B-4829 Marine Maint Yard Plans.pdf
PDF 6 MB Posted
- Attached to
- R-7235 Marine Maintenance Yard Dock Replacement
- Solicitation number
- PW-24-457
- Issued by
- California
About this file
Marine Maintenance Yard Dock Replacement Project
This is a construction design and specification document prepared by Tetra Tech, Inc. for the City of Long Beach Department of Parks, Recreation and Marine, located at 205 N. Marina Drive, Long Beach, California 90803. The project involves the removal and replacement of dock infrastructure at the Marine Maintenance Yard located at 6204 E. 2nd Street, Long Beach 90803. Demolition work includes removal of two existing 14.5' × 59' concrete docks, a 4' × 34' steel gangway, gangway hinge, concrete staircase, and potable waterline to the point of connection. Construction work includes installation of one new 14.5' × 59' concrete dock (855.5 square feet), a 4' × 45' aluminum gangway, gangway hinge, concrete abutment, 3/4-inch copper potable waterline, and aluminum guardrail approximately 7.5 linear feet in length. The project design adheres to the 2022 editions of California Building, Fire, Electrical, Mechanical, and Plumbing Codes, as well as Title 18 of the Long Beach Municipal Code and Americans with Disabilities Act standards.
The design specifications require 5000 PSI minimum concrete (Type II/V) with post-tensioning, epoxy-coated reinforcement steel, and aluminum framing conforming to ASTM standards. The concrete dock must sustain a 100 PSF uniform live load with a maximum water-to-cement ratio of 0.4 and a minimum 3-inch reinforcement cover. The aluminum gangway must support 100 PSF distributed live load with deflection not exceeding L/120 of span and comply with ADA guidelines. Special inspections are required for concrete dock installation, epoxy anchor reinforcement, and concrete landing work. Deferred submittals include shop drawings and calculations for the concrete dock, gangway, gangway hinge, guardrail system, and pile guides, all requiring professional engineer certification. The contractor is responsible for all debris removal within 24 hours of project completion, implementation of marine best management practices, erosion control measures, and compliance with California Coastal Commission and United States Army Corps of Engineers special conditions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
PP
R O
VA
LS
N . M
A R
IN
A
D R
IV
E.
LO
N G
B
EA
C H
C
A
C
IT
Y O
F
LO
N G
B
EA
C H
D
EP
A
R
TM
EN
T
O F
PA
R
K S, R
EC
R
EA
TI
O
N A
N D
M A
R
IN
E
- M
A R
IN
E
B U
R
EA
U
TI
TL
E
SH
EE
T
TETRA TECH, INC.
ENGINEERS, PLANNERS, & ARCHITECTS
17885 VON KARMAN AVE #500,
IRVINE, CA 92614
(949) 809-5000
PROJECT DIRECTORY 1
DWG REF. SHT # TITLE
T-1 1 TITLE SHEET
G-1 2 GENERAL NOTES
G-1A 3 GENERAL NOTES
D-1 4 DEMOLITION PLAN
C-1 5 CONSTRUCTION PLAN
C-2 6 DOCK ELEVATION, SECTIONS AND DETAILS
C-3 7 GANGWAY AND ABUTMENT SECTIONS,
AND DETAILS
SHEET INDEX 2
THE WORK TO BE PERFORMED INCLUDES THE REMOVAL OF THE
EXISTING STEEL GANGWAY, GANGWAY HINGE, POTABLE
WATERLINE, CONCRETE STAIRCASE, AND TWO EXISTING
CONCRETE DOCKS. INSTALL A NEW SINGULAR CONCRETE DOCK,
CONCRETE ABUTMENT, ALUMINUM GANGWAY, GANGWAY HINGE,
POTABLE WATERLINE, AND ALUMINUM GUARDRAIL.
5VICINITY MAP
8SITE MAP/STAGING AREA SCALE: N.T.S.
M A
R
IN
E M
A
IN
TE
N
A N
C E
YA
R
D D
O C
K R
EP
LA
C
EM
EN
T
E . 2
N D
S
TR
EE
T, L O
N G
B
EA
C H
DETAILSECTION NO.
SHT. SHOWN
ON
DETAIL NO.
SHT. SHOWN
ON
PROJECT DESCRIPTION 3
4REFERENCE LEGEND
6APPLICABLE CODES
2022 EDITION OF THE CALIFORNIA BUILDING CODE
2022 EDITION OF THE CALIFORNIA FIRE CODE
2022 EDITION OF THE CALIFORNIA ELECTRICAL CODE
2022 EDITION OF THE CALIFORNIA MECHANICAL CODE
2022 EDITION OF THE CALIFORNIA PLUMBING CODE
TITLE 18 OF THE LONG BEACH MUNICIPAL CODE
SECTION/
ELEVATION
ABBREVIATIONS
ABBR ABBREVIATION(S)
ADA AMERICANS WITH DISABILITIES ACT
ADD/ALT. ADDITIVE/ALTERNATIVE
ALUM. ALUMINUM
ASD ALLOWABLE STRESS DESIGN
ASTM AMERICAN SOCIETY FOR TESTING MATERIALS
C CUPPED END
CLB CITY OF LONG BEACH
CLR. CLEAR
CONC CONCRETE
CONT. CONTINUOUS
C X C CUPPED END X CUPPED END
DEMO DEMOLISH
DIA. DIAMETER
DTL. DETAIL
E EAST
(E) EXISTING
EL. ELEVATION
EMBED EMBEDMENT
GA. GAUGE
GALV. GALVANIZED
GW GANGWAY
H.D.G HOT DIPPED GALVANIZED
HEX HEXAGONAL
L LENGTH
LF LINEAR FEET
MAX MAXIMUM
MIN MINIMUM
MISC. MISCELLANEOUS
MLLW MEAN LOWER LOW WATER
(N) NEW
N.I.C. NOT IN CONTRACT
NO. NUMBER
NPT NATIONAL PIPE THREAD
N.T.S. NOT TO SCALE
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
P.I.P PROTECT IN PLACE
P.O.C. POINT OF CONNECTION
P.O.T. PATH OF TRAVEL
PRM PARKS RECREATION AND MARINE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORIDE
QTY. QUANTITY
R RADIUS
RC REINFORCED CONCRETE
R/R REMOVE AND REPLACE
SEC SECTION
SF SQUARE FEET
SHT. SHEET
SS 304 STAINLESS STEEL 304
STD STANDARD
SPAC SPACING
TEMP. TEMPORARY
TYP TYPICAL
THRU THROUGH
UHMW ULTRA HIGH MOLECULAR WEIGHT
U.O.N. UNLESS OTHERWISE NOTED
W/ WITH
DEMOLITION NOTES
CONSTRUCTION NOTES
1 REMOVE (E) 14.5'X59' CONC. DOCKS (QTY. 2)
2 REMOVE (E) 4'X34' STEEL GANGWAY
3 REMOVE (E) GANGWAY HINGE
4 REMOVE (E) CONCRETE STAIRCASE
5 REMOVE (E) WATERLINE TO P.O.C.
1 INSTALL (N) 14.5'X59' CONCRETE DOCK
2 INSTALL (N) 4'X45' ALUM. GANGWAY
3 INSTALL (N) GANGWAY HINGE
4 INSTALL (N) CONC. GANGWAY ABUTMENT
5 INSTALL (N) 34" COPPER POTABLE WATERLINE
6 INSTALL (N) ALUM. GUARDRAILA
S-1
S-1
CITY OF LONG BEACH
DEPARTMENT OF PUBLIC WORKS
411 W. OCEAN BLVD., 5TH FLOOR
LONG BEACH, CA 90802
PROJECT SITE
STAGING AREA (FINAL LOCATION TO
BE DETERMINED BY ENGINEER)
CITY OF
LONG BEACH
PROJECT
SITE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RAFAEL HOLCOMBE
AutoCAD SHX Text
JONATHAN GOBER
AutoCAD SHX Text LAST SAVED BY: ryan.cheyne
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
OF
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PAGE
AutoCAD SHX Text
GRAPHIC
AutoCAD SHX Text
AutoCAD SHX Text
FIELD BOOK
AutoCAD SHX Text
DRAWING REF.
AutoCAD SHX Text
CITY TRAFFIC ENGINEER
AutoCAD SHX Text
PROJECT MANAGEMENT BUREAU MGR.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PROJECT MANAGER
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
AS-BUILT:
AutoCAD SHX Text
DATE
AutoCAD SHX Text No.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
APPROVAL
AutoCAD SHX Text
REF.
AutoCAD SHX Text
CITY ENGINEER
AutoCAD SHX Text
PROGRAM MANAGER
AutoCAD SHX Text
DATE
AutoCAD SHX Text PLOT DATE: Jun. 4, 24
AutoCAD SHX Text SAVED PATH: P:\Watr\t41970.23 marine maintenance dock replacement\07 design\01 Plans\Title Blocks
AutoCAD SHX Text
PREPARED BY:
AutoCAD SHX Text
PREPARED FOR:
AutoCAD SHX Text T-1
AutoCAD SHX Text B-4829
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text No. C-67958
AutoCAD SHX Text Exp. 06-30-25
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text B
AutoCAD SHX Text J.
