B-1_CLN-1_38KC112310_A01TGI_c0v0.pdf

PDF 296 KB Posted

Attached to
USS SHOUP (DDG-86) 5J1 SIA (Yokosuka, JAPAN)
Solicitation number
N6264925RA020
Issued by

About this file

This Task Group Instruction (TGI) details work requirements for replacing deck covering in passage 1-300-01-L aboard the USS SHOUP (DDG-86). The work involves removing 285 SF of existing chemical-resistant flooring system and installing new MIL-PRF-32584 Type IV flooring in Navy blue with white flake and glass beads in the final seal coat. The scope includes surface preparation and painting of 317 SF of deck plating and vertical surfaces up to one inch height using MIL-PRF-23236 primer.

The work is part of a larger Ship Industrial Availability (SIA) contract opportunity (N6264925RA020) managed by Naval Supply Systems Command in Yokosuka, Japan. SRF-JRMC will provide support services including crane operations, utilities, safety inspections, and QA inspections. The work area contains potential asbestos hazards. Specific work start and completion dates are referenced in a separate TGI POP List. The contract will be awarded as Firm-Fixed-Price (FFP) with pricing required in Japanese Yen using an exchange rate of 145.7323 JPY per USD.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

08-JAN-2025 1325

20.14.15.2.9020 (September 2024) ICN: 38KC112310 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-300-01-L DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-86 USS SHOUP KC1 64511

CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-300-01-L

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 3

CM021885

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

TAKANASHI, TATSUNORI 231A 3152436238 11-DEC-2024

APPROVED BY: CODE: PHONE: DATE:

NANBA, RYOUSUKE 231A 3152436141 13-DEC-2024

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

CM02-1885

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE 1-300-01-L 1 U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

123A4310

1. SCOPE/PURPOSE:

1.1 Title: Deck Covering in 1-300-01-L; replace

1.2 Location of Work:

1.2.1 Passage (1-300-01-L)

1.3 Identification:

1.3.1 Quantity (285 SF), Chemical-Resistant Floorings System [Existing] Remarks: See Sketch Enclosure-01 for location details.

1.3.2 Quantity (285 SF), Chemical-Resistant Floorings System

Specification: MIL-PRF-32584, Type IV Color: 706 Navy blue color coat with white flake Remarks: See Sketch Enclosure-01 for location details. Glass beads must be included in final seal coat.

TGI Short Form

08-JAN-2025 1325

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KC112310 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-300-01-L DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-86 USS SHOUP KC1 64511

CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-300-01-L

FOUO Pg 2 of 3

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1.3.3 Quantity (317 SF), Deck Plating including vertical structural surface up to height of One inch from complete chemical-resistant floorings system level

Remarks: See Sketch Enclosure-01 for location details. The area excepts where insulation is installed.

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Asbestos Hazard

1.6 Contractor work start date: See TGI POP List

1.7 Contractor work completion date: See TGI POP List

2. PROCEDURE:

2.1 Accomplish the requirements of 009-26 of Ref. No. One, including Attachment C, for removal of each existing equipment listed in 1.3.1 and installation of each new equipment listed in 1.3.2.

2.1.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 3, Line(s) 6, Column(s) A, B, and D, for each area listed in 1.3.3. Primer must conform to MIL-PRF-23236, Type V, VI, or VII.

2.2 Notes:

2.2.1 Planner: Code 231A T. Takanashi, 243-6238

2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.2.3 JCN CM02-1885 is related to this TGI.

2.3 Government Furnished Material (GFM): None.

2.4 SRF-JRMC will provide the following service work: (TGI No. 38KC112310S03)

2.4.1 [C740] Crane and crane rigging service.

2.4.2 [X99E] Utility service, electrical.

2.4.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.4.5 [C133] QA inspection for (G) symbols.

08-JAN-2025 1325

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KC112310 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-300-01-L DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-86 USS SHOUP KC1 64511

CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-300-01-L

FOUO Pg 3 of 3

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 38KC112310A01-Sketch.pdf 10-DEC-2024 0000

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38KC112310 KEY OP: A01

R ep la ce m en t A re a of

D ec k C ov er in g

Pa ss ag e

1-

0-

-L

SK

ET

C H

KC

A0

E N

C

LO

SU

R

E-

S

H

EE

T

O F

File details come from the government source that posted it. Updated .