC GRAVITY VENTILATORS
SECTION 234100 - PARTICULATE AIR FILTRATION
SECTION 234200 - GAS-PHASE AIR FILTRATION
SECTION 235213 - ELECTRIC BOILERS
SECTION 235700 - HEAT EXCHANGERS FOR HVAC
SECTION 236423.13 - AIR-COOLED, SCROLL WATER CHILLERS
SECTION 236423.14 - AIR SOURCE CHILLER-HEATER
SECTION 236426 - AIR-COOLED CENTRIFUGAL WATER CHILLERS
SECTION 237200 - AIR-TO-AIR ENERGY RECOVERY EQUIPMENT
SECTION 237323 - CUSTOM OUTDOOR CENTRAL-STATION AIR-HANDLING UNITS
SECTION 237416.11 - PACKAGED, SMALL-CAPACITY, ROOFTOP AIR-CONDITIONING
UNITS
SECTION 237416.11 - PACKAGED, SMALL-CAPACITY, ROOFTOP AIR-CONDITIONING
UNITS - WWTP
SECTION 238123.12 - LARGE CAPACITY (7 TONS (25 KW AND LARGER), COMPUTER-
ROOM AIR-CONDITIONERS
SECTION 238123.13 - COMPUTER-ROOM AIR-CONDITIONERS
SECTION 238126 - SPLIT-SYSTEM AIR-CONDITIONERS
SECTION 238126 - SPLIT-SYSTEM AIR-CONDITIONERS - WWTP
SECTION 238214 - CHILLED BEAMS
SECTION 238216 - AIR COILS
SECTION 238219 - FAN COIL UNITS
SECTION 238239 - UNIT HEATERS
SECTION 238239 - UNIT HEATERS - WWTP
SECTION 238316 - RADIANT-HEATING HYDRONIC PIPING
SECTION 238413 - HUMIDIFIERS
SECTION 238610 - BI-POLAR IONIZATION AIR PURIFICATION SYSTEM
TABLE OF CONTENTS TOC - 12
DIVISION 25 - INTEGRATED AUTOMATION
NOT APPLICABLE
Volume 4
DIVISION 26 – ELECTRICAL
SECTION 260400 - COMMON WORK RESULTS FOR ELECTRICAL
SECTION 260400 - COMMON WORK RESULTS FOR ELECTRICAL - WWTP
SECTION 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
SECTION 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
– WWTP
SECTION 260523 - CONTROL-VOLTAGE ELECTRICAL POWER CABLES
SECTION 260523 - CONTROL-VOLTAGE ELECTRICAL POWER CABLES - WWTP
SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS - WWTP
SECTION 260529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
SECTION 260529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS - WWTP
SECTION 260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
SECTION 260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS - WWTP
SECTION 260536 - CABLE TRAYS FOR ELECTRICAL SYSTEMS - WWTP
SECTION 260539 - UNDERFLOOR RACEWAYS FOR ELECTRICAL SYSTEMS
SECTION 260543 - UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL
SYSTEMS - WWTP
SECTION 260543 - UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL
SYSTEMS-WWTP - M-M
SECTION 260544 - SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND
CABLING
SECTION 260544 - SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND
CABLING - WWTP
SECTION 260548.16 - SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
SECTION 260548.16 - SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS - WWTP
SECTION 260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS
SECTION 260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS - WWTP
SECTION 260573.13 - OVERCURRENT PROTECTIVE DEVICE SHORT-CIRCUIT STUDY
SECTION 260573.13 - OVERCURRENT PROTECTIVE DEVICE SHORT-CIRCUIT STUDY -
WWTP
SECTION 260573.16 - OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY
TABLE OF CONTENTS TOC - 13
SECTION 260573.16 - OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY -
WWTP
SECTION 260573.19 - OVERCURRENT PROTECTIVE DEVICE ARC-FLASH STUDY
