Attachment_Z_-_Response_to_Question_20.pdf

PDF 3 MB Posted

Attached to
Transportation Operator for County Transit Service
Solicitation number
24-P-64AK
Issued by
Volusia County, Florida

About this file

This document is Attachment Z - Response to Question 20, part of the RFP 24-P-64AK for the Volusia County Transit Operator (VOTRAN) Maintenance Plan. The attachment provides a detailed Fixed Route Replacement and Improvement Plan and a Paratransit Replacement and Improvement Plan spanning from 2012 to 2032. The plan outlines the current and projected fleet composition, including various bus models such as 35 ft. Gillig Hybrid, Low Floor, and Cutaway vehicles. The total fleet consists of 69 fixed route buses and 78 paratransit vehicles, with a consistent peak service requirement of 53 fixed route and 58 paratransit vehicles throughout most of the planning period.

The document shows a steady spare ratio of 30.19% for fixed route vehicles until 2024, after which it reduces to 20.41%. For paratransit vehicles, the spare ratio remains constant at 34.48% across the entire planning horizon. The fleet includes various bus types powered by different fuel sources, including hybrid, propane, and standard models. The plan demonstrates a strategic approach to vehicle replacement, with some bus models scheduled for non-replacement in specific years, indicating a carefully managed fleet renewal strategy that balances vehicle age, performance, and operational requirements.

View the file

Other files

File Type Posted
Transportation_Operator_for_County_Transit_Service_(Addendum_#4_Revision).pdf PDF
Attachment_Q_-_KPI_Revised_as_of_03-27-2024.pdf PDF
Previous_Attachment_Q_-_KPI_DO_NOT_USE_See_Attachment_Q_-_KPI_Revised_as_of_3-27-2024.pdf PDF
Attachment_X_-_Response_to_Question_16.pdf PDF
Attachment_Y_-_Response_to_Question_19.pdf PDF
Attachment_V_-_Response_to_Question_14.pdf PDF
Attachment_W_-_Response_to_Question_15.pdf PDF
Attachment_AA_-_Response_to_Question_22.pdf PDF
Attachment_BB_-_Response_to_Question_27.pdf PDF
Attachment_U_-_Federal_Contract_Provisions_10-23-2..(499001).docx DOCX document
Attachment_U_24-P-64AK,_Contract-Draft.pdf PDF
Attachment_Q_-_KPI.pdf PDF
Attachment_G_-_FY_Org_Chart_23-2024.pdf PDF
Attachment_T_-_Insurance_Requirements_24-P-64AK.pdf PDF
Attachment_I_-_Votran_Letter_Of_Understanding.pdf PDF
Attachment_C_-_Non-Revenue_Inventory.pdf PDF
Attachment_D-_East-Southeast_Map.pdf PDF
Attachment_B_-_Paratransit_Inventory.pdf PDF
Attachment_H_-_Union_Contract.pdf PDF
Attachment_K_-_Current_Rides_Per_Mile_by_Route.pdf PDF
Attachment_M_-_Software_Applications.pdf PDF
Attachment_N_-_Maintenance_responsibilities.pdf PDF
Attachment_P_-_2023_PTASP.pdf PDF
Attachment_S_-_Performance_Bond_Sample_Form_RFP_24-P-64AK.pdf PDF
Attachment_A_-_Fixed_Route_Inventory.pdf PDF
Attachment_E_-_West_Volusia_Map.pdf PDF
Attachment_F_-_Active_positions_as_of_2.15.2024.pdf PDF
Attachment_J_-_Preventable_Accidents_FY23.pdf PDF
Attachment_L_-_Maint_Stats_FY-23.pdf PDF
Attachment_O_-_FTA_Clauses.pdf PDF
Attachment_R_-_Computing_Security_Procedures.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment Z - Response to Question 20 RFP 24-P-64AK Transit Operator

Attachment Z - Response to Question 20 RFP 24-P-64AK Transit Operator

Fixed Route Replacement Schedule (q20 and 22)
Paratransit Replacement Schedule (20 and 22)

File details come from the government source that posted it. Updated .