These architectural drawings are for a Sterile Processing Department (SPD) renovation project at the Northport VA Medical Center (VAMC), Building No. 200. The project involves a comprehensive renovation of the existing SPD, including the installation of new medical equipment, floor and wall finishes, and temporary mobile trailers to maintain operations during construction. The equipment plan details over 50 equipment items, including ultrasonic cleaners, washer/disinfectors, steam sterilizers, case carts, work tables, and specialized medical inspection equipment. Two mobile trailers will be used: a Mobile Sterile Processing System trailer and a Mobile Sterile Processing Storage trailer, which will be provided and installed by the General Contractor. The renovation is scheduled for completion by June 18, 2025, with an addendum issued on September 3, 2025, and the project is fully sprinklered.

The first floor equipment plan shows a detailed layout of various rooms including processing areas, decontamination zones, locker rooms, offices, and storage spaces. The floor finishes vary by room, using materials such as LVT (Luxury Vinyl Tile), resilient bases, sheet vinyl, and painted surfaces. The equipment schedule specifies manufacturers like Getinge, Triton, STERIS, and BOBRICK for items ranging from medical equipment to bathroom accessories. The project is being managed by the VA Office of Construction and Facilities Management, with architectural services provided by Delta Consulting and Above Group, located in Melbourne, Florida, and Chevy Chase, Maryland, respectively.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G

H

H1

J

K

L

78910

CLEAN

SUPPLY/STORAGE

OFFICE

CONF /BREAK

OFFICE

OFFICE

CORRIDOR

COOL DOWN

DECON

SCOPE DECON

SCOPE PROC

HAC

WOMENS LOCKER

ANTE ROOM

MENS LOCKER

VENDOR

1.2

CART WASH

CARTS COOL DOWN

CARTS SOILED

HAC

PROCESSING

ANTEROOM

205.1

120.1120.1

120.1120.1

110.3

109.1

205.1

102.1

120.1

204.2

204.2

101.2101.2

109.1

1.

109.1

109.1

203.1

120.1

120.1

109.1

109.1

3'

3' - 7"

3'

3' - 6"

110.2

1.

110.1

202.2202.2

202.1

202.2 202.2

202.2

202.2

101.2

101.2 101.2 101.2

101.2101.2

101.2 101.2 101.2 101.2

101.2

101.2

101.2

101.2

101.2101.2

101.2

101.2 101.2

101.2 101.2

101.2

109.1

109.1 109.1

109.1 109.1

109.1

109.1

207.3

207.3

1.

103.1

103.1

1.

1.

1.

6.

6.

1.

206.1

202.1

120.1

207.3

130.1

131.1

143.1

142.1

141.1

207.1

207.2

A-112

1.

6"

2'

A-111

A-111

A-111

BUMPER

RAIL

CORNER GUARD, TYP.

BUMPER RAIL

BUMPER

RAIL

CORNER

GUARD,

TYP.

BUMPER RAIL

CORNER GUARD,

TYP.

CORNER

GUARD,

TYP.

207.3

202.2

115.1 115.1

115.1

204.2

204.2

208.2

34.2

4.2

4.2

4.2

208.3

204.3

204.1

110.3 201.2

NORTH

G

H

H1

J

K

L

78910

1077 SF

CLEAN

SUPPLY/STORAGE

108 SF

OFFICE

19125 SF

CONF /BREAK

86 SF

OFFICE

100 SF

OFFICE

223 SF

CORRIDOR

333 SF

COOL DOWN

760 SF

DECON

147 SF

SCOPE DECON

100 SF

SCOPE PROC

42 SF

HAC

150 SF

WOMENS LOCKER

172 SF

ANTE ROOM

139 SF

MENS LOCKER

17 SF

VENDOR

1.2

94 SF

CART WASH

99 SF

CARTS COOL DOWN

96 SF

CARTS SOILED

51 SF

HAC

882 SF

PROCESSING

89 SF

ANTEROOM

59 SF

STERILIZERS

11.2

56 SF

SHOWER

2.2

52 SF

SHOWER

3.2

EXPANSION

JOINT

E.J.