AutoCAD SHX Text L
AutoCAD SHX Text
WILLOW ST.
AutoCAD SHX Text
SPRING ST.
AutoCAD SHX Text
OCEAN
AutoCAD SHX Text
BROADWAY
AutoCAD SHX Text
ANAHEIM ST.
AutoCAD SHX Text
PACIFIC COAST HWY.
AutoCAD SHX Text
LONG BEACH FWY.
AutoCAD SHX Text
SANTA FE
AutoCAD SHX Text
MAGNOLIA AVE.
AutoCAD SHX Text
AutoCAD SHX Text
STEARNS ST.
AutoCAD SHX Text
LOS COYOTES
AutoCAD SHX Text
LAKEWOOD BLVD.
AutoCAD SHX Text
CLARK AVE.
AutoCAD SHX Text
PALO VERDE AVE.
AutoCAD SHX Text
BELLFLOWER BLVD.
AutoCAD SHX Text
ATLANTIC AVE.
AutoCAD SHX Text
ORANGE AVE.
AutoCAD SHX Text
CHERRY AVE.
AutoCAD SHX Text
PACIFIC AVE.
AutoCAD SHX Text
LONG BEACH BLVD.
AutoCAD SHX Text
MARTIN LUTHER KING JR. AVE.
AutoCAD SHX Text
ANAHEIM ST.
AutoCAD SHX Text
BROADWAY
AutoCAD SHX Text
REDONDO AVE.
AutoCAD SHX Text
TEMPLE AVE.
AutoCAD SHX Text
BLVD.
AutoCAD SHX Text
7TH ST.
AutoCAD SHX Text
ALAMITOS AVE.
AutoCAD SHX Text
AutoCAD SHX Text
HWY.
AutoCAD SHX Text
XIMENO AVE.
AutoCAD SHX Text
OCEAN BLVD.
AutoCAD SHX Text
2ND ST.
AutoCAD SHX Text
LIVINGSTON DR.
AutoCAD SHX Text
PACIFIC COAST
AutoCAD SHX Text
7TH ST.
AutoCAD SHX Text
AutoCAD SHX Text
STUDEBAKER
AutoCAD SHX Text
ATHERTON ST.
AutoCAD SHX Text
CITY OF
AutoCAD SHX Text
SIGNAL HILL
AutoCAD SHX Text
FWY.
AutoCAD SHX Text
SPRING ST.
AutoCAD SHX Text
WILLOW ST.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SAN DIEGO
AutoCAD SHX Text
WESTMINSTER
AutoCAD SHX Text
AVE.
AutoCAD SHX Text
SAN DIEGO FWY.
AutoCAD SHX Text
AutoCAD SHX Text
SAN GABRIEL
AutoCAD SHX Text
FWY.
AutoCAD SHX Text
FWY.
AutoCAD SHX Text
AutoCAD SHX Text
LOS ANGELES RIVER
AutoCAD SHX Text
LOS CERRITOS CHANNEL
AutoCAD SHX Text
SAN GABRIEL RIVER
AutoCAD SHX Text
PIER G AVE.
AutoCAD SHX Text
PIER F AVE.
AutoCAD SHX Text
PIER D AVE
AutoCAD SHX Text
AVE
AutoCAD SHX Text
PICO
AutoCAD SHX Text
PIER B ST.
www.tetratech.com
17885 VON KARMAN AVE #500,
IRVINE, CA 92614
PHONE: (949) 809-5000
M A
R
IN
E M
A
IN
TE
N
A N
C E
YA
R
D D
O C
K R
EP
LA
C
EM
EN
T
E . 2
N D
S
TR
EE
T, L O
N G
B
EA
C H www.tetratech.com
17885 VON KARMAN AVE #500,
IRVINE, CA 92614
PHONE: (949) 809-5000
M A
R
IN
E M
A
IN
TE
N
A N
C E
YA
R
D D
O C
K R
EP
LA
C
EM
EN
T
E . 2
N D
S
TR
EE
T, L O
N G
B
EA
C H
G
EN
ER
A L
N O
TE
S
GENERAL NOTES
1. THE CONTRACTOR SHALL FURNISH ALL TOOLS, EQUIPMENT, MATERIALS, AND SUPPLIES AND SHALL PERFORM ALL LABOR, SUPERVISION, FABRICATION, ASSEMBLY, AND INSTALLATION HEREIN.
2. CONTRACTOR SHALL STRICTLY ENFORCE ALL APPLICABLE SAFETY LAWS (I.E. OSHA, CAL-OSHA) AND MAINTAIN SITE SAFETY.
3. COPIES OF ALL PERMITS ARE AVAILABLE FROM THE CITY AND SHOULD BE AVAILABLE FOR REFERENCE ON-SITE AT ALL TIMES.
4. CONTRACTOR SHALL SUBMIT FOR APPROVAL TEMPORARY FENCING PLANS AS REQUIRED.
5. CONTRACTOR SHALL EXAMINE THE JOBSITE BEFORE PREPARING SHOP DRAWINGS TO VERIFY ALL PHYSICAL CONDITIONS, SURROUNDINGS, DIMENSIONS AND DISTANCES.
6. THE CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE AND PROTECT FROM DAMAGE ALL UNDERGROUND UTILITIES. THE
CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY AND ALL DAMAGES TO EXISTING STRUCTURES AND UTILITIES DURING CONSTRUCTION. THE CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF EXISTING UTILITIES AND NOTIFY THE APPROPRIATE UTILITY COMPANIES AND UNDERGROUND SERVICE ALERT SUFFICIENTLY IN ADVANCE OF BEGINNING OF WORK.
ANY UTILITIES EXPOSED OR DAMAGED BY THE CONTRACTOR SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
7. THE CONTRACTOR SHALL COMPLY WITH ALL PERMITS FOR THE WORK. THE CONTRACTOR SHALL COMPLY WITH ALL STATE, COUNTY, AND CITY LAWS AND ORDINANCES RELATING TO SAFETY, CHARACTER OF WORK, EQUIPMENT AND LABOR PERSONNEL. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL CITY ORDINANCES, PROVISIONS OF ALL APPLICABLE LOCAL AND REGIONAL GUIDELINES AND STANDARDS. CONSTRUCTION SHALL CONFORM WITH THE 2019 EDITION OF THE CALIFORNIA BUILDING CODE, NFPA 303, UNIFORM MECHANICAL CODE, NATIONAL ELECTRICAL CODE, UNIFORM PLUMBING CODE, AMERICANS WITH DISABILITIES ACT (ADA); ALUMINUM ASSOCIATION'S “SPECIFICATIONS FOR ALUMINUM STRUCTURES”, AND ALL
LOCAL AND STATE CODES AND ORDINANCES WHERE APPLICABLE.
8. THE CONTRACTOR SHALL MAINTAIN PUBLIC ACCESS TO ALL PROPERTY ADJACENT TO THE WORK THROUGHOUT THE PERIOD
OF CONSTRUCTION.
9. THE CONTRACTOR SHALL KEEP DEBRIS, CONCRETE RUBBLE AND OTHER MATERIALS FROM FALLING INTO THE WATER.
CONTAINMENT BOOMS SHALL BE PROVIDED BY THE CONTRACTOR. NO CONSTRUCTION MATERIALS, EQUIPMENT, DEBRIS, OR WASTE SHALL BE PLACED OR STORED WHERE IT MAY BE SUBJECT TO WAVE, WIND, OR RAIN EROSION AND DISPERSION.
NON-BUOYANT DEBRIS DISCHARGED INTO COASTAL WATERS SHALL BE RECOVERED BY DIVERS AS SOON AS POSSIBLE AFTER
LOSS BUT NO LATER THAN THE END OF EACH DAY.
10. STAGING AREA SHALL BE CLEARED OF DEBRIS AND EQUIPMENT UPON COMPLETION OF PROJECT. THE CONTRACTOR SHALL REMOVE AND DISPOSE, USING AN APPROVED LEGAL METHOD, ALL SURPLUS MATERIALS AND DEBRIS FROM THE SITE. THE SURPLUS MATERIALS BELONG TO THE CONTRACTOR. THE CONTRACTOR SHALL MAINTAIN THE SITE IN A NEAT AND ORDERLY
CONDITION AT ALL TIMES.
11. THE CONTRACTOR ASSUMES SOLE AND COMPLETE RESPONSIBILITY FOR THE JOB SITE CONDITIONS AT ALL TIMES. THE CONTRACTOR SHALL PROVIDE ADEQUATE LIABILITY INSURANCE TO DEFEND, INDEMNIFY AND HOLD HARMLESS COLB FROM
ANY CLAIMS AND DAMAGES THAT MAY ARISE FROM THIS CONSTRUCTION.
12. THE CONTRACTOR IS RESPONSIBLE FOR ARRANGING ALL REQUIRED INSPECTIONS. THE PRESENCE OR ABSENCE OF A CITY OR OTHER INSPECTOR WILL NOT RELIEVE THE CONTRACTOR OF FULL RESPONSIBILITY FOR THE PROPER PERFORMANCE OF
WORK.
