This document is a ground floor plumbing plan for a temporary trailer at the Northport VA Medical Center, part of a project to renovate the Sterile Processing Department (Building No. 200). The plan details a comprehensive plumbing configuration for mobile water solutions, including utility and critical water connections, with specific requirements for water treatment and piping. Key specifications include:
The plumbing design involves a Mobile Water Solutions Unit with multiple water connections (2" and 1.5" cold water, 4" fire connection), a Reduced Pressure Zone (RPZ) backflow preventer, and connections to existing sanitary lines. The contractor must coordinate pipe sizing, provide piping insulation with aluminum jacketing and heat tracing, and ensure water treatment meets AAMI TIR34 standards. The plan notes that plumbing fixtures in the storage trailer will not be connected, and signage will indicate non-functional status. The project is in the 100% Construction Documents phase, with the most recent revision made on 09/03/2025, and is located in Northport, VA.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2" CW
2" CW (60 GPM) CONNECTION TO MOBILE
WATER SOLUTIONS UNIT. ALL CW & HW
PIPING BETWEEN TRAILERS WILL BE
PROVIDED BY THE CONTRACTOR.
TIE INTO EXISTING
SANITARY. SEE CIVIL
FOR CONTINUATION.
4" SAN
TIE INTO EXISTING
SANITARY. SEE CIVIL
FOR CONTINUATION.
MOBILE WATER SOLUTIONS UNIT
4" FCO
RPZ
F
E
D
C
1 1/2" CW
STORAGE
CO-49
EX RISER 16-25
EX 2" HW
EX 1/2" HWR
EX 2 1/2" CW
2" CW
1 1/2" CW
TEMP
SPS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
A u to d e s k D o c s /0
N o rt h p o rt
S P
S /0
N o rt h p o rt
S P
S
R
M E
P F
P F
A T
.r v t
/3
/2
:4
:0
P M
P-100
GROUND FLOOR PLAN -
TEMPORARY TRAILER - PLUMBING
RENOVATE STERILE
PROCESSING DEPARTMENT,
BUILDING NO. 200
NORTHPORT VA
0123025
06/18/2025 ADL CNB
100% CONSTRUCTION
DOCUMENTS
632-12-106
CODED NOTES:
UTIILITY AND CRITICAL WATER FROM MWSU TO TEMPORARY TRAILER. COORDINATE PIPE SIZING WITH THE MANUFACTURER. PROVIDE PIPING INSULATION WITH ALUMINUM JACKETING AND HEAT TRACING
TAPE ON EXPOSED PIPING.
VENDOR WILL PROVIDE ALL REQUIRED WATER TREATMENT AND HEATING. THE BASIS OF DESIGN INCLUDES A SEPARATE TRAILER FOR WATER TREATMENT WITH A REVERSE OSMOSIS FILTER SYSTEM.
ENSURE WATER IS TREATED ACCORDING TO THE STANDARDS OF AAMI TIR34 FOR UTILITY AND CRITICAL WATER. REFER TO SPECIFICTION 01 52 13 FOR ADDITIONAL DETAILS. THE PLUMBING CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND COORDINATING PLUMBING UTILITY PIPING BETWEEN THE TRAILERS.
PROVIDE HOT BOX FOR FREEZE PROTECTION FOR RPZ.
PLUMBING FIXTURES IN THE STORAGE TRAILER WILL NOT BE CONNECTED. PROVIDE SIGNAGE ON
FIXTURES TO INDICATE THEY ARE NOT IN SERVICE.
1/8" = 1'-0"
1 GROUND FLOOR PLAN - TEMPORARY TRAILER - PLUMBING
N 0 4' 8' 16' 24'
1/8" = 1'-0"
N.T.S.
KEY PLAN TEMP SPS
DRAWING NOTES:
1. EXISTING PLUMBING SYSTEMS DRAWN ON PLAN ARE BASED ON LIMITED EXISTING DOCUMENTATION AND FIELD VERIFICATION. THE CONTRACTOR SHALL CONFIRM SIZE OF ALL EXISTING PIPING LOCATED WITHIN AND ADJACENT TO THE PROJECT SCOPE BOUNDARY PRIOR TO FABRICATION OF ANY NEW
DUCTWORK OR PIPING SHOWN ON PLAN. CONTRACTOR SHALL MAKE ENGINEER AWARE OF ANY
DEVIATIONS OF THE EXISTING DUCTWORK OR PIPING AS SHOWN ON PLAN.
2. CONCRETE AND CMU WALLS AND CONCRETE PADS/SLABS ON GRADE INSTALLED FOR
CONTINUATION OF MEDICAL CENTER OPERATIONAL REQUIREMENTS ARE TEMPORARY AND SHALL BE
REMOVED AND THE AREAS AFFECTED RESTORED TO PRIOR ORIGINAL CONDITIONS UPON
FUNCTIONAL COMPLETION OF THE NEW SPECIAL PROCESSES SERVICES SPACES AND/OR THE
APPROVAL OF THE PROJECT COR.
3. THE PLANS PROVIDED ARE INTENDED TO SHOW THE KEY ELEMENTS AND SCOPE OF WORK. THE
CONTRACTOR SHALL SUBMIT SITE SPECIFIC SHOP DRAWINGS FOR PLUMBING BASED ON THE
TRAILER RENTED.
Revisions Date
1 ADDENDUM 1 09/03/2025