Attch B - Construction Experience Project Data.docx
DOCX document 17 KB Posted
- Solicitation number
- N6247026R0016
About this file
This is a Construction Experience Project Data Sheet template designed for offerors to document their relevant project experience in response to the Berth 13 Structural Repairs solicitation at Portsmouth Naval Shipyard. The form requires contractors to provide details on up to five previous construction projects, including firm identification information (name, address, DUNS number, point of contact), their role (prime contractor, subcontractor, or joint venture partner), and the percentage of work performed. For each project, offerors must document the contract and delivery/task order numbers, award and completion dates, project location, and contract type (firm-fixed price, cost/time and material, design-build, design-bid-build, or IDIQ delivery/task order).
The template requires comprehensive project descriptions demonstrating relevance to the Berth 13 requirements, specifically addressing unique features, square footage, construction methods, sustainable features, and any USGBC LEED certifications. Offerors must clearly delineate what work their firm self-performed versus subcontracted work. This project data sheet is used to evaluate contractor qualifications for the Berth 13 structural repair work, which involves approximately 25,000 square feet of waterfront facility repairs including concrete wharf deck demolition and replacement, pile repairs, pile cap repairs, steel reaction frame repairs, crane rail beam repairs, anode repairs, and utility coordination—all requiring barge-based and floating platform work capabilities, debris containment protocols, and strict safety compliance at Portsmouth Naval Shipyard in Kittery, Maine.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0003.zip | ZIP file | |
| Amendment 0002.zip | ZIP file | |
| Amendment 0001.zip | ZIP file | |
| Attch D - Historical Small Business Utilization.pdf | ||
| Solicitation - N6247026R0016.pdf | ||
| Attch A - Pre-Proposal Inquiry Log Template.xlsx | XLSX spreadsheet | |
| Attch C - Past Performance Questionnaire.docx | DOCX document | |
| Attch E - Small Business Participation Commitment Document (SBPCD).pdf | ||
| Attch F - Individual Small Business Subcontracting Plan.pdf | ||
| Attch G - Price Proposal Form.docx | DOCX document | |
| Attch H - PIEE Vendor Access Instructions.pdf | ||
| Attch I - Davis-Bacon WD ME20260033.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT B
CONSTRUCTION EXPERIENCE PROJECT DATA SHEET
Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5
1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)
Firm Name:
Address:
Phone Number:
DUNS Number:
Point of Contact: Contact Phone Number:
2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)
Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
3. Contract Number: Delivery/Task Order Number:
Title:
Location:
4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):
5. Type of work:
|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):
Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.
7. Construction Project:
Award Amount: Final Price:
Type of Contract/Task Order: (Check ALL that apply)
|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):
If Design-Build, identify the Lead Design Firm:______________________________________________
8. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.
9. Provide a detailed description of what work your firm self-performed on this project:
10. Other Information:
File details come from the government source that posted it. Updated .