13. DUE TO THE SCALE OF THE DRAWINGS IT IS NOT POSSIBLE TO INDICATE ALL OFFSETS. THE CONTRACTOR SHALL INVESTIGATE
THE EXISTING CONDITIONS AND PLAN WORK ACCORDINGLY.
14. ALL MATERIALS SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR UNLESS OTHERWISE NOTED. ANY AND ALL CONSTRUCTION MATERIAL SHALL BE REMOVED FROM THE SITE WITHIN 10 DAYS OF COMPLETION OF CONSTRUCTION.
15. MACHINERY OR CONSTRUCTION MATERIALS NOT ESSENTIAL FOR PROJECT IMPROVEMENTS SHALL NOT BE ALLOWED IN THE
INTERTIDAL ZONE AT ANY TIME.
16. ANY CONFLICTS WITH THE DESIGN OR ANY CHANGES TO THE PLANS SHALL BE AUTHORIZED BY THE ENGINEER BEFORE
CONTINUING WITH WORK IN THAT AREA.
17. ANY OFF-SITE IMPROVEMENTS FOUND TO BE DAMAGED SHALL BE REPLACED TO THE SATISFACTION OF THE CITY ENGINEER.
18. SHOP DRAWINGS MUST BE REVIEWED AND APPROVED BY THE ENGINEER OF RECORD PRIOR TO SUBMITTAL TO THE BUILDING
DEPARTMENT.
19. SHOP DRAWINGS MUST BE REVIEWED AND APPROVED BY THE BUILDING DEPARTMENT PRIOR TO FABRICATION. CONTRACTOR
SHALL OBTAIN THIS APPROVAL.
STAGING AND DEMOLITION
1. CONTRACTOR SHALL SCHEDULE AND COORDINATE CONSTRUCTION AND DEMOLITION/REMOVAL WITH THE CITY TO ALLOW FOR
USE OF ADJACENT FACILITIES.
2. SEE DEMOLITION NOTES ON DRAWING D-1, SHT. 3.
3. INSTALL 6' TEMPORARY SCREENED SECURITY FENCE AROUND CONTRACTOR STAGING AREA. CONTRACTOR IS RESPONSIBLE
FOR SECURITY OF STAGING AREA. STAGING AREA AND PROJECT SITE TO BE RESTORED TO EXISTING OR BETTER CONDITION
AFTER CONSTRUCTION
DESIGN CRITERIA
THE FOLLOWING DESIGN PARAMETERS HAVE BEEN USED IN THE DESIGN OF THE STRUCTURAL, AND WHERE APPLICABLE, NON-STRUCTURAL SYSTEMS REPRESENTED IN THESE DRAWINGS.
A. CODE OF RECORD: 2022 CBC, AND DBW LAYOUT AND DESIGN GUIDELINES FOR MARINA BERTHING FACILITIES 2005
AUTHORITY HAVING JURISDICTION: CITY OF LONG BEACH BUILDING AND SAFETY
B. BUILDING RISK CATEGORY: II
C. DESIGN LOADS: THE LIVE LOADS USED IN THE DESIGN OF THIS STRUCTURE ARE IN ACCORDANCE WITH THE "PLANS AND
SPECIFICATIONS FOR THE CONSTRUCTION OF WATERFRONT STRUCTURES IN THE LONG BEACH MARINA AREA" AS
FOLLOWS:
· HINGED GANGWAY = 100 PSF (LIVE LOAD)
· DOCK = 100 PSF (LIVE LOAD)
· ANYWHERE ON DOCK = 500 LB (POINT LOAD)
D. WIND DESIGN PARAMETERS:
· BASIC WIND SPEED (V) MPH (3 SEC. GUST): 110 MPH
· EXPOSURE CATEGORY: B
F. SEISMIC DESIGN PARAMETERS:
· SEISMIC SITE CLASS: D
· SEISMIC IMPORTANCE FACTOR: 1.0
· SEISMIC DESIGN CATEGORY: II
REFER TO "GEOTECHNICAL ENGINEERING REPORT - DAVIES LAUNCH RAMP REHABILITATION", DATED JULY 9, 2019.
ASTM DESIGNATIONS, ICC REPORT REFERENCES, AND ALL STANDARDS AND REFERENCED DOCUMENTS SHALL REFER TO THE
LATEST EDITIONS AND/OR AMENDMENTS AS ADOPTED BY THE CODE OF RECORD.
SUBMITTALS
1. CONCRETE MIX DESIGN
2. EPOXY COATED REBAR
DEFERRED SUBMITTALS
CONTRACTOR TO SUBMIT SHOP DRAWINGS AND CALCULATIONS STAMPED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE
OF CALIFORNIA FOR THE FOLLOWING:
1. CONCRETE DOCK
2. GANGWAY
3. GANGWAY HINGE
4. GUARDRAIL SYSTEM AND ANCHORAGE
5. PILE GUIDES
SPECIAL INSPECTIONS
THE FOLLOWING ITEMS REQUIRE "SPECIAL INSPECTION" IN ACCORDANCE WITH SECTIONS 1704 AND 1705 OF THE CALIFORNIA
BUILDING CODE:
1. CONCRETE DOCK
2. EPOXY ANCHOR REINFORCEMENT INSTALLATION
3. CONCRETE LANDING
REINFORCING STEEL
1. ALL ARRANGEMENT AND DETAILING OF REINFORCING STEEL, INCLUDING BAR SUPPORTS AND SPACERS, SHALL BE IN
ACCORDANCE WITH THE LATEST ACI 315 DETAILING MANUAL.
2. ASTM A934 / A934M-16, GRADE 40 (#3 REBAR OR SMALLER), ASTM A934 / A934M-16, GRADE 60 (#4 REBAR OR LARGER), ASTM
A185, GRADE 65 (WELDED WIRE FABRIC SHEETS). BARS TO BE WELDED SHALL BE ASTM A706, GRADE 60.
3. ALL REBAR PROVIDED MUST BE EPOXY COATED .
CALIFORNIA COASTAL COMMISSION (CCC) SPECIAL CONDITIONS
CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL SPECIAL CONDITIONS.
SEE CALIFORNIA COASTAL COMMISSION WAIVER IN DIVISION F - PERMITS.
UNITED STATES ARMY CORPS OF ENGINEERS (USACE) SPECIAL CONDITIONS
CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL SPECIAL CONDITIONS.
SEE UNITED STATES ARMY CORPS OF ENGINEERS WAIVER IN DIVISION F - PERMITS
CONCRETE (MISC.)
1. SHALL BE POST TENSIONED
2. 5000 PSI MIN. (TYPE II/V)
3. 3" MIN.REINFORCEMENT COVER (U.O.N.)
4. BROOM FINISH
5. MAX WATER/CEMENT RATION OF 0.4
ALUMINUM GANGWAY
1. CONTRACTOR SHALL FIELD VERIFY GANGWAY LOCATION AND CONFIRM GANGWAY LANDING DIMENSIONS BEFORE FABRICATION
OF GANGWAY.
2. GANGWAY SHALL BE DESIGNED TO SUSTAIN A 100 PSF UNIFORM LIVE LOAD (ULL) AND A 400 POUND POINT LOAD WITHIN L/120
DEFLECTION.
3. FRAMING SHALL BE 6061-T6 ALUMINUM ALLOY CONFORMING TO ASTM B-209, B-221, AND B-303.
4. HANDRAIL SHALL BE 6061-T6 ALUMINUM PIPE AND TUBING ASTM B-429.
5. DIRECT CONTACT BETWEEN ALUMINUM AND DISSIMILAR METALS IS NOT PERMITTED.
6. THE MOUNTING OF HANDRAILS SHALL BE SUCH THAT THE COMPLETED HANDRAIL AND SUPPORTING STRUCTURE ARE CAPABLE
OF WITHSTANDING A LOAD OF AT LEAST 200 POUNDS APPLIED IN ANY DIRECTION AND AT ANY POINT ON THE RAIL, AND TITLE 24
CRITERIA.
7. TOP OF ALUMINUM DECKING SHALL BE RIBBED AND SANDBLASTED TO PROVIDE A COMMERCIAL NON-SKID SURFACE. ALL ALUMINUM RAILING (EXCEPT POSTS) TO RECEIVE A BRUSH FINISH. ALUMINUM BEAMS TO BE SANDBLASTED FOR A NON-GLARE
FINISH.
8. GANGWAY ROLLERS AND RAMP SUPPORTS SHALL BE DESIGNED SO THAT THE PRESSURE ON THE DECK DOES NOT EXCEED 80
PSF.
9. GANGWAY LANDSIDE ATTACHMENT TO COMPLY WITH ADA GUIDELINES. CONTRACTOR TO PROVIDE SUBMITTAL SHOWING
LANDSIDE-TO-GANGWAY TRANSITION AND GANGWAY-TO-DOCK TRANSITION.
