B.08.02.17 Att 17 ExpInfoSheet.docx

DOCX document 29 KB Posted

Attached to
W912GB20R0030 - Design-Build of Divichki and Shyrokylan Simulation Training Centers - Ukraine
Solicitation number
W912GB20R0030
Issued by

About this file

This document contains an experience information sheet template and details of a related federal contract opportunity for construction services. The experience information sheet is to be completed by offerors and includes fields for project name, whether work was performed as a prime contractor or subcontractor, final project cost, location and dates of work performed, project completion status, and a description of the nature of the work. The related federal contract opportunity is a solicitation from the Department of the Army European Command to design-build two simulation training centers in Ukraine. Offerors are to complete the experience information sheet template as an attachment to their proposals. A site visit is scheduled for a date to be specified in an upcoming amendment, with registration required by June 22, 2020.

View the file

Other files

File Type Posted
Atch 22 Amend 0003 Ukraine Site Visit Attendee Registration Roster 2020.06.25.pdf PDF
Atch 24 Amend 0003 Statement of Work_011010_Shyrokylan Simulation Center_14Jul20.pdf PDF
Atch 21 Amend 0003 ProjNet Bidder Responses.pdf PDF
W912GB20R0030 Amend 0003 SF30 Ukraine Sim Centers.pdf PDF
Atch 23 Amend 0003 Statement of Work_011010_Divichki Simulation Center_14Jul20.pdf PDF
B.08.02 W912GB20R0030_Amend 0001 Sim Centers Ukraine_Site Visit.pdf PDF
B.08.02 W912GB20R0030_Amend 0002 Sim Centers Ukraine_Travel Advisory.pdf PDF
Attachment 6 - Dedication Plaque.pdf PDF
Attachment 3 - Conceptual Site Plan_Divichki_Alternative2.pdf PDF
Attachment 2 - Conceptual Site Plan_Divichki_Alternative1.pdf PDF
Attachment 1 - Location Map_Divichki.pdf PDF
Attachment 11 - Preparation of Structural Calculations.pdf PDF
Attachment 7- Location Map_Shyrokylan.pdf PDF
B.08.02.13 Att 13 BLA Template 20R0030.docx DOCX document
Attachment 4 - Conceptual Floor Plan Layout.pdf PDF
B.08.02.12 Att 12 Price and Payment Procedures.docx DOCX document
Attachment 9 - Conceptual Site Plan_Shyrokylan.pdf PDF
B.08.02.15 Att 15 Site Visit Attendee Worksheet.xlsx XLSX spreadsheet
B.08.02.19 Att 19 Specification Binder.pdf PDF
Attachment 5 - Preparation of Structural Calculations.pdf PDF
B.08.02.20 Att 20 Site Photos.pdf PDF
B.08.02.16 Att 16 Past Performance Questionnaire.pdf PDF
B.08.02 W912GB20R0030 Sim Centers Ukraine.pdf PDF
B.08.02.14 Att 14 BLG Template 20R0030.docx DOCX document
Attachment 8- Conceptual Floor Plan Layout.pdf PDF
Attachment 10 - Dedication Plaque.pdf PDF
B.08.02.18 Att 18 ExpOverviewSheet.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 17

EXPERIENCE INFORMATION SHEET

PROJECT NO. _____, Page 1 (project number is taken from column 1 on Attachment 8)

Project Name:

Experience:

1. Indicate whether the work was performed as the prime contractor, a subcontractor, or as a partner of a Joint Venture. If work was performed as a subcontractor or JV partner, clearly describe what part of the work the firm for which the experience information is submitted performed (both in magnitude and description of the work performed).

2. The final cost of this project: $_________________________

3. The location the work was performed is: ___________________________________

4. The day, month, and year work was completed: _______________

5. Is this project more than 50% complete by the closing date of this solicitation? ____ Yes ____ No

6. Describe the nature of the work. Do not provide a listing of existing or previous contracts, but rather provide detailed information of the construction work.

(Continue typing if required to provide more information)

ATTACHMENT 7 - EXPERIENCE INFORMATION SHEET

PROJECT NO. _____ Page 2

ATTACHMENT 7 - EXPERIENCE INFORMATION SHEET

PROJECT NO. _____ Page 3

File details come from the government source that posted it. Updated .