SECTION 260573.19 - OVERCURRENT PROTECTIVE DEVICE ARC-FLASH STUDY –
WWTP
SECTION 260800 - ELECTRICAL SYSTEMS COMMISSIONING
SECTION 260913 - ELECTRICAL POWER MONITORING AND CONTROL
SECTION 260913 - ELECTRICAL POWER MONITORING AND CONTROL - WWTP
SECTION 260923 - LIGHTING CONTROL DEVICES
SECTION 260923 - LIGHTING CONTROL DEVICES - WWTP
SECTION 260943 - NETWORK LIGHTING CONTROLS
SECTION 260943.23 - RELAY-BASED LIGHTING CONTROLS
SECTION 262213 - LOW-VOLTAGE DISTRIBUTION TRANSFORMERS
SECTION 262213 - LOW-VOLTAGE DISTRIBUTION TRANSFORMERS - WWTP
SECTION 262300 - LOW-VOLTAGE SWITCHGEAR
SECTION 262313 - PARALLELING LOW-VOLTAGE SWITCHGEAR
SECTION 262413 - SWITCHBOARDS
SECTION 262413 - SWITCHBOARDS - WWTP
SECTION 262416 - PANELBOARDS
SECTION 262416 - PANELBOARDS - WWTP
SECTION 262419 - MOTOR CONTROL CENTERS - WWTP
SECTION 262713 - ELECTRICITY METERING
SECTION 262713 - ELECTRICITY METERING - WWTP
SECTION 262726 - WIRING DEVICES
SECTION 262726 - WIRING DEVICES - WWTP
SECTION 262743 - ELECTRIC-VEHICLE SERVICE EQUIPMENT - AC LEVEL 1 AND
LEVEL 2
SECTION 262813 - FUSES
SECTION 262813 - FUSES - WWTP
SECTION 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS
SECTION 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS - WWTP
SECTION 262923 - VARIABLE-FREQUENCY MOTOR CONTROLLERS
SECTION 262923 - VARIABLE-FREQUENCY MOTOR CONTROLLERS - WWTP
SECTION 263100 - PHOTOVOLTAIC COLLECTORS
SECTION 263213 - ENGINE GENERATORS
SECTION 263213 - ENGINE GENERATORS - WWTP
SECTION 263233 - ROTARY UNINTERRUPTIBLE POWER UNITS
SECTION 263353 - STATIC UNINTERRUPTIBLE POWER SUPPLY
SECTION 263353 - STATIC UNINTERRUPTIBLE POWER SUPPLY - WWTP
TABLE OF CONTENTS TOC - 14
SECTION 263600 - TRANSFER SWITCHES
SECTION 263600 - TRANSFER SWITCHES - WWTP
SECTION 263650 - GENERATOR DOCKING STATIONS
SECTION 264113 - LIGHTNING PROTECTION FOR STRUCTURES
SECTION 264313 - SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER
CIRCUITS - WWTP
SECTION 264313 - SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER
CIRCUITS-WWTP
SECTION 265100 - INTERIOR LIGHTING
SECTION 265100 - INTERIOR LIGHTING - WWTP
SECTION 265600 - EXTERIOR LIGHTING
SECTION 265600 - EXTERIOR LIGHTING - WWTP
DIVISION 27 – COMMUNICATIONS
SECTION 270413 - COMMON SUBMITTAL REQUIREMENTS FOR COMMUNICATIONS
SECTION 270526 - GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS
SECTION 270528 - PATHWAYS FOR COMMUNICATIONS SYSTEMS
SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
SECTION 270544 - SLEEVES AND SLEEVE SEALS FOR COMMUNICATIONS
PATHWAYS AND CABLING
SECTION 270553 - IDENTIFICATION FOR COMMUNICATIONS SYSTEMS
SECTION 270800 - COMMUNICATIONS SYTEMS COMMISSIONING
SECTION 271100 - COMMUNICATIONS EQUIPMENT ROOM FITTINGS
SECTION 271300 - COMMUNICATIONS BACKBONE CABLING
SECTION 271500 - COMMUNICATIONS HORIZONTAL CABLING
SECTION 272100 - DATA COMMUNICATIONS NETWORK EQUIPMENT
SECTION 273226 - TWO-WAY COMMUNICATIONS SYSTEM
SECTION 274116 - INTEGRATED AUDIOVISUAL SYSTEMS AND EQUIPMENT
SECTION 275113 - PAGING SYSTEMS
SECTION 275119 - SOUND MASKING SYSTEMS
SECTION 275123 - EMERGENCY HELP POINTS AND CALL BOXES
SECTION 275223 - NURSE CALL AND CODE BLUE SYSTEMS
SECTION 275313 - SYNCHRONIZED CLOCK SYSTEM
SECTION 275316 - PATIENT, INFANT, AND EQUIPMENT RFID TRACKING SYSTEMS
SECTION 275319 - DISTRIBUTED ANTENNA STSYTEMS
TABLE OF CONTENTS TOC - 15
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
SECTION 280413 - COMMON SUBMITTAL REQUIREMENTS FOR ELECTRONIC SAFETY
AND SECURITY
SECTION 280513 - CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND
SECURITY
SECTION 280526 - GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND
SECURITY
SECTION 280528 - PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY
SECTION 280544 - SLEEVES AND SLEEVE SEALS FOR ELECTRONIC SAFETY AND
SECURITY PATHWAYS AND CABLING
SECTION 280800 - ELECTRONIC SAFETY AND SECURITY SYSTEMS COMMISSIONING
SECTION 281300 – ACCESS CONTROL
SECTION 281600 - INTRUSION DETECTION SYSTEM
SECTION 282300 - VIDEO SURVEILLANCE
SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM
SECTION 285000 - SECURITY CONTROL SYSTEM
Volume 5
DIVISION 31 – EARTHWORK
SECTION 312213 - ROUGH GRADING
SECTION 312300 - EXCAVATION AND FILL
SECTION 312316.16 - STRUCTURAL EXCAVATION FOR MINOR STRUCTURES
SECTION 312323.13 - BACKFILL
SECTION 312333 - TRENCHING AND BACKFILL
SECTION 312500 - EROSION AND SEDIMENTATION CONTROLS
SECTION 313116 - TERMITE CONTROL
SECTION 316329 - DRILLED CONCRETE PIERS AND SHAFTS
TABLE OF CONTENTS TOC - 16
DIVISION 32 - EXTERIOR IMPROVEMENTS
SECTION 321123 - AGGREGATE BASE COURSES
SECTION 321216 - ASPHALT PAVING
SECTION 321223 - IMPRINTED ASPHALT
SECTION 321313 - CONCRETE PAVING
SECTION 321315 - CONCRETE WALKS, CURBS AND GUTTERS
SECTION 321316 - DECORATIVE CONCRETE PAVING
SECTION 321373 - CONCRETE PAVING JOINT SEALANTS
SECTION 321716 - MANUFACTURED TRAFFIC-CALMING DEVICES
SECTION 321723 - PAVEMENT MARKINGS
SECTION 323113 - CHAIN LINK FENCES AND GATES
SECTION 323119 - DECORATIVE METAL FENCES AND GATES
SECTION 323213 - CAST-IN-PLACE CONCRETE RETAINING WALLS
SECTION 324020 - PIPE AND TUBE RAILINGS
SECTION 328000 - IRRIGATION SYSTEM
SECTION 329100 - SOIL PREPARATION (TOPSOIL)
SECTION 329220 - NATIVE SEEDING
SECTION 329300 - EXTERIOR PLANTINGS
DIVISION 33 - UTILITIES
SECTION 331000 - WATER UTILITIES
SECTION 331623 - WELDED STEEL WATER STORAGE TANK AND FOUNDATION
SECTION 333000 - SANITARY SEWERAGE UTILITIES
SECTION 333213 - PACKAGE LIFT STATION
SECTION 333723 - SLIDE GATE
SECTION 334213 - STORMWATER CULVERTS AND DRAINAGE FACILITIES
DIVISION 34 - TRANSPORTATION
SECTION 340114 - SIGNING AND MARKING
SECTION 344113 - TRAFFIC SIGNALS
SECTION 347100 - ADOT REQUIREMENTS
SECTION 347113 - VEHICLE BARRIERS
SECTION 347116 - IMPACT ATTENUATING DEVICES
TABLE OF CONTENTS TOC - 17
DIVISION 40 - PROCESS INTERCONNECTIONS
SECTION 400205 - PIPING SCHEDULE
SECTION 400510 - PIPING - GENERAL
SECTION 400510.03 - DPS - EPOXY LINED DUCTILE IRON PIPE AND FITTINGS
SECTION 400510.04 - DPS - MILL TYPE STEEL PIPE AND FITTINGS (GENRAL SERVICE)
SECTION 400510.09 - DPS STAINLESS STEEL PIPE AND FITTINGS
SECTION 400510.12 - DPS - POLYVINYL CHLORIDE (PVC) PIPE AND FITTINGS
SECTION 400510.13 - DPS - CHLORINATED POLYVINYL CHLORIDE (CPVC) PIPE
AND FITTINGS
SECTION 400510.30 - DPS HIGH DENSITY POLYETHYLENE (HDPE) PIPE
AND TUBING
SECTION 400533 - MANUAL VALVES
SECTION 400555 - SELF CONTAINED AUTOMATIC VALVES