10. PRE-MANUFACTURED ALUMINUM GANGWAYS AND RAMPS SHALL BE DESIGNED TO SUPPORT THE DEAD WEIGHT OF THE GANGWAY OR RAMP PLUS A LIVE LOAD OF 100 POUNDS PER SQUARE FOOT DISTRIBUTED OVER THE ENTIRE GANGWAY OR RAMP SURFACE. THE MAXIMUM VERTICAL DEFLECTION OF THE GANGWAY OR RAMP, UNDER FULL LIVE LOAD, SHALL NOT
EXCEED L/120 OF THE GANGWAY OR RAMP SPAN.
STRUCTURAL OBSERVATIONS
DURING CONSTRUCTION, INTERMITTENT STRUCTURAL OBSERVATIONS SHALL BE PERFORMED BY A LICENSED CIVIL/STRUCTURAL
ENGINEER AT VARIOUS STAGES DURING CONSTRUCTION, AS FOLLOWS:
1. GENERAL CONSTRUCTION AND FABRICATION OF DOCK
2. INSTALLATION OF GANGWAY
3. ASSEMBLY OF DOCK STRUCTURES
MARINE BEST MANAGEMENT PRACTICES
1. CONSTRUCTION RESPONSIBILITIES AND DEBRIS REMOVAL.
A. NO DEMOLITION OR CONSTRUCTION MATERIALS, EQUIPMENT, DEBRIS, OR WASTE SHALL BE PLACED OR STORED WHERE IT MAY ENTER SENSITIVE HABITAT, RECEIVING WATERS OR A STORM DRAIN, OR BE SUBJECT TO WAVE, WIND, RAIN OR TIDAL EROSION AND DISPERSION;
B. ANY AND ALL DEBRIS RESULTING FROM DEMOLITION OR CONSTRUCTION ACTIVITIES, AND ANY REMAINING CONSTRUCTION MATERIAL, SHALL BE REMOVED FROM THE PROJECT SITE WITHIN 24 HOURS OF COMPLETION OF THE
PROJECT;
C. DEMOLITION OR CONSTRUCTION DEBRIS AND SEDIMENT SHALL BE REMOVED FROM WORK AREAS EACH DAY THAT
DEMOLITION OR CONSTRUCTION OCCURS TO PREVENT THE
ACCUMULATION OF SEDIMENT AND OTHER DEBRIS THAT MAY BE DISCHARGED INTO COASTAL WATERS;
D. MACHINERY OR CONSTRUCTION MATERIALS NOT ESSENTIAL FOR PROJECT IMPROVEMENTS WILL NOT BE ALLOWED
AT ANY TIME IN THE INTERTIDAL ZONE;
E. IF TURBID CONDITIONS ARE GENERATED DURING CONSTRUCTION A SILT CURTAIN WILL BE UTILIZED TO CONTROL
TURBIDITY;
F. FLOATING BOOMS WILL BE USED TO CONTAIN DEBRIS DISCHARGED INTO COASTAL WATERS AND ANY DEBRIS DISCHARGED WILL BE REMOVED AS SOON AS POSSIBLE BUT NO LATER THAN THE END OF EACH DAY;
G. NON BUOYANT DEBRIS DISCHARGED INTO COASTAL WATERS WILL BE RECOVERED BY DIVERS AS SOON AS POSSIBLE
AFTER LOSS;
H. ALL TRASH AND DEBRIS SHALL BE DISPOSED IN THE PROPER TRASH AND RECYCLING RECEPTACLES AT THE END OF
EVERY CONSTRUCTION DAY;
I. THE APPLICANT SHALL PROVIDE ADEQUATE DISPOSAL FACILITIES FOR SOLID WASTE, INCLUDING EXCESS CONCRETE, PRODUCED DURING DEMOLITION OR CONSTRUCTION;
J. DEBRIS SHALL BE DISPOSED OF AT A LEGAL DISPOSAL SITE OR RECYCLED AT A RECYCLING FACILITY. IF THE DISPOSAL SITE IS LOCATED IN THE COASTAL ZONE, A COASTAL DEVELOPMENT PERMIT OR AN AMENDMENT TO THIS PERMIT SHALL BE REQUIRED BEFORE DISPOSAL CAN TAKE PLACE UNLESS THE EXECUTIVE DIRECTOR DETERMINES
THAT NO AMENDMENT OR NEW PERMIT IS LEGALLY REQUIRED;
K. ALL STOCK PILES AND CONSTRUCTION MATERIALS SHALL BE COVERED, ENCLOSED ON ALL SIDES, SHALL BE LOCATED AS FAR AWAY AS POSSIBLE FROM DRAIN INLETS AND ANY WATERWAY, AND SHALL NOT BE STORED IN CONTACT WITH
THE SOIL;
L. MACHINERY AND EQUIPMENT SHALL BE MAINTAINED AND WASHED IN CONFINED AREAS SPECIFICALLY DESIGNED TO CONTROL RUNOFF. THINNERS OR SOLVENTS SHALL NOT BE DISCHARGED INTO SANITARY OR STORM SEWER
SYSTEMS;
M. THE DISCHARGE OF ANY HAZARDOUS MATERIALS INTO ANY RECEIVING WATERS SHALL BE PROHIBITED;
N. SPILL PREVENTION AND CONTROL MEASURES SHALL BE IMPLEMENTED TO ENSURE THE PROPER HANDLING AND
STORAGE OF PETROLEUM PRODUCTS AND OTHER CONSTRUCTION MATERIALS. MEASURES SHALL INCLUDE A DESIGNATED FUELING AND VEHICLE MAINTENANCE AREA WITH APPROPRIATE BERMS AND PROTECTION TO PREVENT ANY SPILLAGE OF GASOLINE OR RELATED PETROLEUM PRODUCTS OR CONTACT WITH RUNOFF. THE AREA SHALL BE LOCATED AS FAR AWAY FROM THE RECEIVING WATERS AND STORM DRAIN INLETS AS POSSIBLE;
O. BEST MANAGEMENT PRACTICES (BMPS) AND GOOD HOUSEKEEPING PRACTICES (GHPS) DESIGNED TO PREVENT SPILLAGE AND/OR RUNOFF OF DEMOLITION OR CONSTRUCTION-RELATED MATERIALS, AND TO CONTAIN SEDIMENT OR CONTAMINANTS ASSOCIATED WITH DEMOLITION OR CONSTRUCTION ACTIVITY, SHALL BE IMPLEMENTED PRIOR TO THE
ON-SET OF SUCH ACTIVITY; AND
P. ALL BMPS SHALL BE MAINTAINED IN A FUNCTIONAL CONDITION THROUGHOUT THE DURATION OF CONSTRUCTION
ACTIVITY.
2. BEST MANAGEMENT PRACTICES (BMP) PROGRAM. BY ACCEPTANCE OF THIS PERMIT, THE PERMITTEE AGREES THAT THE DOCKING AND LAUNCHING OF BOAT(S) AT THE PUBLIC LAUNCH RAMP SHALL BE MANAGED IN A MANNER THAT PROTECTS WATER QUALITY PURSUANT TO THE IMPLEMENTATION OF THE FOLLOWING BEST MANAGEMENT PRACTICES (BMPS):
A. BOAT CLEANING AND MAINTENANCE MEASURES:
i. IN-WATER TOP-SIDE AND BOTTOM-SIDE BOAT CLEANING SHALL MINIMIZE THE DISCHARGE OF SOAPS, PAINTS, AND DEBRIS;
ii. IN-THE-WATER HULL SCRAPING OR ANY PROCESS THAT OCCURS UNDER WATER THAT RESULTS IN THE
REMOVAL OF PAINT FROM BOAT HULLS SHALL BE PROHIBITED. ONLY DETERGENTS AND CLEANING COMPONENTS THAT ARE DESIGNATED BY THE MANUFACTURER AS PHOSPHATE-FREE AND BIODEGRADABLE
SHALL BE USED, AND THE AMOUNTS USED MINIMIZED; AND.
B. SOLID AND LIQUID WASTE MANAGEMENT MEASURES:
i. ALL TRASH, RECYCLABLES, AND HAZARDOUS WASTES OR POTENTIAL WATER CONTAMINANTS, INCLUDING
OLD GASOLINE OR GASOLINE WITH WATER, ABSORBENT MATERIALS, OILY RAGS, LEAD ACID BATTERIES, ANTI-FREEZE, WASTE DIESEL, KEROSENE AND MINERAL SPIRITS SHALL NOT AT ANY TIME BE DISPOSED OF IN THE WATER OR GUTTER BUT, RATHER BE DISPOSED OF IN A MANNER CONSISTENT WITH STATE AND/OR
FEDERAL REGULATIONS.
C. PETROLEUM CONTROL MANAGEMENT MEASURES:
i. BOATERS WILL PRACTICE PREVENTIVE ENGINE MAINTENANCE AND WILL USE OIL ABSORBENTS IN THE BILGE
AND UNDER THE ENGINE TO PREVENT OIL AND FUEL DISCHARGES. OIL ABSORBENT MATERIALS SHALL BE EXAMINED AT LEAST ONCE A YEAR AND REPLACED AS NECESSARY. USED OIL ABSORBENTS ARE HAZARDOUS WASTE IN CALIFORNIA. USED OIL ABSORBENTS MUST THEREFORE BE DISPOSED IN ACCORDANCE WITH HAZARDOUS WASTE DISPOSAL REGULATIONS. THE BOATERS SHALL REGULARLY INSPECT AND MAINTAIN ENGINES, SEALS, GASKETS, LINES AND HOSES IN ORDER TO PREVENT OIL AND FUEL SPILLS. THE USE OF
SOAPS THAT CAN BE DISCHARGED BY BILGE PUMPS IS PROHIBITED;
ii. IF THE BILGE NEEDS MORE EXTENSIVE CLEANING (E.G., DUE TO SPILLS OF ENGINE FUELS, LUBRICANTS OR OTHER LIQUID MATERIALS), THE BOATERS WILL USE A BILGE PUMP-OUT FACILITY OR STEAM CLEANING SERVICES THAT RECOVER AND PROPERLY DISPOSE OR RECYCLE ALL CONTAMINATED LIQUIDS; AND
iii. BILGE CLEANERS WHICH CONTAIN DETERGENTS OR EMULSIFIERS WILL NOT BE USED FOR BILGE CLEANING
SINCE THEY MAY BE DISCHARGED TO SURFACE WATERS BY THE BILGE PUMPS.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
OF
AutoCAD SHX Text
FIELD BOOK
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
PAGE
AutoCAD SHX Text
GRAPHIC
AutoCAD SHX Text
AS-BUILT:
AutoCAD SHX Text
DATE
AutoCAD SHX Text No.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DRAFTING CHECK BY:
AutoCAD SHX Text
DESIGN CHECK BY:
AutoCAD SHX Text
REF.
AutoCAD SHX Text
APPROVAL
AutoCAD SHX Text
DATE: 10/9/18
AutoCAD SHX Text FN: Maintenance Dock Replacement_2.2.24
AutoCAD SHX Text
JONATHAN GOBER
AutoCAD SHX Text B-4829
AutoCAD SHX Text
RAFAEL HOLCOMBE
AutoCAD SHX Text
RAFAEL HOLCOMBE
AutoCAD SHX Text
RAFAEL HOLCOMBE
AutoCAD SHX Text
AutoCAD SHX Text
DRAWING REF.
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text No. C-67958
AutoCAD SHX Text Exp. 06-30-25
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text B
AutoCAD SHX Text J.
AutoCAD SHX Text L
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
OF
AutoCAD SHX Text
FIELD BOOK
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
PAGE
AutoCAD SHX Text
GRAPHIC
AutoCAD SHX Text
AS-BUILT:
AutoCAD SHX Text
DATE
AutoCAD SHX Text No.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DRAFTING CHECK BY:
AutoCAD SHX Text
DESIGN CHECK BY:
AutoCAD SHX Text
REF.
AutoCAD SHX Text
APPROVAL
AutoCAD SHX Text
DATE: 10/9/18
AutoCAD SHX Text FN: Maintenance Dock Replacement_2.2.24
AutoCAD SHX Text
JONATHAN GOBER
AutoCAD SHX Text B-4829
AutoCAD SHX Text
RAFAEL HOLCOMBE
AutoCAD SHX Text
RAFAEL HOLCOMBE
AutoCAD SHX Text
RAFAEL HOLCOMBE
AutoCAD SHX Text
AutoCAD SHX Text
DRAWING REF.
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text No. C-67958
AutoCAD SHX Text Exp. 06-30-25
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text B
AutoCAD SHX Text J.
AutoCAD SHX Text L
AutoCAD SHX Text
G-1 www.tetratech.com
17885 VON KARMAN AVE #500,
IRVINE, CA 92614
PHONE: (949) 809-5000
M A
R
IN
E M
A
IN
TE
N
A N
C E
YA
R
D D
O C
K R
EP
LA
C
EM
EN
T
E . 2
N D
S
TR
EE
T, L O
N G
B
EA
C H www.tetratech.com
17885 VON KARMAN AVE #500,
IRVINE, CA 92614
PHONE: (949) 809-5000
M A
R
IN
E M
A
IN
TE
N
A N
C E
YA
R
D D
O C
K R
EP
LA
C
EM
EN
T
E . 2
N D
S
TR
EE
T, L O
N G
B
EA
C H
G
EN
ER
A L
N O
TE
S
EROSION CONTROL BMP
ESCI SCHEDULING
PURPOSE: TO REDUCE THE DISCHARGE OF POLLUTANTS FROM CONSTRUCTION SITES BY SEQUENCING THE CONSTRUCTION
PROJECT TO REDUCE THE AMOUNT AND DURATION OF SOIL EXPOSURE.
· SCHEDULE MAJOR GRADING OPERATIONS DURING DRY MONTHS.
· PRACTICE EROSION AND SEDIMENT CONTROL YEAR ROUND.
· SCHEDULE PROJECT TO DISTURB ONLY SMALL PORTIONS OF THE SITE AT ANY ONE TIME.
· CLOSE AND STABILIZE OPEN TRENCHES AS SOON AS POSSIBLE.
ESC21 DUST CONTROL
PURPOSE: TO REDUCE THE DISCHARGE OF POLLUTANTS FROM CONSTRUCTION SITES BY USING DUST CONTROL MEASURES TO STABILIZE SOIL FROM WIND EROSION, AND REDUCE DUST GENERATED BY CONSTRUCTION ACTIVITIES.
· STABILIZE EXPOSED SOILS BY USING VEGETATION, WATERING/SPRINKLING, AND STONE GRAVEL LAYERING.
· IDENTIFY AND STABILIZE PRIMARY ACCESS TO SITE.
· DIRECT TRAFFIC TO STABILIZED AREAS WITHIN THE PROJECT.
· STREET SWEEPING OF ADJACENT PUBLIC RIGHT-OF-WAY.
ESC24 STABILIZED CONSTRUCTION ENTRANCE
PURPOSE: TO REDUCE THE DISCHARGE OF POLLUTANTS FROM CONSTRUCTION SITES BY REDUCING THE AMOUNT OF SEDIMENT, DUST, AND MUD TRACKED OFF-SITE FROM CONSTRUCTION TRAFFIC.
· STABILIZE CONSTRUCTION ENTRANCE WITH AGGREGATE UNDERLAIN WITH FILTER CLOTH.
· CONSTRUCT ON LEVEL GROUND WHERE POSSIBLE.
· PROVIDE AMPLE TURNING RADIUS AS PART OF ENTRANCE.
· LENGTH SHOULD BE 50-FOOT MINIMUM, AND WIDTH 30-FOOT MINIMUM.
ESC50 SILT FENCE
PURPOSE: TO REDUCE THE DISCHARGE OF POLLUTANTS FROM CONSTRUCTION SITES UTILIZING A SILT FENCE THAT DETAINS
SEDIMENT-LADEN WATER, PROMOTING SEDIMENTATION BEHIND THE FENCE.
· USE IN AREAS WHERE SHEET FLOW OCCURS.
· TURN ENDS OF FENCE UPHILL.
· SELECT FILTER FABRIC THAT RETAINS 85% OF SOIL.
· SILT FENCE, WHICH IS MADE OF FILTER FABRIC, SHOULD BE ENTRENCHED AND ATTACHED TO SUPPORTING POLES.
ESC52 SAND BAG BARRIER
PURPOSE: TO REDUCE THE DISCHARGE OF POLLUTANTS FROM CONSTRUCTION SITES BY STACKING SAND BAGS ALONG A LEVEL CONTOUR CREATING A BARRIER THAT DETAINS SEDIMENT-LADEN WATER PROMOTING SEDIMENTATION. USE ALONG THE PERIMETER OF THE SITE AND AROUND CATCH BASIN INLETS TO STORM DRAINS TO CREATE A TEMPORARY SEDIMENT TRAP.
· USE SAND BAGS LARGE ENOUGH TO WITHSTAND FLOODING.
· INSPECT SAND BAGS AFTER EACH RAIN.
· REMOVE SEDIMENT BEHIND SAND BAGS.
· RESHAPE OR REPLACE DAMAGED SAND BAGS.
ESC56 SEDIMENT BASIN
PURPOSE: TO DISCHARGE THE POLLUTANTS FROM CONSTRUCTION SITES BY RETAINING RUNOFF SUFFICIENTLY TO ALLOW
EXCESSIVE SEDIMENT TO SETTLE.
· SHOULD BE LOCATED WHERE FAILURE OF EMBANKMENT WOULD NOT CAUSE LIFE/PROPERTY DAMAGE.
· INSPECT WEEKLY AND AFTER EACH RAIN.
· REMOVE SEDIMENTS BY USING FILTERS IF NECESSARY WHEN BASIN IS HALF-FULL.
· LINE BASIN IF GROUND WATER IS WITHIN 10 FEET OF BOTTOM.
