B-book-2026 Danny Thomas Park Ballfield Sink Hole Repair.pdf
PDF 2 MB Posted
- Solicitation number
- 146059
- Issued by
- Lucas County, Ohio
About this file
Summary: Danny Thomas Park Ballfield Sink Hole Investigation and Turf Repair Bid Book
This is a Notice to Bidders and Bid Book (Part B) issued by the City of Toledo, Ohio, Department of Public Services, Division of Parks & Recreation, for the investigation and repair of a sink hole beneath the synthetic playing surface at Danny Thomas Park Ballfield. The project scope includes exposing the affected area, determining the cause and extent of subsurface failure, inspecting associated underground drainage and piping systems, documenting conditions, authorizing repairs, reconstructing disturbed subsurface materials, and returning the synthetic turf system to safe, stable, uniform, and playable condition. Bids must be submitted electronically through the City of Toledo's PlanetBids portal by 1:30 p.m. local time on September 29, 2026. All bids require compliance with prevailing wage requirements, submission of required paperwork packets, and a bid guaranty of not less than five percent of the estimated total contract price but no more than $200,000. The contract is subject to performance bond requirements for expenditures of $40,000 or more and Project Labor Agreement (PLA) requirements for contracts of $100,000 or greater with the Northwest Ohio Building and Construction Trades Council.
Pricing for the project is based on line-item bidding with prices stated to two decimal places. The City reserves the right to increase or decrease contract quantities and rejects any or all bids at its discretion. Prevailing wage rates apply to multiple skilled trades including bricklayers, carpenters, cement masons, electricians, ironworkers, laborers, operating engineers, plumbers/pipefitters, sheet metal workers, and sprinkler fitters, with rates varying by classification and effective dates ranging from early 2024 through September 2026. The project encourages 15 percent minority business enterprise (MBE) and women business enterprise (WBE) participation, with companies required to be registered with the City of Toledo for participation credit. Contractors must comply with Toledo Income Tax Ordinance requiring a 2.5 percent tax on net profits and must withhold prevailing wages for both resident and nonresident employees. A pre-construction compliance meeting is required prior to work commencement, and successful bidders must execute contracts within ten calendar days of award notification or risk forfeiture of bid guaranty funds.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF TOLEDO, OHIO
Department of Public Services
Division of Parks & Recreation u u u u u u u u u u u u
NOTICE TO BIDDERS, PROPOSAL, CONTRACT
BONDS AND SPECIFICATIONS
PART 'B' - BID BOOK
FOR
Danny Thomas Park Ballfield Sink Hole Investigation and Turf Repair
BID RECEIVED:
NAME OF CONTRACTOR:
CONTRACT NO.:
CONTRACT DATE:
Karen Ranney Wolkins
COMMISSIONER
PARKS & RECREATION
9/29/2026
Wade Kapszukiewicz
MAYOR
PUBLIC SERVICES
Joe Fausnaugh
DIRECTOR
i
Updated 3-17-26
TABLE OF CONTENTS
NOTICE TO BIDDERS ............................................................................. NB-1 TO NB-7
WAGE RATES ..................................................................................... WR-1 TO WR-47
SPECIAL PROVISIONS ......................................................................... SP-1 TO SP-18
PROPOSAL
Proposal Forms .................................................................................... F-1 TO F-7
Public Notice ............................................................................... F-1 to F-2
Insurance Requirements ............................................................ F-3 TO F-5
Bid Guaranty Sample ............................................................................. F-6
Tax Exemption Certificate** .................................................................. F-7
Project Paperwork** .......................................................................... F-8 TO F-14
Acknowledgement and Acceptance ...................................................... F-8
Living Wage Contract Addendum .......................................................... F-9
Best Bid Criteria ....................................................................... F-10 to F-13
Tax Exemption Certificate** ................................................................ F-14
Contract Forms ................................................................................... C-1 TO C-6
**Documents will be in separate packets on Planet Bids
NB-1
Updated 10-3-2025
NOTICE TO BIDDERS
1. PROPOSAL
The City of Toledo desires to enter into a contract for the Danny Thomas Park
Ballfield Sink Hole Investigation and Turf Repair.
This project is directed at determining the cause of a sink hole under the synthetic playing surface of the Danny Thomas Ballfield. Work Includes but may not be limited to: expose the affected area, determine the actual cause and extent of the subsurface failure, inspect associated underground drainage and piping systems, document all conditions encountered, make authorized repairs, properly reconstruct all disturbed subsurface materials, and return the synthetic turf system lo a safe, stable, uniform, and playable condition.
The quantities specified are estimated and informative only and not a binding offer of purchase on the part of the City. The City of Toledo reserves the right to either increase or decrease the contract quantities.
Proposals for the work as described in this document, PART ‘B’ - BID BOOK Danny
Thomas Park Ballfield Sink Hole Investigation and Turf Repair, endorsed with the name of the bidder, any other interested persons, the date of its presentation, will be received through the Planet Bids website (accessible through the City of Toledo Website at https://toledo.oh.gov/business/how-to-do-business-with-the-city), until 1:30 p.m., Toledo LOCAL Time, on the BID RECEIVED date shown on the cover of this book, at which hour the online bids will be publicly opened and read at the office of the
Commissioner of Purchases and Supplies Division, One Government Center, Suite 2000
(located at Erie and Jackson Streets), Toledo, Ohio. No bids will be accepted that are not submitted through the Planet Bids website.
All bids must conform to the attached specifications. Any and all deviations from the specifications must be clearly detailed.
The successful bidder assumes all obligations and liabilities, and expressly makes all representations and warranties imposed within the contract provisions. No effort is made to emphasize any particular provisions of the Contract, but bidders must be familiar with every provision and its effect.
By signing a contract, the Contractor agrees to work with the City in organizing, controlling and expediting these efforts at no cost to the City.
The City of Toledo, Division of Engineering Services, “PART ‘A’ - STANDARDS – 2026” and the “2026 City of Toledo Construction Standards”, shall govern and are a part of this Proposal and Contract, unless specifically noted in this book. Where apparent conflicts exist between “PART ‘A’ - STANDARDS – 2026” and “PART ‘B’ - BID BOOK”, the terms of
“PART ‘B’ - BID BOOK” will govern.
NB-2
A copy of “PART ‘A’ - STANDARDS – 2026” and the “2026 City of Toledo Construction
Standards” are available at the City of Toledo Website
(https://toledo.oh.gov/departments/transportation/engineering-construction-management) via For Contractors & Consultants/Construction Standards drop down menu.
2. PROJECT PLANS
A download of the plans for this project can be obtained from the Planet Bids website at no charge.
3. QUESTIONS PERTAINING TO THE PLANS AND SPECIFICATIONS
All questions regarding the plans and specifications must be in writing by through the Planet
Bids website. The City’s response will be placed on Planet Bids for all potential bidders.
This will assure that all potential bidders have the benefit of the same answers to the same questions.