S /S

W A

IN

S

C O

T W

/ C A

P T

R

IM

T O

2"

A F

F S

/S W

A

IN

S C

O T

W / C

A P

T R

IM

T

O

2" A

F F

RES-6B-2, TYP

1'

3'

RES-6B-2, TYP

1'

1'

" 6"

1' - 0"

1'

1'

6"

6"

A-4014

4.1

4.1

6.1

6.2

6.2

6.1

A-401

WOMENS LOCKER

SHOWER

2.2

MENS LOCKER

SHOWER

3.2

PRIVACY CURTAIN,

ROD & HOOKS

PRIVACY CURTAIN,

ROD & HOOKS

SHOWER CURTAIN,

ROD & HOOKS

SHOWER CURTAIN,

ROD & HOOKS

TOILET

PARTITION

ASSEMBLY

TOILET

PARTITION

ASSEMBLY

5 6.3

6.3

1 1 1 1 1

1 1 1 1 1

FLOOR FINISH LEGEND

LVT-1

LVT-2

PT-1

RES-6A-2 & RES-6B-2

WSV-1

SVT-1

RES-6A-1 & RES-6B-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

Email: mail@delta-eas.com www.delta-eas.com

8401 Connecticut Avenue, Suite 350 Chevy Chase, MD 20815

Tel: 301.718.0080 Fax: 301.718.9520

A u to d e s k D o c s /0

N o rt h p o rt

S P

S /2

.4

.0

N o rt h p o rt V

A M

C S

P D

R e n o v a ti o n

.r v t

/3

/2

:3

:2

A

M

A-112

FIRST FLOOR EQUIPMENT & FINISH

PLANS

RENOVATE STERILE

PROCESSING DEPARTMENT,

BUILDING NO. 200

NORTHPORT VA

632-12-106

B200

06/18/2025 EJL EJL, LDM,

JDH

100% CONSTRUCTION

DOCUMENTS

SCALE: 1/8" = 1'-0"A-112

1 FIRST FLOOR - EQUIPMENT PLAN

SCALE: 1/8" = 1'-0"A-112

2 FIRST FLOOR - FINISH PLAN

0'

SCALE: 1/8" = 1'-0"

2' 4' 16'8'

EQUIPMENT SCHEDULE

EQUIPMENT

NUMBER EQUIPMENT NAME MANUFACTURER MODEL QUANTITY NEW/EXISTING FURNISHED INSTALLED COMMENTS

1 LOCKERS ASI Storage 1Z181872 10 NEW GC GC

2 MIRROR BOBRICK B-290 1830 2 NEW GC GC

3 SOAP DISPENSER BOBRICK B-4112 6 NEW GC GC

4.1 PAPER TOWEL DISPENSER/TRASH RECEP. BOBRICK B-43944 2 NEW GC GC

4.2 PAPER TOWEL DISPENSER BOBRICK B-4262 4 NEW GC GC

5 TOILET SEAT COVER DISPENSER BOBRICK B-4221 3 NEW GC GC

6.1 GRAB BAR Bobrick Washroom Equipment, Inc. B-5806x36 2 NEW GC GC

6.2 GRAB BAR BOBRICK B-5806.99x42 2 NEW GC GC

6.3 SHOWER GRAB BAR BOBRICK B-58616 2 NEW GC GC

7 TOILET TISSUE DISPENSER BOBRICK B-2721 3 NEW GC GC

8 SANITARY DISPOSAL BOBRICK B-270 2 NEW GC GC

9 SHOWER SEAT BOBRICK B-918116L 1 NEW GC GC

10 HAND DRYER BOBRICK B-7120 115V 2 NEW GC GC

101.1 PPE SHELF - - 1 EXISTING VA VA

101.2 SHELF UNIT - - 28 EXISTING VA VA

102.1 WRAP DISPENSER - - 1 EXISTING VA VA

103.1 TRASH RECEPTACLE - - 2 EXISTING VA VA * QUANTITY MAY VARY BASED ON USE

106.6 SHELF UNIT - - 2 EXISTING VA VA

109.1 CASE CART - - 12 EXISTING VA VA * QUANTITY MAY VARY BASED ON USE

110.1 UTILITY TABLE GETINGE 6720 - 5'-0" L 1 NEW VA GC

110.2 UTILITY TABLE GETINGE 6720 - 6'-0" L 1 NEW VA GC

110.3 WORK TABLE 24x24 - 2 EXISTING VA VA

115.1 THREE SINK WORK STATION GETINGE HW6760 3 NEW VA EQUIP. VENDOR / GC

120.1 WORK TABLE GETINGE HAT72 HEIGHT ADJUSTABLE 30 X 72 7 EXISTING VA VA

130.1 DESKTOP PRINTER - 6 EXISTING VA VA

131.1 COMPUTER/MONITOR - 6 EXISTING VA VA

141.1 MAGNIFIER/LIGHT-DESK MOUNTED - 6 EXISTING VA VA

142.1 SCOPE INSPECTOR-DESK MOUNTED - 6 EXISTING VA VA

143.1 INSULATION INSPECTOR-DESK MOUNTED - 6 EXISTING VA VA

201.1 ULTRASONIC CLEANER TRITON TRITON 36 3 NEW VA EQUIP. VENDOR / GC

201.2 EYE ULTRASONIC CLEANER STERIS INNOWAVE ECO 1 NEW VA EQUIP. VENDOR / GC

202.1 WASHER / DISINFECTOR GETINGE 86668T 2 NEW VA EQUIP. VENDOR / GC

202.2 WASHER TROLLEY GETINGE - 7 NEW VA EQUIP. VENDOR / GC * QUANTITY MAY VARY BASED ON USE

203.1 STERILIZER-PASS THROUGH MEDIVATOR ADVANTAGE PLUS PASS-THRU ERS 1 NEW VA EQUIP. VENDOR / GC

204.1 WIRE SHELVING ULINE H-6816 1 NEW VA EQUIP. VENDOR / GC

204.2 DRYING CABINET - - 4 EXISTING VA EQUIP. VENDOR / GC

204.3 STORAGE CABINET - - 1 NEW VA EQUIP. VENDOR / GC

205.1 STERRAD STERRAD - 2 EXISTING VA EQUIP. VENDOR / GC

206.1 CART WASHER GETINGE 9125E 1 NEW VA EQUIP. VENDOR / GC

207.1 STEAM STERILIZER GETINGE GSS67 1 NEW VA EQUIP. VENDOR

207.2 STEAM STERILIZER GETINGE GSS67 1 NEW VA EQUIP. VENDOR

207.3 LOADING CAR TRANSFER CARRIAGE 66" GETINGE - 4 NEW VA EQUIP. VENDOR * QUANTITY MAY VARY BASED ON USE

208.2 PASS THROUGH CHAMBER CMP SC2-2424-24-PT 1 NEW VA EQUIP. VENDOR / GC

208.3 CHAMBER CABINET PASS-THROUGH CMP SC2-3672 36-PT-CPT 1 NEW VA EQUIP. VENDOR / GC

209 S/S SHELF- PASS THROUGH WINDOW CMP 12x24 2 NEW VA EQUIP. VENDOR / GC

301 MOBILE SPS SYSTEM TRAILER mmic Medical Solutions MSPS-01 1 NEW GC EQUIP. VENDOR / GC PROVIDE SPS EQUIPMENT AS ASSEMBLY UNIT