CONSTRUCTION ACTIVITY - INDUSTRIAL / COMMERCIAL BMP
SC-1 NON-STORMWATER DISCHARGES TO DRAINS
PURPOSE: TO ENSURE THAT THE STORMWATER SYSTEM DISCHARGE CONTAINS ONLY STORMWATER.
STANDARDS:
·LOCATE DISCHARGES TO THE MUNICIPAL STORM DRAIN SYSTEM.
·LOCATE AND EVALUATE ALL DISCHARGES TO THE INDUSTRIAL STORM DRAIN SYSTEM.
·DEVELOP A PLAN TO ELIMINATE ELICIT CONNECTIONS.
·DEVELOP PROPOSAL OPTIONS.
·DOCUMENT THAT NON-STORM WATER DISCHARGES HAVE BEEN ELIMINATED BY RECORDING TESTS PERFORMED.
NON-STORMWATER DISCHARGES MAY INCLUDE PROCESS WASTE WATERS, COOLING WATERS, WASH WATERS AND SANITARY WASTEWATER. WHEN FACILITIES ARE SUBJECT TO THIS BMP, THEY MUST INCLUDE A CERTIFICATION THAT THE STORM WATER COLLECTION SYSTEM HAS BEEN TESTED OR EVALUATED FOR THE PRESENCE OF NON-STORM WATER DISCHARGES.
SC-2 VEHICLE AND EQUIPMENT FUELING
PURPOSE: TO PREVENT FUEL SPILLS AND LEAKS AND THEIR IMPACTS TO STORM WATER.
STANDARDS:
·DESIGN FUELING AREA TO PREVENT RUN-ON OF STORM WATER AND RUN-OFF OF SPILLS.
·DISCOURAGE "TOPPING OFF" OF FUEL TANKS.
·USE ABSORBENT MATERIALS ON SMALL SPILLS.
SC-3 VEHICLE AND EQUIPMENT WASHING AND STEAM CLEANING
PURPOSE: TO PREVENT OR REDUCE THE DISCHARGE OF POLLUTANTS TO STORM WATER FROM VEHICLE AND EQUIPMENT WASHING
AND STEAM CLEANING.
STANDARDS:
·USE DESIGNATED WASH AREAS DESIGNED TO PREVENT RUNOFF.
·CONSIDER FILTERING AND RECYCLING WASH WATER.
SC-4 VEHICLE AND EQUIPMENT MAINTENANCE AND REPAIR
PURPOSE: TO PREVENT THE DISCHARGE OF POLLUTANTS TO STORM WATER FROM VEHICLE AND EQUIPMENT MAINTENANCE AND
REPAIR INCLUDING WRECKING YARDS BY RUNNING A DRY SHOP.
STANDARDS:
·LOCATE ON PAVED SURFACES WHERE PRACTICAL.
·USE BERMS TO PROTECT MAINTENANCE AREAS.
·KEEP EQUIPMENT CLEAN.
· INSPECT EQUIPMENT FOR LEAKS ON A REGULAR BASIS.
SC-5 OUTDOOR LOADING - UNLOADING OF MATERIALS
PURPOSE: TO PREVENT OR REDUCE THE DISCHARGE OF POLLUTANTS TO STORM WATER FROM LOADING DOCKS.
STANDARDS:
·LIMIT EXPOSURE OF MATERIAL TO RAINFALL.
·PREVENT STORM WATER RUNOFF.
·CONTAIN SPILLS DURING TRANSFER OPERATIONS.
SC-6 OUTDOOR CONTAINER STORAGE OF LIQUIDS
PURPOSE: TO PREVENT THE DISCHARGE OF POLLUTANTS TO STORM WATER FROM OUTDOOR CONTAINER STORAGE AREAS BY
INSTALLING SAFEGUARDS AGAINST ACCIDENTAL RELEASE.
STANDARDS:
·COVER STORAGE AREA WITH ROOF.
·CONTROL RUNOFF BY ENCLOSING AREA WITH A BERM.
· A SPILL PREVENTION CONTROL PLAN.
·EMERGENCY PREPAREDNESS PLAN.
SC-7 OUTDOOR PROCESS EQUIPMENT
PURPOSE: TO PREVENT DISCHARGES OF POLLUTANTS TO STORM WATER FROM OUTDOOR PROCESSING EQUIPMENT BY ENCLOSING
OR COVERING ALL OR SOME EQUIPMENT AND INSTALLING SECONDARY CONTAINMENT.
STANDARDS:
·MOVE ACTIVITY INDOORS.
·COVER AREA WITH PERMANENT ROOF.
·USE BERMS TO PROTECT AREA FROM RUN-ON. ACTIVITIES SUCH AS ROCK GRINDING OR CRUSHING, PAINTING OR
COATING, GRINDING OR SANDING CAN LEAD TO CONTAMINATION OF STORM WATER RUNOFF.
SC-8 OUTDOOR STORAGE OF RAW MATERIALS
PURPOSE: TO PREVENT THE DISCHARGE OF POLLUTANT TO STORM WATER FROM OUTDOOR MATERIAL AND PRODUCT STORAGE
AREAS BY ENCLOSING, COVERING OR INSTALLING SECONDARY CONTAINMENT.
STANDARDS:
·STORE MATERIALS INDOORS.
·COVER STORAGE AREA WITH ROOF.
·COVER THE MATERIALS WITH A TEMPORARY COVERING MADE OF POLYETHYLENE, POLYPROPYLENE, OR HYPALON.
SC-9 WASTE HANDLING AND DISPOSAL
PURPOSE: TO PREVENT THE DISCHARGE OF POLLUTANTS TO STORM WATER FROM WASTE HANDLING AND DISPOSAL OF
RECYCLABLE MATERIAL.
STANDARDS:
·MAINTAIN USAGE INVENTORY TO LIMIT WASTE GENERATION.
·RAW MATERIAL SUBSTITUTION OR ELIMINATION.
·PROCESS OR EQUIPMENT MODIFICATION.
·PRODUCTION PLANNING AND SEQUENCE.
SC-10 CONTAMINATED OR ERODIBLE SURFACE AREAS
PURPOSE: TO PREVENT THE DISCHARGE OF POLLUTANTS TO STORM WATER FROM CONTAMINATED OR ERODIBLE SURFACE AREAS BY LEAVING AS MUCH VEGETATION ON SITE AS POSSIBLE MINIMIZING SOIL EXPOSURE TIME, STABILIZING EXPOSED SOILS AND
PREVENTING STORM WATER RUN-ON AND RUN-OFF.
STANDARDS:
·PRESERVE NATURAL VEGETATION.
·REMOVAL OF CONTAMINATED SOILS.
·CHEMICAL STABILIZATION.
SC-11 BUILDING AND GROUNDS MAINTENANCE
PURPOSE: TO PREVENT THE DISCHARGE OF POLLUTANTS TO STORM WATER FROM BUILDING AND GROUNDS MAINTENANCE BY
WASHING AND CLEANING UP WITH AS LITTLE WATER AS POSSIBLE.
STANDARDS:
·LEAVING OR PLANTING NATIVE VEGETATION TO REDUCE WATER, FERTILIZER, AND PESTICIDE NEEDS.
·SWEEPING OF PAVED SURFACES.
·CLEANING OF STORM DRAINAGE SYSTEM AT APPROPRIATE INTERVALS.
·PROPER DISPOSAL OF WASH WATER, SWEEPINGS, AND SEDIMENTS.
SC-12 BUILDING REPAIR, REMODELING AND CONSTRUCTION
PURPOSE: TO PREVENT THE DISCHARGE OF POLLUTANTS TO STORM WATER FROM BUILDING REPAIR REMODELING AND CONSTRUCTION BY USING SOIL EROSION CONTROLS, PROPER STORAGE OF BUILDING MATERIALS AND COVERING BUILDING MATERIALS. THE SOURCE OF THESE CONTAMINANTS MAY BE SOLVENTS, PAINTS, PAINT AND VARNISH REMOVERS, FINISHING RESIDUES, SPENT THINNERS, SOAP CLEANERS, KEROSENE, ASPHALT AND CONCRETE MATERIALS, ADHESIVE RESIDUES AND OLD
ASBESTOS.
STANDARDS:
·USE SOIL EROSION TECHNIQUES IF BARE GROUND IS TEMPORARILY EXPOSED.
·USE PERMANENT SOIL CONTROL TECHNIQUES IF THE REMODELING CLEARS BUILDINGS FROM AN AREA THAT ARE NOT
TO BE REPLACED. ·
·ENCLOSE PAINTING OPERATIONS
·PROPERLY STORE MATERIALS.
·PROPERLY STORE DISPOSAL WASTE GENERATED FROM THE ACTIVITY.