4. REQUIREMENTS FOR PROPOSALS
Bidders are warned that all bids, which are deficient in any of the following requirements, may be rejected:
Each bid must be accompanied by a sufficient Surety Bond on the form included in the project’s B Book (marked "Proposal Guaranty") executed by the bidder and a Surety
Company together with a power of attorney showing the authority of the person or persons executing the bond for the surety or the sureties, and the date of the bond, to the satisfaction of the Mayor, or else by a certified check on some solvent bank payable to the
City of Toledo in the sum of not less than five percent (5%) of the Estimated Total Contract price shown on the bidder's Proposal, but no more than $200,000. Should any bidder whose Proposal has been accepted by the Mayor refuse or fail to enter into the Contract and furnish the Contract Bond therefore as specified herein, the Mayor shall be entitled to collect on the said Proposal Guarantee Bond or deduct from the said check an amount equal to the excess of the Estimated Total Contract Price shown in the Proposal finally accepted over that contained in the Proposal of the originally accepted bidder. This deduction will be in the form of liquidated damages to the City and not in the nature of a penalty.
Each proposal must also be accompanied by the following:
If the bidder is a corporation, a statement of the names and residences of its officers and directors, a certified copy of its Certificates of Incorporation, and proof of its authority to do business in the State of Ohio. If a partnership, a statement of the names and residences of its members indicating which are general and which are specific partners. If an individual, a statement of his residence is required.
https://toledo.oh.gov/departments/transportation/engineering-construction-management
NB-3
Unless otherwise specified, bids shall be guaranteed for Ninety (90) days.
5. RIGHT TO ACCEPT AND REJECT PROPOSALS
The City of Toledo reserves the right to reject any, or any part of any, or all bids, to waive technicalities, to advertise for new bids or to make the award if, in the judgment of the City, the best interest of the City will be promoted thereby.
6. OTHER REQUIREMENTS
Attention is called to Section 100, General Provisions, of the 2023 State of Ohio, Department of Transportation "Construction & Material Specifications” as amended by the City of Toledo “Part ‘A’ – Standards – 2026”, which contain specifications and provisions supplementing this proposal and contract. The materials and methods for the work to be accomplished shall be in accordance with industry standards and the latest local, State and Federal regulations for the type of work involved and those specifically stated herein.
The Contractor shall take particular note of contract form provisions, dealing with Time of
Performance and Liquidated Damages, which will be used in the determination of resulting damages in the event this contract obligation is not fulfilled by the specified completion date.
Not less than the minimum salaries and wages as set forth in the contract documents shall be paid on this project. The Contractor shall insure that employees and applicants for employment are not discriminated against because of their race, religion, color, national origin, sex, age, ancestry or handicap.
In compliance with the Affirmative Action Program as promulgated by the U.S. Department of Labor - Office of Contract Compliance, Governor of Ohio's executive order of January 27, 1972, and the City of Toledo Ordinance No. 527-73, the successful bidder shall be required to execute "Bidder Certification Forms" on the bidder's compliance to the Affirmative Action
Program. The successful bidder shall execute the said forms before a contract may be entered into.
Any documents submitted with bid or proposal, will be treated by the City as a public document unless informed in writing by bidder that bidder considers such document to contain trade secrets under Ohio law. The City may require additional information in support of such claim.
The successful vendor shall protect the City from any and all infringements of patents, royalties or damages arising from the transaction.
The contracting party and all subcontractors performing services under this contract within the City of Toledo, Ohio, are subject to the provisions of the Toledo Income Tax Ordinance requiring a payment to the City of Toledo of two and one half percent (2 ½ %) tax on all net profits attributable to their activities within the limits of the City of Toledo, and shall withhold said tax on the entire wages paid to both resident and nonresident employees
NB-4
performing services within the limits of the said city.
As soon as the recommendation of award of bid is made, the contract documents will be sent to the successful vendor for execution, complete with required bonding, insurance and indemnification. If the contracts are not executed, completed and returned to the City within ten (10) calendar days of the date of sending, the bid bond/check may be declared forfeited as liquidated damages.
The City of Toledo is a public entity that must comply with certain legal requirements and internal review procedures prior to awarding any contract. No party has a right to expect that he/she/it will be awarded a contract with the City absent adherence to these legal requirements and review procedures. All contracts with the City of Toledo must contain the signature of the Mayor or the Mayor's duly authorized designee.
The City reserves the right to refuse to enter into a contract with any party unless and until all legal requirements have been met, all internal review procedures have been adhered to, and the Mayor or the Mayor's duly authorized designee executes the contract.
LOCAL PREFERENCE
The description of and procedure to apply local preference to complainant bids received by the City of Toledo can be found under Toledo Municipal Code section 187.34.
The Toledo Municipal Code can be found by searching for the City of Toledo webpage toledo.oh.gov and clicking the "Government" link, then clicking the "City Code" link.
CONTRACT AWARDS CRITERIA FOR CONSTRUCTION, ALTERATION, AND/OR
RENOVATION PROJECTS
Please find the criteria to identify the lowest and best bidder for construction, alteration, and/or renovation projects in excess of one hundred thousand dollars ($100,000), under the Toledo Municipal Code section 187.12.
The city of Toledo encourages all bidders to achieve a 15% MBE/WBE participation on all construction contracts. The MBE/WBE companies must be registered with the city of Toledo for these percentages to count towards this goal. For MBE/WBE information and current list of MBE/WBE registered companies, please visit the Office of Diversity & Inclusion’s website at https://toledo.oh.gov/business/how-to-do-business-with-the-city/mbe-wbe or contact Tiffany Whitman at 419-936-2375/ tiffany.whitman@toledo.oh.gov .
Project Labor Agreements (PLA) Toledo Municipal Code Section 187.12(d) requires the successful bidder of a construction contract of $100,000 or greater, which is funded by the City of Toledo or other sources that do not exclude Project Labor Agreements ("PLA"), to enter into a PLA with the Northwest Ohio Building and Construction Trades Council ("NWOBTC").
Once the successful bidder is notified of bid award, a pre-job conference shall be held within fifteen (15) days of the award notification between the Bidder and the Northwest Ohio Building and Construction Trades Council (“NWOBTC”). An executed Project https://toledo.oh.gov/business/how-to-do-business-with-the-city/mbe-wbe https://toledo.oh.gov/business/how-to-do-business-with-the-city/mbe-wbe mailto:tiffany.whitman@toledo.oh.gov%20.chong@toledo.oh.gov
NB-5
Labor Agreement must be delivered to the Division of Purchases and Supplies within fifteen (15) working days from pre-job conference with NWOBTC. An executed Project Labor Agreement must have the signature of the lead contractor and the Executive Secretary of the Northwest Ohio Building and Construction Trades Council at a minimum to be deemed valid. A template PLA is attached to this bid for your review.
PERFORMANCE BOND (may be applicable per TMC 187.28) Every contract involving an expenditure of the amount of forty thousand dollars ($40,000) or more for the performance of work and labor and for the installation of equipment upon any street, highway, bridge, building or other public improvement in which both labor and material are involved, shall be accompanied by a bond in the Ohio statutory form, in an amount not less than the bid price, of the contractor to the City, guaranteeing the performance of the contract according to its provisions and payment of all lawful claims of subcontractors, material suppliers and laborers for work performed or materials furnished in performing the contract, and indemnifying the City against damages suffered by failure to perform the contract. Such bond shall be for the benefit of any subcontractor, material supplier or laborer having a just claim as well as the City.
PREVAILING WAGE
This is a prevailing wage project. The latest prevailing wage rates at the time this bid was posted are available on the “Documents” tab of this bid in PlanetBids. The successful bidder shall submit certified payrolls to the City for all labor performed on the project 2 weeks after start dates and weekly thereafter. Please Note; Pre-Construction meeting w/ Compliance is required prior to work starting.
TARIFFS
Proposers must clearly identify any portion of their pricing that may be subject to fluctuation due to current or future tariffs, duties, or trade restrictions imposed by the
United States or other governing bodies.
If any materials, products, or components included in the proposal are subject to tariffs or similar trade measures, the proposer should identify these items and specify the associated cost impact within the pricing section of their proposal. The awarded contractor shall not adjust pricing after contract execution unless such adjustment is directly attributable to a documented and material change in tariff costs that could not have been reasonably anticipated at the time of the proposal.
Any request for price adjustment due to tariff changes must include detailed supporting documentation and will be subject to review and approval by the City.
BID SUBMISSION
Bids for this project can be accepted via e-bid only through the City of Toledo’s PlanetBids portal. Bid submittals or other transmissions of information have not been completed until an email confirmation of the transmission has been issued by PlanetBids. Bids prices shall be to two (2) decimal places (i.e. $0.00) or four (4) decimal places (i.e. $0.0000). Only one (1) price per line item will be accepted with this bid.
NB-6
In order to be considered, the bidder must have submitted the City Paperwork Packet* to the City of Toledo. If any information pertaining to this document changes, it is the company’s responsibility to notify the city and update the applicable information. This submission includes:
• Vendor Registration Form
• Business Tax Registration Form
• Child Support Affidavit, notarized
• Vendor Utility
In order to be considered, the bidder must have submitted the following forms to the City of Toledo once in the calendar year the project is advertised:
• Annual Paperwork Packet*, which includes:
o Equal Employment Opportunity Certification o Living Wage Affidavit, updated no later than February 1st o Debarment Certification o W-9
• Certificate of Insurance, naming the City of Toledo as an additional insurer & through expiration and then annually
• Bureau of Worker’s Compensation Certificate, through expiration and then annually
In order to be considered, the bidder must submit the following forms to the City of Toledo for each project the company bids on:
• Construction Project Paperwork Packet*, which includes:
o Acknowledgement and Acceptance of Terms & Conditions o Living Wage Contract Addendum o Primary/Subcontractor Agreement Certificate o Best Bid Criteria, if applicable
• Signed Contract by the Vendor*
• Tax Exemption Certificate*
• Bid Guaranty (bid bond or certified check / cashier's check on a solvent bank)
• Line Items**
*Located on PlanetBids in the "Documents" tab **Located on PlanetBids in the “Line Items” tab
Bid Guaranty requirements are located on the “Bid Information” tab on PlanetBids. The bid guaranty shall be in the form of a cashier’s check/official check on a solvent bank or a bid bond. If using a check as the bid guaranty, the check must be scanned and uploaded with your bid. In addition, the check must be received by the Division of Purchases and Supplies no later than the due date and time to be deemed responsive.
No Company / No Personal checks will be accepted. Checks shall be made payable to “City of Toledo.” If your company is using a bid bond, scan and upload with bid; the original does not need to be received by the City of Toledo. If your company does not
NB-7
provide a bid guaranty, your bid submittal will be deemed non-responsive. (TMC 187.09)
City of Toledo Division of Purchases and Supplies One Government Center, Suite 2000 640 Jackson Street Toledo, OH 43604
PREVAILING WAGE THRESHOLD LEVELS
IMPORTANT NOTICE
Before advertising for bids, contracting, or undertaking construction with its own forces, to construct a public improvement, the Public Authority shall have the Ohio Department of Commerce-Division of Industrial Compliance, Bureau of Wage and Hour Administration determine the prevailing rates of wages for workers employed on the public improvement. The wage determination must be included in the project specifications and printed on the bidding blanks where work is done by contract.
“New” construction threshold for Building Construction: $250,000
“Reconstruction, enlargement, alteration, repair, remodeling, renovation, or painting” threshold level for Building Construction:
$75,000
As of January 1, 2026:
“New” construction that involves roads, streets, alleys, sewers, ditches and other works connected to road or bridge construction threshold level has been adjusted to:
$101,201
“Reconstruction, enlargement, alteration, repair, remodeling, renovation, or painting” that involves roads, streets, alleys, sewers, ditches and other works connected to road or bridge construction threshold level has been adjusted to:
$30,320
A) Thresholds are to be adjusted biennially by the Director of the Ohio Department of Commerce.
B) Biennial adjustments to threshold levels are made according to the Building Cost for Skilled Labor Index published by McGraw-Hill’s Engineering News-Record, but may not increase or decrease more than 3% for any year.
If there are questions concerning this notification, please contact:
Bureau of Wage and Hour Administration
6606 Tussing Road, PO Box 4009 Reynoldsburg, Ohio 43068-9009
Phone: 614-644-2239 Fax: 614-728-8639 www.com.ohio.gov
W-1
WR-2
Updated 10\12\22
Prevailing Wage Determination Cover Letter
County:
Determination Date:
Expiration Date:
THE FOLLOWING PAGES ARE PREVAILING RATES OF WAGES ON PUBLIC IMPROVEMENTS
FAIRLY ESTIMATED TO BE MORE THAN THE AMOUNT IN O.R.C. SEC. 4115.03 (b) (1) or (2), AS
APPLICABLE.
Section 4115.05 provides, in part: “Where contracts are not awarded or construction undertaken within ninety days from the date of the establishment of the prevailing wages, there shall be a redetermination of the prevailing rate of wages before the contract is awarded.” The expiration date of this wage schedule is listed above for your convenience only. This wage determination is not intended as a blanket determination to be used for all projects during this period without prior approval of this Department.
Section 4115.04, Ohio Revised Code provides, in part: “Such schedule of wages shall be attached to and made a part of the specifications for the work, and shall be printed on the bidding blanks where the work is done by contract...”
The contract between the letting authority and the successful bidder shall contain a statement requiring that mechanics and laborers be paid a prevailing rate of wage as required in Section 4115.06, Ohio Revised Code.
The contractor or subcontractor is required to file with the contracting public authority upon completion of the project and prior to final payment therefore an affidavit stating that he has fully complied with Chapter 4115 of the Ohio Revised Code.
The wage rates contained in this schedule are the “Prevailing Wages” as defined by Section 4115.03, Ohio Revised Code (the basic hourly rates plus certain fringe benefits). These rates and fringes shall be a minimum to be paid under a contract regulated by Chapter 4115 of the Ohio Revised Code by contractors and subcontractors. The prevailing wage rates contained in this schedule include the effective dates and wage rates currently on file. In cases where future effective dates are not included in this schedule, modifications to the wage schedule will be furnished to the Prevailing Wage Coordinator appointed by the public authority as soon as prevailing wage rates increases are received by this office.
“There shall be posted in a prominent and accessible place on the site of work a legible statement of the Schedule of Wage Rates specified in the contract to the various classifications of laborers, workmen, and mechanics employed, said statement to remain posted during the life of such contract.” Section 4115.07, Ohio Revised Code.
Apprentices will be permitted to work only under a bona fide apprenticeship program if such program exists and if such program is registered with the Ohio Apprenticeship Council.
Section 4115.071 provides that no later than ten days before the first payment of wages is due to any employee of any contractor or subcontractor working on a contract regulated by Chapter 4115, Ohio Revised Code, the contracting public authority shall appoint one of his own employees to act as the prevailing wage coordinator for said contract. The duties of the prevailing wage coordinator are outlined in Section 4115.071 of the Ohio Revised Code.
Lucas
WR-3
Updated 10\12\22
Section 4115.05 provides for an escalator in the prevailing wage rate. Each time a new rate is established, that rate is required to be paid on all ongoing public improvement projects.
