S02_RFP Attachment Divisional Price Breakdown.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Z2DA--FY26 NRM (PROJ: 516-CSI-134) BB Prepare Site for Installation of a New PET/CT
Solicitation number
36C24826Q0459
Issued by

About this file

This is a Divisional Price Breakdown template for the Base Offer submission in response to RFP 36C24826R0112 for construction services at Bay Pines VAMC. The template is structured according to the MasterFormat 2004 classification system and requires offerors to provide itemized Labor Costs and Material Costs across 28 construction divisions, including General Requirements, Concrete, Masonry, Metals, HVAC, Electrical, Plumbing, and Earthwork, among others. Each division line item calculates a Total Cost as the sum of labor and material expenses, with a Division Subtotals row aggregating all costs.

The template incorporates overhead, profit, and bond calculations applied sequentially to the division subtotals. Offerors must enter the Overhead percentage, Profit percentage, and Bond percentage, which are then automatically calculated and summed to produce the Total Base Offer Cost. The spreadsheet is designed to enforce transparent cost accounting by explicitly separating labor and material components within each division and preventing lump-sum pricing. Project information fields include space for the project number (516-CSI-134), project title, location (Bay Pines VAMC, Bay Pines, Florida), offeror name and address, and the date the offer is prepared or submitted. This pricing template serves as the primary mechanism for Government price analysis of the base offer and must accompany all bids without exceptions or deviations from the required divisional structure.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis