Attahment 7__ Northport VAMC SPD Renovation-addendum.pdf
PDF 1 MB Posted
- Solicitation number
- 36C24225B0039
About this file
These architectural drawings are for a Sterile Processing Department (SPD) renovation project at the Northport VA Medical Center (VAMC), Building No. 200. The project involves a comprehensive renovation of the existing SPD, including the installation of new medical equipment, floor and wall finishes, and temporary mobile trailers to maintain operations during construction. The equipment plan details over 50 equipment items, including ultrasonic cleaners, washer/disinfectors, steam sterilizers, case carts, work tables, and specialized medical inspection equipment. Two mobile trailers will be used: a Mobile Sterile Processing System trailer and a Mobile Sterile Processing Storage trailer, which will be provided and installed by the General Contractor. The renovation is scheduled for completion by June 18, 2025, with an addendum issued on September 3, 2025, and the project is fully sprinklered.
The first floor equipment plan shows a detailed layout of various rooms including processing areas, decontamination zones, locker rooms, offices, and storage spaces. The floor finishes vary by room, using materials such as LVT (Luxury Vinyl Tile), resilient bases, sheet vinyl, and painted surfaces. The equipment schedule specifies manufacturers like Getinge, Triton, STERIS, and BOBRICK for items ranging from medical equipment to bathroom accessories. The project is being managed by the VA Office of Construction and Facilities Management, with architectural services provided by Delta Consulting and Above Group, located in Melbourne, Florida, and Chevy Chase, Maryland, respectively.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G
H
H1
J
K
L
78910
CLEAN
SUPPLY/STORAGE
OFFICE
CONF /BREAK
OFFICE
OFFICE
CORRIDOR
COOL DOWN
DECON
SCOPE DECON
SCOPE PROC
HAC
WOMENS LOCKER
ANTE ROOM
MENS LOCKER
VENDOR
1.2
CART WASH
CARTS COOL DOWN
CARTS SOILED
HAC
PROCESSING
ANTEROOM
205.1
120.1120.1
120.1120.1
110.3
109.1
205.1
102.1
120.1
204.2
204.2
101.2101.2
109.1
1.
109.1
109.1
203.1
120.1
120.1
109.1
109.1
3'
3' - 7"
3'
3' - 6"
110.2
1.
110.1
202.2202.2
202.1
202.2 202.2
202.2
202.2
101.2
101.2 101.2 101.2
101.2101.2
101.2 101.2 101.2 101.2
101.2
101.2
101.2
101.2
101.2101.2
101.2
101.2 101.2
101.2 101.2
101.2
109.1
109.1 109.1
109.1 109.1
109.1
109.1
207.3
207.3
1.
103.1
103.1
1.
1.
1.
6.
6.
1.
206.1
202.1
120.1
207.3
130.1
131.1
143.1
142.1
141.1
207.1
207.2
A-112
1.
6"
2'
A-111
A-111
A-111
BUMPER
RAIL
CORNER GUARD, TYP.
BUMPER RAIL
BUMPER
RAIL
CORNER
GUARD,
TYP.
BUMPER RAIL
CORNER GUARD,
TYP.
CORNER
GUARD,
TYP.
207.3
202.2
115.1 115.1
115.1
204.2
204.2
208.2
34.2
4.2
4.2
4.2
208.3
204.3
204.1
110.3 201.2
NORTH
G
H
H1
J
K
L
78910
1077 SF
CLEAN
SUPPLY/STORAGE
108 SF
OFFICE
19125 SF
CONF /BREAK
86 SF
OFFICE
100 SF
OFFICE
223 SF
CORRIDOR
333 SF
COOL DOWN
760 SF
DECON
147 SF
SCOPE DECON
100 SF
SCOPE PROC
42 SF
HAC
150 SF
WOMENS LOCKER
172 SF
ANTE ROOM
139 SF
MENS LOCKER
17 SF
VENDOR
1.2
94 SF
CART WASH
99 SF
CARTS COOL DOWN
96 SF
CARTS SOILED
51 SF
HAC
882 SF
PROCESSING
89 SF
ANTEROOM
59 SF
STERILIZERS
11.2
56 SF
SHOWER
2.2
52 SF
SHOWER
3.2
EXPANSION
JOINT
E.J.
S /S
W A
IN
S
C O
T W
/ C A
P T
R
IM
T O
2"
A F
F S
/S W
A
IN
S C
O T
W / C
A P
T R
IM
T
O
2" A
F F
RES-6B-2, TYP
1'
3'
RES-6B-2, TYP
1'
1'
" 6"
1' - 0"
1'
1'
6"
6"
A-4014
4.1
4.1
6.1
6.2
6.2
6.1
A-401
WOMENS LOCKER
SHOWER
2.2
MENS LOCKER
SHOWER
3.2
PRIVACY CURTAIN,
ROD & HOOKS
PRIVACY CURTAIN,
ROD & HOOKS
SHOWER CURTAIN,
ROD & HOOKS
SHOWER CURTAIN,
ROD & HOOKS
TOILET
PARTITION
ASSEMBLY
TOILET
PARTITION
ASSEMBLY
5 6.3
6.3
1 1 1 1 1
1 1 1 1 1
FLOOR FINISH LEGEND
LVT-1
LVT-2
PT-1
RES-6A-2 & RES-6B-2
WSV-1
SVT-1
RES-6A-1 & RES-6B-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
Email: mail@delta-eas.com www.delta-eas.com
8401 Connecticut Avenue, Suite 350 Chevy Chase, MD 20815
Tel: 301.718.0080 Fax: 301.718.9520
A u to d e s k D o c s /0
N o rt h p o rt
S P
S /2
.4
.0
N o rt h p o rt V
A M
C S
P D
R e n o v a ti o n
.r v t
/3
/2
:3
:2
A
M
A-112
FIRST FLOOR EQUIPMENT & FINISH
PLANS
RENOVATE STERILE
PROCESSING DEPARTMENT,
BUILDING NO. 200
NORTHPORT VA
632-12-106
B200
06/18/2025 EJL EJL, LDM,
JDH
100% CONSTRUCTION
DOCUMENTS
SCALE: 1/8" = 1'-0"A-112
1 FIRST FLOOR - EQUIPMENT PLAN
SCALE: 1/8" = 1'-0"A-112
2 FIRST FLOOR - FINISH PLAN
0'
SCALE: 1/8" = 1'-0"
2' 4' 16'8'
EQUIPMENT SCHEDULE
EQUIPMENT
NUMBER EQUIPMENT NAME MANUFACTURER MODEL QUANTITY NEW/EXISTING FURNISHED INSTALLED COMMENTS
1 LOCKERS ASI Storage 1Z181872 10 NEW GC GC
2 MIRROR BOBRICK B-290 1830 2 NEW GC GC
3 SOAP DISPENSER BOBRICK B-4112 6 NEW GC GC
4.1 PAPER TOWEL DISPENSER/TRASH RECEP. BOBRICK B-43944 2 NEW GC GC
4.2 PAPER TOWEL DISPENSER BOBRICK B-4262 4 NEW GC GC
5 TOILET SEAT COVER DISPENSER BOBRICK B-4221 3 NEW GC GC
6.1 GRAB BAR Bobrick Washroom Equipment, Inc. B-5806x36 2 NEW GC GC
6.2 GRAB BAR BOBRICK B-5806.99x42 2 NEW GC GC
6.3 SHOWER GRAB BAR BOBRICK B-58616 2 NEW GC GC
7 TOILET TISSUE DISPENSER BOBRICK B-2721 3 NEW GC GC
8 SANITARY DISPOSAL BOBRICK B-270 2 NEW GC GC
9 SHOWER SEAT BOBRICK B-918116L 1 NEW GC GC
10 HAND DRYER BOBRICK B-7120 115V 2 NEW GC GC
101.1 PPE SHELF - - 1 EXISTING VA VA
101.2 SHELF UNIT - - 28 EXISTING VA VA
102.1 WRAP DISPENSER - - 1 EXISTING VA VA
103.1 TRASH RECEPTACLE - - 2 EXISTING VA VA * QUANTITY MAY VARY BASED ON USE
106.6 SHELF UNIT - - 2 EXISTING VA VA
109.1 CASE CART - - 12 EXISTING VA VA * QUANTITY MAY VARY BASED ON USE
110.1 UTILITY TABLE GETINGE 6720 - 5'-0" L 1 NEW VA GC
110.2 UTILITY TABLE GETINGE 6720 - 6'-0" L 1 NEW VA GC
110.3 WORK TABLE 24x24 - 2 EXISTING VA VA
115.1 THREE SINK WORK STATION GETINGE HW6760 3 NEW VA EQUIP. VENDOR / GC
120.1 WORK TABLE GETINGE HAT72 HEIGHT ADJUSTABLE 30 X 72 7 EXISTING VA VA
130.1 DESKTOP PRINTER - 6 EXISTING VA VA
131.1 COMPUTER/MONITOR - 6 EXISTING VA VA
141.1 MAGNIFIER/LIGHT-DESK MOUNTED - 6 EXISTING VA VA
142.1 SCOPE INSPECTOR-DESK MOUNTED - 6 EXISTING VA VA
143.1 INSULATION INSPECTOR-DESK MOUNTED - 6 EXISTING VA VA
201.1 ULTRASONIC CLEANER TRITON TRITON 36 3 NEW VA EQUIP. VENDOR / GC
201.2 EYE ULTRASONIC CLEANER STERIS INNOWAVE ECO 1 NEW VA EQUIP. VENDOR / GC
202.1 WASHER / DISINFECTOR GETINGE 86668T 2 NEW VA EQUIP. VENDOR / GC
202.2 WASHER TROLLEY GETINGE - 7 NEW VA EQUIP. VENDOR / GC * QUANTITY MAY VARY BASED ON USE
203.1 STERILIZER-PASS THROUGH MEDIVATOR ADVANTAGE PLUS PASS-THRU ERS 1 NEW VA EQUIP. VENDOR / GC
204.1 WIRE SHELVING ULINE H-6816 1 NEW VA EQUIP. VENDOR / GC
204.2 DRYING CABINET - - 4 EXISTING VA EQUIP. VENDOR / GC
204.3 STORAGE CABINET - - 1 NEW VA EQUIP. VENDOR / GC
205.1 STERRAD STERRAD - 2 EXISTING VA EQUIP. VENDOR / GC
206.1 CART WASHER GETINGE 9125E 1 NEW VA EQUIP. VENDOR / GC
207.1 STEAM STERILIZER GETINGE GSS67 1 NEW VA EQUIP. VENDOR
207.2 STEAM STERILIZER GETINGE GSS67 1 NEW VA EQUIP. VENDOR
207.3 LOADING CAR TRANSFER CARRIAGE 66" GETINGE - 4 NEW VA EQUIP. VENDOR * QUANTITY MAY VARY BASED ON USE
208.2 PASS THROUGH CHAMBER CMP SC2-2424-24-PT 1 NEW VA EQUIP. VENDOR / GC
208.3 CHAMBER CABINET PASS-THROUGH CMP SC2-3672 36-PT-CPT 1 NEW VA EQUIP. VENDOR / GC
209 S/S SHELF- PASS THROUGH WINDOW CMP 12x24 2 NEW VA EQUIP. VENDOR / GC
301 MOBILE SPS SYSTEM TRAILER mmic Medical Solutions MSPS-01 1 NEW GC EQUIP. VENDOR / GC PROVIDE SPS EQUIPMENT AS ASSEMBLY UNIT
302 MOBILE SPS STORAGE SYSTEM TRAILER mmic Medical Solutions MSSU 1 NEW GC EQUIP. VENDOR / GC
ROOM FINISH SCHEDULE
ROOM
NUMBER
ROOM NAME
FLOOR FINISHES
NORTH FINISH EAST FINISH SOUTH FINISH WEST FINISH
CEILING
FINISH
COMMENTS
FLOOR BASE
1 ANTE ROOM SVT-1 RB-1 SC-1 SC-1 SC-1 SC-1 ACP-1 * S/S PANELS AS IDENTIFIED
1.2 VENDOR SVT-1 RB-1 SC-1 SC-1 SC-1 SC-1 ACP-1
2 WOMENS LOCKER PT-1 PT-1 PT-2 / P-1 PT-2 / P-1 PT-2 / P-1 PT-2 / P-1 P-1** ** CEILING TYPE
2.2 SHOWER PT-1 PT-1 PT-2 / P-1 PT-2 / P-1 PT-2 / P-1 PT-2 / P-1 P-1** ** CEILING TYPE
3 MENS LOCKER PT-1 PT-1 PT-2 / P-1 PT-2 / P-1 PT-2 / P-1 PT-2 / P-1 P-1** ** CEILING TYPE
3.2 SHOWER PT-1 PT-1 PT-2 / P-1 PT-2 / P-1 PT-2 / P-1 PT-2 / P-1 P-1** ** CEILING TYPE
4 DECON RES-6B-1; RES-6B-2 RES-6A-2 RES-W1 RES-W1 RES-W1 RES-W1 RES-W1** * S/S PANELS AS IDENTIFIED; ** CEILING TYPE
5 HAC RES-6A-1 RES-6A-1 SC-1 SC-1 SC-1 PT-3 / SC-1 RES-W1*
6 CARTS SOILED RES-6A-1; RES-6A-2 RES-6A-2 PT-3 - PT-3 PT-3 RES-W1** ** CEILING TYPE
7 CART WASH RES-6A-1 RES-6A-1 RES-W1 - RES-W1 - RES-W1**
8 CARTS COOL DOWN RES-6B-1; RES-6B-2 RES-6B-2 PT-3 PT-3 PT-3 - RES-W1**
9 SCOPE DECON RES-6A-1; RES-6A-2 RES-6B-2 RES-W1 S/S PARTITION RES-W1 RES-W1 RES-W1** * S/S PANELS AS IDENTIFIED; ** CEILING TYPE
10 SCOPE PROC RES-6B-1; RES-6B-2 RES-6B-2 SC-1 SC-1 SC-1 S/S PARTITION SC-1
11 PROCESSING RES-6B-1; RES-6B-2 RES-6B-2 SC-1 SC-1 SC-1 SC-1 SC-1** ** CEILING TYPE
11.2 STERILIZERS RES-6B-1; RES-6B-2 RES-6B-2 RES-W1 RES-W1 RES-W1 RES-W1 RES-W1** ** CEILING TYPE
12 ANTEROOM SVT-1 RB-1 SC-1 SC-1 SC-1 SC-1 SC-1** ** CEILING TYPE
13 COOL DOWN RES-1 RES-1 RES-W1 RES-W1 RES-W1 RES-W1 RES-W1** ** CEILING TYPE
14 CLEAN SUPPLY/STORAGE WSV-1 WSV-1 SC-1 SC-1 SC-1 SC-1 SC-1**
15 CORRIDOR SVT-1 SVT-1 P-1 P-1 P-1 P1 ACP-1
16 HAC WSV-1 WSV-1 SC-1 SC-1 P-1 PT-3 / SC-1 RES-W1* ** CEILING TYPE
17 OFFICE LVT-1 RB-1 P-1 P-1 PT-3 P1 ACP-1
18 CONF /BREAK LVT-2 RB-1 P-1 P-1 PT-3 P1 ACP-1
19 OFFICE LVT-1 RB-1 PT-3 P-1 P-1 P1 ACP-1
20 OFFICE LVT-1 RB-1 P-1 P-1 P-1 PT-3 ACP-1
101 TEMPORARY CORRIDOR SVT-1 RB-1 P-1 P-1 P-1 P-1 ACP-1
B0-29 EQUIP STO ETR*** ETR*** ETR*** ETR*** ETR*** ETR*** ETR*** ***PATCH TO MATCH EXISTING
B002 MECHANICAL EQUIPMENT
ROOM #2
G01 VESTIBULE SVT-1 RB-1 P-1 P-1 P-1 P2 ACP-1
G02 LOBBY SVT-1 RB-1 P-1 P-1 P-1 P2 ACP-1
G03.B15 MECH ROOM MTL RB-1 - - - - EXPOSED
G03A LIFT A CONC - P-1 P-1 P-1 P-1 P-1** ** CEILING TYPE
G03B LIFT B CONC - P-1 P-1 P-1 P-1 P-1** ** CEILING TYPE
SCALE: 1/4" = 1'-0"A-112
3 LOCKER ROOM EQUIPMENT PLAN
0'
SCALE: 1/4" = 1'-0"
1' 2' 8'4'
NOTE: EQUIPMENT NUMBERS USED ARE FOR PLANNING PURPOSES AND REFER ONLY TO THESE DOCUMENTS
Revisions Date
1 ADDENDUM 01 09/03/2025
UP
UP
UP
A-103
A-103
A-103
A-103
A-301
A-301
A-301
A-302
STAIR & PORCH
ASSEMBLY
ABOVE
TEMPORARY
MOBILE SPS
TEMPORARY
SUPPLY
DECK & STAIR
DECK & STAIR
A-302
A-301
VESTIBULE
G01
50' - 6" 15' - 11"
5"
5"
LOBBY
G02
LIFT A
G03A
X1.5 X3.5
B1.1
B1.5
C1.1 B1.1
X3.5
X2.5X3.5 X3.5
MODIFY RAMP
TO ALIGN WITH
NEW LANDING AT
BASE OF RAMP.
SEE CIVIL
EXISTING RAMP
CONCRETE WALL
CONCRETE AREAWAY
BELOW. SEE CIVIL.
SEE STRUCTURAL.
EXISTING AREAWAY
CONCRETE WALL BELOW
EXISTING BUILDING
CONCRETE SLAB.
SEE CIVIL. SEE STRUCT.
PARTITION/WALL ON
CONCRETE CURB
CONCRETE PAD.
SEE CIVIL FOR
LOCATION &
DIMENSIONS
LIFT B
G03B
A-103
A-103
A-103
A-103
A-301
A-301
A-301
A-302
57' - 2"
LOWER ENCLOSURE &
ROOF ASSEMBLY
OVER AREAWAY
62' - 0"
TEMPORARY SUPPLY
(BY SUPPLIER)
TEMPORARY SPS
(BY SUPPLIER)
A-302
A-301
X3.5
X3.5
B1.1
B1.1
X2.5
X1.5X1.5
28' - 8 1/2" 4' - 3 1/2" G03.A2TEMPORARY
CORRIDOR
LIFT A
G03A
PT STAIR, RAILING
GUARD RAIL &
COVERED DECK
ASSEMBLY
TRAILER
DECK/STAIR
(BY SUPPLIER)
TRAILER
DECK/STAIR
(BY SUPPLIER)
LIFT B
G03B G03.B2
X2.5
22' - 0" 11' - 0" 17' - 6"
A-103
A-103
A-103
A-103
A-301
A-301
A-301
A-302
A-302
A-301
TEMPORARY
CORRIDOR
ABOVE
14' - 11"1' - 0"
MODIFY RAMP
TO ALIGN WITH
NEW LANDING AT
BASE OF RAMP.
SEE CIVIL
VESTIBULE
G01
TEMPORARY
TRAILERS
ABOVE
TEMPORARY
TRAILERS
ABOVE
LOBBY
G02
LIFT A
G03A
C1.1
B1.1
B1.5
X3.5
G
G02
G03.A1
NEW LANDING
AT BASE OF
RAMP. SEE
CIVIL
CONCRETE AREAWAY.
SEE CIVIL. SEE
STRUCTURAL.
EXISTING RAMP
CONCRETE WALL
EXISTING AREAWAY
CONCRETE WALL
EXISTING BUILDING
G04
2'
/2
7' - 8"LIFT B
G03B G03.B1
A-104
VESTIBULE
G01
LOBBY
G02
LIFT A
G03A
NOTE:
1. CEILING SHALL BE 8'-0" UNLESS OTHERWISE NOTED.
2. REFER TO MECHANICAL & ELECTRICAL FOR LIGHTING, DIFFUSERS & OTHER CEILING DEVICES.
LIFT B
G03B
TEMPORARY
CORRIDOR
ABOVE
TEMPORARY
TRAILERS
ABOVE
TEMPORARY
TRAILERS
ABOVE
TEMPORARY
CORRIDOR
LIFT A
G03A
NOTE:
1. CEILING SHALL BE 8'-0" UNLESS OTHERWISE NOTED.
2. REFER TO MECHANICAL & ELECTRICAL FOR LIGHTING, DIFFUSERS & OTHER CEILING DEVICES.
LIFT B
G03B
NORTH
A-301
A-301
A-302
A-302
LIFT B
G03B
LIFT A
G03A
LOBBY
G02
VESTIBULE
G01
B1.5
C1.1
B1.1
G03.B1
G03.A1
G02
G
14' - 11"
23' - 7"
5' - 1" 7 1/2" 6' - 9 1/2" 5" 10' - 8"
5'
/2
5" 4'
1/
2"
D1.2
G04
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
Email: mail@delta-eas.com www.delta-eas.com
8401 Connecticut Avenue, Suite 350 Chevy Chase, MD 20815
Tel: 301.718.0080 Fax: 301.718.9520
A u to d e s k D o c s /0
N o rt h p o rt
S P
S /2
.4
.0
N o rt h p o rt V
A M
C S
P D
R e n o v a ti o n
.r v t
/3
/2
:3
:3
A
M
A-104
TEMPORARY TRAILER PLANS RENOVATE STERILE
PROCESSING DEPARTMENT,
BUILDING NO. 200
NORTHPORT VA
632-12-106
B200
06/18/2025 EJL EJL, JDH,
LDM
100% CONSTRUCTION
DOCUMENTS
SCALE: 1/8" = 1'-0"A-104
2 TEMPORARY SPS - GRADE FLOOR PLAN
SCALE: 1/8" = 1'-0"A-104
3 TEMPORARY SPS-FIRST FLOOR PLAN
SCALE: 1/8" = 1'-0"A-104
1 TEMPORARY SPS - GROUND FLOOR PLAN
SCALE: 1/8" = 1'-0"A-104
4 TEMPORARY SPS-GROUND FLOOR RCP
SCALE: 1/8" = 1'-0"A-104
5 TEMPORARY SPS-FIRST FLOOR RCP
0'
SCALE: 1/8" = 1'-0"
2' 4' 16'8'
SCALE: 1/4" = 1'-0"A-104
6 LIFT ENLARGED PLAN
0'
SCALE: 1/4" = 1'-0"
1' 2' 8'4'
NOTE: SEE MECHANICAL & ELECTRICAL FOR TEMPORARY TRAILER EQUIPMENTNOTE: SEE MECHANICAL & ELECTRICAL FOR TEMPORARY TRAILER EQUIPMENT mmic MOBILE STERILE PROCESSING
STRORAGE TRAILER
GC SHALL PROVIDE AND INSTALL "mmic
MOBILE STERILE PROCESSING
STORAGE TRAILER". DOOR
CONFIGURATIONS AND LOCATIONS
SHALL BE AS SHOWN ON THIS PLAN.
GC SHALL PROVIDE AND INSTALL "mmic
MOBILE STERILE PROCESSING SYSTEM
TRAILER" WITH ITS ASSOCIATED
INTERIOR EQUIPMENT. DOOR
CONFIGURATIONS AND LOCATIONS
SHALL BE AS SHOWN ON THIS PLAN.
mmic MOBILE STERILE PROCESSING
STRORAGE TRAILER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
Email: mail@delta-eas.com www.delta-eas.com
8401 Connecticut Avenue, Suite 350 Chevy Chase, MD 20815
Tel: 301.718.0080 Fax: 301.718.9520
A u to d e s k D o c s /0
N o rt h p o rt
S P
S /2
.4
.0
N o rt h p o rt V
A M
C S
P D
R e n o v a ti o n
.r v t
/3
/2
:3
:3
A
M
A-117
TEMPORARY TRAILER UNITS RENOVATE STERILE
PROCESSING DEPARTMENT,
BUILDING NO. 200
NORTHPORT VA
06/18/2025 EJL EJL, LDM,
JDH
100% CONSTRUCTION
DOCUMENTS
SCALE: N.T.S.A-117
2 TEMPORARY STORAGE TRAIL EQUIPMENT PLAN
SCALE: N.T.S.A-117
1 TEMPORARY SPS TRAIL EQUIPMENT PLAN
| 2022.441.001 Northport VAMC SPD Renovation |
| A-112 - FIRST FLOOR EQUIPMENT & FINISH PLANS |
| A-104 - TEMPORARY TRAILER PLANS |
| A-117 - TEMPORARY TRAILER UNITS |
File details come from the government source that posted it. Updated .