A further requirement of Section 4115.05 of the Ohio Revised Code is: “On the occasion of the first pay date under a contract, the contractor shall furnish each employee not covered by a collective bargaining agreement or understanding between employers and bona fide organizations of Labor with individual written notification of the job classification to which the employee is assigned, the prevailing wage determined to be applicable to that classification, separated into the hourly rate of pay and the fringe payments, and the identity of the prevailing wage Coordinator appointed by the public authority. The contractor or subcontractor shall furnish the same notification to each affected employee every time the job classification of the employee is changed.”
Work performed in connection with the installation of modular furniture may be subject to prevailing wage.
THIS PACKET IS NOT TO BE SEPARATED BUT IS TO REMAIN COMPLETE AS IT IS SUBMITTED
TO YOU. (Reference guidelines and forms are included in this packet to be helpful in the compliance of the Prevailing Wage law.)
wh1500
Prevailing Wage Rate Skilled Crafts
Name of Union: Bricklayer Local 23 (Fremont Cement Mason)
Type of Rate: Commercial
Change #:
LCN01-2024ib
Craft:
Bricklayer
Effective Date:
6/5/2024
Effective Date:
6/5/2024
Fringe Benefit Payments Irrevocable FundBHR
H&W Pension App Tr. Vac. Annuity Other LECET (*) MISC (*)
Total
PWR
Overtime Rate
Classification
Bricklayer Cement Mason
$36.53 $10.00 $11.69 $0.81 $0.00 $1.53 $0.00 $0.00 $0.00 $60.56 $78.83
Plaster $36.53 $10.00 $11.69 $0.81 $0.00 $1.53 $0.00 $0.00 $0.00 $60.56 $78.83
Cement Mason Verticle
Slip Work from base of 50 ft
$38.03 $10.00 $11.69 $0.81 $0.00 $1.53 $0.00 $0.00 $0.00 $62.06 $81.08
Cement Mason Verticle
Slip work
ABOVE
50 ft
$54.80 $10.00 $11.69 $0.81 $0.00 $1.53 $0.00 $0.00 $0.00 $78.83 $106.23
Masonry Maintenan ce Specialist
$18.27 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $18.27 $27.41
Apprentice BHR Percent
1st 6 Months $21.92 $60.00 $10.00 $11.69 $0.81 $0.00 $1.53 $0.00 $0.00 $0.00 $45.95 $56.91
2nd 6 Months $23.74 $65.00 $10.00 $11.69 $0.81 $0.00 $1.53 $0.00 $0.00 $0.00 $47.77 $59.65
3rd 6 Months $25.57 $70.00 $10.00 $11.69 $0.81 $0.00 $1.53 $0.00 $0.00 $0.00 $49.60 $62.39
4th 6 Months $27.40 $75.00 $10.00 $11.69 $0.81 $0.00 $1.53 $0.00 $0.00 $0.00 $51.43 $65.13
5th 6 Months $29.22 $80.00 $10.00 $11.69 $0.81 $0.00 $1.53 $0.00 $0.00 $0.00 $53.25 $67.87
6th 6 Months $31.05 $85.00 $10.00 $11.69 $0.81 $0.00 $1.53 $0.00 $0.00 $0.00 $55.08 $70.61
7th 6 Months $32.88 $90.00 $10.00 $11.69 $0.81 $0.00 $1.53 $0.00 $0.00 $0.00 $56.91 $73.35
8th 6 Months $34.70 $95.00 $10.00 $11.69 $0.81 $0.00 $1.53 $0.00 $0.00 $0.00 $58.73 $76.09
Mason Trainee
1-90 Days $21.92 $60.00 $0.00 $0.00 $0.00 $0.00 $1.53 $0.00 $0.00 $0.00 $23.45 $34.41
91-365 Days $21.92 $60.00 $10.00 $0.00 $0.00 $0.00 $1.53 $0.00 $0.00 $0.00 $33.45 $44.41
2nd Year $25.57 $70.00 $10.00 $0.00 $0.00 $0.00 $1.53 $0.00 $0.00 $0.00 $37.10 $49.89
(*)Special Calculation Note :
Classification title contains "Bricklayer" because contract originates within the Bricklayer Local. Note that the classification description is clarified after the local union number at the top of the page.
Ratio :
1-2 Journeyman to 1 Apprentice 3-4 Journeyman to 2 Apprentice 5-6 Journeyman to 2 Apprentice 6-10 Journeyman to 3 Apprentice Apprentice must be hired prior to hiring Mason Trainees Mason Trainee Ratio 1 Apprentice permits 1 Mason Trainee 2 Apprentice permits 1 Mason Trainee 3 Apprentice permits 2 Mason Trainee 4 Apprentice permits 2 Mason Trainee.
Jurisdiction ( * denotes special jurisdictional note ) :
Defiance, Erie*, Fulton, Hancock, Henry, Huron, Lucas, Ottawa, Paulding, Putnam, Sandusky*, Seneca, Williams, Wood
Special Jurisdictional Note :
The Islands of Lake Erie north of Sandusky.
Details :
Name of Union: Bricklayer Local 23 (Toledo Tile Setters & Finishers)
Type of Rate: Commercial
Change #:
LCN01-2026ib
Craft:
Bricklayer
Effective Date:
7/1/2026
Effective Date:
7/1/2026
Fringe Benefit Payments Irrevocable FundBHR
H&W Pension App Tr. Vac. Annuity Other LECET (*) MISC (*)
Total
PWR
Overtime Rate
Classification
Bricklayer Tile Setter $38.19 $11.53 $9.88 $0.86 $0.00 $0.00 $0.00 $0.00 $0.00 $60.46 $79.55
Terrazzo Worker $38.19 $11.53 $9.88 $0.86 $0.00 $0.00 $0.00 $0.00 $0.00 $60.46 $79.55
Mosaic Worker $38.19 $11.53 $9.88 $0.86 $0.00 $0.00 $0.00 $0.00 $0.00 $60.46 $79.55
Tile Assistant Finishers
1st Year $25.11 $11.53 $2.61 $0.76 $0.00 $0.00 $0.00 $0.00 $0.00 $40.01 $52.56
2nd Year $30.35 $11.53 $2.61 $0.76 $0.00 $0.00 $0.00 $0.00 $0.00 $45.25 $60.43
3rd Year $35.58 $11.53 $2.61 $0.76 $0.00 $0.00 $0.00 $0.00 $0.00 $50.48 $68.27
Apprentice BHR Percent
1st 6 months $22.91 $60.00 $11.53 $9.88 $0.86 $0.00 $0.00 $0.00 $0.00 $0.00 $45.18 $56.64
2nd 6 months $24.82 $65.00 $11.53 $9.88 $0.86 $0.00 $0.00 $0.00 $0.00 $0.00 $47.09 $59.50
3rd 6 months $26.73 $70.00 $11.53 $9.88 $0.86 $0.00 $0.00 $0.00 $0.00 $0.00 $49.00 $62.36
4th 6 months $28.64 $75.00 $11.53 $9.88 $0.86 $0.00 $0.00 $0.00 $0.00 $0.00 $50.91 $65.23
5th 6 months $30.55 $80.00 $11.53 $9.88 $0.86 $0.00 $0.00 $0.00 $0.00 $0.00 $52.82 $68.09
6th 6 months $32.46 $85.00 $11.53 $9.88 $0.86 $0.00 $0.00 $0.00 $0.00 $0.00 $54.73 $70.96
7th 6 months $34.37 $90.00 $11.53 $9.88 $0.86 $0.00 $0.00 $0.00 $0.00 $0.00 $56.64 $73.82
8th 6 months $36.28 $95.00 $11.53 $9.88 $0.86 $0.00 $0.00 $0.00 $0.00 $0.00 $58.55 $76.69
(*)Special Calculation Note :
Boatswain Chair and Swing Stage shall be one dollar ($1.00) above journeyman rate. Radial Smoke Stack shall be fifty cents ($.50) above journeyman rate.
