B-1_CLN-1_38KC115501_A01TGI_c0v0.pdf

PDF 140 KB Posted

Attached to
USS SHOUP (DDG-86) 5J1 SIA (Yokosuka, JAPAN)
Solicitation number
N6264925RA020
Issued by

About this file

This is a Task Group Instruction (TGI) document for replacing the nonskid system on the 04 Level Weather deck of the USS SHOUP (DDG-86). The work is to be performed between frames 140 and 159 on both port and starboard sides, covering approximately 340 square feet of deck plating including vertical surfaces up to 4 inches from the deck.

The document specifies the technical requirements for installing new peel and stick nonskid deck covering that must conform to MIL-PRF-24667, Type XI, Composition PS. The work requires compliance with standards 009-32 and 009-26. SRF-JRMC will provide Government Furnished Material (GFM) and support services including crane operations, utilities (electrical, air, water, steam), safety inspections, gas free inspections, and QA inspections. The material list includes specific components like grating clips, screws, and nuts. While work start and completion dates are referenced in a TGI POP List, specific dates are not provided in this document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

08-JAN-2025 1329

20.14.15.2.9020 (September 2024) ICN: 38KC115501 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 04 LVL WEATHER DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-86 USS SHOUP KC1 15511

CU PHASE TITLE: *F/O - REPLACE NONSKID SYSTEM ON 04 LEVEL WEATHER

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 3

NN011178 * NN011179

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

ISHIKAWA, HIROTSUGU 231A 3152436152 16-DEC-2024

APPROVED BY: CODE: PHONE: DATE:

NANBA, RYOUSUKE 231A 3152436141 17-DEC-2024

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

NN01-1178 * NN01-1179

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE 04 LVL WEA 04 U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

155A1101

1 SCOPE/PURPOSE:

1.1 Title: Nonskid System on 04 Level Weather; replace

1.2 Location of Work:

1.2.1 04 Level Weather, Frames between 140 and 159, Port and Starboard

1.3 Identification:

1.3.1 Quantity (340 SF in Total), 04 Level Deck Plating, Frames between 140 and 159, including vertical surface up to height of 4 inches from deck in and around peel and stick nonskid deck covering area

1.4 Security Classification: None.

1.5 Initial Condition: None.

TGI Short Form

08-JAN-2025 1329

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KC115501 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 04 LVL WEATHER DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-86 USS SHOUP KC1 15511

CU PHASE TITLE: *F/O - REPLACE NONSKID SYSTEM ON 04 LEVEL WEATHER

FOUO Pg 2 of 3

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1.6 Contractor work start date: See TGI POP List

1.7 Contractor work completion date: See TGI POP List

2 PROCEDURE:

2.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 2, Line(s) 25, for each area listed in 1.3.1.

2.1.1 Accomplish the requirements of 009-26 of Ref No. One, including Attachment G, for installation of new peel and stick nonskid deck covering. Application of peel and stick nonskid deck covering must conform to MIL-PRF-24667, Type XI, Composition PS.

2.2 Notes:

2.2.1 Planner: Code 231A H. Ishikawa, 243-6152

2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.2.3 JCNs NN01-1178 and NN01-1179 are related to this TGI.

2.3 Government Furnished Material (GFM):

2.3.1 SRF-JRMC will provide GFM listed in the material list.

2.4 SRF-JRMC will provide the following service work: (TGI No. 38KC115501S02).

2.4.1 [C740] Crane and crane rigging service.

2.4.2 [X99E] Utility service, electrical.

2.4.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.4.6 [C133] QA inspection for (G) symbol(s).

08-JAN-2025 1329

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KC115501 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 04 LVL WEATHER DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-86 USS SHOUP KC1 15511

CU PHASE TITLE: *F/O - REPLACE NONSKID SYSTEM ON 04 LEVEL WEATHER

FOUO Pg 3 of 3

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 1 M GRATING CLIP, GRATING CLIP,

J SHAPE,

DWG: 672-6220241 (0450-M-FH-

GHGO-01)/ 672-7058782 (M-FH-

GHGO-01), DET 8S-B & 8S-L,

SIZE: 3/4" W X 1-3/4” TOTAL LG

X 1-9/16” TOTAL HEIGHT, 1/16"

THK, WITH MOUNT HOLE 9/32”

DIA,

MATL: CRES 316, 16 GA,

ORDER FOR KTR

ORIG: C226 H.SHIMIZU, 080-

9350-1431

9B 5340 LL9302558 NA 4 N 43317410 50/EA

002 1 M SCREW,CA, ORDER FOR KTR

ORIG: C226 H.SHIMIZU, 080-

9350-1431

9B 5305 013723542 NA 4 N 43315038 50/EA

003 1 M NUT,SELF, ORDER FOR KTR

ORIG: C226 H.SHIMIZU, 080-

9350-1431

9B 5310 015126463 NA 4 N 43315041 50/EA

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

1 600-7059121 A

ICN: 38KC115501 KEY OP: A01