B.08.02.12 Att 12 Price and Payment Procedures.docx

DOCX document 30 KB Posted

Attached to
W912GB20R0030 - Design-Build of Divichki and Shyrokylan Simulation Training Centers - Ukraine
Solicitation number
W912GB20R0030
Issued by

About this file

This document provides pricing and payment procedures for the design-build of two simulation training centers in Ukraine. The solicitation includes base items for minimum functional areas at the Divichki and Shyrokylan centers, comprising training operation centers, classrooms, and support functions. There are also option items such as additional training operation centers and optional components like briefing areas and maintenance rooms. Pricing will be by job for each item. The related federal contract opportunity is solicitation number W912GB20R0030 from the Department of the Army European Command for the design and construction of the centers. A site visit is scheduled for June 22nd prior to the response date.

View the file

Other files

File Type Posted
Atch 22 Amend 0003 Ukraine Site Visit Attendee Registration Roster 2020.06.25.pdf PDF
Atch 24 Amend 0003 Statement of Work_011010_Shyrokylan Simulation Center_14Jul20.pdf PDF
Atch 21 Amend 0003 ProjNet Bidder Responses.pdf PDF
W912GB20R0030 Amend 0003 SF30 Ukraine Sim Centers.pdf PDF
Atch 23 Amend 0003 Statement of Work_011010_Divichki Simulation Center_14Jul20.pdf PDF
B.08.02 W912GB20R0030_Amend 0001 Sim Centers Ukraine_Site Visit.pdf PDF
B.08.02 W912GB20R0030_Amend 0002 Sim Centers Ukraine_Travel Advisory.pdf PDF
Attachment 6 - Dedication Plaque.pdf PDF
Attachment 3 - Conceptual Site Plan_Divichki_Alternative2.pdf PDF
Attachment 2 - Conceptual Site Plan_Divichki_Alternative1.pdf PDF
Attachment 1 - Location Map_Divichki.pdf PDF
Attachment 11 - Preparation of Structural Calculations.pdf PDF
Attachment 7- Location Map_Shyrokylan.pdf PDF
B.08.02.13 Att 13 BLA Template 20R0030.docx DOCX document
Attachment 4 - Conceptual Floor Plan Layout.pdf PDF
B.08.02.17 Att 17 ExpInfoSheet.docx DOCX document
Attachment 9 - Conceptual Site Plan_Shyrokylan.pdf PDF
B.08.02.15 Att 15 Site Visit Attendee Worksheet.xlsx XLSX spreadsheet
B.08.02.19 Att 19 Specification Binder.pdf PDF
Attachment 5 - Preparation of Structural Calculations.pdf PDF
B.08.02.20 Att 20 Site Photos.pdf PDF
B.08.02.16 Att 16 Past Performance Questionnaire.pdf PDF
B.08.02 W912GB20R0030 Sim Centers Ukraine.pdf PDF
B.08.02.14 Att 14 BLG Template 20R0030.docx DOCX document
Attachment 8- Conceptual Floor Plan Layout.pdf PDF
Attachment 10 - Dedication Plaque.pdf PDF
B.08.02.18 Att 18 ExpOverviewSheet.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 22 00

PRICE AND PAYMENT PROCEDURES

03/20

PART 1 GENERAL

SCHEDULE OF ITEMS: BASE ITEMS

Base Item 0001: Divichki Simulation Center - Minimum functional areas

Unit of Measure: Job.

Payment will be made for costs associated with the design and construction of the minimum functional areas for the Divichki Simulation Center as indicated in the SECTION 01 10 10, paragraph 1.3 and shown on the conceptual layout, with the exception of the bid options listed below. The minimum functional areas include: two Training Operation Centers (TOC), three VBS Training classrooms, one JCATS Training classrooms, one Excon/Hicon, and all necessary support functions. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

Base Item 0002: Shyrokylan Simulation Center - Minimum functional areas

Unit of Measure: Job.

Payment will be made for costs associated with the design and construction of the minimum functional areas for the Shyrokylan Simulation Center as indicated in the SECTION 01 10 10, paragraph 1.3 and shown on the conceptual layout, with the exceptions of the bid options listed below. The minimum functional areas include: two Training Operation Centers (TOC), three VBS Training classrooms, one JCATS Training classrooms, one Excon/Hicon, and all necessary support functions. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

SCHEDULE OF ITEMS: OPTION ITEMS

Option 1: Item 0003: Divichki Simulation Center - Two additional Training Operation Centers (TOC)

Unit of Measure: Job.

Payment will be made for costs associated with the design and construction of two additional Training Operation Centers (TOC)in the Divichki Simulation Center as indicated in the SECTION 01 10 10, paragraph 1.3 and shown on the conceptual layout. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

Option 2: Item 0004: Divichki Simulation Center - Optional components

Unit of Measure: Job.

Payment will be made for costs associated with the design and construction of the optional components for the Divichki Simulation Center as indicated in the SECTION 01 10 10, paragraph 1.3 and shown on the conceptual layout, with the exceptions of the base items listed above. The optional components include: one After Action Review (AAR)/Briefing Area, one ECG area, one staff area, and one computer parts storage and maintenance room. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

Option 3: Item 0005: Shyrokylan Simulation Center - Two additional Training Operation Centers (TOC)

Unit of Measure: Job.

Payment will be made for costs associated with the design and construction of two additional Training Operation Centers (TOC)in the Shyrokylan Simulation Center as indicated in the SECTION 01 10 10, paragraph 1.3 and shown on the conceptual layout. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

Option 4: Item 0006: Shyrokylan Simulation Center - Optional components

Unit of Measure: Job.

Payment will be made for costs associated with the design and construction of the optional components for the Shyrokylan Simulation Center as indicated in the SECTION 01 10 10, paragraph 1.3 and shown on the conceptual layout, with the exceptions of the base items listed above. The optional components include: one After Action Review (AAR)/Briefing Area, one ECG area, one staff area, and one computer parts storage and maintenance room. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section - 23 March 2020