Ratio :
3 Journeyman to 1 Apprentice 8 Journeyman to 2 Apprentices 13 Journeyman to 3 Apprentices 18 Journeyman to 4 Apprentices
Jurisdiction ( * denotes special jurisdictional note ) :
Defiance, Fulton, Henry, Lucas, Paulding, Putnam, Williams, Wood
Special Jurisdictional Note :
Name of Union: Bricklayer Local 23 (Toledo Zone 1)
Type of Rate: Commercial
Change #:
LCN01-2026ib
Craft:
Bricklayer
Effective Date:
7/1/2026
Effective Date:
7/1/2026
Fringe Benefit Payments Irrevocable FundBHR
H&W Pension App Tr. Vac. Annuity Other LECET (*) MISC (*)
Total
PWR
Overtime Rate
Classification
Bricklayer $38.25 $12.23 $11.90 $0.91 $0.00 $2.00 $0.00 $0.00 $0.00 $65.29 $84.42
Stone Mason/ Pointer Caulker Cleaner/ Refractory
Worker
$38.25 $12.23 $11.90 $0.91 $0.00 $2.00 $0.00 $0.00 $0.00 $65.29 $84.42
Apprentice BHR Percent
1st 6 months $22.95 $60.00 $12.23 $11.90 $0.91 $0.00 $2.00 $0.00 $0.00 $0.00 $49.99 $61.47
2nd 6 months $24.86 $65.00 $12.23 $11.90 $0.91 $0.00 $2.00 $0.00 $0.00 $0.00 $51.90 $64.33
3rd 6 months $26.77 $70.00 $12.23 $11.90 $0.91 $0.00 $2.00 $0.00 $0.00 $0.00 $53.81 $67.20
4th 6 months $28.69 $75.00 $12.23 $11.90 $0.91 $0.00 $2.00 $0.00 $0.00 $0.00 $55.73 $70.08
5th 6 months $30.60 $80.00 $12.23 $11.90 $0.91 $0.00 $2.00 $0.00 $0.00 $0.00 $57.64 $72.94
6th 6 months $32.51 $85.00 $12.23 $11.90 $0.91 $0.00 $2.00 $0.00 $0.00 $0.00 $59.55 $75.81
7th 6 months $34.43 $90.00 $12.23 $11.90 $0.91 $0.00 $2.00 $0.00 $0.00 $0.00 $61.47 $78.69
8th 6 months $36.34 $95.00 $12.23 $11.90 $0.91 $0.00 $2.00 $0.00 $0.00 $0.00 $63.38 $81.55
Mason Trainee
1-90 Days $17.21 $45.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $17.21 $25.82
Mason Trainee 90-365
Days
$17.21 $45.00 $12.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $29.44 $38.05
Mason Trainee 2nd Year
$19.13 $50.00 $12.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $31.36 $40.92
Ratio :
1 Journeyman to 1 Apprentice 2-6 Journeyman to 2 Apprentices 7-12 Journeyman to 3 Apprentices 13-18 Journeyman to 4 Apprentices
MASON TRAINEE
1 Apprentice permits 1 Mason Trainee 2 Apprentices permits 1 Mason Trainee 3 Apprentices permits 2 Mason Trainee Apprentices permits 2 Mason Trainee
Jurisdiction ( * denotes special jurisdictional note ) :
Fulton, Henry, Lucas, Wood*
Special Jurisdictional Note :
In Wood County, the following townships are EXCLUDED: Bloom and Perry
Details :
BAT Registered Apprentices must be employed prior to hiring Mason Finisher (s). IMPROVERS ARE IN AN APPROVED APPRENTICESHIP PROGRAM. Under no condition may a Mason Finisher work on a job site unless a registered apprentice is on the job site.
Name of Union: Bricklayer Local 23 Heavy Hwy (A)
Type of Rate: Commercial
Change #:
LCN02-2026ib
Craft:
Bricklayer
Effective Date:
6/10/2026
Effective Date:
6/10/2026
Fringe Benefit Payments Irrevocable FundBHR
H&W Pension App Tr. Vac. Annuity Other LECET (*) MISC (*)
Total
PWR
Overtime Rate
Classification
Cement Mason
Bricklayer Sewer Water
Works A
$35.31 $10.71 $10.14 $0.59 $0.00 $1.80 $0.00 $0.00 $0.00 $58.55 $76.21
Apprentice BHR Percent
1st year $24.72 $70.00 $10.71 $10.14 $0.59 $0.00 $1.80 $0.00 $0.00 $0.00 $47.96 $60.32
2nd year $28.25 $80.00 $10.71 $10.14 $0.59 $0.00 $1.80 $0.00 $0.00 $0.00 $51.49 $65.62
3rd year $31.78 $90.00 $10.71 $10.14 $0.59 $0.00 $1.80 $0.00 $0.00 $0.00 $55.02 $70.91
(*)Special Calculation Note :
This rate is not for building construction.
This rate applies only to the Cement Masons. All other Bricklaying, PCC, Stone, Tile, Marble, Refractory, Industrial and all other applicable work performed will be performed under the applicable rates for those contracts.
Ratio :
3 Journeymen to 1 Apprentice 6 Journeymen to 2 Apprentice 9 Journeymen to 3 Apprentice 12 Journeymen to 4 Apprentice 15 Journeymen to 5 Apprentice
Jurisdiction ( * denotes special jurisdictional note ) :
Adams, Allen, Ashland, Ashtabula, Athens, Auglaize, Belmont, Brown, Butler, Carroll, Champaign, Clark, Clermont, Clinton, Columbiana, Coshocton, Crawford, Cuyahoga, Darke, Defiance, Delaware, Erie, Fairfield, Fayette, Franklin, Fulton, Gallia, Geauga, Greene, Guernsey, Hamilton, Hancock, Hardin, Harrison, Henry, Highland, Hocking, Holmes, Huron, Jackson, Jefferson, Knox, Lake, Lawrence, Licking, Logan, Lorain, Lucas, Madison, Mahoning, Marion, Medina, Meigs, Mercer, Miami, Monroe, Montgomery, Morgan, Morrow, Muskingum, Noble, Ottawa, Paulding, Perry, Pickaway, Pike, Portage, Preble, Putnam, Richland, Ross, Sandusky, Scioto, Seneca, Shelby, Stark, Summit, Trumbull, Tuscarawas, Union, Van Wert, Vinton, Warren, Washington, Wayne
Bricklayer Local 23 Heavy Hwy (A): Highway Construction, Sewer, Waterworks And Utility Construction, Industrial & Building Site Heavy Construction, Airport Construction Or Railroad Construction Work.
Bricklayer Local 23 Heavy Hwy (B): Power Plant, Tunnels, Amusement Park, Athletic Stadium Site Work ,Pollution Control, Sewer Plant, Waste Plant, & Water Treatment Facilities, Construction.