SECTION 400557 - POWER OPERATED GATE AND VALVE ASSEMBLIES
SECTION 406110 - PROCESS INSTRUMENTATION AND CONTROLS SYSTEM (PICS)
GENERAL
SECTION 406115 - PICS SCOPE OF WORK
SECTION 406116 - PICS ENCLOSURES
SECTION 406120 - PROCESS CONTROL NARRATIVES (PCNs)
SECTION 406120.01- PCN-INFLUENT PUMP STATION
SECTION 406120.02 - PCN-EQ BASIN TRANSFER PUMP STATION
SECTION 406120.03 - PCN-AEORBIC SLUDGE DIGESTER
SECTION 406120.04 - PCN-EFFLUENT PUMPING SYSTEM
SECTION 406121 - PICS PROCESS TAPS AND PRIMARY ELEMENTS
SECTION 406124 - PICS INSTRUMENTATION CABLE
SECTION 406127 - PICS INDUSTRIAL ETHERNET NETWORK
SECTION 406128 - PICS MISCELLANEOUS EQUIPMENT
SECTION 406140 - PICS INSTRUMENTATION REQUIREMENTS
SECTION 406160 - PICS PLC I-O INDEX
SECTION 406171 - INSTRUMENT SPECIFICATIONS
SECTION 406176 - PLANT CONTROL SYSTEM (PCS) SOFTWARE REQUIREMENTS
SECTION 406177 - PLANT CONTROL SYSTEM (PCS) HARDWARE AND SOFTWARE
SECTION 406180 - PICS TESTING, CALIBRATION, AND INSTALLATION VERIFICATION
SECTION 406181 - PICS COMMISSIONING AND START-UP
SECTION 406182 - PICS PERSONNEL TRAINING
SECTION 406191- PICS SPARE PARTS
TABLE OF CONTENTS TOC - 18
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
SECTION 412213.17 - DAVIT AND GANTRY CRANES
SECTION 413313 - OVERHEAD TRAVELING CRANES
SECTION 413313.01 - DETAIL SPECIFICATION - TREATMENT PLANT BRIDGE CRANE
DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE
EQUIPMENT
SECTION 431030 - SUBMERSIBLE NON-CLOG CENTIFUGAL PUMPS
SECTION 431111 - BLOWERS
SECTION 432256 - SUBMERSIBLE MIXERS
SECTION 432321 - RECLAIMED EFFLUENT PUMPING SYSTEMS
SECTION 432331 - NPW PUMPING SYSTEMS
SECTION 432331.01 - PCN NON-POTABLE WATER SYSTEM
SECTION 432332 - RECLAIMED WATER PUMPING SYSTEM
SECTION 432358 - POSITIVE DISPLACEMENT ROTARY LOBE PUMPS
SECTION 433230 - ODOR CONTROL BIOTRICKLING SYSTEM
SECTION 433269 - CHEMICAL FEED SKID – PERISTALTIC PUMPS
SECTION 434010 - CHEMICAL STORAGE AND CONTAINMENT
DIVISION 46 – WATER AND WASTEWATER EQUIPMENT
SECTION 460754 - MEMBRANE BIOREACTOR PACKAGE PLANT SYSTEM
SECTION 460754.01 - DES-SKID COMPONENTS
SECTION 460754.02 - DES-SUBMERSIBLE MIXERS
SECTION 460754.03 - DES-FLEXIBLE MEMBRANE DIFFUSERS
SECTION 460754.04 - DES-SUBMERSIBLE PUMPS
SECTION 460754.05 - DES SELF-PRIMING CENTRIFUGAL PUMPS
SECTION 460754.06 - DES-REGENERATIVE BLOWERS
SECTION 460754.07 - DES-PROCESS INSTRUMENTATION
SECTION 460754.08 - PACKAGE MBR SYSTEM - LAYOUT DRAWINGS
SECTION 460754.09 - PACKAGE MBR SYSTEM - P&ID DDRAWINGS
SECTION 460754.10 - DES-CHEMICAL FEED SKIDS
SECTION 461155 - SLUDGE DEWATERING SYSTEM - GENERAL
SECTION 461155.01 - DES VOLUTE PRESS
SECTION 461155.02 - DES POLYMER BLENDING SYSTEM
SECTION 461155.03 - DES SCREW CONVEYOR
SECTION 461155.04 - PCN-SLUDGE DEWATERING SYSTEM
SECTION 462113 - SCREENING AND GRIT REMOVAL SYSTEM - GENERAL
TABLE OF CONTENTS TOC - 19
SECTION 462113.1 - DES - COARSE SCREENING AND GRIT REMOVAL PACKAGE
SYSTEM
SECTION 462113.2 - DES - FINE SCREENING
SECTION 462113.3 - DES - MANUAL BAR SCREEN
SECTION 465035 - WASTEWATER ULTRAVIOLET DISINFECTION SYSTEM
SECTION 465035.01 - DES-HOSPITAL WASTEWATER ULTRAVIOLET DISINFECTION
SYSTEM
SECTION 465035.02 - DES HON-DAH WASTEWATER ULTRAVIOLET DISINFECTION
SYSTEM