302 MOBILE SPS STORAGE SYSTEM TRAILER mmic Medical Solutions MSSU 1 NEW GC EQUIP. VENDOR / GC

ROOM FINISH SCHEDULE

ROOM

NUMBER

ROOM NAME

FLOOR FINISHES

NORTH FINISH EAST FINISH SOUTH FINISH WEST FINISH

CEILING

FINISH

COMMENTS

FLOOR BASE

1 ANTE ROOM SVT-1 RB-1 SC-1 SC-1 SC-1 SC-1 ACP-1 * S/S PANELS AS IDENTIFIED

1.2 VENDOR SVT-1 RB-1 SC-1 SC-1 SC-1 SC-1 ACP-1

2 WOMENS LOCKER PT-1 PT-1 PT-2 / P-1 PT-2 / P-1 PT-2 / P-1 PT-2 / P-1 P-1** ** CEILING TYPE

2.2 SHOWER PT-1 PT-1 PT-2 / P-1 PT-2 / P-1 PT-2 / P-1 PT-2 / P-1 P-1** ** CEILING TYPE

3 MENS LOCKER PT-1 PT-1 PT-2 / P-1 PT-2 / P-1 PT-2 / P-1 PT-2 / P-1 P-1** ** CEILING TYPE

3.2 SHOWER PT-1 PT-1 PT-2 / P-1 PT-2 / P-1 PT-2 / P-1 PT-2 / P-1 P-1** ** CEILING TYPE

4 DECON RES-6B-1; RES-6B-2 RES-6A-2 RES-W1 RES-W1 RES-W1 RES-W1 RES-W1** * S/S PANELS AS IDENTIFIED; ** CEILING TYPE

5 HAC RES-6A-1 RES-6A-1 SC-1 SC-1 SC-1 PT-3 / SC-1 RES-W1*

6 CARTS SOILED RES-6A-1; RES-6A-2 RES-6A-2 PT-3 - PT-3 PT-3 RES-W1** ** CEILING TYPE

7 CART WASH RES-6A-1 RES-6A-1 RES-W1 - RES-W1 - RES-W1**

8 CARTS COOL DOWN RES-6B-1; RES-6B-2 RES-6B-2 PT-3 PT-3 PT-3 - RES-W1**

9 SCOPE DECON RES-6A-1; RES-6A-2 RES-6B-2 RES-W1 S/S PARTITION RES-W1 RES-W1 RES-W1** * S/S PANELS AS IDENTIFIED; ** CEILING TYPE

10 SCOPE PROC RES-6B-1; RES-6B-2 RES-6B-2 SC-1 SC-1 SC-1 S/S PARTITION SC-1

11 PROCESSING RES-6B-1; RES-6B-2 RES-6B-2 SC-1 SC-1 SC-1 SC-1 SC-1** ** CEILING TYPE

11.2 STERILIZERS RES-6B-1; RES-6B-2 RES-6B-2 RES-W1 RES-W1 RES-W1 RES-W1 RES-W1** ** CEILING TYPE

12 ANTEROOM SVT-1 RB-1 SC-1 SC-1 SC-1 SC-1 SC-1** ** CEILING TYPE

13 COOL DOWN RES-1 RES-1 RES-W1 RES-W1 RES-W1 RES-W1 RES-W1** ** CEILING TYPE

14 CLEAN SUPPLY/STORAGE WSV-1 WSV-1 SC-1 SC-1 SC-1 SC-1 SC-1**

15 CORRIDOR SVT-1 SVT-1 P-1 P-1 P-1 P1 ACP-1

16 HAC WSV-1 WSV-1 SC-1 SC-1 P-1 PT-3 / SC-1 RES-W1* ** CEILING TYPE

17 OFFICE LVT-1 RB-1 P-1 P-1 PT-3 P1 ACP-1

18 CONF /BREAK LVT-2 RB-1 P-1 P-1 PT-3 P1 ACP-1

19 OFFICE LVT-1 RB-1 PT-3 P-1 P-1 P1 ACP-1

20 OFFICE LVT-1 RB-1 P-1 P-1 P-1 PT-3 ACP-1

101 TEMPORARY CORRIDOR SVT-1 RB-1 P-1 P-1 P-1 P-1 ACP-1

B0-29 EQUIP STO ETR*** ETR*** ETR*** ETR*** ETR*** ETR*** ETR*** ***PATCH TO MATCH EXISTING

B002 MECHANICAL EQUIPMENT

ROOM #2

G01 VESTIBULE SVT-1 RB-1 P-1 P-1 P-1 P2 ACP-1

G02 LOBBY SVT-1 RB-1 P-1 P-1 P-1 P2 ACP-1

G03.B15 MECH ROOM MTL RB-1 - - - - EXPOSED

G03A LIFT A CONC - P-1 P-1 P-1 P-1 P-1** ** CEILING TYPE

G03B LIFT B CONC - P-1 P-1 P-1 P-1 P-1** ** CEILING TYPE

SCALE: 1/4" = 1'-0"A-112

3 LOCKER ROOM EQUIPMENT PLAN

0'

SCALE: 1/4" = 1'-0"

1' 2' 8'4'

