About this file
This Task Group Instruction (TGI) details work requirements for replacing deck covering in passage 1-300-01-L aboard the USS SHOUP (DDG-86). The work involves removing 285 SF of existing chemical-resistant flooring system and installing new MIL-PRF-32584 Type IV flooring in Navy blue with white flake and glass beads in the final seal coat. The scope includes surface preparation and painting of 317 SF of deck plating and vertical surfaces up to one inch height using MIL-PRF-23236 primer.
The work is part of a larger Ship Industrial Availability (SIA) contract opportunity (N6264925RA020) managed by Naval Supply Systems Command in Yokosuka, Japan. SRF-JRMC will provide support services including crane operations, utilities, safety inspections, and QA inspections. The work area contains potential asbestos hazards. Specific work start and completion dates are referenced in a separate TGI POP List. The contract will be awarded as Firm-Fixed-Price (FFP) with pricing required in Japanese Yen using an exchange rate of 145.7323 JPY per USD.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
08-JAN-2025 1325
20.14.15.2.9020 (September 2024) ICN: 38KC112310 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-300-01-L DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC1 64511
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-300-01-L
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 3
CM021885
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
TAKANASHI, TATSUNORI 231A 3152436238 11-DEC-2024
APPROVED BY: CODE: PHONE: DATE:
NANBA, RYOUSUKE 231A 3152436141 13-DEC-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
CM02-1885
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE 1-300-01-L 1 U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
123A4310
1. SCOPE/PURPOSE:
1.1 Title: Deck Covering in 1-300-01-L; replace
1.2 Location of Work:
1.2.1 Passage (1-300-01-L)
1.3 Identification:
1.3.1 Quantity (285 SF), Chemical-Resistant Floorings System [Existing] Remarks: See Sketch Enclosure-01 for location details.
1.3.2 Quantity (285 SF), Chemical-Resistant Floorings System
Specification: MIL-PRF-32584, Type IV Color: 706 Navy blue color coat with white flake Remarks: See Sketch Enclosure-01 for location details. Glass beads must be included in final seal coat.
TGI Short Form
08-JAN-2025 1325
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KC112310 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-300-01-L DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC1 64511
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-300-01-L
FOUO Pg 2 of 3
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1.3.3 Quantity (317 SF), Deck Plating including vertical structural surface up to height of One inch from complete chemical-resistant floorings system level
Remarks: See Sketch Enclosure-01 for location details. The area excepts where insulation is installed.
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard
1.6 Contractor work start date: See TGI POP List
1.7 Contractor work completion date: See TGI POP List
2. PROCEDURE:
2.1 Accomplish the requirements of 009-26 of Ref. No. One, including Attachment C, for removal of each existing equipment listed in 1.3.1 and installation of each new equipment listed in 1.3.2.
2.1.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 3, Line(s) 6, Column(s) A, B, and D, for each area listed in 1.3.3. Primer must conform to MIL-PRF-23236, Type V, VI, or VII.
2.2 Notes:
2.2.1 Planner: Code 231A T. Takanashi, 243-6238
2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.2.3 JCN CM02-1885 is related to this TGI.
2.3 Government Furnished Material (GFM): None.
2.4 SRF-JRMC will provide the following service work: (TGI No. 38KC112310S03)
2.4.1 [C740] Crane and crane rigging service.
2.4.2 [X99E] Utility service, electrical.
2.4.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.4.5 [C133] QA inspection for (G) symbols.
08-JAN-2025 1325
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KC112310 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-300-01-L DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC1 64511
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-300-01-L
FOUO Pg 3 of 3
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
ATTACHMENT LIST
TITLE FILE NAME SAVED DATE
ENCLOSURE-01 38KC112310A01-Sketch.pdf 10-DEC-2024 0000
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38KC112310 KEY OP: A01
R ep la ce m en t A re a of
D ec k C ov er in g
Pa ss ag e
1-
0-
-L
SK
ET
C H
KC
A0
E N
C
LO
SU
R
E-
S
H
EE
T
O F
File details come from the government source that posted it. Updated .