Attachment2_Design Features.pdf

PDF 152 KB Posted

Attached to
Tiny G-Z STEWARDSHIP IRSC – Region 6, Fremont-Winema National Forest, Chemult Ranger District, Chemult, Oregon
Solicitation number
12363N25Q4072
Issued by

About this file

This document is a design features document for the Tiny G-Z IRSC (Integrated Resource Service Contract) for the Chemult Ranger District, dated March 2025. The document focuses on Item 4: Implementation Plan and Preliminary Project Area, providing detailed guidance for the contractor's project preparation and execution. Key requirements include developing an implementation plan for Optional Units 1-4, identifying and distinguishing treatment types, and applying specific prescriptions such as fuel break and lodgepole pine treatments. The contractor must delineate units based on treatment type, applicable prescriptions, and specific criteria like control features and overlapping treatments. Additionally, the document addresses special considerations such as handling dead and dying trees (removing those under 21" DBH while retaining 5 snags per acre) and provides instructions for addressing White Bark Pine populations in certain units, with the U.S. Forest Service to provide specific species information and protection measures by July 30, 2025.

View the file

Other files

File Type Posted
A0002Attachment10a_eq5tonsVolumeEstimateRasters.zip ZIP file
A0002Attachment10_eq5bfVolumeEstimateRasters.zip ZIP file
A0002Attachment11TinyGZ.gdb.zip ZIP file
A0002Tiny G to Z Site Visit Q_A.pdf PDF
3. A0002_Tiny G-Z IRSC Appendix B - Timber Specifications Pages 19+20.pdf PDF
2. A0002_Tiny G-Z IRSC Appendix A - Tech Specifications.pdf PDF
A0002 SF30_Tiny G-Z.pdf PDF
1. A0002_12363N25Q4072 Tiny G-Z Solicitation.pdf PDF
A0001_SF30_Tiny G-Z.pdf PDF
1. A0001_SF1449 Tiny G-Z.pdf PDF
A0001_SF30_Tiny G-Z.pdf PDF
2. A0001_Tiny G-Z IRSC Appendix A - Pages3_4.pdf PDF
Attachment1_ForestProductAccountabilityActionPlan.pdf PDF
4. Tiny G-Z IRSC Appendix C - Road Mtc.pdf PDF
Attachment6_FreWinCommercialRoadUseRules_20220203.pdf PDF
Attachment9_VolumeRasterAndAerialMaps.pdf PDF
6. Tiny G-Z IRSC FirePlan.pdf PDF
7. Tiny G-Z IRSC TrafficControlPlan.pdf PDF
Attachment3_Logging Plan Summary.pdf PDF
3. Tiny G-Z IRSC Appendix B - Timber Specifications.pdf PDF
1. 12363N25Q4072 Tiny G-Z Solicitation.pdf PDF
8. SCA Wage Determination_OR 1977-0079_Rev78.pdf PDF
Attachment7_TSpecs_06242024.pdf PDF
Attachment4_Prescriptions.pdf PDF
Attachment8_FSH7709.59_Fre-Win_SRR.pdf PDF
5. Tiny G-Z IRSC CAM.pdf PDF
2. Tiny G-Z IRSC Appendix A - Tech Specifications.pdf PDF
Attachment5_VolEstDescription.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Chemult Ranger District | March 2025

Tiny G-Z IRSC Design Features

The main objective of the Tiny G-Z Contract is for the contractor to carry out necessary sale preparation and then implement the project. This document provides context and outlines objectives to guide the work and ensure the project meets its intended goals.

Item 4: Implementation Plan and Preliminary Project Area

The focus of Item 4 is to apply the appropriate treatment prescriptions and service items to maximize the area of commercial removal and fuel reduction. Service work should only be included where necessary to achieve the desired results, avoiding unnecessary treatments in areas that don’t require them.

Identification of Treatments The contractor will develop an implementation plan for Optional Units 1-4. During reconnaissance of the project area, treatment types must be identified and clearly distinguished. Some areas may require multiple treatment methods (e.g., timber removal combined with cut, skid, and deck), which should be noted and accounted for in the planning.

A goal is to implement the fuel break prescription as shown on the map, ensuring the treatment maximizes areas dominated by fire-resistant ponderosa pine. In regions where there isn't sufficient residual ponderosa pine, the lodgepole pine prescription should be applied to balance the age and diameter classes of the trees.

Treatment types shall be split into units and classified as the following:

- Timber Removal o Areas with 30 square feet per acre basal area of merchantable trees designated for removal as identified in Attachment 4 shall be identified as a Timber Removal treatment type.

o Of the two Lodgepole Pine prescriptions, Lodgepole overstory removal prescription should be applied in areas where the overstory lodgepole is in decline and there is another ag. In otherwise healthy lodgepole pine stands, the variable density thinning prescription should be applied.

- Cut, skid, and deck: Timber removal areas, Natural Stands, and Plantations o Notes on units will provide service work recommendations and rankings based on how far from the end result the treatment area is in comparison to other units.

Unit Delineation Units shall be delineated according to the following criteria:

- Treatment type

- Applicable DxP Prescription

Chemult Ranger District | March 2025

- The control feature should be split into its own units so it can be identified separately and prioritized for treatment at the time of contract modification.

- Overlapping treatments should share a common boundary.

o i.e. Overlapping treatment units must share common boundaries. For example, if only part of a timber removal unit requires CSD, it should be split into two separate units:

o Ex) Unit 1: Timber removal and CSD, Unit 2: Timber removal.

o This delineation best supports Forest Service activity tracking.

- There are areas of burned dead and dying trees in Units 1 and 2. Dead and dying trees less than 21” DBH that meet merchantability specification in A.2 shall be removed. Otherwise, these areas should be appropriately delineated and removed from units. If dead and dying trees are removed, retain 5 snags per acre.

White Bark Pine In Optional Unit 4 and along the Crater Lake National Park Boundary in Optional Units 1 and 2 there is a modeled population of White Bark Pine. Following award and by July 30 2025, the USFS will provide the contractor with specie information/locations and any protection measures and design criteria that need to be accounted for in Item 3.

File details come from the government source that posted it. Updated .