NOTE: EQUIPMENT NUMBERS USED ARE FOR PLANNING PURPOSES AND REFER ONLY TO THESE DOCUMENTS

Revisions Date

1 ADDENDUM 01 09/03/2025

UP

UP

UP

A-103

A-103

A-103

A-103

A-301

A-301

A-301

A-302

STAIR & PORCH

ASSEMBLY

ABOVE

TEMPORARY

MOBILE SPS

TEMPORARY

SUPPLY

DECK & STAIR

DECK & STAIR

A-302

A-301

VESTIBULE

G01

50' - 6" 15' - 11"

5"

5"

LOBBY

G02

LIFT A

G03A

X1.5 X3.5

B1.1

B1.5

C1.1 B1.1

X3.5

X2.5X3.5 X3.5

MODIFY RAMP

TO ALIGN WITH

NEW LANDING AT

BASE OF RAMP.

SEE CIVIL

EXISTING RAMP

CONCRETE WALL

CONCRETE AREAWAY

BELOW. SEE CIVIL.

SEE STRUCTURAL.

EXISTING AREAWAY

CONCRETE WALL BELOW

EXISTING BUILDING

CONCRETE SLAB.

SEE CIVIL. SEE STRUCT.

PARTITION/WALL ON

CONCRETE CURB

CONCRETE PAD.

SEE CIVIL FOR

LOCATION &

DIMENSIONS

LIFT B

G03B

A-103

A-103

A-103

A-103

A-301

A-301

A-301

A-302

57' - 2"

LOWER ENCLOSURE &

ROOF ASSEMBLY

OVER AREAWAY

62' - 0"

TEMPORARY SUPPLY

(BY SUPPLIER)

TEMPORARY SPS

(BY SUPPLIER)

A-302

A-301

X3.5

X3.5

B1.1

B1.1

X2.5

X1.5X1.5

28' - 8 1/2" 4' - 3 1/2" G03.A2TEMPORARY

CORRIDOR

LIFT A

G03A

PT STAIR, RAILING

GUARD RAIL &

COVERED DECK

ASSEMBLY

TRAILER

DECK/STAIR

(BY SUPPLIER)

TRAILER

DECK/STAIR

(BY SUPPLIER)

LIFT B

G03B G03.B2

X2.5

22' - 0" 11' - 0" 17' - 6"

A-103

A-103

A-103

A-103

A-301

A-301

A-301

A-302

A-302

A-301

TEMPORARY

CORRIDOR

ABOVE

14' - 11"1' - 0"

MODIFY RAMP

TO ALIGN WITH

NEW LANDING AT

BASE OF RAMP.

SEE CIVIL

VESTIBULE

G01

TEMPORARY

TRAILERS

ABOVE

TEMPORARY

TRAILERS

ABOVE

LOBBY

G02

LIFT A

G03A

C1.1

B1.1

B1.5

X3.5

G

G02

G03.A1

NEW LANDING

AT BASE OF

RAMP. SEE

CIVIL

CONCRETE AREAWAY.

SEE CIVIL. SEE

STRUCTURAL.

EXISTING RAMP

CONCRETE WALL

EXISTING AREAWAY

CONCRETE WALL

EXISTING BUILDING

G04

2'

/2

7' - 8"LIFT B

G03B G03.B1

A-104

VESTIBULE

G01

LOBBY

G02

LIFT A

G03A

NOTE:

1. CEILING SHALL BE 8'-0" UNLESS OTHERWISE NOTED.

2. REFER TO MECHANICAL & ELECTRICAL FOR LIGHTING, DIFFUSERS & OTHER CEILING DEVICES.

LIFT B

G03B

TEMPORARY

CORRIDOR

ABOVE

TEMPORARY

TRAILERS

ABOVE

TEMPORARY

TRAILERS

ABOVE

TEMPORARY

CORRIDOR

LIFT A

G03A

NOTE:

1. CEILING SHALL BE 8'-0" UNLESS OTHERWISE NOTED.

2. REFER TO MECHANICAL & ELECTRICAL FOR LIGHTING, DIFFUSERS & OTHER CEILING DEVICES.

LIFT B

G03B

NORTH

A-301

A-301

A-302

A-302

LIFT B

G03B

LIFT A

G03A

LOBBY

G02

VESTIBULE

G01

B1.5

C1.1

B1.1

G03.B1

G03.A1

G02

G

14' - 11"

