Attachment 10__Addendum Summary.pdf

PDF 152 KB Posted

Attached to
Y1DA--630-12-106 Renovate Sterile Processing Dept. - Building 200
Solicitation number
36C24225B0039
Issued by

About this file

This document is an Addendum Summary for the Northport SPS project (Project Number: 632-12-106), issued by Above Group Engineering on 9/3/2025. The addendum includes specification and drawing changes across multiple sections, including Network Analysis Schedules, Field Offices and Sheds, Plumbing Work, Water Softeners, and Reverse-Osmosis Water Equipment. Specification modifications involve adding or modifying subsections in various technical specification areas, while drawing changes impact multiple plan sheets such as A-112, A-104, A-117, P-100, E-100, E-601, and E-801, with updates related to equipment schedules, trailer plans, plumbing configurations, electrical distribution, and one-line diagrams for SPS and Storage trailers.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(321) 345-9026

305 East Drive Suite H

Melbourne, FL 32904 abovegroup@abovegroupinc.com

Addendum Summary

9/3/2025

Project Name: Northport SPS

Project Number: 632-12-106

Addendum/Change Bulletin Designation: 01

Subject: Pre-Bid RFI Clarifications to Contract Drawings and Project Manual

This Bulletin is not a change order. If work described in this Bulletin involves a change in time or contract sum, provide on Change of Work Proposal for each line item, itemizing labor and material, overhead and profit price breakdown in accordance with the Specifications. Also include any time extensions, if required. Lump sum labor and material prices will not be accepted. If sub-contractors’ or suppliers’ prices are included in the prime contractor’s proposal, provide a copy of their quotation. If no response to a Bulletin is received within the time specified above, then the non-responding Contractor will be determined to not be affected by the change and any rights for increased compensation or time extensions shall be waived.

Specification Changes:

01 32 16.13 Network Analysis Schedules – Large VISN 2 Construction Project Design-Bid-Build

1. No changes made to content, removed highlighting and red text formatting

01 52 13 Field Offices and Sheds – Section 2.1 MATERIALS, EQUIPMENT, FURNISHINGS

1. Modified subsection 2.1.A – refer to specification for specifics

2. Added subsection 2.1.B – refer to specification for specifics

3. Added subsection 2.1.B.1 – 2.1.B.3 – refer to specification for specifics

22 05 11 Common Work Results for Plumbing – Section 3.2 TEMPORARY PIPING AND EQUIPMENT

1. Added subsection 3.2.D – refer to specification for specifics

22 31 11 Water Softeners

1. Specification added in its entirety.

22 67 19.16 Reverse-Osmosis Water Equipment – Section 1.7 WATER QUALITY REQUIREMENTS

1. Added subsection 1.7 – refer to specification for specifics

(321) 345-9026

305 East Drive Suite H

Melbourne, FL 32904 abovegroup@abovegroupinc.com

Drawing Changes:

A-112 – FIRST FLOOR EQUIPMENT & FINISH PLANS

1. SPS and Storage trailers added to equipment schedule – refer to drawings for specifics

A-104 – TEMPORARY TRAILERS PLANS

1. Equipment tags provided on plan – refer to drawings for specifics

A-117 – TEMPORARY TRAILER UNITS

1. Sheet added in its entirety.

P-100 – GROUND FLOOR PLAN – TEMPORARY TRAILER – PLUMBING

1. Mobile Steam Generation Unit removed from drawing – refer to drawings for specifics

2. Clarification to note for connection point at Mobile Water Solutions Unit – refer to drawings for specifics

E-100 – ELECTRICAL OVERALL GROUND FLOOR PLAN

1. Updates to power distribution for SPS and Storage trailers – refer to drawing for specifics.

E-601 – ELECTRICAL DIAGRAMS

1. Updates to the one-line diagram for the SPS and Storage trailers – refer to drawings for specifics.

E-801 – ELECTRICAL SCHEDULES

1. Updates to panelboard HTPS – refer to drawings for specifics.

2. Updates to panelboard LTPS – refer to drawings for specifics.

File details come from the government source that posted it. Updated .