SECTION 465131 - AERATION EQUIPMENT – GENERAL
SECTION 465131.01 - DES-FINE BUBBLE AERATION
SECTION 465131.02 - DES-COARSE BUBBLE AERATION
END OF TABLE OF CONTENTS
FINAL CONSTRUCTION DOCUMENTS
23 JANUARY 2026
SECTION 210533 - HEAT TRACING AND INSULATION FOR FIRE-SUPPRESSION PIPING
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes heat tracing and insulation for fire-suppression piping with the following electric heating cables:
1. Plastic insulated, series resistance.
2. Self-regulating, parallel resistance.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include rated capacities, operating characteristics, and furnished specialties and accessories.
2. Schedule heating capacity, length of cable, spacing, and electrical power requirement for each electric heating cable required.
B. Shop Drawings: For electric heating cable.
1. Include plans, elevations, sections, and attachment details.
2. Include diagrams for power, signal, and control wiring.
3. Calculations or manufacturer references for insulation thickness.
1.3 PERFORMANCE REQUIREMENTS
A. UL
B. IEEE
C. NFPA 13
D. NFPA 14
E. NFPA 70
F. NFPA 72
1.4 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For all products provided under this section, to include in operation and maintenance manuals.
1.5 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace electric heating cable that fails in materials or workmanship within specified warranty period.
1. Warranty Period: Three years from date of Final Acceptance..
PART 2 - PRODUCTS
2.1 PLASTIC-INSULATED, SERIES-RESISTANCE HEATING CABLES
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
1. Pyrotenax; a brand of Chemelex
2. Raychem; a brand of Chemelex
HEAT TRACING FOR FIRE-SUPPRESSION PIPING 210533 - 1
FINAL CONSTRUCTION DOCUMENTS
23 JANUARY 2026
3. Thermon, Inc.
4. Chromalox, Inc.
B. Comply with IEEE 515.1.
C. Heating Element: Single- or dual-stranded resistor wire. Terminate with waterproof, factory-assembled nonheating leads with connectors at both ends.
D. Electrical Insulating Jacket: Minimum 4.0-mil Kapton with silicone, Tefzel, or polyolefin.
E. Cable Cover: Aluminum braid and silicone or Hylar outer jacket or TPR overjacket.
F. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70 and NFPA 13, by a qualified testing agency, and marked for intended location and application.
2.2 SELF-REGULATING, PARALLEL-RESISTANCE HEATING CABLES
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
1. BriskHeat.
2. Chromalox.
3. Delta-Therm Corporation.
4. Easy Heat; a division of EGS Electrical Group LLC.
5. Nelson Heat Trace; a division of EGS Electrical Group LLC.
6. Pyrotenax; a brand of Tyco Thermal Controls LLC.
7. Raychem; a brand of Tyco Thermal Controls LLC.
8. Thermon Americas Inc.
9. Trasor Corp.
B. Comply with IEEE 515.1.
C. Heating Element: Pair of parallel No. 16 AWG, tinned, stranded copper bus wires embedded in crosslinked conductive polymer core, which varies heat output in response to temperature along its length. Terminate with waterproof, factory-assembled, nonheating leads with connectors at one end, and seal the opposite end watertight. Cable shall be capable of crossing over itself once without overheating.
D. Electrical Insulating Jacket: Flame-retardant polyolefin.
E. Cable Cover: Tinned-copper braid.
F. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
2.3 CONTROLS
A. Remote bulb unit with adjustable temperature range from 30 to 50 deg F.
B. Snap action; open-on-rise, single-pole switch with minimum current rating adequate for connected cable.
C. Remote bulb on capillary, resistance temperature device, or thermistor for directly sensing pipe-wall temperature.
HEAT TRACING FOR FIRE-SUPPRESSION PIPING 210533 - 2
FINAL CONSTRUCTION DOCUMENTS
23 JANUARY 2026
D. Corrosion-resistant, waterproof control enclosure.
E. Provide contacts for supervisory signals to be monitored by fire alarm system.
2.4 ACCESSORIES
A. Cable Installation Accessories: Fiberglass tape, heat-conductive putty, cable ties, silicone end seals and splice kits, and installation clips all furnished by manufacturer or as recommended in writing by manufacturer.
B. Insulation: Insulation designed to work in conjunction with heat tracing and listed for use with heat tracing shall be provided on all piping where heat tracing is utilized.
C. Warning Tape: Continuously printed "Electrical Tracing"; vinyl, at least 3 mils thick, and with pressure-sensitive, permanent, waterproof, self-adhesive back.
1. Width for Markers on Pipes with OD, Including Insulation, Less Than 6 Inches: 3/4 inch minimum.
2. Width for Markers on Pipes with OD, Including Insulation, 6 Inches or Larger: 1-1/2 inches minimum.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine surfaces and substrates to receive electric heating cables for compliance with requirements for installation tolerances and other conditions affecting performance.
1. Ensure surfaces and pipes in contact with electric heating cables are free of burrs and sharp protrusions.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION
A. Install electric heating cable where indicated and according to NFPA 70 and NFPA 13.
B. Install electric heating cable across expansion joints according to manufacturer's written instructions; use cable to allow movement without damage to cable.
C. Install electric heating cables after piping has been tested and before insulation is installed.
D. Install electric heating cables according to IEEE 515.1.
E. Install insulation over piping with electric cables.
F. Install warning tape on piping insulation where piping is equipped with electric heating cables.
G. Set field-adjustable switches and circuit-breaker trip ranges.
H. Insulation designed for use with selected heat tracing shall be installed to ensure water in piping does not freeze.
3.3 CONNECTIONS
A. Ground equipment according to Section 260526 "Grounding and Bonding for Electrical Systems."
HEAT TRACING FOR FIRE-SUPPRESSION PIPING 210533 - 3
FINAL CONSTRUCTION DOCUMENTS
23 JANUARY 2026
B. Connect wiring according to Section 260519 "Low-Voltage Electrical Power Conductors and Cables."
C. Connect heat-tracing controls to fire-alarm system according to NFPA 13. Comply with requirements in Section 283111 "Digital, Addressable Fire-Alarm System."
3.4 FIELD QUALITY CONTROL
A. Testing Agency: Engage a qualified testing agency to perform tests and inspections.
B. Manufacturer's Field Service: Engage a factory-authorized service representative to test and inspect components, assemblies, and equipment installations, including connections.
C. Perform the following tests and inspections:
1. Perform tests after cable installation but before application of coverings such as insulation, wall or ceiling construction, or concrete.
2. Test cables for electrical continuity and insulation integrity before energizing.
3. Test cables to verify rating and power input. Energize and measure voltage and current simultaneously.
D. Repeat tests for continuity, insulation resistance, and input power after applying thermal insulation on pipe-mounted cables.
E. Cables will be considered defective if they do not pass tests and inspections.
F. Prepare test and inspection reports.
3.5 PROTECTION
A. Protect installed heating cables, including nonheating leads, from damage during construction.
B. Remove and replace damaged heat-tracing cables.
END OF SECTION
HEAT TRACING FOR FIRE-SUPPRESSION PIPING 210533 - 4
FIRE SUPPRESSION SYSTEM COMMISSIONING 210800 - 1
SECTION 210800 – FIRE SUPPRESSION SYSTEM COMMISSIONING
PART 1 - GENERAL
1.1 SUMMARY
A. This project will have selected building systems commissioned. The complete list of equipment and systems to be commissioned are specified in SECTION 01 91 13 GENERAL COMMISSIONING REQUIREMENTS. The commissioning process, which the contractor is partially responsible to execute, is defined in SECTION 01 91 13 GENERAL COMMISSIONING REQUIREMENTS. A Commissioning Agent (CxA) contacted by IHS will manage the commissioning process.