23' - 7"

5' - 1" 7 1/2" 6' - 9 1/2" 5" 10' - 8"

5'

/2

5" 4'

1/

2"

D1.2

G04

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

Email: mail@delta-eas.com www.delta-eas.com

8401 Connecticut Avenue, Suite 350 Chevy Chase, MD 20815

Tel: 301.718.0080 Fax: 301.718.9520

A u to d e s k D o c s /0

N o rt h p o rt

S P

S /2

.4

.0

N o rt h p o rt V

A M

C S

P D

R e n o v a ti o n

.r v t

/3

/2

:3

:3

A

M

A-104

TEMPORARY TRAILER PLANS RENOVATE STERILE

PROCESSING DEPARTMENT,

BUILDING NO. 200

NORTHPORT VA

632-12-106

B200

06/18/2025 EJL EJL, JDH,

LDM

100% CONSTRUCTION

DOCUMENTS

SCALE: 1/8" = 1'-0"A-104

2 TEMPORARY SPS - GRADE FLOOR PLAN

SCALE: 1/8" = 1'-0"A-104

3 TEMPORARY SPS-FIRST FLOOR PLAN

SCALE: 1/8" = 1'-0"A-104

1 TEMPORARY SPS - GROUND FLOOR PLAN

SCALE: 1/8" = 1'-0"A-104

4 TEMPORARY SPS-GROUND FLOOR RCP

SCALE: 1/8" = 1'-0"A-104

5 TEMPORARY SPS-FIRST FLOOR RCP

0'

SCALE: 1/8" = 1'-0"

2' 4' 16'8'

SCALE: 1/4" = 1'-0"A-104

6 LIFT ENLARGED PLAN

0'

SCALE: 1/4" = 1'-0"

1' 2' 8'4'

NOTE: SEE MECHANICAL & ELECTRICAL FOR TEMPORARY TRAILER EQUIPMENTNOTE: SEE MECHANICAL & ELECTRICAL FOR TEMPORARY TRAILER EQUIPMENT mmic MOBILE STERILE PROCESSING

STRORAGE TRAILER

GC SHALL PROVIDE AND INSTALL "mmic

MOBILE STERILE PROCESSING

STORAGE TRAILER". DOOR

CONFIGURATIONS AND LOCATIONS

SHALL BE AS SHOWN ON THIS PLAN.

GC SHALL PROVIDE AND INSTALL "mmic

MOBILE STERILE PROCESSING SYSTEM

TRAILER" WITH ITS ASSOCIATED

INTERIOR EQUIPMENT. DOOR

CONFIGURATIONS AND LOCATIONS

SHALL BE AS SHOWN ON THIS PLAN.

mmic MOBILE STERILE PROCESSING

STRORAGE TRAILER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

Email: mail@delta-eas.com www.delta-eas.com

8401 Connecticut Avenue, Suite 350 Chevy Chase, MD 20815

Tel: 301.718.0080 Fax: 301.718.9520

A u to d e s k D o c s /0

N o rt h p o rt

S P

S /2

.4

.0

N o rt h p o rt V

A M

C S

P D

R e n o v a ti o n

.r v t

/3

/2

:3

:3

A

M

A-117

TEMPORARY TRAILER UNITS RENOVATE STERILE

PROCESSING DEPARTMENT,

BUILDING NO. 200

NORTHPORT VA

06/18/2025 EJL EJL, LDM,

JDH

100% CONSTRUCTION

DOCUMENTS

SCALE: N.T.S.A-117

2 TEMPORARY STORAGE TRAIL EQUIPMENT PLAN

SCALE: N.T.S.A-117

1 TEMPORARY SPS TRAIL EQUIPMENT PLAN

2022.441.001 Northport VAMC SPD Renovation
A-112 - FIRST FLOOR EQUIPMENT & FINISH PLANS
A-104 - TEMPORARY TRAILER PLANS
A-117 - TEMPORARY TRAILER UNITS

File details come from the government source that posted it. Updated .