Attachment_SYNOPSIS_Scope Of Work_Rev1.docx

DOCX document 17 KB Posted

Attached to
Z2DA--FY26 NRM (PROJ: 516-CSI-134) BB Prepare Site for Installation of a New PET/CT
Solicitation number
36C24826Q0459
Issued by

About this file

This is a Scope of Work document for a construction project at Bay Pines VA Medical Center in Bay Pines, Florida. Project 516-CSI-134 involves preparing the site and installing a new PET/CT imaging facility. The scope includes creating a new PET/CT Scan Room (2C118) and Control Room (2C107) within the footprint of the existing Imaging Room 2C118 and adjacent spaces, carving out a new PET/CT Equipment Room (114) from reconfigured corridor areas, and modifying several areas within the Nuclear Medicine suite, including upgrades to the Check-In area (2C129) for improved patient privacy and creation of a new Med Gas closet (2C129A) to accommodate displaced storage functions.

The project must be completed within 400 calendar days from the Notice to Proceed. This is a pre-solicitation notice for a Request for Quote (RFQ #36C24826Q0459) set-aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under 38 U.S.C. 8127. The project is classified under NAICS code 236220 (Commercial and Institutional Building Construction) with a small business size standard of $45 million, and the estimated project magnitude is between $2,000,000.00 and $5,000,000.00. The RFQ is expected to be posted on or about April 6, 2026. All bidders must be registered with SAM.gov before contract award and maintain registration throughout the contract period. The Contracting Officer is Cynda Rosa, and the Contracting Specialist is Laurie Whitmore.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope Of Work/SYNOPSIS:

a. Project # and Title: 516-CSI-134, Prepare Site for installation of a new PET/CT

b. Description of project: The project creates a new PET/CT Scan Room (2C118) and Control Room 2C107 in the footprint of existing Imaging Room 2C118 and adjacent Dosage Admin 2C107 and Storage 2C107A. A new PET/CT Equipment Room (114) will be carved out of existing re-configured nearby corridor areas. Also, the project modifies several areas within the Nuclear Medicine suite. Modified areas include Check-In 2C129 to provide better patient privacy. New Med Gas closet 2C129A will house functions displaced from Storage 2C107A.

c. Completion time: 400 calendar days from receipt of Notice to Proceed.