B. Related Sections:
1. The requirements of this Section apply to all Sections of Division 21
2. SECTION 01 33 00 – SUBMITTAL PROCEDURES
3. SECTION 01 91 13 – GENERAL COMMISSIONING REQUIREMENTS
1.2 DEFINITIONS
A. Refer to SECTION 01 91 13 GENERAL COMMISSIONING REQUIREMENTS, for definitions.
1.3 COMMISSIONED SYSTEMS
A. Commissioning of a system or systems specified in Division 21 is part of the construction process. Documentation and testing of these systems, as well as training of O&M personnel in accordance with the requirements of Division 01 and 21 Sections, is required in cooperation with the IHS and CxA.
B. The Fire Suppression systems commissioning will include the systems listed in
SECTION 01 91 13 – GENERAL COMMISSIONING REQUIREMENTS.
1.4 SUBMITTALS
A. The commissioning process requires review of selected Submittals. The CxA will provide a list of Submittals earmarked for CxA review. This list will be reviewed and approved by IHS prior to sharing with the contractor. Refer to SECTION 01 33 00 – SUBMITTAL PROCEDURES for further details.
B. The commissioning process requires Cx Submittal review simultaneous to A/E Submittal review. Specific submittal requirements related to the Commissioning Process are specified in SECTION 01 91 13 – GENERAL COMMISSIONING
REQUIREMENTS.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 START-UP AND CONSTRUCTION INSPECTIONS
A. General. Commissioning of the Building Fire Suppression Systems will require inspection of individual elements of the Fire Suppression System construction throughout the construction period. The Contractor shall coordinate with the CxA in accordance with SECTION 01 91 13 – GENERAL COMMISSIONING REQUIREMENTS and the Commissioning Plan to schedule inspections as required to support the commissioning process.
FIRE SUPPRESSION SYSTEM COMMISSIONING 210800 - 2
3.2 PRE-FUNCTIONAL CHECKLISTS
A. General. Pre-functional Checklists are developed and completed for all major equipment and systems being commissioned. The checklist captures equipment nameplate and characteristics data, confirming the as-built status of the equipment or system. These checklists also ensure that the systems are complete and operational, so that the functional performance testing can be scheduled. The checklists are drafted by the CxA and completed (filled out) by the installing Contractor.
B. Review. Upon notification of checklist completion, the CxA and IHS will review the Pre- Functional Checklists for accuracy. If the CxA or IHS determine that the information provided on a checklist is not accurate, the marked-up checklist will be returned to the Contractor for correction and resubmission. An item be added to the Commissioning Issue Log (CIL) to track the deficiency.
If the CxA or IHS determine that a significant number of completed checklists for similar equipment are not accurate, all the checklists for the equipment type will be returned to the Contractor for correction and resubmission.
Refer to SECTION 01 91 13 – GENERAL COMMISSIONING REQUIREMENTS
3.3 FUNCTIONAL PERFORMANCE TESTING
A. Objectives and Scope. The objective of functional performance testing is to demonstrate that each system is operating according to the documented design intent and Contract Documents. In general, each system should be operated through all modes of operation (seasonal, occupied, unoccupied, warm-up, cool-down, part-and full-load) where there is a specified system response. Verifying each sequence in the sequences of operation is required. Proper responses to such modes and conditions as power failure, freeze condition, no flow, equipment failure, etc. shall also be tested.
B. Development of Test Procedures. Before test procedures are written, the CxA shall obtain all requested documentation and a current list of change orders affecting equipment or systems, including an updated points list, program code, control sequences and parameters. The CxA shall develop specific test procedures and forms to verify and document proper operation of each piece of equipment and system. Prior to execution, the CxA shall provide a copy of the test procedures to the Contractor who shall review the tests for feasibility, safety, equipment and warranty protection. The CxA shall review contracted or factory testing which the CxA is not responsible to oversee and shall determine what further testing may be required to comply with the Contract Documents. Redundancy of testing shall be minimized.
C. Test Methods:
1. Functional performance testing and verification may be achieved by manual testing (persons manipulate the equipment and observe performance) or by monitoring the performance and analyzing the results using the control system’s trend log capabilities or by stand-alone data loggers. The CxA will determine which method is most appropriate.
2. Setup. Each function and test shall be performed under conditions that simulate actual conditions as close as is practically possible. The Contractor executing the test shall provide all necessary materials, system modifications, etc. to produce the necessary flows, pressures, temperatures, FIRE SUPPRESSION SYSTEM COMMISSIONING 210800 - 3 etc. necessary to execute the test according to the specified conditions. At completion of the test, the Contractor shall return all affected building equipment and systems, due to these temporary modifications, to their pre-test condition.
3. Sampling. Multiple identical pieces of non-life-safety or non-critical equipment may be functionally tested using a sampling strategy. The sampling strategy will be developed by the CxA and approved by the Owner’s Representative.
For details on Sampling, refer to the Commissioning Plan. If, after three attempts at testing the specified sample percentage, failures are still present, then all remaining units are tested at the Contractor’s expense.
D. Coordination and Scheduling. The Contractor shall provide sufficient notice to the CxA regarding their completion schedule for the pre-functional checklists and startup of all equipment and systems. The CxA will schedule functional tests through the Owner’s Representative. The CxA shall direct, witness and document the functional testing of all equipment and systems. The Contractor shall execute the tests.
E. Problem Solving. The CxA will recommend solutions to problems found; however, the burden of responsibility to solve, correct, and retest problems lie with the Contractor and their subcontractors.
3.4 O&M PERSONNEL TRAINING REQUIREMENTS
A. Training Plans: Contractor shall develop an instructional program that includes individual training modules for each system, subsystem, and equipment as specified in SECTION
01 79 00 – DEMONSTRATION AND TRAINING.
B. The minimum training requirements for Fire Suppression Systems are specified in technical sections.
C. The CxA shall review and provide comment on the training plans developed by the contractor for alignment with the requirements of the OPR and BOD.
-- END OF SECTION --
FIRE SPRINKLER AND STANDPIPE SYSTEMS 211300 - 1
SECTION 211300 - FIRE SPRINKLER AND STANDPIPE SYSTEMS
PART 1 - GENERAL
1.1 SUMMARY
A. Description of Work: Furnish all new materials and labor for the detailed design and installation of new automatic fire sprinkler and standpipe systems as outlined in Design Drawings, hereafter referred to as the "Systems" in complete compliance with this Specification, Contract Drawings, and all applicable codes and standards.
B. Contract drawings are for information only to show conceptual system arrangement.
Field verify all site conditions and information contained on the contract drawings.
Provide complete design that is coordinated with installed conditions and other building systems.
C. Section Includes:
1. Pipes, fittings, and specialties.
2. Fire-protection valves.
3. Nitrogen generation systems.
4. Hose connections.
5. Backflow Preventers.
6. Fire department connections.
7. Sprinklers.
8. Alarm devices.
9. Manual control stations.
10. Control panels.
11. Pressure gauges.
12. Identification signs.
13. Escutcheons.
14. Floor plates.
15. Sleeves.
16. Stack-sleeve fittings.
17. Sleeve-seal systems.
18. Sleeve-seal fittings.
19. Grout.
D. Related Requirements:
1. Section 013573 "Delegated Design Requirements and Procedures."
1.2 DEFINITIONS
A. High-Pressure Sprinkler Piping: Wet-pipe sprinkler system piping designed to operate at working pressure higher than standard 175 psig, but not higher than 250 psig.
B. Standard-Pressure Sprinkler Piping: Wet-pipe sprinkler system piping designed to operate at a maximum working pressure of 175 psig.
C. AHJ: Authority Having Jurisdiction.
D. UL: Underwriters Laboratories.
FIRE SPRINKLER AND STANDPIPE SYSTEMS 211300 - 2
1.3 INTENT OF SPECIFICATION
A. The work performed pursuant to these specifications is to be complete in every respect, resulting in the Systems installed in accordance with the applicable codes, standards, manufacturers' recommendations, and UL listings.
B. Commencement of Work:
1. No work shall be performed until shop drawings, calculations, and data sheets have been approved by Architect and Engineer. The contractor is solely liable for any work performed prior to this approval.