Name of Union: Bricklayer Local 23 Heavy Hwy (B)
Type of Rate: Commercial
Change #:
LCN02-2026ib
Craft:
Bricklayer
Effective Date:
6/10/2026
Effective Date:
6/10/2026
Fringe Benefit Payments Irrevocable FundBHR
H&W Pension App Tr. Vac. Annuity Other LECET (*) MISC (*)
Total
PWR
Overtime Rate
Classification
Cement Mason
Bricklayer Power Plants
Tunnels Amuseme nt Parks B
$36.31 $10.71 $10.14 $0.60 $0.00 $1.80 $0.00 $0.00 $0.00 $59.56 $77.72
Apprentice BHR Percent
1st year $25.42 $70.00 $10.71 $10.14 $0.60 $0.00 $1.80 $0.00 $0.00 $0.00 $48.67 $61.38
2nd year $29.05 $80.00 $10.71 $10.14 $0.60 $0.00 $1.80 $0.00 $0.00 $0.00 $52.30 $66.83
3rd year $32.68 $90.00 $10.71 $10.14 $0.60 $0.00 $1.80 $0.00 $0.00 $0.00 $55.93 $72.27
(*)Special Calculation Note :
This rate is not for building construction.
This rate applies only to the Cement Masons. All other Bricklaying, PCC, Stone, Tile, Marble, Refractory, Industrial and all other applicable work performed will be performed under the applicable rates for those contracts.
Ratio :
3 Journeymen to 1 Apprentice 6 Journeymen to 2 Apprentice 9 Journeymen to 3 Apprentice 12 Journeymen to 4 Apprentice 15 Journeymen to 5 Apprentice
Jurisdiction ( * denotes special jurisdictional note ) :
Adams, Allen, Ashland, Ashtabula, Athens, Auglaize, Belmont, Brown, Butler, Carroll, Champaign, Clark, Clermont, Clinton, Columbiana, Coshocton, Crawford, Cuyahoga, Darke, Defiance, Delaware, Erie, Fairfield, Fayette, Franklin, Fulton, Gallia, Geauga, Greene, Guernsey, Hamilton, Hancock, Hardin, Harrison, Henry, Highland, Hocking, Holmes, Huron, Jackson, Jefferson, Knox, Lake, Lawrence, Licking, Logan, Lorain, Lucas, Madison, Mahoning, Marion, Medina, Meigs, Mercer, Miami, Monroe, Montgomery, Morgan, Morrow, Muskingum, Noble, Ottawa, Paulding, Perry, Pickaway, Pike, Portage, Preble, Putnam, Richland, Ross, Sandusky, Scioto, Seneca, Shelby, Stark, Summit, Trumbull, Tuscarawas, Union, Van Wert, Vinton, Warren, Washington, Wayne
Bricklayer Local 23 Heavy Hwy (A): Highway Construction, Sewer, Waterworks And Utility Construction, Industrial & Building Site Heavy Construction, Airport Construction Or Railroad Construction Work.
Bricklayer Local 23 Heavy Hwy (B): Power Plant, Tunnels, Amusement Park, Athletic Stadium Site Work ,Pollution Control, Sewer Plant, Waste Plant, & Water Treatment Facilities, Construction.
Name of Union: Carpenter Hev Hwy Zone 1-WAHH
Type of Rate: Commercial
Change #:
LCN01-2026ib
Craft:
Carpenter
Effective Date:
5/6/2026
Effective Date:
5/6/2026
Fringe Benefit Payments Irrevocable FundBHR
H&W Pension App Tr. Vac. Annuity Other LECET (*) MISC (*)
Total
PWR
Overtime Rate
Classification
Carpenter $36.48 $9.64 $12.13 $0.97 $0.00 $5.99 $0.00 $0.00 $0.00 $65.21 $83.45
Apprentice BHR Percent
1st 6 Months $21.89 $60.00 $9.64 $0.00 $0.97 $0.00 $0.00 $0.00 $0.00 $0.00 $32.50 $43.45
2nd 6 Months $21.89 $60.00 $9.64 $12.13 $0.97 $0.00 $5.99 $0.00 $0.00 $0.00 $50.62 $61.57
3rd 6 Months $23.71 $65.00 $9.64 $12.13 $0.97 $0.00 $5.99 $0.00 $0.00 $0.00 $52.44 $64.30
4th 6 Months $27.36 $75.00 $9.64 $12.13 $0.97 $0.00 $5.99 $0.00 $0.00 $0.00 $56.09 $69.77
5th 6 Months $29.18 $80.00 $9.64 $12.13 $0.97 $0.00 $5.99 $0.00 $0.00 $0.00 $57.91 $72.50
6th 6 Months $31.01 $85.00 $9.64 $12.13 $0.97 $0.00 $5.99 $0.00 $0.00 $0.00 $59.74 $75.25
7th 6 Months $32.83 $90.00 $9.64 $12.13 $0.97 $0.00 $5.99 $0.00 $0.00 $0.00 $61.56 $77.97
8th 6 Months $34.66 $95.00 $9.64 $12.13 $0.97 $0.00 $5.99 $0.00 $0.00 $0.00 $63.39 $80.72
(*)Special Calculation Note :
Ratio :
1 Journeymen to 1 Apprentice
Jurisdiction ( * denotes special jurisdictional note ) :
Lucas, Wood
Any construction work as performed within the definitions listed here below, all of which, taken together are “Heavy-Highway Construction” work:
“HIGHWAY CONSTRUCTION” work is defined as work performed to provide a facility to accommodate vehicular or pedestrian traffic and includes, but is not limited to, the construction of all streets, roads, expressways, turnpikes, bridges, drainage structures, grade separations, parking lots, rest areas, alleys, sidewalks, guardrails, fences, and sound barriers, but shall not include construction of buildings.
“AIRPORT CONSTRUCTION” work is defined as including site preparation, grading, paving, drainage, fences, sidewalks, driveways, parking areas and similar work incidental to the construction of airfields but shall not include the construction of buildings.
“HEAVY CONSTRUCTION” work is defined as including, but not limited to grade separations, foundations (does not include building foundations), abutments, retaining walls, shafts, tunnels, subways, elevators, drainage projects, flood control projects, reclamation projects, reservoirs, water supply projects, water development projects, hydro-electric development, utility transmission lines, including right-of-way clearing, locks, dams, dikes, levees, revetments, channels, channel cutoffs, intakes, dredging projects, jetties, breakwater, docks, harbors; and all municipal and utility construction except construction classified as building construction.
“RAILROAD CONSTRUCTION” work is defined as including, grading, drainage, placing of rails, crossties, ballast and the construction of bridges, and other incidentals for railroads, street railways construction projects and rapid transit system projects, but shall not include the construction of buildings.
“SEWER WATERWORKS AND UTILITY CONSTRUCTION” work is defined as including construction of all storm sewers, sanitary sewers, supplying and distributing waterlines, gas lines, telephone and television conduit, underground electrical lines, and similar utility construction. Main waterline and trunk sewers connecting water works and/or sewage disposal plants are included within this definition.
”SUPPORIVE EXCAVATION AND DEEP FOUNDATIONS” work is all driven and drilled foundations within the building site.
“POWER PLANT SITE” work is defined as all work which is inside the property line, but outside the actual building construction. Such work shall include, but is not limited to, the grading and installation of sewer lines, drainage lines, gas lines, telephone and television conduit, underground electrical lines and similar utility construction, parking lots, bridges, roads, streets, sidewalks, reservoirs, ash pits, storage tanks, ramps and other such construction work performed on the work site, but shall not include the actual excavation for the buildings, foundations or footers or construction of the buildings.
“POLLUTION CONTROL, SEWAGE PLANT, WASTE PLANT AND WATER TREATMENT FACILITIES
CONSTRUCTION” WORK shall be all work in construction of pumping stations, waste and sewage disposal plants, incinerator plants, water treatment plants, filtration plants, solid waste disposal and similar pollution control facilities.
“SOLAR & WIND FARM” WORK is considered “HEAVY CONSTRUCTION” and includes all work in the construction of solar fields/farms and wind fields/farms (not installations on buildings).
Name of Union: Carpenter Zone I North
Type of Rate: Commercial
Change #:
LCN01-2026ib
Craft:
Carpenter
Effective Date:
5/6/2026
Effective Date:
5/6/2026
Fringe Benefit Payments Irrevocable FundBHR
H&W Pension App Tr. Vac. Annuity Other LECET (*) MISC (*)
Total
PWR
Overtime Rate
Classification
Carpenter $37.22 $9.69 $12.13 $0.97 $0.00 $6.15 $0.00 $0.00 $0.00 $66.16 $84.77
Apprentice BHR Percent
1st 6 Months $26.05 $70.00 $9.69 $12.13 $0.97 $0.00 $6.15 $0.00 $0.00 $0.00 $54.99 $68.02
2nd 6 Months $26.05 $70.00 $9.69 $12.13 $0.97 $0.00 $6.15 $0.00 $0.00 $0.00 $54.99 $68.02
3rd 6 Months $29.78 $80.00 $9.69 $12.13 $0.97 $0.00 $6.15 $0.00 $0.00 $0.00 $58.72 $73.61
4th 6 Months $29.78 $80.00 $9.69 $12.13 $0.97 $0.00 $6.15 $0.00 $0.00 $0.00 $58.72 $73.61
5th 6 Months $33.50 $90.00 $9.69 $12.13 $0.97 $0.00 $6.15 $0.00 $0.00 $0.00 $62.44 $79.19
6th 6 Months $33.50 $90.00 $9.69 $12.13 $0.97 $0.00 $6.15 $0.00 $0.00 $0.00 $62.44 $79.19
7th 6 Months $35.36 $95.00 $9.69 $12.13 $0.97 $0.00 $6.15 $0.00 $0.00 $0.00 $64.30 $81.98
8th 6 Months $35.36 $95.00 $9.69 $12.13 $0.97 $0.00 $6.15 $0.00 $0.00 $0.00 $64.30 $81.98
(*)Special Calculation Note :
Special Work Rates: 40-100 foot free fall - $ .50 per hour above scale Over 100 foot free fall - $1.00 per hour above scale
Ratio :
3 Journeymen to 1 Apprentice
Jurisdiction ( * denotes special jurisdictional note ) :
Allen*, Lucas, Ottawa*, Wood
Special Jurisdictional Note :
- 5501 Ohio State Route 2, Oak Harbor, Ottawa County, Ohio commonly known as "Davis Besse." -The parcels bound by railroad tracks to the north, S. Metcalf Street to the east, railroad tracks to Buckeye Road to the south and Ft.
Amanda Road to the west, located in Lima, Allen County, Ohio 45804, commonly known as the "Cenovus Lima Refinery Site", the "Ineos Site" and the ''Nutrien Lima Nitrogen Site." -3875 Reservoir Road, Lima, Allen County, Ohio 45801, commonly known as the "Procter & Gamble Lima Plant."
Name of Union: Cement Mason Local 886 (Toledo)
Type of Rate: Commercial
Change #:
LCN01-2026ib
Craft:
Cement Mason
Effective Date:
7/1/2026
Effective Date:
7/1/2026
Fringe Benefit Payments Irrevocable FundBHR
H&W Pension App Tr. Vac. Annuity Other LECET (*) MISC (*)
Total
PWR
Overtime Rate
Classification
Cement Mason $38.64 $10.20 $9.90 $0.92 $0.00 $5.28 $0.00 $0.00 $0.00 $64.94 $84.26
Apprentice BHR Percent
1st Year $27.05 $70.00 $10.20 $9.90 $0.92 $0.00 $5.28 $0.00 $0.00 $0.00 $53.35 $66.88
2nd Year $30.91 $80.00 $10.20 $9.90 $0.92 $0.00 $5.28 $0.00 $0.00 $0.00 $57.21 $72.67
3rd Year $34.78 $90.02 $10.20 $9.90 $0.92 $0.00 $5.28 $0.00 $0.00 $0.00 $61.08 $78.47
(*)Special Calculation Note :
Ratio :
5 Journeymen to 1 Apprentice
Jurisdiction ( * denotes special jurisdictional note ) :
Defiance, Erie, Fulton, Hancock, Henry, Huron, Lucas, Ottawa, Paulding, Putnam, Sandusky, Seneca, Williams, Wood
Name of Union: Cement Mason Local 886 Hev Hwy
Type of Rate: Commercial
Change #:
LCN01-2026ib
Craft:
Cement Mason
Effective Date:
5/1/2026
Effective Date:
5/1/2026
Fringe Benefit Payments Irrevocable FundBHR
H&W Pension App Tr. Vac. Annuity Other LECET (*) MISC (*)
Total
PWR
Overtime Rate
Classification
Cement Mason $37.74 $9.30 $8.35 $1.14 $0.00 $2.80 $0.08 $0.00 $0.00 $59.41 $78.28
Apprentice BHR Percent
1st Year $26.42 $70.00 $9.30 $8.35 $1.14 $0.00 $2.80 $0.08 $0.00 $0.00 $48.09 $61.30
2nd Year $30.19 $80.00 $9.30 $8.35 $1.14 $0.00 $2.80 $0.08 $0.00 $0.00 $51.86 $66.95
3rd Year $33.97 $90.00 $9.30 $8.35 $1.14 $0.00 $2.80 $0.08 $0.00 $0.00 $55.64 $72.63
(*)Special Calculation Note :
Other: International Training Fund
Ratio :
1 Journeyman to 1 Apprentice 2 Journeymen to 1 Apprentice thereafter
Jurisdiction ( * denotes special jurisdictional note ) :
Allen, Auglaize, Defiance, Erie, Fulton, Hancock, Hardin, Henry, Huron, Logan, Lucas, Mercer, Ottawa, Paulding, Putnam, Sandusky, Seneca, Van Wert, Williams, Wood
Special Jurisdictional Note :
Details :
Highway Construction, Sewer, Waterworks And Utility Construction, Industrial & Building Site, Heavy Construction, Airport Construction Or Railroad Construction Work, Power Plant, Tunnels, Amusement Park, Athletic Stadium Site Work, Pollution Control, Sewer Plant, Waste & Water Plant, Water Treatment Facilities Construction.
Name of Union: Electrical Local 245 Outside Toledo Chapter
Type of Rate: Commercial
Change #:
LCN02-2026ib
Craft:
Electrical
Effective Date:
9/2/2026
Effective Date:
9/2/2026
Fringe Benefit Payments Irrevocable FundBHR
H&W Pension App Tr. Vac. Annuity Other LECET (*) MISC (*)
Total
PWR
Overtime Rate
Classification
Electrical Lineman $50.54 $7.50 $1.52 $0.51 $0.00 $12.64 $0.00 $0.00 $0.00 $72.71 $97.98
Traffic Signal & Lighting
Journeym an
$45.49 $7.50 $1.36 $0.45 $0.00 $11.37 $0.00 $0.00 $0.00 $66.17 $88.91
Operator I $40.43 $7.50 $1.21 $0.40 $0.00 $10.11 $0.00 $0.00 $0.00 $59.65 $79.86
Operator II $35.38 $7.50 $1.06 $0.35 $0.00 $8.85 $0.00 $0.00 $0.00 $53.14 $70.83
Groundma n / Truck Driver 12 Months &
Over
$30.22 $7.50 $0.91 $0.30 $0.00 $7.56 $0.00 $0.00 $0.00 $46.49 $61.60
Groundma n / Truck
Driver 6-12
Months
$25.40 $7.50 $0.76 $0.25 $0.00 $6.35 $0.00 $0.00 $0.00 $40.26 $52.96
Groundma n / Truck Driver 0- 6
Months
$22.11 $7.50 $0.66 $0.22 $0.00 $5.53 $0.00 $0.00 $0.00 $36.02 $47.08
TRAFFIC
SIGNAL
LIGHTING
APPRENT
ICE
1st 6 mos $27.29 $7.50 $0.82 $0.27 $0.00 $6.82 $0.00 $0.00 $0.00 $42.70 $56.34
2nd 6 mos $29.57 $7.50 $0.89 $0.30 $0.00 $7.39 $0.00 $0.00 $0.00 $45.65 $60.44
3rd 6 mos $31.84 $7.50 $0.96 $0.32 $0.00 $7.96 $0.00 $0.00 $0.00 $48.58 $64.50
4th 6 mos $34.12 $7.50 $1.02 $0.34 $0.00 $8.53 $0.00 $0.00 $0.00 $51.51 $68.57
5th 6 mos $36.39 $7.50 $1.09 $0.36 $0.00 $9.10 $0.00 $0.00 $0.00 $54.44 $72.63
6th 6 mos $40.94 $7.50 $1.23 $0.41 $0.00 $10.24 $0.00 $0.00 $0.00 $60.32 $80.79
Apprentice BHR Percent
1st 6 Month $30.32 $60.00 $7.50 $0.91 $0.30 $0.00 $7.58 $0.00 $0.00 $0.00 $46.61 $61.77
2nd 6 Month $32.85 $65.00 $7.50 $0.99 $0.33 $0.00 $8.21 $0.00 $0.00 $0.00 $49.88 $66.31
3rd 6 Month $35.38 $70.00 $7.50 $1.06 $0.35 $0.00 $8.85 $0.00 $0.00 $0.00 $53.14 $70.83
4th 6 Month $37.91 $75.00 $7.50 $1.14 $0.38 $0.00 $9.48 $0.00 $0.00 $0.00 $56.41 $75.36
5th 6 Month $40.43 $80.00 $7.50 $1.21 $0.40 $0.00 $10.11 $0.00 $0.00 $0.00 $59.65 $79.86
6th 6 Month $42.96 $85.00 $7.50 $1.29 $0.43 $0.00 $10.74 $0.00 $0.00 $0.00 $62.92 $84.40
7th 6 Month $45.49 $90.00 $7.50 $1.36 $0.45 $0.00 $11.37 $0.00 $0.00 $0.00 $66.17 $88.91
(*)Special Calculation Note :
Ratio :
1 Journeyman to 1 Apprentice
Jurisdiction ( * denotes special jurisdictional note ) :
Defiance, Fulton, Hancock, Henry, Lucas, Ottawa, Paulding, Putnam, Sandusky, Seneca, Williams, Wood, Wyandot
Special Jurisdictional Note :
Details :
A groundman when directed shall assist a Journeymen in the performance of his/her work on the ground, including the use of hand tools.
A Groundmen, under no circumstances , shall this classification climb poles, towers, ladders, or work from an elevated platform or bucket truck.
Heli - Arc Welding will be paid $.30 above Journeyman rate.
Additional compensation of 10% over the Journeyman Lineman and Journeyman Technician for performing work on structures outside of buildings such as water towers, smoke stacks, radio and television towers, more than 75' above the ground. This clause does not apply to pole line work, substation structures, transmission towers, etc.
Name of Union: Electrical Local 245 Outside Utility Power
Type of Rate: Commercial
Change #:
LCN01-2026ib
Craft:
Electrical
Effective Date:
1/21/2026
Effective Date:
1/21/2026
Fringe Benefit Payments Irrevocable FundBHR
H&W Pension App Tr. Vac. Annuity Other LECET (*) MISC (*)
Total
PWR
Overtime Rate
Classification
Electrical Lineman $52.03 $7.50 $1.56 $0.52 $0.00 $12.49 $0.00 $0.00 $0.00 $74.10 $100.12
Substation Technicia n $52.03 $7.50 $1.56 $0.52 $0.00 $12.49 $0.00 $0.00 $0.00 $74.10 $100.12
Cable Splicer $54.50 $7.50 $1.64 $0.55 $0.00 $13.08 $0.00 $0.00 $0.00 $77.27 $104.52
Equipment Mechanic
C $33.00 $7.50 $0.99 $0.33 $0.00 $7.92 $0.00 $0.00 $0.00 $49.74 $66.24
Equipment Mechanic
B $37.09 $7.50 $1.11 $0.37 $0.00 $8.90 $0.00 $0.00 $0.00 $54.97 $73.52
Equipment Mechanic
A $41.17 $7.50 $1.24 $0.41 $0.00 $9.88 $0.00 $0.00 $0.00 $60.20 $80.78
Equipment Operator
C $33.00 $7.50 $0.99 $0.33 $0.00 $7.92 $0.00 $0.00 $0.00 $49.74 $66.24
Equipment Operator
B $41.17 $7.50 $1.24 $0.41 $0.00 $9.88 $0.00 $0.00 $0.00 $60.20 $80.78
Equipment Operator
A $46.61 $7.50 $1.40 $0.47 $0.00 $11.19 $0.00 $0.00 $0.00 $67.17 $90.47
Groundma n Truck
Driver 0 to 12 Months
$26.02 $7.50 $0.78 $0.26 $0.00 $6.24 $0.00 $0.00 $0.00 $40.80 $53.81
Groundma n Truck
Driver 0 to 12 Months with CDL
$28.62 $7.50 $0.86 $0.29 $0.00 $6.87 $0.00 $0.00 $0.00 $44.14 $58.45
Groundma n Truck Driver 1 Year or
More
$28.62 $7.50 $0.86 $0.29 $0.00 $6.87 $0.00 $0.00 $0.00 $44.14 $58.45
Groundma n Truck Driver 1 Year or
More with
CDL
$33.82 $7.50 $1.01 $0.34 $0.00 $8.12 $0.00 $0.00 $0.00 $50.79 $67.70
Apprentice BHR Percent
1st 6 Month $31.22 $60.00 $7.50 $0.94 $0.31 $0.00 $7.49 $0.00 $0.00 $0.00 $47.46 $63.07
2nd 6 Month $33.82 $65.00 $7.50 $1.01 $0.34 $0.00 $8.12 $0.00 $0.00 $0.00 $50.79 $67.70
3rd 6 Month $36.43 $70.01 $7.50 $1.09 $0.36 $0.00 $8.74 $0.00 $0.00 $0.00 $54.12 $72.33
4th 6 Month $39.02…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .