About this file
This Task Group Instruction (TGI) details work requirements for replacing deck covering in compartment 1-174-01-L aboard the USS SHOUP (DDG-86). The work involves removing 820 SF of existing chemical-resistant flooring system and installing new Navy blue chemical-resistant flooring (MIL-PRF-32584, Type IV) with white flakes, along with treating 928 SF of deck plating and vertical surfaces. The work location is in Passage 1-174-01-L.
The TGI specifies that SRF-JRMC will provide government furnished materials, crane services, utilities, safety inspections, and QA inspections. There are potential asbestos hazards noted. The work requires following specifications 009-26 and 009-32 of referenced documents. The material list includes various insulation materials, sealing compounds, and adhesives. Work dates are to be determined according to the TGI POP List. This is part of a larger contract opportunity (N6264925RA020) for USS SHOUP's FY25 5J1 SIA maintenance work in Yokosuka, Japan.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
08-JAN-2025 1330
20.14.15.2.9020 (September 2024) ICN: 38KC164502 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-174-01-L DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC1 64511
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-174-01-L
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 5
SS023031
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
KANO, DAISUKE 231A 3152430098 02-DEC-2024
APPROVED BY: CODE: PHONE: DATE:
NANBA, RYOUSUKE 231A 3152436141 02-DEC-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
SS02-3031
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE 1-174-01-L 1 U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
645A1102
1. SCOPE/PURPOSE:
1.1 Title: Deck Covering in 1-174-01-L; replace
1.2 Location of Work:
1.2.1 Passage (1-174-01-L)
1.3 Identification:
1.3.1 Quantity (820 SF), Chemical-Resistant Floorings System [Existing] Remarks: See Sketch Enclosure-01 for location detail.
1.3.2 Quantity (820 SF), Chemical-Resistant Floorings System
Specification: MIL-PRF-32584, Type IV Color: 706 Navy blue color coat with white flakes Remarks: See Sketch Enclosure-01 for location detail.
TGI Short Form
08-JAN-2025 1330
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KC164502 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-174-01-L DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC1 64511
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-174-01-L
FOUO Pg 2 of 5
CU PHASE DESCRIPTION (Cont.)
1.3.3 Quantity (928 SF), Deck Plating including vertical structural surface up to height of One inch from complete chemical-resistant floorings system level
Remarks: See Sketch Enclosure-01 for location detail.
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard
1.6 Contractor work start date: See TGI POP List
1.7 Contractor work completion date: See TGI POP List
2. PROCEDURE:
2.1 Accomplish the requirements of 009-26 of Ref. No. One, including Attachment C, for removal of each existing equipment listed in 1.3.1 and installation of each new equipment listed in 1.3.2.
2.1.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 3, Line(s) 6, Column(s) A, B, and D, for each area listed in 1.3.3. Primer must conform to MIL-PRF-23236, Type V, VI, or VII.
2.2 Notes:
2.2.1 Planner: Code 231A D. Kano, 243-0098
Planner: Code 234 Y. Yajima, 243-0977
2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.2.3 JCN SS02-3031 is related to this TGI.
2.3 Government Furnished Material (GFM):
2.3.1 SRF-JRMC will provide GFM listed in the Material List.
2.4 SRF-JRMC will provide the following service work: (TGI No. 38KC164502S02)
2.4.1 [C740] Crane and crane rigging service.
2.4.2 [X99E] Utility service, electrical.
2.4.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.4.5 [C106.2] Provide gas free inspection for SRF-JRMC employees.
2.4.6 [C133] QA inspection for (G) symbols.
08-JAN-2025 1330
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KC164502 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-174-01-L DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC1 64511
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-174-01-L
FOUO Pg 3 of 5
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
08-JAN-2025 1330
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KC164502 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-174-01-L DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC1 64511
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-174-01-L
FOUO Pg 4 of 5
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
400 M INSULATI, ORDER FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 5970 LL9607844 NA 4 N 43197532 2/EA
401 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013, FOR SIZE: 2-1/2" IPS,
SIZE: 2-7/8" ID X 3/4" THK X 6FT
LG, UI: EA/6 FT(ONE
CONTINUOUS LENGTH
REQUIRED), MATL: NON-
HALOGEN, **GSA ADVANTAGE
ITEM**
ORDER FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 5970 LL9607845 NA 4 N 43197534 2/EA
402 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013, FOR 5" IPS, SIZE: 5-
5/8" ID X 3/4" THK X 6 FT LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED), MATL:
NON-HALOGEN, 2EA/BOX
ORDER FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 5640 LL9607849 NA 4 N 43197540 2/EA
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38KC164502 KEY OP: A01
08-JAN-2025 1330
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KC164502 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-174-01-L DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC1 64511
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-174-01-L
FOUO Pg 5 of 5
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
403 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 8" IPS,
SIZE: 8-5/8" ID X 3/4" THK X 6
FT LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
ORDER FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 5640 LL9607851 NA 4 N 43197543 2/EA
404 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 3/4" IPS,
SIZE: 1-1/8" ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
**GSA ADVANTAGE ITEM**
ORDER FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 5640 LL9607842 NA 4 N 43197529 2/EA
405 M SEALING COMPOUND, ORDER
FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 8030 001742588 NA 4 Y 43175320 1/GL
406 M ADHESIVE, ADHESIVE FOR
CLOTH,
ORDER FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 8040 002738708 NA 4 Y 43175321 1/GL
407 M ADHESIVE, ADHESIVE FOR
PLASTIC TUBE
ORDER FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 8040 008419773 NA 4 Y 43175322 2/PT
ATTACHMENT LIST
TITLE FILE NAME SAVED DATE
ENCLOSURE-01 38KC164502A01-Sketch.pdf 20-NOV-2024 0000
LOCATION MAP OF REPLACEMENT DECK
COVERING AREA IN 1-174-01-L
38KC164502A01
SKETCH
ENCLOSURE-01 SHEET 1 OF 1
※Remarks: The area exclude where power tool cannot reach.
And due to the intent of project the machine will not be moved.
Passage 1-174-01-L
Remarks: The deck covering area for under and around of the switch box is excluded from the replacement area.
Daisuke.Kano.ja Polygon
Daisuke.Kano.ja_1 Rectangle
Daisuke.Kano.ja_2 Line
Daisuke.Kano.ja_3 Oval
Daisuke.Kano.ja_4 Rectangle
File details come from the government source that posted it. Updated .