Attachment 8- Conceptual Floor Plan Layout.pdf
PDF 364 KB Posted
- Attached to
- W912GB20R0030 - Design-Build of Divichki and Shyrokylan Simulation Training Centers - Ukraine
- Solicitation number
- W912GB20R0030
- Issued by
-
Department of the Army European Command
About this file
This conceptual floor plan layout and related federal contract opportunity solicitation provide details for the design-build of two simulation training centers in Ukraine. The solicitation seeks proposals for site design and construction at the Divichki and Shyrokylan locations. Key requirements include construction of classrooms, offices, break areas, mechanical and server rooms, and tactical engagement simulation spaces. Site visits are scheduled for registration by June 22nd, with an upcoming amendment providing the exact date and time. Proposals are due in response to solicitation number W912GB20R0030 issued by the Department of the Army European Command. Award timing is not specified. The conceptual floor plan depicts potential space layouts totaling over 1500 square meters of basic requirements and 600 square meters of optional areas, depending on available funds.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
77.64 m²
TOC (OPTION)
10.47 m²
OFFICE
10.43 m²
OFFICE
12.32 m²
OFFICE
12.32 m²
OFFICE
77.60 m²
TOC
10.47 m²
OFFICE
10.43 m²
OFFICE
12.32 m²
OFFICE
12.32 m²
OFFICE
89.97 m²
VBS TRAINING
89.97 m²
VBS TRAINING
(ALTERNATIVE
SET UP)
50.52 m²
JCATS
(ALTERNATE
SET UP) 89.97 m²
VBS TRAINING
50.52 m²
JCATS
32.98 m²
UTILITY
50.52 m²
JCATS
89.75 m²
EXCON / HICON
21.33 m²
SECURITY
OFFICE
35.37 m²
MEN'S
4.75 m²
WOMEN'S
21.02 m²
BREAK
63.53 m²
MECH.
21.61 m²
SERVER
56.26 m²
LOBBY
89.64 m²
EXCON / HICON
.2 m
²
PL
O
TT
ER
99.47 m²
AAR
52.49 m²
ECG OPEN
OFFICE
15.09 m²
OFFICE
86.47 m²
INSTRUCTORS
52.72 m²
ECG OPEN
OFFICE
15.14 m²
OFFICE
53.11 m²
ECG OPEN
OFFICE
15.38 m²
OFFICE
.3 m
² C
PX
G
R O
U P
.9 m
²
C O
M
PU
TE
R
M
AI
N
TE
N
AN
C E
7.72 m²
OFFICE
7.72 m²
OFFICE
77.55 m²
TOC (OPTION)
10.43 m²
OFFICE
10.43 m²
OFFICE
12.32 m²
OFFICE
12.36 m²
OFFICE
10.43 m²
OFFICE
10.43 m²
OFFICE
12.32 m²
OFFICE
12.36 m² OFFICE7.75 m²
OFFICE
7.75 m²
OFFICE
77.51 m²
TOC
7.30 m²
OFFICE
7.72 m²
OFFICE
7.34 m²
OFFICE
7.75 m²
OFFICE
48.00 30.00
15.00 TOC MODULE = 200 sm
15.00
FUTURE TOC
15.00
.5
TO
C M
O
DU
LE
.3
2.
TO
C
M O
DU
LE
.3
33.51 m²
CIRCULATION
33.23 m²
CIRCULATION
33.25 m²
CIRCULATION CIRCULATION
106.60
OPTION (DEPENDING ON FUNDS AVAILABLE) = 615 sm 28.60
BASIC REQUIREMENTS AREA = 1500 sm 63.00
OPTION (DEPENDING ON FUNDS AVAILABLE) = 443 sm 15.00
.5
ALTERNATE SETUP
Att#4 - Conceptual Floor Plan Layout Simulation Center, Ukraine (not to scale)
| Floor Plans |
| 01 Level - Simulation Center |
File details come from the government source that posted it. Updated .