2nd Apparent Low Bid - R-7235 Dutra Group_Redacted.pdf
PDF 18 MB Posted
- Attached to
- R-7235 Marine Maintenance Yard Dock Replacement
- Solicitation number
- PW-24-457
- Issued by
- California
About this file
This is a contract opportunity package for the City of Long Beach Department of Public Works involving the Marine Maintenance Yard Dock Replacement project. The scope of work includes removal of existing steel gangway, gangway hinge, potable waterline, concrete staircase, and two existing concrete docks, with installation of a new singular concrete dock, concrete abutment, aluminum gangway, gangway hinge, potable waterline with utility rack, and aluminum guardrail. A mandatory online pre-bid meeting was held on June 17, 2024 at 9:00 a.m., with the original bid due date of July 29, 2024 at 2:00 p.m. (extended from July 22, 2024). The contractor must demonstrate related experience with at least two reinforced concrete dock projects completed within the last five years, with a combined minimum of 1,000 square feet of concrete docks installed. The contract includes seven bid items covering mobilization/demobilization, demolition/disposal, concrete dock, aluminum gangway, concrete abutment, waterline and utility rack, and an 18-inch steel guide pile HDPE sleeve repair.
The base bid total submitted by The Dutra Group is $4,133,000. All contractors and subcontractors must register with California's Department of Industrial Relations and maintain workers' compensation insurance. The project is subject to City of Long Beach business licensing requirements, equal benefits ordinance compliance, and Iran Contracting Act of 2010 certification. The bidder must provide a bid bond equal to ten percent of the total amount bid and execute performance and payment bonds upon contract award. The contractor shall list subcontractors performing work exceeding one-half of one percent of the prime contractor's total bid, with one identified subcontractor (Siverado Contractors for demolition and disposal at $55,000). Specifications take precedence over plans in case of conflicts, with particular clarifications addressing floating concrete pier design parameters, aluminum gangway finishing requirements, structural observation responsibilities, and steel pile repair specifications provided through three addenda issued between June 27 and July 19, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .