These electrical engineering documents are for a Renovate Sterile Processing Department project at the Northport VA Medical Center. The drawings detail electrical system modifications, including installing a new 750kVA, 480V, 3-phase transformer, mobile power distribution unit, and reconfiguring existing electrical infrastructure. The electrical plans cover ground floor temporary power arrangements, riser diagrams, lighting control matrices, equipment schedules, and branch panel configurations. Key electrical components include new transformers, disconnect switches, emergency power systems, and lighting fixtures from manufacturers like Cooper Lighting, Lithonia, and Metalux. The project involves upgrading electrical systems to support renovations in the sterile processing area, with careful integration of new and existing electrical infrastructure.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C1-6000
ONCOLOGY
1,707.22
B1-2000
PHARMACY
4,587.74
C1-5000
VOLUNTEERS
851.45
C1-4000
SURGICAL
1,573.88
C1-3000
ON CALL
2,206.34
C1-5500
IRM OFFICE
1,483.38
C1-3500
EMERGENCY
1,403.42
C1-3100
EMP. HEALT
491.84
C1-1000
EMERGENCY
5,913.72
C1-1100
OUTREACHRM
208.85
B1-6000
ESCORT SER
503.04
C1-2700
PHYSICAL T
337.88
B1-6250 M.A.S.
4,686.71
A1-1600
CARDIOLOGY
5,893.24
A1-1800 A.S.U.
1,624.33
A1-8600
RADIOLOGY
11,546.47
A1-6600
SURGERY OR
16,146.55
B1-2900
MECHANICAL
1,229.79
A1-1200
PULMONARY
2,203.66
A1-5000 I.R.M.
1,660.82
A1-4000
GASTROENTR
1,520.56
B1-3600
D.A.V. OFF
1,619.83
A1-1260 I.C.U.
7,206.80
D1-1000
PRIMARY CA
35,381.22
C
12 10.811
D
E
F
E
F
11 10.8
10 9 8 6
10 9
24 33.2
D
E
24 33.2
F
G
B
A
G
H1
J
K
10.811 10 9 8
12 11 10
H
H.1
7 6 5 1
D
G
H
J
K
5 4
3.2 3
H1
E
J.4
13 12 11 10 9 8
5 4 3 2 1
S
R
Q
P
N
M
L L
M
N
P
Q
R
S
Q83
3.2
4 3.2
F
E
1 20.2
21 21.9 22
21.9 22 23 23.2 2424
23 23.2 24 25
13 12 11 10 9 8 7 6
HISTOLOGY LAB AREA
C
B
CURTAIN TRACK
#7
#6
#5
#4
C1-78
LAB STORAGE
496.12
C1-760
CHIEF PATHOLOGY
255.00
C1760
PATHOLOGY
142.89
C1-76L 129.64
C1-76K
BREAK ROOM
285.41
C1-76J
PATHOLOGIST/
106.76
C1-76H
SUPERVISOR/
126.09
C1-76G
LEAD TECHNOLOGIST OFFICE
131.77 C1-76F
LAB ADMINISTRATIVE
123.98
C1-76E
CONFERENCE ROOM
149.89
C1-66B
8.74
C1-65 31.13
C1-66A
BATHROOM
45.79
C1-64A
BATHROOM
45.12
C1-66
1 BEDROOM
126.40
C1-64
WOMEN'S RM
134.72
C1-62
137.16
C1-62A
10.14
C1-61B
10.14
C1-61A
BATHROOM
44.35
C1-61
O.D. RM.
135.15
C1-59
O.D. RM.
149.68
C1-58A
BATHROOM
44.35
C1-58
135.11
C1-57
119.50
C1-80
TOILET
88.86
C1-81
61.11
C1-83 63.13
C1-84
87.50
C1-C10B
FEC
2.70
C1-76A
SEC PATHOLOGY
146.55
C1-74 34.01
C1-C11A E.C.
45.50
C1-76B
COAGULATION
112.53
C1-76C
96.96
C1-76D
LOCKER
155.61
C1-68
CANCER REG
115.84
C1-67
ONCOLOGY
131.87
C1-75
CANCER REGISTRY
146.38
C1-73
PATIENT
120.44
C1-71
ATTEND
135.44
C1-69
CONFERENCE
291.38
C1-51
58.72
C1-C13
CORRIDOR
467.35
C1-49
COFFEE
83.64
C1-C13A
ELEC. CL.
12.73
C1-41
CLINICAL
149.78
C1-42
CHF. SURGICAL
206.05
C1-39
MEN TOILET
67.14
C1-38
DOD ADMIN.
117.50
C1-37
121.92
C1-36
ER. CODING
152.42
C1-35
SOCIALWORK
122.08
C1-28
NURSE OD.
151.57
C1-C6A E.C.
79.65
C1-29
PHYSICIAN ASST.
170.51
C1-31
VA/DOD
148.08
C1-C1B
ST. 2
141.60
C1-C1A
FEC
3.13
C1-26A
EXAM/TREAT
165.87
C1-26B
EXAM/TREAT
128.88
C1-27C
EXAM/TREAT
103.42
150.84
C1-26
EXAM/TREAT
131.82
C1-56A
BATHROOM
46.97
C1-33A
BATHROOM
46.98
C1-56
146.86
C1-34
139.55
C1-59A
10.14
C1-58B
10.14
C1-57A
CL.
10.08
C1-56B
CL.
10.08
C1-33 129.67
C1-32
25.73
C1-17A
BATHROOM
39.69
C1-17
ER ON CALL
134.24 C1-C3
VEST.
83.07
D.W.
AMBULANCE
1,192.28
C1-15
SURGICAL ER
271.12 C1-15A
35.39
C1-16
26.78
C1-C4
CORR.
408.82
C1-C1C 12.32
C1-C1D 12.32
C1-22
OBSERVATION
239.06
C1-7
140.03
C1-20
EXAM/TREAT
120.21 C-14 H.A.C.
43.71
C1-11
FILE RM.
45.48
C1-C3A
FEC
5.25
C1-C11
CORRIDOR
598.12
C1-C12
CORRIDOR
482.56
C1-34A
CL.
10.08
C1-33B
CL.
10.08
C1-C5
CORRIDOR
184.18
C1-C7
649.05
C1-76
LABORATORY
2,572.03
C1-77A
TCOMM. CL.
12.75
C1-77B
ELEC. CL.
13.81 C1-C10
CORR.
226.32
B1-9A
CHF. CARDI
154.17
B1-17A
VEST.
12.25
B1-29
CLIMATE CO
856.96
59.50
80.75
B1-9B
NURSE
123.00
B1-C3A E.C.
16.50
B1-18
PHARMACY
148.44
B1-10
126.00
B1-16
CHF PHARMA
155.64
102.00
B1-9
121.50
B1 224
LOUNGE
120.75
B1-19 125.00
C1-6
EXAM
135.56
C1-8
EMERG.
141.91
C1-5
WOMEN'S TOIL
41.00
C1-4
MEN'S TOILET
39.96
C1-C1
CORRIDOR
382.10
E1-15
FEMALE H/C TOILET
59.23
E1-C10A
MED.RECORDS
75.32
E1-16
MEN'S H/C TOILET
114.98
E1-14 H.A.C.
80.05
E1-17
CENTRAL
305.51
E1-C12A
FEC
1.46
E1-C1A
FEC
0.83
E1-C11
RECEPTIONIST
334.63
E1-58
EXAM/
86.48
E1-57
CLINIC.DIE
118.75
CI-2
C1-C3B
CORRIDOR
463.67
C1-15B
ER
74.92
C1-C11B
FIRE CL.
3.78
C1-45
SURGICAL
163.08
C1-46
OUTREACHRM
271.35
C1-53
OFFICE
79.08
C1-52
NURSE
96.37
C1-47
PHYSICIAN
68.90
C1-48
PHYSICIAN
71.42
C1-44
PHYSICIAN
55.17
C1-43
ASST.CHIEF
53.78
C1-C9
CORRIDOR
115.50
C1-70
CHIEF
171.05
C1-72
COMPREHENSIVE CANCER
402.36
C1-54
VESTIBULE
32.64
C1-40
WORK ROOM
144.58
C1-30
EMP. HEALT
176.12
C1-C6
CORRIDOR
368.08
C1-76M
CORE
133.20
C1-76N
FLOW CYTOM
108.52
E1-C10
WAITING RM
795.01
E1-C1
CORRIDOR
1,198.58
E1-18
SOILED UT.
102.51
E1-56
EXAM/TREAT
122.54
E1-55
PRIMARY CARE
109.82
E1-54
PRIMARY CARE
113.09
E1-53
EKG
108.84
E1-52
PRIMARY CARE
118.75
E1-69
EXAM/TREAT
98.46
E1-67
EXAM/TREAT
99.42
E1-65
EXAM/TREAT
99.42
E1-63
EXAM/TREAT
94.60
E1-61
EXAM/TREAT
115.22
E1-70
ELECTRICAL
44.58
E1-71
COMMUN.
32.39
E1-C19A
FEC
0.81
E1-44
EXAM/TREAT
100.45
E1-48
PRIMARY CARE
128.52
E1-50
PRIMARY CA
134.18
E1-51
EXAM/TREAT
117.76
E1-49
EXAM/TREAT
103.01
E1-60
EXAM/TREAT
104.06
E1-42
EXAM/TREAT
84.94
E1-C18
CORR.
236.07
E1-59
EXAM/TREAT
107.86
E1-45
PRIMARY CA
105.30
E1-43
PRIMARY CARE
127.97
E1-66
EXAM/TREAT
105.86
E1-46
PRIMARY CA
133.98
E1-47
EXAM/TREAT
102.24
E1-C20
CORR.
325.41
E1-C13A
FEC
0.86
E1-68
EXAM/TREAT
72.96
E1-19
CLEAN UTILITY
136.47
E1-20
EXAM/TREAT
102.10
E1-21B
FEMALE H/C TOILET
48.49
E1-72
CL.
39.29
E1-22
COMM.
34.17
E1-C18A
VALVE CABINET
0.58
E1-C19
CORRIDOR
357.32
E1C13
CORRIDOR
487.48
E1-C12
CORRIDOR
785.48
E1-37
PR I MA R Y C AR E
148.85
E1-32
SECURITY
244.77
E1-33
AMB CARE RN
106.58
E1-35
PR IMAR Y C AR E O FF IC E
129.35
E1-34
PRIMARY
143.36
E1-21A
M. H/CTOILET
46.78
E1-31
WHEELCHAIR
126.03
E1-28
CONFERENCE ROOM
352.45
E1-38
STAFF LOCKER
91.07
E1-26
STAFF LOCKER
88.26
E1-26A
TOILET
27.56
E1-38A
TOILET
27.56
E1-C17
CORR.
163.55
E1-C16
CORRIDOR
120.18
99.14
E1-C14A
FEC
1.11
E C
C O R R
ID
O R
.7
E1-25
ACHA NURSING
80.56
OUTPATIENT
CLINIC
107.94
E1-29
BLUE/YELLOW
109.82
E1-30
CHIEF
149.84
E1-C15
CORRIDOR
142.64
E1-C2
RECEPT/CON
62.67
E1-4
PHARMACY
106.17
E1-10
PHARM
100.58
E1-40
EXAM ROOM
114.33
E1-39
TOILET
47.83
E1-41 38.50
E1-13
51.46
E1-12
G.I. OFFICE
276.76
E1-11 106.25
E 1A
S T O R A G E
.0
E1-8
PHARM
146.67
E1-8A
DRESSING RM.
19.19
E1-9
DRESSING RM.
22.67
E1-9A
OFF/EXAM
19.83
E1-9B
DRESSING R
19.83
E1-7
TECH.OTHER
128.00
E1-C6
CORR.
128.17
D1-56
BREAK ROOM
672.77
D1-49
MANAGEMENT
SERVICE
D1-48
MANAGEMENT
115.15
D1-46
AMB CARE
109.00
D1-44
AMB CARE
SUPERVISOR
D C
C O R R
ID
O R
.2
D1-57
PHARMACY
148.61
D C
C O R R
ID
O R
.8
D1-53
FEMALE H/C TOILET
174.39
D1-54 H.A.C.
50.74
D1-55
M. H/CTOILET
181.46
D1-C22
CORRIDOR
190.54
D1-8
CONTROL SU
148.65
D1-7
PREPACK
108.00
D1-6 H.A.C.
54.05
D1-40 H.A.C.
69.26
D1-34
CLOSET
17.23
D1-38
ELECTRICAL
85.80
D1-33
88.00
F. H/C TOILET
66.11
D1-39
M. H/CTOIL
60.14
D1-41
120.59
D1-29
101.80
D1-31
100.00
D1-C19
CORRIDOR
66.52
D1-25
EXAM ROOM
107.40
D1-28
EXAM ROOM #3
121.50
D1-42
ORTHO EXAM
135.20
D1-27
EXAM ROOM #7
120.13
D1-43
126.69
D1-32
CAST ROOM
132.71CLINIC
RECORDS
57.76
D1-36
STORAGE
45.85
D1-12
MEDICAL
SERVICE
D1-21
EXAM ROOM #1
113.09D1-45 #5
114.40
D1-47 #4
123.74
D1-50
EXAM ROOM
123.74
D1-16
EXAM ROOM
126.28
D1-14
OFF. CHIEF/DAY TREAT #1
116.15 D1-23
EXAM ROOM #4
117.20
D1-24
EXAM ROOM #5
110.39
D1-26
EXAM ROOM #6
109.20
D1-22
CONFERENCE
301.64D1-20
M. H/CTOILET
54.90
D1-17
LOCKER ROOM
57.02
D1-15
SCREENING AREA
730.23
D1-13
STAFF
204.12
D1-15A
CLOSET
61.49
D1-C15
CORRIDOR
338.75
D1-C16
CORRIDOR
130.72
D1-C17A
VALVE CAB.
0.58
D1-C17
CORRIDOR
273.95
D1-C18
CORRIDOR
343.65
D1-C18A
FEC
1.67
D1-C15A
FEC
1.15
TELEPHONES
D1-5
F. H/CTOILET
64.29
D1-4
M. H/CTOILET
160.83
D1-C7
ELEV. LOBBY
279.88
P4
ELEV.
85.57
P5
ELEV.
86.42
D1-9B
DRUG RECEIVING
346.41
D1-51
ELEC. CL.
10.88
D1-52
COMM.
17.50
D
C O N S U L T
R M
.2
D A
P R E S C R
IP
T
IO
N
R E C V
.6
D1-9D
FEC
1.50
D1-9C
DISPENSING
165.41 D1-9
ACTIVE STO
920.66
D1-9A
ASSEMBLE
851.41
D1-C1
VESTIBULE
855.24
D1-11
M. H/CTOILET
219.22
D1-C11
STAIR 7
295.13
D1-C6
ALCOVE
111.52
D1-C6A
FEC
0.75
E1-36
PR I MA R Y C AR E HS S
111.05
C1-77C
HOUSEKEEPING
43.56
A1-92A
CL.
34.46
A1-89A 28.06
A1-C1A
FEC
3.17
A1-78
VACANT
115.68
A1-75A
COMPUTER R
76.50
A1-66
PAT TREATM
145.00
A1-26B
DIETARY
64.75
A1-C7
CORR.
157.50
A1-40A 94.50
A1-C15
CORR.
410.50
A1-C15A 2.75
A1-121A
I.C.U. BED
182.92
A1-121D
EXAM/TREAT
179.00
A1-121G
EXAM/TREAT
172.92
A1-90
TOILET
103.91
A1-85
VACANT
308.13
A1-85E
VACANT
90.50
A1-C17
CORR.
134.50
A1-C16
CORR.
272.62
A1-C1B
ST. 5
125.39
A1-40
OR. #1
360.27
A1-C14
CORRIDOR
541.10
A1-32
OFFICE
127.50
A1-106
218.47
A1-123
CLEAN UTIL
104.50
A1-36
ANESTHESIA
115.00
A1-45A
41.17
A1-120 200.67
A1-121E
EXAM/TREAT
171.19
A1-85D
VACANT
22.50
A1-74
RADIOLOGY
A1-C4
CORRIDOR
352.48
A1-34A 66.00
A1-39A 33.00
A1-49A
OR. #5
397.08
A1-31
OFFICE
144.00
A1-45D 103.75
A1-124
CLEANLINEN
67.83
A1-52A
TOILET
108.67
A1-29
ENDOSCOPY #1
206.50
A1-99
VACANT
159.14
A1-5A
STORAGE CLOSET
237.95
A1-103
VACANT
200.56
A1-93
VACANT
291.73
A1-75
125.33
EMS
25.99
A1-67B
H/C TOILET
79.33
A1-28A
234.50
A1-24
TOILET
63.00
A1-51
UTILITY
A1-39
192.33
A1-110
145.17
A1-115
63.00
A1-48
OR. #4
377.25
A1-56
LOUNGE
136.00
A1-30
UTILITY
100.00
A1-121 S.I.C.U.
1,944.69
A1-96A
VACANT
361.42A1-77
VACANT
258.52
A1-71
PAT TREATM
85.62
A1-11 141.83
A1-22
92.00
A1-52
LOUNGE
386.33
A1-37
ANESTHESIA
132.00
A1-42
STORAGE
102.00
A147
OR. #3
338.00
A1-108
PATIENT CARE
A1-104
VACANT
180.50
A1-121F
EXAM/TREAT
165.93
A1-C16C
CRASH CART
13.55
A1-76
VACANT
55.00
A1-25
RECEPTION/
152.25
CORR.
351.05
A1-50
MEDITATION
45.00
A1-54A
BATHROOM
92.17
A1-63 E.C.
56.25
A1-46 29.75
A1-34
CYSTOSCOPY
244.96
A1-45B 120.33
A1-70
PAT TREATM
78.08
A1-C18
118.83
A1-82
VACANT
275.83
A1-62
OR SECRETARY
A1-44
OR. #2
451.40
A1-C15B 2.75
A1-34B
CL.
18.88
A1-58
O.R. SUPER
124.04
A1-68
PAT TREATM
129.77
A1-41
STORAGE
A1-C12A 20.00
A1-112
ICU
112.00
A1-88
TOILET
49.00
A1-38
WAITING RM
159.40
A1-C12C E.C.
4.00
A1-35 51.73
A1-C11
CORRIDOR
A1-C2
CORR.
353.50
A1-C6
CORRIDOR
391.63
A1-C19
VACANT
853.35
A1-33
URODYNAMKG
229.75
A1-C12D
ST 4.
172.08
A1-C21
VACANT
653.48
A1-53
BATHROOM
86.75
A1-54
LOCKER RM.
205.50
A1-114
TOILET
30.00
A1-69
PAT TREATM
286.81
A1-28
STORAGE
329.47
A1-96
VACANT
150.00
A1-94
TOILET
126.00
A1-83A
VACANT
38.54
A1-67
LOCKER RM.
39.75
A1-C16A
F.H. CL.
5.13
A1-121H
EXAM/TREAT
173.33
A1-104A
VACANT
11.00
A1-95
259.60
A165
PATIENT CARE ROOM
165.25
A1-67A
TOILET
27.50
A1-25A
WAITING RM
90.82
A1-57
NITROUS OX
22.50
A1-112A
BATHROOM
67.17
A1-116 184.33
A1-113A 24.11
A1-45C 108.00
A1-125
TOILET
47.67
A1-2
ATTENDING
145.00
A1-3
ATTENDING
130.00
A1-91
EMS
26.00
A1-C19A
VACANT
45.00
A1-73
X-RAY
347.53
A1-80
VACANT
123.25
A1-27
ENDOSCOPY #3
127.00
A1-117
TOILET
50.75
A1-107
33.00
A1-105
TOILET
56.75
A1-122
MED PREP
49.50
A1-100
VACANT
126.25
A1-97
VACANT
308.25
A1-121C
I.C.U. BED
174.00
A1-119 52.83
A1-C21A
VACANT
5.25
A1-85A
VACANT
316.75
A1-73B 40.26
A1-113B 69.33
A1-34C
TOILET
34.00
A1-111 212.92
A1-61
PATIENT HO
274.80
A1-98
VACANT
358.00
A1-1
G.I. SECRT
158.50
A1-92
VACANT
326.19
A1-83
VACANT
107.75
A1-89 245.49
A1-C16B
NOURISH ST
18.63
A1-73A 48.75
A1-65
NURSES ST.
146.25
A1-79
VACANT
117.25
TOILET
59.00
A1-55
LOUNGE-MEN
A1-60
ANESTHESIOLOGY
A1-113
EXAM/TREAT
132.00
A1-43
253.63
A1-109 121.00
A128B
EMS
82.99
A1-102
VACANT
152.08
A1-5
CONFERENCE
1,053.72
A1-121B
I.C.U. BED
174.00
A1-C3
CORR.
399.00
B1-28E
CL.
10.83
B1-28F
CL.
7.63
B1-28A
STORAGE
127.50
B1-28B
GROSSING ROOM
167.53
B1-28C
MEDCHEMSPR
140.08
B1-28D
LABORATORY
309.65
A1-C9
CORRIDOR
344.00
A1-45
CORRIDOR
773.19
A1-101
VACANT
270.00
A1-104B
COMMUN.
12.00
A1-104C
ELECTRICAL
10.50
F.E.C.
D1-C7A
VESTIBULE
254.00
B1-34
ELEV. LOBB
170.26
E1-62
EXAM TREAT
101.33
E1-64
EXAM/TREAT
106.38
E1-C11A
STAIRWAY 8
283.70
E1-6
CHEST X-RA #1
344.79
D1-1
PATIENT
EDUCATION
D1-C8A
MAIN LOBBY
3,196.18
E1-1A
STAIRWAY 1
363.41
PATIENT
REPRESENTATIVE
163.23
E1-2
CLINICAL
86.00
E1-3
MEDICATION
61.27
B1-4B
NRSETRIAGE
70.69
A1-15
CARDIOCATH
442.53
B1-C4
CORR.
588.56
C1-C10A
ST 3.
135.29
B1-20
STRESS LAB
307.36
B1-22
PHARMACY
2,008.53
107.25
A1-19
WAITING ROOM
147.75
A1-118
PRE-ADMIT
339.22
A1-20
EXAM TREAT
183.71
A1-20A
EXAM TREAT
93.83
A1-16A 70.98
A1-16
CARDIAC CATH.
133.71
A1-17
87.75
A1-17A
EXAM
78.00
A1-12
RESP-THERP
287.50
B-135
PULMONARY
106.58 A1-14
PULMONARY/
TESTING LAB
B-136
D.A.V. OFF
184.92
B-136A
EXAM
66.40
B1-34A
NO.5 FRGHT
86.25
B1-34B
NO.4 FRGHT
99.53
A1-8
OFFICE
108.75
A1-9
RECEPTION
116.81
A1-10
CONFERENCE
158.00
A1-11A
LAB
131.83
A1-11B
STORAGE
140.00
A1-11C
OFFICE
149.33
A1-7
MEN TOILET
96.00
A1-6
WOMEN'S RM
90.00
A1-84
VACANT
159.51
A1-C1
CORRIDOR
730.14
A1-84A
VACANT
80.71
A1-87
VACANT
216.76
A1-86
VACANT
91.00
A1-85B
142.67 A1-85C
VACANT
159.83
A1-93A
VACANT
69.89
B1-39A
NURSE PRACTITIONER
118.67
B1-38
ATTENDING
173.38
A1-C3A
CORRIDOR
1,231.49
A1-4
G.I. FELLOW OFFICE
187.50
B1-22E
INVESTIGINAL
77.00
B1-22F
VAULT
71.75
B1-21
I V ORDERS
314.40
B1-17B
COORDINATOR
63.23
B1-15
ELEV. LOBB
360.72
B1-15C
ELEVATOR 3
80.57
B1-15B
ELEVATOR 2
75.83
B1-15A
ELEVATOR 1
92.10
B1-13
ECHO LAB
1,280.23
C1-27
PATIENT
B1-11
DOC WRK RM
503.88
B1-5C
SUPPORT
328.49
B1-4A
NRSETRIAGE
59.83
B1-5B
OFFICE
114.48
B1-7E
OFFICE
75.59
B1-5A
LOUNGE
106.85
B1-7B
RELEASEINF
771.89
B1-7D
OFFICE
98.71
B1-7C
OFFICE
90.99
B1-6B
RECEPTION
965.83
B1-1
CENT LOBBY
3,631.59
B1-1C
PHARMCOPAY
102.89 B1-1B
136.96
B1-1A
P.I. OFFICE
133.76
B1-8
WOMEN'S RM
71.39
B1-7A
TRANSCRITI
698.06
B1-6A
CENTRAL INTAKE
463.52
B1-C1
LOBBY
607.66
B1-C1A
LOBBY
1,307.37
C1-33C
LOUNGE
282.16
C1-C2
CORRIDOR
949.55
B1-C2
CORR.
688.92
B1-22D
SUPERVISOR
161.34
C1-77
841.75
C1-79A
LAB.
94.78
C1-79
BLOOD DRAWING ROOM
377.40
C1-82
LABORATORY
248.18
C1-50
IRM OFFICE
291.67
C1-50A 234.57
C150A
278.25
C150B
PHYSICIAN'S OFFICE
219.06
C1-50D
VESTIBULE
87.39
C1-3
DECEDENT
160.65
B1-6C
ESCORT SER
380.60
A1-59
CHIEF
132.28
A1-11D
PULMONARY
199.80
ASST. CHIEF MEDICAL
TECHNOLOGIST
/BLOOD BANK
O.D. RM.
O.D. RM. O.D. RM. O.D. RM. UNIT
ADMINISTRATION
LABORATORY
SUPERVISOR
SECRETARY
OFFICE
LAB MEDICAL
SERVICE
FLOW
CYTOMETERY
ROOM
HEMATOLOGY/
ONCOLOGY
DEPARTMENT
C1-72A
FELLOW
CENTER
DEPARTMENT OF ONCOLOGY
HEMATOLOGY
/ONCOLOGY
CONFERENCE ROOM
PHYSICIAN'S
PHYSICIAN'S OFFICE
ASSISTANT SURGICAL
SERVICE
ASSISTANT
COORDINATOR
LABORATORY
OFFICE
REST
ROOM
BLOOD DRAWING ROOM
DRUG
PHARMACY
EXAM ROOM #2
EXAM ROOM #1
CARDIOLOGY
ECHO LAB
EKG
STRESS LAB
CHAPLIN
OFFICE
SUITE
ER
CLEAN
LINES
ROLLING SHUTTERS
UTILITY
STORAGE
EXAM ROOM STORAGE
NURSE MANAGER
ER
STORAGE
WAITING ACE
E M E R G E N C Y
R O O M
C127A
CLINAL
PHARMACIST
B1-7F
ATTENDING
NURSE
BILLING
INQUIRES
ROOM
STORAGE
TOILET
SCHEDULING UNIT
RESIDENT
PHARMACIST
SUPERVISOR
E1-27
E1-26
PGM
ASSISTANT
E1-24
HOUSEKEEPER
E1-23
CLOSET
E1-38
EXAM ROOM -II
# 10
# 9
# 11
EXAM ROOM #14
# 3
# 8# 7
# 6 # 9
# 5 # 12
# 4 # 8
# 7
# 6
# 4
# 3
# 2
# 1
3 2 1
EMS ROOM
COMPUTER
ROOM
A1-118
A1-113A
MEN
LOCKER
STORAGE ROOM
ICU
WAITING ROOM
125.75
COORDINATOR
CLEAN
SUPPLY ROOM
ROOM #2
EXAM
ROOM #3
B1-13C
HOTTER ROOM
PAT-ASU UROLOGY
STORAGE ROOM
RECOVERY ROOM 6
RECOVERY ROOM 7
133.00
SUPPLY ROOM
CONFERENCE
ROOM 143.75
125.00
GAS
STORAGE
36.00
A1-52
MEN LOCKER RM.
A1-64
SPECIAL
PROCEDURE
EXAM ROOM #7
143.25
VACANT
VACANT
99.19
MEN'S
D1-15A
PATIENT EDUCATION
MEN'S
#3#2
ROOM #2
ORTHO EXAM
OFFICE
D1-35
100.00
D1-C13
RECEPTIONIST
D1-10
D1-37 ORTHO
ROOM #3
ORTHO EXAM
ROOM #4
EXAM EXAM ROOM #6
ROOM #5
119.80
PROGRAM
SERVICE
OFFICER
PROGRAMME
107.29
WORK ROOM
D1-52
C CLOSET
D1-51
E CLOSET
119.57
E1-1
ANALYST
SUPPORT
LOCKER ROOM
EXAM ROOM
PHARMACY
B1-28H
OFFICE
B1-28G
CYTOLOGY
B1-C1
AISLE WAY
B1-28I
DRY STORAGE
B1-28J
GROSS-TISS.
B-137
OFFICE
66.40
PR OG R AMME S UP P OR T
VACANT
VACANT
ROOM
ROOM
OFFICE
PHARMACIST
OFFICE
AFFAIRS
LAB
MGR
PHYSICIAN
SERV.
STRG.R
OFANESTHESIA
183.38
ADVOCATE
ROOM
EXAM
COORDINATOR
PRACTITIONER
PRACTITIONER
TREAT
EXAM
E1-C5A
PRIMARY CARE
68.00
SECERETARY
CARE ACOS
EXAM ROOM
SUPPORT
OFFICE
SHAFT.11
DN
SH A FT . 1 2
SH A FT . 9
UP
UP
DN
SH A FT . 1 4
SH A FT . 1 3
SH AF T . 1
UP DN
SH A FT . 7
SH A FT . 8
DN
UP UP
DN
SHAFT
SFT.2 5
DN
DN UP
UP DN
#1 #3
#2
1ST
A1-C12B
COMMUICATI
UP
DN
OS OS
L V
D
M
WP
LPD
C P
M
J
J
J
J
R
C P
CP
J J
J
J
RR
RRR
J
T S
F S
E-100
BUILDING 7
EXISTING BUILDING 7
TRANSFORMER
XW
ATS-SPS
POWER FOR EXTERIOR LIFT.
PROVIDE WEATHERPROOF ENCLOSURE.
BASIS OF DESIGN: SAVARIA V-1504
POWER: 20A, 120V, 1PH
G,WP
P
MDPU
LE LELLEL
DS-MDPU
W
AC-1
CU-1DS-CU-1
DS-MWSUDS-MSGUDS-CWP
T-SPS
T-LTPSHTPS
LTPS
GEN-SPS
8 88
HTPS-4 HTPS-4 HTPS-4
HTPS- 4
HTPS-4 HTPS-4
HTPS-4
HTPS-4
HTPS-4
LTPS-7
LTPS-7
LTPS-7
30cd 30cd
270 270
G,WP
LTPS-7
P
HTPS-4
POWER FOR EXTERIOR LIFT.
PROVIDE WEATHERPROOF ENCLOSURE.
BASIS OF DESIGN: SAVARIA M-1504
POWER: 30A, 120V, 1PH
LTPS-9
LTPS-9
LTPS-9
MSWU
MGSU
HTPS-7
G,WP
G,WP
G,WP
LTPS-11
LTPS-12
HTPS-8
HTPS-6
18 18
ICS
S S
S
S HTPS-5
HTPS-5
HTPS-5
HTPS-5
HTPS-9
LTPS-7
LTPS-7P
P
HTPS-4
HTPS-4
DS-MSSU
DS-MSSU-CWP
TEMP
SPS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
A u to d e s k D o c s
/0
N o rt h p o rt
S P
S /0
N o rt h p o rt
S P
S
R
M E
P F
P F
A T
.r v t
/2
/2
:3
:3
P
M
E-100
ELECTRICAL OVERALL GROUND
FLOOR PLAN
RENOVATE STERILE
PROCESSING DEPARTMENT,
BUILDING NO. 200
NORTHPORT VA
0123025
B200
06/18/2025 CJM IMW
100% CONSTRUCTION
DOCUMENTS
632-12-106
CODED NOTES:
DRAWING NOTES:
1" = 40'-0"1 ELECTRICAL OVERALL GROUND FLOOR PLAN - TEMPORARY
3/32" = 1'-0"2 ENLARGED PLAN - TEMPORARY TRAILER
N 0 20' 40' 80' 120'
1" = 40'
0 8' 16' 24' 32'
3/32" = 1'-0"
N.T.S.
KEY PLAN TEMP SPS
1. CONCRETE AND CMU WALLS, CONCRETE PADS/SLABS ON GRADE, AND ALL ASSOCIATED EQUIPMENT
AND INFRASTRUCTURE INSTALLED FOR CONTINUATION OF MEDICAL CENTER OPERATIONAL
REQUIREMENTS ARE TEMPORARY AND SHALL BE REMOVED AND THE AREAS AFFECTED RESTORED
TO PRIOR ORIGINAL CONDITIONS UPON FUNCTIONAL COMPLETION OF THE NEW SPECIAL
PROCESSES SERVICES SPACES AND/OR THE APPROVAL OF THE PROJECT COR.
2. ALL EQUIPMENT TO BE INSTALLED OUTDOORS SHALL BE NEMA 3R, EXTERIOR RATED.
3. COORDINATE ALL POWER OUTAGES WITH COR (4) WEEKS IN ADVANCE.
4. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR THE SINGLE POINT CONNECTION TO THE MDPU, CWP, MSGU, AND MWSU. TEMPORARY SPS VENDOR IS RESPONSIBLE FOR ALL CONNECTIONS FROM
THE MDPU, CWP, MSGU, AND MWSU TO THE TEMPORARY SPS EQUIPMENT.
5. CONNECT NEW FIRE ALARM NOTIFICATION AND INITIATION DEVICES TO EXISTING FIRE ALARM NAC
PANEL IN ELECTRICAL CLOSET C1-1.
COORDINATE EXACT CONDUIT ROUTING FOR TEMPORARY SPS WITH ARCHITECT, CIVIL AND VA
ELECTRICAL SHOP PRIOR TO CONSTRUCTION.
EXISTING BUILDING 7 TRANSFORMER IS A LOOP FEED TRANSFORMER USED AS A RADIAL FEED
TRANSFORMER WITH DEADFRONT ARRESTERS ON THE 'HV B' TERMINALS. DEADBREAK ARRESTERS SHALL BE DISCONNECTED, AND NEW LOAD BREAK ELBOWS SHALL BE INSTALLED. PROVIDE NEW 15kV 3#2/0AWG IN 5" CONDUIT AND CONNECT TO THE 'HV B' SIDE OF THE TRANSFORMER. PROVIDE A 316
STAINLESS STEEL NEMA 4X SIDE BOX TO PULL THE FEEDERS THROUGH AND DOWN INTO THE
UNDERGROUND CONDUITS. COORDINATE ALL CONNECTIONS WITH THE VA, CIVIL, AND STRUCTURAL
DRAWINGS PRIOR TO CONSTRUCTION.
PROVIDE STAINLESS STEEL UNISTRUT RACK TO MOUNT PANELS HTPS AND LTPS.
ROUTE UNDERGROUND FEEDERS FROM ATS-SPS TO PANEL HTPS.
ROUTE UNDERGROUND FEEDERS FROM PANEL HTPS TO DS-MDPU.
PROVIDE STAINLESS STEEL UNISTRUT RACK TO MOUNT DISCONNECT DS-MDPU.
APPROXIMATE LOCATION OF MPDU (MOBILE POWER DISTRIBUTION UNIT). BASIS OF DESIGN IS MMIC MEDICAL SYSTEMS. BASIS OF DESIGN POWER REQUIREMENTS ARE 600A, 480V, 3PH. ANY DEVIATION FROM BASIS OF DESIGN IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND SHALL BE
PROVIDED AT NO ADDITIONAL COST TO THE VA.”
EQUIPMENT POWERED BY MDPU AS BASIS OF DESIGN. ANY DEVIATION FROM BASIS OF DESIGN IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND SHALL BE PROVIDED AT NO ADDITIONAL COST
TO THE VA.”
PROVIDE WEATHERPROOF FIRE ALARM NOTIFICATION DEVICE. COORDINATE FIRE ALARM
CONNECTION AS REQUIRED TO CONNECT BACK TO EXISTING FIRE ALARM PANEL IN ROOM D0-3.
CONTINUE ROUTING OF CONDUIT AND CONDUCTOR BACK TO THE EXISTING 300kVA, 13.2kV-208/120V
TRANSFORMER SERVING BUILDING 7.
PROVIDE 3' x 3' CONCRETE HANDHOLE FOR THE INSTALLATION OF MEDIUM VOLTAGE CABLE. WHEN
THE TEMPORARY SPS IS REMOVED, DISCONNECT THE MEDIUM VOLTAGE CABLE FROM THE
TRANSFORMER T-SPS, PULL BACK THE MEDIUM VOLTAGE CABLE TO THE HANDHOLE, CAP THE ENDS
OF THE MEDIUM VOLTAGE CABLE, AND MAINTAIN FOR FUTURE USE.
PROVIDE TASK LIGHTING AS SHOWN ON THE ELECTRICAL EQUIPMENT SUPPORT DETAIL ON SHEET E-501.
PROVIDE ELECTRICAL CONNECTIONS TO RAYCHEM 920 (OR EQUAL) HEAT TRACE CONTROLLERS.
PLUMBING CONTRACTOR SHALL PROVIDE INSTALLATION OF HEAT TRACE CABLE ON PIPING AND
ELECTRICAL CONTRACTOR TO FURNISH CONTROLLER. ELECTRICAL CONTRACTOR TO INSTALL
CONTROLLER AND PROVIDE CONDUIT AND ASSOCIATED CIRCUIT WIRING FROM ELECTRICAL PANEL TO
CONTROLLER, FROM CONTROLLER TO HEAT TRACE WIRE. COORDINATE FINAL ELECTRICAL
REQUIREMENTS WITH PLUMBING CONTRACTOR PRIOR TO FINAL INSTALLATION AS RUN LENGTHS CAN IMPACT FINAL ELECTRICAL DEMAND. SEE SHEET E-801 FOR CIRCUITING INFORMATION. ANY DEVIATION FROM BASIS OF DESIGN IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND SHALL BE
PROVIDED AT NO ADDITIONAL COST TO THE VA.”
PROVIDE 120V, 1PH POWER FOR MOTORIZED CONTROLLED DAMPER. COORDINATE FINAL LOCATION
AND CONNECTION REQUIREMENTS WITH MECHANICAL CONTRACTOR PRIOR TO INSTALLATION.
PROVIDE NEW LOCKED ENCLOSURE IN THIS AREA FOR FIBER PASS THROUGH AND PULL ASSISTANCE.
PROVIDE ALUMINUM RMC FOR FIBER RUN ALONG WALK WAY TO SPS TRAILER. PULL MULTIMODE FIBER
THROUGH FROM ROOM C1-50 INTO SPS TRAILER THROUGH CONDUIT. COORDINATE FIBER
CONNECTION AS REQUIRED TO CONNECT BACK TO TELECOM ROOM.
PROVIDE THREE (3) SETS OF FIRE ALARM CONTACTS FOR SUPERVISORY, ALARM, AND TROUBLE CONDITIONS. ALL FEEDERS SHALL BE INSTALLED IN ALUMINUM RMC. COORDINATE CONNECTION AS REQUIRED TO CONNECT BACK TO EXISTING FIRE ALARM PANEL IN ROOM D0-3. COORDINATE EXACT
LOCATIONS AND INSTALLATION REQUIREMENTS WITH MMIC PRIOR TO CONSTRUCTION.
PROVIDE (1) LOCKABLE 1' x 2' TIER 5 HANDHOLE FOR DATA TO COMBINATION CARD READER/NUMERIC KEYPAD. PROVIDE 2#8AWG, 1#8AWG GROUND IN 1-1/2" CONDUIT A MINIMUM OF 12" DEEP WITH WARNING TRACER TAPE A MINIMUM OF 6" ABOVE CONDUIT. PROVIDE A NEMA 4 ENCLOSURE TO HOUSE
A FIBER CONVERTER AND POE INJECTOR. COORDINATE EXACT LOCATION AND MOUNTING
REQUIREMENTS OF JUNCTION BOX WITH VA AND CIVIL DRAWINGS PRIOR TO CONSTRUCTION.
PROVIDE NEW AREA SITE LUMINAIRE(S) WITH NEW 15' ROUND POLE AS SHOWN ON PLAN AND THE LIGHTING FIXTURE SCHEDULE SHOWN ON SHEET E-601. PROVIDE (1) LIGHTING POLE-MOUNTED, PTZ
CAMERA LIGHTING POLE-MOUNTED AT 12'-0". PROVIDE LIGHTING POLE MOUNTED EQUIPMENT
ENCLOSURE. PROVIDE QUAZITE 1' x 2' TIER 5 HANDHOLE LOCATED AT THE BASE OF EACH LIGHTING POLE WITH A CAMERA. ALL LOW VOLTAGE CABLING FOR CAMERA AND ASSOCIATED EQUIPMENT MUST
BE ROUTED THROUGH PULL BOX. REFER TO TYPICAL LIGHTING POLE MOUNTED EQUIPMENT
ENCLOSURE DETAIL ON SHEET T-501 FOR ADDITIONAL INFORMATION. COORDINATE EXACT LOCATION
AND INSTALLATION REQUIREMENTS WITH CIVIL DRAWINGS PRIOR TO INSTALLATION.
PROVIDE CEILING MOUNTED DOME STYLE MULTI-LENS CAMERA.
COORDINATE THE REMOVAL AND REINSTALLATION OF THE EXISTING CAMERA AND SPEAKER LOCATED
ON THE EXTERIOR OF THE BUILDING WITH THE VA PRIOR TO CONSTRUCTION.
PROVIDE INTERCOM CALL STATION INSIDE THE VESTIBULE FOR COMMUNICATION WITH THE
TEMPORARY SPS TRAILERS. COORDINATE FINAL LOCATION AND CONNECTION REQUIREMENTS WITH
THE VA AND TEMPORARY TRAILER MANUFACTURER PRIOR TO INSTALLATION.
PROVIDE FIRE ALARM RELAYS AND ALL ASSOCIATED RACEWAY FOR TAMPER AND WATER FLOW
SWITCHES AT ENTRANCE TO BUILDING. COORDINATE EXACT LOCATION, QUANTITY OF DEVICES, AND
INSTALLATION REQUIREMENTS WITH FIRE PROTECTION CONTRACTOR PRIOR TO CONSTRUCTION.
N.T.S.
3 BUILDING 7 TRANSFORMER - PRIMARY COMPARTMENT
ANY DEVIATION FROM BASIS OF DESIGN IS THE
RESPONSIBILITY OF THE GENERAL CONTRACTOR AND
SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE VA.”
Revisions Date
1 ADDENDUM 1 09/03/2025
BASEMENT
ALL ELECTRICAL PANELS AND
TRANSFORMERS SHOWN ON THE RISER
DIAGRAM ARE EXISTING.
PANELS IN BOLD ARE PANELS TO BE UTILIZED
FOR THIS RENOVATION PROJECT.
N = NORMAL POWER
C = CRITICAL POWER
LS = LIFE SAFETY
CLB-CD
CLB-C
CHB-C
NLB-C
NLB-CD2
ELEC. CLOSET CB-2
CHB-CD
NLB-CD
NHB-C
NLB-C2
NL1-C3
CL1-C
480V- 120/208V
#1/0
T-CLB-CD
112.5 kVA
CL1-C1
CL1-C
CH1-C
NL1-C
NL1-C2
EH1-C
1ST FLOOR
TO CSWB#2
TO NHB-C
VIA XFMR
100 150
NO
POWER
PANEL
OFF
ELEC. CLOSET CB-1
TO 2001 B1
TO EM SWBD
ELEC. CLOSET C1-2 ELEC. CLOSET C1-1
N NN NC
LS
CNCC
C C CN N N
TO CHB-CD
TO CHB-C
NHKD
TO NSWBD-C2
MAIN ELEC. ROOM A011A-E
2ND FLOOR
NL2-C
TO NLB-CD
N
N
CHB-AD
TO CSWB#2
C
ELEC. ROOM A011D
CH2-PH
C
2 22
NOTES: (APPLICABLE TO LUMINAIRE SCHEDULE ONLY)
1. CATALOG NUMBERS FOR LUMINAIRES INDICATE THE TYPE AND QUALITY OF THE LUMINAIRE TO BE PROVIDED BY THE CONTRACTOR AND ARE GENERAL IN NATURE. THE CATALOG NUMBERS ARE NOT INTENDED TO INDICATE AN ACTUAL ORDER MODEL NUMBER.
2. PROVIDE EXIT SIGNS WITH SINGLE FACE OR DOUBLE FACE AND WITH OR WITHOUT CHEVRONS AS INDICATED ON THE DRAWINGS.
3. EMERGENCY FIXTURES AND BATTERY PACKS ARE TO BE CONNECTED TO CONSTANT HOT LEG (UN-SWITCHED) OF CIRCUIT INDICATED.
4. ALL MOUNTING HEIGHTS SHALL BE AS INDICATED ON THE DRAWINGS, LIGHTING FIXTURE SCHEDULE, OR AS DIRECTED BY ARCHITECT OR ENGINEER. MOUNTING HEIGHTS OF WALL MOUNTED LUMINAIRES SHALL BE MEASURED FROM THE FINISHED FLOOR TO THE CENTERLINE OF THE LUMINAIRE. MOUNTING HEIGHTS OF CEILING SUSPENDED LUMINAIRES SHALL BE MEASURED FROM THE FINISHED FLOOR TO THE BOTTOM OF THE LUMINAIRE.
5. WHERE FIXTURES ARE TO BE INSTALLED IN A HARD CEILING, PROVIDE A DRY WALL FRAMING KIT.
TO
G
G
LE
S W
IT
C
H (E
S) C
E
IL
IN
G
/W
AL
L M
O U
N
TE
D O
C C
U P
AN
C
Y S
EN
SO
R (S
W
AL
L
BO
X O
C C
U
PA
N C
Y
SE
N
SO
R (S
) W
IT
H S
IN
G
LE
O
U
TP
U T
R E
LA
Y
W
AL
L
BO
X O
C C
U
PA
N C
Y
SE
N S
O R
(S ) W
IT
H
D
IM
M
IN
G
LU
M
IN
AI
R E
W
IT
H B
U
IL
T-
IN
O C
C U
P
AN
C Y
S
EN
SO
R
- D
IG
IT
A
L
SW
IT
C
H (E
S) C
E
IL
IN
G
/W A
LL
M
O U
N
TE
D O
C C
U P
AN
C
Y
SE
N
SO
R (S
IN
D
O O
R P
H O
TO
SE
N
SO
R (S
IN
TE
G R
A L
IU
TD
O O
R P
H O
TO
C
EL
L
AS
TR
O N
O M
IC
AL
T
IM
EC
LO
C K
FR
ES
C A
SW
IT
C H
IN
G
ST
E
P- D
IM
M
IN
G
FU
LL
R
AN
G E
D
IM
M
IN
G C
E N
TR
A
LI
ZE
D C
IR
C
AD
IA
N R
H
YT
H M
C C
T C
O N
TR
O
L
VA
C
AN
C
Y
SE
N S
O R
T
IM
E O
U T/
D
EL
AY
(I
N M
IN
U
TE
S
LI
G
H
TS
M
AN
U
AL
O N
LI
G
H
TS
A U
TO
M
AT
IC
O N
T O
L
IG
H
T
LE
V
EL
U
PO
N O
C C
U
PA
N C
Y
LI
G
H
TS
A U
TO
M
AT
IC
O N
T O
0%
L
IG
H T
LE
V
EL
U
PO
N
O C
C U
PA
N
C Y, M
A N
U
AL
O N
TI
M
EC
LO
C K
SC
H
ED
U
LE
D
"O N
" T
IM
E
TI
M
EC
LO
C K
SC
H
ED
U
LE
D
"O
FF
" T
IM
E
O C
C . S
EN
S
O R
O
VE
R R
ID
E
TI
M
EC
LO
C K
D U
R
IN
G "O
FF
" H
O U
R S
D A
YL
IG
H
TI
N G
-D
IM
L
IG
H
TS
T O
M
AI
N
TA
IN
M
IN
IM
U M
0F
C A
T
" A
FF
LINE VOLTAGE CONTROL DEVICE LOW VOLTAGE CONTROL DEVICE SWITCHING/DIMMING MISCELLANEOUS
CORRIDORS
TYPICAL SPACE TYPE
- - - - - - X - - - - X-- - 20 X 5AM 10PM
X
X
X - -
NOTES
COORDINATE SCHEDULE WITH COR.
OFFICES - - - - - - X - - - - X-- - X -X - -
DECONTAMINATION / SCOPE PROCESSING
X X - - - - - - - - - X - - - - -- X-
CLEAN SUPPLY
HAC
ANTEROOM
CONFERENCE/BREAK
MENS/WOMENS LOCKER & BATHROOMS
CART WASH / CARTS SOILED & CLEAN
TRAILER CORRIDOR
X X X 5AM 10PMX COORDINATE SCHEDULE WITH COR.
- - - -- - - - - - X - - - - X-- - - -X - -
- - - -- - - - - - X - - - - X-- - - -X - -
X -- - - - - - - - - - -- - - -X X X 5AM 10PMX COORDINATE SCHEDULE WITH COR.
X -- - - - - - - - - - -- - - -X X X 5AM 10PMX COORDINATE SCHEDULE WITH COR.
X -- - - - - - - - - - -- - - -X X X 5AM 10PMX COORDINATE SCHEDULE WITH COR.
X -- - - - - - - - - - -- - - -X X X 5AM 10PMX COORDINATE SCHEDULE WITH COR.
11 - - - -X X - - - - - - X - - X - - - - -- X-EXTERIOR / PENTHOUSE 20
G
BUILDING 7
NEW 750kVA, 480V, 3PH
TRANSFORMER
MDPU
MOBILE POWER
DISTRIBUTION UNIT
GEN-SPS
1MW
480Y/277V
NEMA 3R
SOUND LEVEL 1
96 HR SUB BASE TANK
DS-MDPU
DISCONNECT SWITCH
600V, 600A, 3P, 600A FUSED,
NEMA 3R
2 SETS OF (4#600KCMIL +
1#1/0AWG GND IN 4" C.)
T-SPS
750kVA 13.2kV- 480/277V
800 A
277/480V, 3-PHASE, 4 WIRE(65,000 AIC)
HTPS
EXISTING 300kVA, 208V, 3PH TRANSFORMER
T-BLDG 7
300kVA
13.2kV- 208/120V
225 T-LTPS
112.5kVA
480V- 208/120V
#2
LTPS
(10,000 AIC)
#2/0
2 SETS OF (4#3/0AWG +
1#2AWG GND IN 2" C.)
NEMA 3R, EXTERIOR RATED
NEMA 3R,
EXTERIOR RATED
15kV 3#2/0AWG IN 5" C.
ATS-SPS
800A, 480V, 4P, NEMA 3R
NEW 112.5kVA, 208V, 3PH TRANSFORMER
2 SETS OF (4#350KCMIL + 1#1/0AWG GND IN 2-1/2" C.)
3#4/0AWG + 1#6AWG GND IN 2-1/2" C.
200 DS-MSSU
DISCONNECT SWITCH
240V, 200A, 3P, 200A FUSED,
NEMA 3R
DS-MSSU-CWP
DISCONNECT SWITCH
600V, 30A, 3P, 15A FUSED,
NEMA 3R
4#12AWG + 1#12AWG GND IN 3/4" C.
4#3/0AWG + 1#6AWG
GND IN 2-1/2" C.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
A u to d e s k D o c s
/0
N o rt h p o rt
S P
S /0
N o rt h p o rt
S P
S
R
M E
P F
P F
A T
.r v t
/2
/2
:3
:0
P
M
E-601
ELECTRICAL DIAGRAMS RENOVATE STERILE
PROCESSING DEPARTMENT,
BUILDING NO. 200
NORTHPORT VA
0123025
06/18/2025 CJM IMW
100% CONSTRUCTION
DOCUMENTS
632-12-106
LIGHTING FIXTURE SCHEDULE
TYPE DESCRIPTION MANUFACTURER MODEL VOLTAGE VA
LAMP
TYPE
FIXTURE
LUMENS
FIXTURE
COLOR TEMP
(K) DRIVER/BALLAST COMMENTS
A2 2'x2', LED, CLEANROOM RECESSED LUMINAIRE COOPER LIGHTING BAA-FLR-MC-22-35-35-CA125 277 V 31 VA LED 3560 3500K 10%, 0-10V DIMMING
B2 2'x2', LED LAY-IN FIXTURE COOPER LIGHTING 22FPSL2SCT3-A3/8-4/18GDIM 277 V 31 VA LED 3440 3500K 10%, 0-10V DIMMING
D 6" LED DOWNLIGHT LITHONIA LDN6-35/15-LO6-AR-LSS-MVOLT-GZ10 277 V 18 VA LED 1500 3500K 10%, 0-10V DIMMING
L 4' SURFACE MOUNTED LED STRIP FIXTURE LITHONIA CSVT-L48-3000L-MVOLT-35K-80CRI-WLFEND2 277 V 24 VA LED 3000 3500K 10%, 0-10V DIMMING PROVIDE 'OPTION 'STSL' STAINLESS STEEL LATCHES.
L (120 V) 4' SURFACE MOUNTED LED STRIP FIXTURE LITHONIA CSVT-L48-3000L-MVOLT-35K-80CRI-WLFEND2 120 V 24 VA LED 3000 3500K 10%, 0-10V DIMMING PROVIDE 'OPTION 'STSL' STAINLESS STEEL LATCHES.
LE 4' SURFACE MOUNTED LED STRIP FIXTURE LITHONIA CSVT-L48-3000L-MVOLT-35K-80CRI-IE7WCP-WLFEND2 277 V 24 VA LED 3000 3500K 10%, 0-10V DIMMING PROVIDE 'OPTION 'STSL' STAINLESS STEEL LATCHES.
LE (120 V) 4' SURFACE MOUNTED LED STRIP FIXTURE LITHONIA CSVT-L48-3000L-MVOLT-35K-80CRI-IE7WCP-WLFEND2 120 V 24 VA LED 3000 3500K 10%, 0-10V DIMMING PROVIDE 'OPTION 'STSL' STAINLESS STEEL LATCHES.
P RECESSED LINEAR LED FIXTURE LITHONIA IDMW2-L24-2000LM-ACL-MD-MVOLT-GZ10-35K-80CRI 277 V 27 VA LED 3000 3500K 10%, 0-10V DIMMING
S AREA / SITE LUMINAIRE - 1 HEAD COOPER LIGHTING BAA-GALN-SA2D-840-U-T3-BK
POLE: RSS415SY21X
277 V 63 VA LED 9180 4000K N/A MOUNTED AT 15' AFG. FIXTURE SHALL BE
CONTROLLED BY INTEGRAL PHOTOCELL.
T LED STRIP FIXTURE, WET LOCATION METALUX BAA-4VT3-SL3C3-G-UNV 120 V 37 VA LED 5129 3500K N/A COORDINATE MOUNTING HEIGHT WITH THE
MECHANICAL EQUIPMENT INSTALLED.
W WALL MOUNT EXTERIOR LED FIXTURE WITH PHOTOCELL, BUTTON TYPE LITHONIA WDGE3-LED-P1-40K-80CRI-R3-MVOLT-SRM-E20WC-BAA-PIR1FC3V 277 V 52 VA LED 7000 4000K N/A FIXTURE SHALL BE CONTROLLED BY INTEGRAL
PHOTOCELL AND MOTION SENSOR. MOUNT AT 7'-6"
AFF.
W (120 V) WALL MOUNT EXTERIOR LED FIXTURE WITH PHOTOCELL, BUTTON TYPE LITHONIA WDGE3-LED-P1-40K-80CRI-R3-MVOLT-SRM-E20WC-BAA-PIR1FC3V 120 V 52 VA LED 7000 4000K N/A FIXTURE SHALL BE CONTROLLED BY INTEGRAL
PHOTOCELL AND MOTION SENSOR. MOUNT AT 7'-6"
AFF.
X RECESSED EDGE LIT LED EXIT SIGN, RED LETTERS, SINGLE OR DOUBLE FACE LITHONIA EDGR 277 V 5 VA LED N/A N/A N/A
XW RECESSED EDGE LIT LED EXIT SIGN, RED LETTERS, SINGLE OR DOUBLE FACE, WETLOCATION LITHONIA WTLE 277 V 4 VA LED N/A N/A N/A
N.T.S.
1 PARTIAL ELECTRICAL RISER DIAGRAM - MAIN BUILDING
N.T.S.
3 LIGHTING CONTROL MATRIX
N.T.S.
2 ELECTRICAL RISER DIAGRAM - TEMPORARY SPS
EQUIPMENT SCHEDULE
EQUIPMENT NAME IDENTIFICATION HP FLA MCA VOLT / PH / LOAD (VA) MOCP
CB
AMPS PANEL CKT # FEEDER SIZE CONDUIT MOTOR STARTING DISC MEANS COMMENTS
200-ACC-SPD AIR COOLED CHILLER - - 37 480 V/3-24608 VA 50 50 CH2-PH 7,9,11 (3) #6 AWG + #10 AWG GND 1" NA DS-200-ACC-SPD -
200-AHU-SPD AIR HANDLING UNIT - 31 38 480 V/3-25773 VA 40 40 CH2-PH 1,3,5 (3) #8 AWG + #10 AWG GND EXISTING NA DS-200-AHU-SPD EXISTING BREAKER SPACE AND CONDUIT TO BE REUSED.
200-CHWP-1 MECHANICAL PUMP 1 - - 480 V/3-1746 VA - 20 CH2-PH 2,4,6 (3) #12 AWG + #12 AWG GND 3/4" NA TS-200-CHWP-1 -
200-CHWP-2 MECHANICAL PUMP 1 - - 480 V/3-1746 VA - 20 CH2-PH 8,10,12 (3) #12 AWG + #12 AWG GND 3/4" NA TS-200-CHWP-2 -
200-CRU-SPD STEAM CONDENSATE RETURN PUMP (2) 3/4 - - 480 V/3-3000 VA - 20 CHB-AD 21,23,25 (3) #12 AWG + #12 AWG GND 3/4" NA DS-200-CRU-SPD -
200-CSG-SPD STEAM-TO-STEAM GENERATOR - - - 120 V/1-200 VA - 20 CLB-C 24 (2) #12 AWG + #12 AWG GND 3/4" NA TS-200-CSG-SPD -
200-EF-SPD-C EXHAUST FAN 3 - - 480 V/3-3991 VA - 20 CH2-PH 13,15,17 (3) #12 AWG + #12 AWG GND 3/4" NA DS-200-EF-SPD-C -
200-EF-SPD-D EXHAUST FAN 3 - - 480 V/3-3991 VA - 20 CH2-PH 19,21,23 (3) #12 AWG + #12 AWG GND 3/4" NA DS-200-EF-SPD-D -
AC-1 / CU-1 SPLIT SYSTEM - - 22 208 V/1-3661 VA 30 30 LTPS 2,4 (2) #10 AWG + #10 AWG GND 3/4" NA DS-CU-1 INDOOR UNIT POWERED BY OUTDOOR UNIT.
CUH-1 STEAM UNIT HEATER 1/60 - - 120 V/1-50 VA - 20 NL2-C 23 (2) #12 AWG + #12 AWG GND 3/4" NA TS-CUH-1 -
GFS-1 GLYCOL FEED SYSTEM 1/3 - - 120 V/1-864 VA - 20 NL2-C 21 (2) #12 AWG + #12 AWG GND 3/4" NA N/A -
P-2 CIRCULATION PUMP 1/100 - - 120 V/1-180 VA - 20 CL1-C1 34 (2) #12 AWG + #12 AWG GND 3/4" NA N/A -
P-3 CIRCULATION PUMP 1/35 - - 120 V/1-200 VA - 20 CL1-C1 36 (2) #12 AWG + #12 AWG GND 3/4" NA TS-P-3 -
RO-1 REVERSE OSMOSIS PUMP 5 - - 480 V/3-6319 VA 20 20 CHB-AD 26,28,30 (3) #12 AWG + #12 AWG GND 3/4" NA DS-RO-1 -
RO-2 REVERSE OSMOSIS PUMP 5 - - 480 V/3-6319 VA 20 20 CHB-AD 27,29,31 (3) #12 AWG + #12 AWG GND 3/4" NA DS-RO-2 -
RP-1 RO BOOSTER PUMP 3/4 - - 120 V/1-1330 VA 20 20 CLB-C 1 (2) #12 AWG + #12 AWG GND 3/4" NA TS-RP-1 -
RP-2 RO BOOSTER PUMP 5 - - 480 V/3-6319 VA 20 20 CHB-AD 32,34,36 (3) #12 AWG + #12 AWG GND 3/4" NA DS-RP-2 -
TP-1 TRAP PRIMER - 0.5 - 120 V/1-50 VA - 20 NL1-C 36 (2) #12 AWG + #12 AWG GND 3/4" NA TS-TP-1 -
DISCONNECT SCHEDULE
DISC NAME TYPE OF EQUIPMENT VOLTAGE RATING ENCLOSURE RATING DISC. AMP/POLE FUSE SIZE DISCONNECT NOTES
DS-200-ACC-SPD FUSED DISCONNECT SWITCH 600V NEMA 3R 50A/3P 50A -
DS-200-AHU-SPD FUSED DISCONNECT SWITCH 600V NEMA 3R 40A/3P 40A -
DS-200-CRU-SPD NON-FUSED DISCONNECT SWITCH 600V NEMA 3R 30A/3P 30A -
DS-200-EF-SPD-C FUSED DISCONNECT SWITCH 600V NEMA 3R 20A/3P 20A -
DS-200-EF-SPD-D FUSED DISCONNECT SWITCH 600V NEMA 3R 20A/3P 20A -
DS-CU-1 FUSED DISCONNECT SWITCH 240V NEMA 3R 30A/2P 30A -
DS-RO-1 FUSED DISCONNECT SWITCH 600V NEMA 4X 30A/3P 30A 316 STAINLESS STEEL
DS-RO-2 FUSED DISCONNECT SWITCH 600V NEMA 4X 30A/3P 30A 316 STAINLESS STEEL
DS-RP-2 NON-FUSED DISCONNECT SWITCH 600V NEMA 3R 20A/3P 20A -
N/A TOGGLE SWITCH WITH PILOT LIGHT 240V NEMA 3R 20A/1P - -
TS-200-CHWP-1 TOGGLE SWITCH WITH PILOT LIGHT 240V NEMA 3R 20A/3P - -
TS-200-CHWP-2 TOGGLE SWITCH WITH PILOT LIGHT 240V NEMA 3R 20A/3P - -
TS-200-CSG-SPD TOGGLE SWITCH WITH PILOT LIGHT 240V NEMA 3R 20A/1P - -
TS-CUH-1 TOGGLE SWITCH WITH PILOT LIGHT 240V NEMA 3R 20A/1P - -
TS-P-3 TOGGLE SWITCH WITH PILOT LIGHT 120V NEMA 1 20A/1P - SWITCH SHALL BE HORSEPOWER RATED.
TS-RP-1 TOGGLE SWITCH WITH PILOT LIGHT 120V NEMA 3R 20A/1P - SWITCH SHALL BE HORSEPOWER RATED.
TS-TP-1 TOGGLE SWITCH WITH PILOT LIGHT 120V NEMA 1 20A/1P - SWITCH SHALL BE HORSEPOWER RATED.
CODED NOTES:
EXISTING BUILDING 7 TRANSFORMER IS A LOOP FEED TRANSFORMER USED AS A RADIAL FEED
TRANSFORMER WITH DEADFRONT ARRESTERS ON THE 'HV B' TERMINALS. DEADBREAK ARRESTERS SHALL BE DISCONNECTED, AND NEW EQUIPMENT SHALL BE FED FROM THE 'HV B' SIDE OF THE TRANSFORMER. COORDINATE ANY DOWNTIME WITH THE VA AND ACQUIRE ALL APPROPRIATE WORK PERMITS PRIOR TO CONSTRUCTION. PROVIDE A SIDE BOX TO PULL THE FEEDERS THROUGH AND DOWN INTO THE UNDERGROUND CONDUITS. COORDINATE ALL LOCATIONS AND CONNECTIONS WITH THE VA, CIVIL, AND STRUCTURAL DRAWINGS PRIOR TO CONSTRUCTION.
DUE TO PART AVAILABILITY AND END-OF-LIFE CONSIDERATIONS, THIS PANEL WILL BE REMOVED AND REPLACED WITH A NEW PANELBOARD. COORDINATE ANY POWER OUTAGES WITH THE VA (4) WEEKS IN
ADVANCE.
Revisions Date
1 ADDENDUM 1 09/03/2025
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
A u to d e s k D o c s
/0
N o rt h p o rt
S P
S /0
N o rt h p o rt
S P
S
R
M E
P F
P F
A T
.r v t
/2
/2
:3
:0
P
M
E-801
ELECTRICAL SCHEDULES RENOVATE STERILE
PROCESSING DEPARTMENT,
BUILDING NO. 200
NORTHPORT VA
0123025
06/18/2025 CJM IMW
100% CONSTRUCTION
DOCUMENTS
632-12-106
Notes:
Total Est. Demand Current: 464 A
SPS Equipment 466685 VA 75.00% 350014 VA Total Conn. Current: 604 A
Receptacle 1800 VA 100.00% 1800 VA Total Est. Demand: 385705 VA
Other 33635 VA 100.00% 33635 VA Total Conn. Load: 502377 VA
Lighting 257 VA 100.00% 257 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
604 A
502377 VA
10 SPARE 1 20 A 0.0 kVA
9 HEAT TRACE 1 20 A 6.6 kVA
8 HEAT TRACE 1 30 A 6.6 kVA
7 HEAT TRACE 1 30 A 6.6 kVA
6 HEAT TRACE 1 30 A 6.6 kVA
5 SITE LIGHTING 1 20 A 0.3 kVA
4 LIGHTING - TRAILER CORRIDOR 1 20 A 0.3 kVA
3 MSSU-CWP 3 15 A 10.0 kVA
2 MDPU 3 600 A 399.1 kVA
1 PANEL LTPS VIA T-LTPS 3 400 A 66.2 kVA
CKT Circuit Description # of
Poles Trip Rating Load Remarks
NEW NEMA 3R, EXTERIOR RATED 480/277V NORMAL POWER PANELBOARD.
Notes:
Neutral Rating: 100.00%
Enclosure: NEMA 1 MCB Rating: 800 A
Mounting: Surface Wires: 4 Mains Rating: 800 A
Supply From: ATS-SPS Phases: 3 Mains Type: MCB
Location: EXTERIOR Volts: 480/277 Wye A.I.C. Rating: 65,000
Panelboard: HTPS
BRANCH CIRCUIT NOTES:
TOTAL EST. DEMAND... 144 A
TOTAL CONNECTED... 184 A
SPS Equipment 57644 VA 75.00% 43233 VA TOTAL EST. DEMAND: 51824 VA
Receptacle 1800 VA 100.00% 1800 VA TOTAL CONNECTED LOAD: 66234 VA
Other 6791 VA 100.00% 6791 VA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS
LEGEND:
TOTAL... 211 A 182 A 164 A
TOTAL... 25005 VA 21585 VA 19645 VA
23 SPACE -- 1 -- -- 1 -- SPACE 24
21 SPACE -- 1 -- -- 1 -- SPACE 22
19 SPACE -- 1 -- -- 1 -- SPACE 20
17 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 18
15 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 16
13 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 14
11 RECEPT - EQUIPMENT SUPPORT 20 A 1 180 VA 200 VA 1 20 A JBOX - MODs 12
9 RECEPT - TRAILER EXTERIOR 20 A 1 540 VA 0 VA 1 20 A V-1504 LIFT 10
7 RECEPT - TRAILER CORRIDOR 20 A 1 1080... 2880... 1 30 A M-1504 LIFT 8
5 1921... 50 VA 1 20 A LIGHTING - EQUIPMENT SUPPORT 6
3 1921... 1830... 4
MSSU 200 A 3
1921... 1830...
2 30 A AC-1 / CU-1
CKT CIRCUIT DESCRIPTION
NOTE
S TRIP POLES A B C POLES TRIP
NOTE
S CIRCUIT DESCRIPTION CKT
NEW NEMA 3R, EXTERIOR RATED 208/120V NORMAL POWER PANELBOARD.
GENERAL NOTES:
ENCLOSURE: Type 1 SERVICE ENTRANCE: NO
MOUNTING: Surface WIRES: 4 MAINS RATING: 400 A
SUPPLY FROM: T-LTPS PHASES: 3 MAINS TYPE: MCB
LOCATION: COURTYARD VOLTS: 120/208 Wye A.I.C. RATING: 10,000
BRANCH PANEL: LTPS
1. EXISTING CIRCUIT OR SPARE/SPACE TO REMAIN.
2. EXISTING SPARE TO BE UTILIZED FOR NEW CIRCUIT.
BRANCH CIRCUIT NOTES:
TOTAL EST. DEMAND... 1 A
TOTAL CONNECTED... 1 A
TOTAL EST. DEMAND: 804 VA
TOTAL CONNECTED LOAD: 804 VA
Lighting 804 VA 100.00% 804 VA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS
LEGEND:
TOTAL... 2 A 0 A 1 A
TOTAL... 464 VA 0 VA 340 VA
29 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 30
27 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 28
25 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 26
23 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 24
21 LIGHTING: 1ST FLOOR CORRIDOR 1 20 A 1 0 VA 0 VA 1 20 A 1 LIGHTING: 4TH FLOOR CORRIDOR 22
19 LIGHTING: BASEMENT CORRIDOR 1 20 A 1 0 VA 0 VA 1 20 A 1 LIGHTING: 3RD FLOOR CORRIDOR 20
17 SPARE 1 20 A 1 0 VA 0 VA 1 20 A 1 LIGHTING: 2ND FLOOR CORRIDOR 18
15 -- -- 16
13 -- -- 14
LOWER SECTION CONTROL -- 3
3 -- LOWER SECTION CONTROL
9 LIGHTING: 4TH FLOOR CORRIDOR 1 20 A 1 0 VA -- 1 -- 1 SPACE 10
7 LIGHTING: 3RD FLOOR CORRIDOR 1 20 A 1 0 VA 464 VA 1 20 A 2 LIGHTING - SPS 8
5 LIGHTING: 2ND FLOOR CORRIDOR 1 20 A 1 0 VA 340 VA 1 20 A 2 LIGHTING - OFFICES 6
3 LIGHTING: 1ST FLOOR CORRIDOR 1 20 A 1 0 VA 0 VA 1 20 A 1 LIGHTING: STAIR #1 4
1 LIGHTING: BASEMENT CORRIDOR 1 20 A 1 0 VA 0 VA 1 20 A 1 LIGHTING: EXIT 2
CKT CIRCUIT DESCRIPTION
NOTE
S TRIP POLES A B C POLES TRIP
NOTE
S CIRCUIT DESCRIPTION CKT
EXISTING PARK METAL PROD. CO. CTL 480/277V LIFE SAFETY PANELBOARD. THIS PANEL WILL BE REPLACED WITH A NEW PANELBOARD AS PART OF THIS PROJECT.
LOADS SHOWN REFLECT THE AMOUNT OF NEW LOAD BEING ADDED TO THE PANEL.
GENERAL NOTES:
ENCLOSURE: Type 1 SERVICE ENTRANCE: NO
MOUNTING: Surface WIRES: 4 MAINS RATING: 100 A
SUPPLY FROM: EM SWBD PHASES: 3 MAINS TYPE: MCB
LOCATION: ELEC. CLOSET C1-1 VOLTS: 480/277 Wye A.I.C. RATING: 14,000
BRANCH PANEL: EH1-C
Revisions Date
1 ADDENDUM 1 09/03/2025
| Sheets |
| E-001 - ELECTRICAL LEGENDS & SYMBOLS |
| E-002 - ELECTRICAL GENERAL NOTES |
| E-100 - ELECTRICAL OVERALL GROUND FLOOR PLAN |
| E-401 - ELECTRICAL ENLARGED PLANS |
| E-501 - ELECTRICAL DETAILS |
| E-601 - ELECTRICAL DIAGRAMS |
| E-801 - ELECTRICAL SCHEDULES |
| E-802 - ELECTRICAL SCHEDULES |
| E-803 - ELECTRICAL SCHEDULES |
| ED101 - ELECTRICAL FIRST FLOOR PLAN - DEMO |
| EL101 - ELECTRICAL FIRST FLOOR PLAN - LIGHTING NEW WORK |
| EL102 - ELECTRICAL SECOND FLOOR PLAN - LIGHTING NEW WORK |
| EP100 - ELECTRICAL BASEMENT FLOOR PLAN - POWER NEW WORK |
| EP101 - ELECTRICAL FIRST FLOOR PLAN - POWER NEW WORK |
| EP102 - ELECTRICAL SECOND & FIFTH FLOOR PLAN - POWER NEW WORK |