SC-13 OVER-WATER ACTIVITIES
PURPOSE: TO PREVENT THE DISCHARGE OF POLLUTANTS TO STORM WATER FROM OVER-WATER ACTIVITIES BY MINIMIZING OVER-WATER MAINTENANCE. OVER-WATER ACTIVITIES OCCUR AT BOAT AND SHIP REPAIR YARDS, MARINAS AND YACHT CLUBS. ACTIVITIES OF CONCERN INCLUDE STRIPPING AND PAINTING OF HULLS, ON-BOARD MAINTENANCE OF ENGINES AND THE DISPOSAL OF DOMESTIC WATER AND BALLAST
WATER
SC-14 EMPLOYEE TRAINING
PURPOSE: EMPLOYEE TRAINING IS A METHOD BY WHICH TO IMPLEMENT BMPS AND THEIR MAINTENANCE AND TO INTEGRATE THE ELEMENTS OF EMPLOYEE TRAINING AND INDIVIDUAL SOURCE CONTROLS INTO A COMPREHENSIVE TRAINING PROGRAM INTO THE
FACILITIES STORM WATER POLLUTION PREVENTION PLAN.
GENERAL NOTES (CONT.)
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
OF
AutoCAD SHX Text
FIELD BOOK
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
PAGE
AutoCAD SHX Text
GRAPHIC
AutoCAD SHX Text
AS-BUILT:
AutoCAD SHX Text
DATE
AutoCAD SHX Text No.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DRAFTING CHECK BY:
AutoCAD SHX Text
DESIGN CHECK BY:
AutoCAD SHX Text
REF.
AutoCAD SHX Text
APPROVAL
AutoCAD SHX Text
DATE: 10/9/18
AutoCAD SHX Text FN: Maintenance Dock Replacement_2.2.24
AutoCAD SHX Text
JONATHAN GOBER
AutoCAD SHX Text B-4829
AutoCAD SHX Text
RAFAEL HOLCOMBE
AutoCAD SHX Text
RAFAEL HOLCOMBE
AutoCAD SHX Text
RAFAEL HOLCOMBE
AutoCAD SHX Text
AutoCAD SHX Text
DRAWING REF.
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text No. C-67958
AutoCAD SHX Text Exp. 06-30-25
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text B
AutoCAD SHX Text J.
AutoCAD SHX Text L
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
OF
AutoCAD SHX Text
FIELD BOOK
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
PAGE
AutoCAD SHX Text
GRAPHIC
AutoCAD SHX Text
AS-BUILT:
AutoCAD SHX Text
DATE
AutoCAD SHX Text No.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DRAFTING CHECK BY:
AutoCAD SHX Text
DESIGN CHECK BY:
AutoCAD SHX Text
REF.
AutoCAD SHX Text
APPROVAL
AutoCAD SHX Text
DATE: 10/9/18
AutoCAD SHX Text FN: Maintenance Dock Replacement_2.2.24
AutoCAD SHX Text
JONATHAN GOBER
AutoCAD SHX Text B-4829
AutoCAD SHX Text
RAFAEL HOLCOMBE
AutoCAD SHX Text
RAFAEL HOLCOMBE
AutoCAD SHX Text
RAFAEL HOLCOMBE
AutoCAD SHX Text
AutoCAD SHX Text
DRAWING REF.
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text No. C-67958
AutoCAD SHX Text Exp. 06-30-25
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text B
AutoCAD SHX Text J.
AutoCAD SHX Text L
AutoCAD SHX Text
G-1A
BOTTOM LANDING
EL. 7.64'
TOP LANDING EL.
10.16'
EL. -2.5'
TOP OF FOOTING
EL. -3.54'
MUD LINE
EL. -6.17'
MEAN TIDE LINE
EL. 2.85'
HIGH TIDE LINE
EL. 7.24'
www.tetratech.com
17885 VON KARMAN AVE #500,
IRVINE, CA 92614
PHONE: (949) 809-5000
M A
R
IN
E M
A
IN
TE
N
A N
C E
YA
R
D D
O C
K R
EP
LA
C
EM
EN
T
E . 2
N D
S
TR
EE
T, L O
N G
B
EA
C H
DEMOLITION PLAN
SCALE: 1" = 20'
D-1
DEMOLITION NOTES
1 REMOVE (E) 14.5'X59' CONC. DOCKS (QTY. 2)
2 REMOVE (E) 4'X34' STEEL GANGWAY
3 REMOVE (E) GANGWAY HINGE
4 REMOVE (E) CONCRETE STAIRCASE
5 REMOVE (E) WATERLINE TO P.O.C.
www.tetratech.com
17885 VON KARMAN AVE #500,
IRVINE, CA 92614
PHONE: (949) 809-5000
M A
R
IN
E M
A
IN
TE
N
A N
C E
YA
R
D D
O C
K R
EP
LA
C
EM
EN
T
E . 2
N D
S
TR
EE
T, L O
N G
B
EA
C H
D
EM
O
LI
TI
O
N P
LA
N
59'
14'-6"
59' 14'-6"
25'-8"
P.I.P. (E) 18"
CONC. PILE
P.I.P. (E) 18"
CONC. PILE
P.I.P. (E) 18"
STEEL PILE
P.I.P. (E) 18"
CONC. PILE
P.I.P. ADJACENT
CONC. ABUTMENT
P.I.P. CONC. BRIDGE
COLUMN TYP.
34'
DISPOSAL NOTES
1. DOCK REMOVAL - CUT PILE GUIDES AND PROTECT-IN-PLACE EXISTING PILES.
2. GANGWAY HINGE REMOVAL - CUT AND GRIND ANCHORS FLUSH WITH CONCRETE.
3. TRANSPORT EXISTING DOCKS AND GANGWAY TO AN APPROVED DISPOSAL FACILITY.
4. DAVIES LAUNCH RAMP, ADJACENT TO THE PROJECT SITE, IS THE DESIGNATED
LAUNCH RAMP TO BE USED FOR DOCK REMOVAL. CONTRACTOR TO COORDINATE
WITH CLB FOR LAUNCH RAMP PERMIT.
5. CONTRACTOR IS REQUIRED TO PREPARE WASTE MANIFESTS TO DOCUMENT
PROPER TRANSPORTATION AND DISPOSAL.
ELEVATION: EXISTING DOCK AND GANGWAY (LOW TIDE -2.5')
SCALE: 1" = 5'
C-1
NOTE: ALL ELEVATIONS ARE IN MLLW.
3 4
14°
34'
P.I.P. ADJACENT
CONC. ABUTMENT
5 WATERLINE P.O.C.
1'-8" MIN.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
OF
AutoCAD SHX Text
FIELD BOOK
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
PAGE
AutoCAD SHX Text
GRAPHIC
AutoCAD SHX Text
AS-BUILT:
AutoCAD SHX Text
DATE
AutoCAD SHX Text No.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DRAFTING CHECK BY:
AutoCAD SHX Text
DESIGN CHECK BY:
AutoCAD SHX Text
REF.
AutoCAD SHX Text
APPROVAL
AutoCAD SHX Text PLOT DATE: Jun. 4, 24
AutoCAD SHX Text SAVED PATH: P:\Watr\t41970.23 marine maintenance dock replacement\07 design\01 Plans
AutoCAD SHX Text LAST SAVED BY: ryan.cheyne
AutoCAD SHX Text
DATE: 10/9/18
AutoCAD SHX Text FN: Maintenance Dock Replacement_2.2.24
AutoCAD SHX Text
JONATHAN GOBER
AutoCAD SHX Text B-4829
AutoCAD SHX Text
RAFAEL HOLCOMBE
AutoCAD SHX Text
RAFAEL HOLCOMBE
AutoCAD SHX Text
RAFAEL HOLCOMBE
AutoCAD SHX Text
AutoCAD SHX Text
DRAWING REF.
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text No. C-67958
AutoCAD SHX Text Exp. 06-30-25
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text B
AutoCAD SHX Text J.
AutoCAD SHX Text L
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
OF
AutoCAD SHX Text
FIELD BOOK
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
PAGE
AutoCAD SHX Text
GRAPHIC
AutoCAD SHX Text
AS-BUILT:
AutoCAD SHX Text
DATE
AutoCAD SHX Text No.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DRAFTING CHECK BY:
AutoCAD SHX Text
DESIGN CHECK BY:
AutoCAD SHX Text
REF.
AutoCAD SHX Text
APPROVAL
AutoCAD SHX Text PLOT DATE: Jun. 4, 24
AutoCAD SHX Text SAVED PATH: P:\Watr\t41970.23 marine maintenance dock replacement\07 design\01 Plans
AutoCAD SHX Text LAST SAVED BY: ryan.cheyne
AutoCAD SHX Text
DATE: 10/9/18
AutoCAD SHX Text FN: Maintenance Dock Replacement_2.2.24
AutoCAD SHX Text
JONATHAN GOBER
AutoCAD SHX Text B-4829
AutoCAD SHX Text
RAFAEL HOLCOMBE
AutoCAD SHX Text
RAFAEL HOLCOMBE
AutoCAD SHX Text
RAFAEL HOLCOMBE
AutoCAD SHX Text
AutoCAD SHX Text
DRAWING REF.
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text No. C-67958
AutoCAD SHX Text Exp. 06-30-25
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text B
AutoCAD SHX Text J.
AutoCAD SHX Text L
AutoCAD SHX Text
D-1
-5'
-5'
-6'
-6'
-7'
-6'
-7'
-7'
-6'
-9'
-9'
-6'
-5'
-7'
-7' -8'
-8'
-7'-8'
-7'
-8'
-4'
-3'
-2'
-1'
0'
+2.85' MEAN
TIDE LINE
+7.24' HIGH
TIDE LINE
BOTTOM LANDING
EL. 7.64'
www.tetratech.com
17885 VON KARMAN AVE #500,
IRVINE, CA 92614
PHONE: (949) 809-5000
M A
R
IN
E M
A
IN
TE
N
A N
C E
YA
R
D D
O C
K R
EP
LA
C
EM
EN
T
E . 2
N D
S
TR
EE
T, L O
N G
B
EA
C H
CONSTRUCTION PLAN
SCALE: 1" = 10'
C-1
CONSTRUCTION NOTES
1 INSTALL (N) 14.5'X59' CONCRETE DOCK (855.5 SF)
2 INSTALL (N) 4'X45' ALUM. GANGWAY
3 INSTALL (N) GANGWAY HINGE
4 INSTALL (N) CONC. GANGWAY ABUTMENT
5 INSTALL (N) 34" COPPER POTABLE WATER LINE
6 INSTALL (N) ALUM. GUARDRAIL (~7.5 LF)
www.tetratech.com
17885 VON KARMAN AVE #500,
IRVINE, CA 92614
PHONE: (949) 809-5000
M A
R
IN
E M
A
IN
TE
N
A N
C E
YA
R
D D
O C
K R
EP
LA
C
EM
EN
T
E . 2
N D
S
TR
EE
T, L O
N G
B
EA
C H
C
O N
ST
R
U C
TI
O
N P
LA
N
3 SEE C-2, SEC. B
59'
14'-6"(E) 18" DIAM.
STEEL PILE
(E) 18"
OCTAGONAL
CONC. PILE
(E) CONC. BRIDGE
COLUMN TYP.
25'-8"
(E) 18"
OCTAGONAL
CONC. PILE
1 CONNECT TO (E)
POTABLE WATERLINE
STUB-OUT
ELEVATION: DOCK AND GANGWAY (LOW TIDE -2.5')
SCALE: 1" = 5'
C-1
TOP OF WALL
EL. +10.16'
EL. -2.5'
NOTE: ALL ELEVATIONS ARE IN MLLW.
MATERIAL SCHEDULE
QTY ITEM DESCRIPTION SPECIFICATION
1 3/4" DIA. BALL VALVE W/ FEMALE NPT BOTH ENDS APOLLO: 20RE09, 3/4" BALL VALVE, LEAD FREE BRASS
2 3/4" DIA. WIRE REINFORCED NITRILE JACKET HOSE W/ MALE NPT THREAD ENDS HOSECRAFT RM4, 3/4" DIA., LENGTH AS REQUIRED
AS-REQ. 3/4" DIA. COPPER POTABLE WATER LINE COPPER TYPE "K" WITH SILVER SOLDER
AS-REQ. 1 5/8" X 3" LG. 12 GA. SQUARE ALUM. CHANNEL STRUT UNISTRUT: P1000, 12 GA. ALUM CHANNEL STRUT
AS-REQ. 3/4" ALUM. PIPE CLAMP W/ ISOLATION MATERIAL UNISTRUT: P2030 ALUM PIPE CLAMP, P2600 ISOLATION MATERIAL
2 3/4" DIA. COPPER 90 DEG. FITTING, C X C NIBCO: 59053, WROT COPPER FITTING WITH SILVER SOLDER
1 3/4" DIA. COPPER ADAPTER, C X FEMALE NPT NIBCO: 5P018, WROT COPPER ADAPTER WITH SILVER SOLDER
1 3/4" DIA. HOSE BIB W/ MALE NPT ZURN: 34-195XL, 3/4" HOSE BIB, LEAD FREE BRASS
3 3/4" SS 304 PIPE CLAMP W/ ISOLATION MATERIAL UNISTRUT: P2030 SS 304 PIPE CLAMP, P2600 ISOLATION MATERIAL
2 1 5/8" X 1'-3" LG. 12 GA. SQUARE SS 304 SLOTTED CHANNEL STRUT UNISTRUT: P1000T, 12 GA. SS 304 SLOTTED CHANNEL STRUT
7 1 5/8" 12 GA. SQUARE SS 304 CHANNEL STRUT UNISTRUT: P1000, 12 GA. SS 304 CHANNEL STRUT
1/2" DIA. X 2" LG. MIN. SS 304 HEX BOT AND WASHER, W/ 1/2" DIA. X 2" LG SS 304
DROP-IN ANCHOR (ESR-4233)
SIMPSON STRONG TIE: 1/2" DIA. X 2" LG MIN. SS 304 HEX BOLT, GRAINGER: 30PK22, 1/2"
DIA. THREAD X 2" LG. SS 304 DROP-IN ANCHOR
4 45° ANGLE FITTING, SS 304 UNISTRUT: P1186, 45° ANGLE FITTING, SS 304
4 90° ANGLE FITTING, SS 304 UNISTRUT: P1026, 90° ANGLE FITTING, SS 304
4 "Z" SHAPE FITTING, SS 304 UNISTRUT: P1347, "Z" SHAPE FITTING, SS 304
2 WING SHAPE FITTING, SS 304 UNISTRUT: P2341L & P2341R, WING SHAPE FITTING, SS 304
2 1/2" DIA. X 3" LG. MIN. SS 304 HEX LAG SCREW AND WASHER GRAINGER: 21JE13, 1/2" DIA. X 3" LG. SS 304 HEX LAG SCREW W/ WASHER
2' MIN.
SEE C-1,
DTL. 4
UTILITY RACK
SEE C-1, DTL. 4
SEAL
WELD
3" LG. TYP. 4
1'-03 4"
6 7
4'
TYP.
DETAIL: UTILITY RACK
SCALE: 1" = 1'
C-1
3" MIN.
9"
1'-3"
7 3
NOTE: ALL UNISTRUT PRODUCTS TO UTILIZE P1006U1420 CHANNEL NUT
AND HHCS025150 1/4" DIA. X 1 1/2" CAP SCREW OF SIMILAR MATERIAL.
10 10
12 17 12 17
9 TYP.
9 TYP.
16 TYP.
15 TYP.15 TYP.
9 13 TYP.
6" 3"
1'-6"1'-6"
1'-03 4" 111
2"
4"
4"
45'
45'
C-1
46°
6"
4'-93 4"
4'-33 4"
6'-91
4" 4' MIN.
14°
PILE GUIDE
SEE C-3, DTL. 4
4 6 SEE C-1, DTL.3
TRANSITION PLATE
SEE C-3, DTL. 3
PLAN: CONC. GANGWAY ABUTMENT
SCALE: 1" = 1'
C-1
1'-6"
5'
6'-91 4"
3'-6"
2'-03 4"
3'-31 4"
(E) 18"X18"
CONC. CAP
4 (N) CONC.
ABUTMENT
6 (N) 42" ALUM.
GUARDRAIL TYP.
C C-3
6"
5'-6"
2'-91 4"
3"
4'-83 4"
1'-6"
3"
(E) CONC.
RETAINING WALL
3" CLR.
TYP.
3" CLR.
TYP.
(E) CONC.
SLAB
1'-6"
D C-3
PILE GUIDE
SEE C-3, DTL. 5
5 POTABLE WATER LINE
POINT OF CONNECTION
5 POTABLE WATER LINE
POINT OF CONNECTION
B C-2
5'
3'
3'-6"
3 (N) GANGWAY HINGE
AND TRANSITION PLATE
A C-2
E C-3
MEAN TIDE LINE
EL. 2.85'
HIGH TIDE LINE
EL. 7.24'
18" DRAFT
(MAX)
(E) 1'-6" THICK CONCRETE
RETAINING WALL
(N) CONCRETE
DECK
(N) WALER
BOARD
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
OF
AutoCAD SHX Text
FIELD BOOK
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
PAGE
AutoCAD SHX Text
GRAPHIC
AutoCAD SHX Text
AS-BUILT:
AutoCAD SHX Text
DATE
AutoCAD SHX Text No.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DRAFTING CHECK BY:
AutoCAD SHX Text
DESIGN CHECK BY:
AutoCAD SHX Text
REF.
AutoCAD SHX Text
APPROVAL
AutoCAD SHX Text PLOT DATE: Jun. 4, 24
AutoCAD SHX Text SAVED PATH: P:\Watr\t41970.23 marine maintenance dock replacement\07 design\01 Plans
AutoCAD SHX Text LAST SAVED BY: ryan.cheyne
AutoCAD SHX Text
DATE: 10/9/18
AutoCAD SHX Text FN: Maintenance Dock Replacement_2.2.24
AutoCAD SHX Text
JONATHAN GOBER
AutoCAD SHX Text B-4829
AutoCAD SHX Text
RAFAEL HOLCOMBE
AutoCAD SHX Text
RAFAEL HOLCOMBE
AutoCAD SHX Text
RAFAEL HOLCOMBE
AutoCAD SHX Text
AutoCAD SHX Text
DRAWING REF.
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .