This document is a standard design drawing cover sheet and drawing index for an Air Traffic Control Tower (ATCT) project, dated June 26, 2024, prepared by the Federal Aviation Administration (FAA). The drawing is specifically labeled as WASD-D-ATCT-G000 and WASD-D-ATCT-G001, representing a conceptual design for an unspecified airport location.
The cover sheet contains critical disclaimers, noting that the dimensions, specifications, and notes are conceptual and provided solely for bidding purposes. The FAA explicitly states that it does not assume responsibility for the accuracy of the drawings, and the design-builder is required to verify all information before finalizing the design. The document appears to be part of a standard template for ATCT design, with placeholders for specific airport details and a systematic approach to drawing documentation and revision tracking.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REV APPROVED DATE DESCRIPTION JCN REDLINE DATE APVD
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
ISSUED BYDESIGNED
DRAWN
CHECKED
JCNDATE
DRAWING NO REV
E
D
C
B
A
F
G
H
5678 4 3 2 1
SUBMITTED BY APPROVED BY
E
D
C
B
A
F
G
H
5678 4 3 2 1
REVIEWED BY
FAA OFFICE WASHINGTON, DC
ATCT (FINAL STANDARD V1.1 - 06/26/24)
GENERAL
COVER SHEET
CITY STAIRPORT
Designer
Author
Checker
WASD-D-ATCT- G000
JUNE 26, 2024
ATCT STANDARD
FINAL STANDARD V1.1
AIRPORT
CITY, ST
ATCT
DE
PA
RT
MENT OF TRANSPORTATION
UNITED STATES OF AMERIC
A
AVI ATI O
N
LAREDE
T R A T I O N
SINI
M D
A
F
IMPORTANT:
THE DIMENSIONS,
SPECIFICATIONS, AND
NOTES SHOWN ON THIS
DRAWING ARE
CONCEPTUAL AND
PROVIDED FOR BIDDING
PURPOSES ONLY. THE
FAA DOES NOT ASSUME
RESPONSIBILITY FOR
THEIR ACCURACY. THE
DESIGN-BUILDER IS
REQUIRED TO VERIFY
THE INFORMATION
BEFORE USING IT IN THE
FINAL DESIGN.
REV APPROVED DATE DESCRIPTION JCN REDLINE DATE APVD
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
ISSUED BYDESIGNED
DRAWN
CHECKED
JCNDATE
DRAWING NO REV
E
D
C
B
A
F
G
H
5678 4 3 2 1
SUBMITTED BY APPROVED BY
E
D
C
B
A
F
G
H
5678 4 3 2 1
REVIEWED BY
FAA OFFICE WASHINGTON, DC
ATCT (FINAL STANDARD V1.1 - 06/26/24)
GENERAL
DRAWING INDEX SHEET
CITY STAIRPORT
Designer
Author
Checker
WASD-D-ATCT- G001
INDEX - ARCHITECTURAL
A��� ARCHITECTURAL S<MBOLS
A��� GROUND LE9EL FLOOR PLAN
A���A FIRST INTERMEDIATE LE9EL FLOOR PLAN �ASHP OPTION�
A���A SECOND INTERMEDIATE LE9EL FLOOR PLAN
A���A�� T<PICAL SHAFT LE9EL FLOOR PLAN
A���B MECHANICAL ACCESS LE9EL FLOOR PLAN
A��� SUB-UNCTION LE9EL FLOOR PLAN
A��� -UNCTION LE9EL FLOOR PLAN
A���A CONSOLE ACCESS LE9EL FLOOR PLAN ���� SF CAB�
A���B CONSOLE ACCESS LE9EL FLOOR PLAN ���� SF CAB�
A���A CAB LE9EL FLOOR PLAN ���� SF CAB�
A���B CAB LE9EL FLOOR PLAN ���� SF CAB�
A���A ROOF PLAN ���� SF CAB�
A���B ROOF PLAN ���� SF CAB�
A���B CAB LE9EL REFLECTED CEILING PLAN ���� SF CAB�
A��� T<PICAL ATCT HEIGHTS - ELE9ATION
A��� ARCHITECTURAL NORTH ELE9ATION - TALLEST TOWER HEIGHT
A��� ARCHITECTURAL EAST ELE9ATON - TALLEST TOWER HEIGHT
A��� ARCHITECTURAL SOUTH ELE9ATON - TALLEST TOWER HEIGHT
A��� ARCHITECTURAL WEST ELE9ATON - TALLEST TOWER HEIGHT
A��� ARCHITECTURAL NORTH ELE9ATION - SHORTEST TOWER HEIGHT
A��� ARCHITECTURAL EAST ELE9ATION - SHORTEST TOWER HEIGHT
A��� ARCHITECTURAL SOUTH ELE9ATION - SHORTEST TOWER HEIGHT
A��� ARCHITECTURAL WEST ELE9ATION - SHORTEST TOWER HEIGHT
A��� T<PICAL ATCT HEIGHTS - SECTION
A��� ARCHITECTURAL EAST-WEST STAIR SECTION - TALLEST TOWER HEIGHT
A��� ARCHITECTURAL EAST-WEST SECTION II - TALLEST TOWER HEIGHT
A��� ARCHITECTURAL NORTH-SOUTH SECTION - TALLEST TOWER HEIGHT
A��� ARCHITECTURAL EAST-WEST SECTION - SHORTEST TOWER HEIGHT
A��� ARCHITECTURAL EAST-WEST SECTION II - SHORTEST TOWER HEIGHT
A��� ARCHITECTURAL NORTH-SOUTH SECTION - SHORTEST TOWER HEIGHT
A��� ARCHITECTURAL ENLARGED CONSOLE ACCESS LE9EL AND CAB SECTIONS
A��� ENLARGED EGRESS STAIR PLANS AND SECTIONS I
| A��� ENLARGED EGRESS STAIR PLANS | SECTIONS II |
| A��� ENLARGED EGRESS STAIR PLANS | SECTIONS III |
| A��� ENLARGED CAB STAIR PLAN� SECTIONS | �D 9IEW |
| A��� ENLARGED PARTIAL STAIR PLANS | SECTIONS I |
| A��� ENLARGED PARTIAL STAIR PLANS | SECTIONS II |
A��� EXTERIOR WALL SECTION DETAILS
A��� ROOF DETAILS I
A��� PERSPECTI9E S.ETCH
INDEX - GENERAL
G��� CO9ER SHEET
G��� DRAWING INDEX SHEET
G��� GENERAL ABBRE9IATIONS
G��� GENERAL NOTES S<MBOLS
G��� BASIS OF DESIGN I
G��� BASIS OF DESIGN II
G��� BASIS OF DESIGN III
| G��� SUB-UNCTION LE9EL | -UNCTION LE9EL LIFE SAFET< PLANS |
| G��� CONSOLE ACCESS LE9EL | CAB LE9EL LIFE SAFET< PLANS |
INDEX - STRUCTURAL
S��� GENERAL NOTES I
S��� GENERAL NOTES II
S��� FLOOR LOADING DIAGRAMS I
S��� FLOOR LOADING DIAGRAMS II
S��� FLOOR LOADING DIAGRAMS III
S��� GROUND LE9EL FOUNDATION PLAN
S��� FIRST INTERMEDIATE LE9EL FRAMING PLAN
S��� SECOND INTERMEDIATE LE9EL ROOF FRAMING PLAN
S����� T<PICAL SHAFT LE9EL FRAMING PLAN
S��� SUB-UNCTION LE9EL FRAMING PLAN
S��� -UNCTION LE9EL FRAMING PLAN
S���A ��� S4 FT CAB - CONSOLE ACCESS LE9EL FRAMING PLAN
S���B ��� S4 FT CAB - CONSOLE ACCESS LE9EL FRAMING PLAN
S���A ��� S4 FT CAB - CAB FLOOR LE9EL FRAMING PLAN
S���B ��� S4 FT CAB - CAB FLOOR LE9EL FRAMING PLAN
S���A ��� S4 FT CAB - CAB ROOF LE9EL FRAMING PLAN
S���B ��� S4 FT CAB - CAB ROOF LE9EL FRAMING PLAN
S��� EXTERIOR CORE WALL ELE9ATIONS I
S��� EXTERIOR CORE WALL ELE9ATIONS II
S��� INTERIOR CORE WALL ELE9ATIONS I
S��� INTERIOR CORE WALL ELE9ATIONS II
S��� CAB FRAME ELE9ATION
S��� T<PICAL ATCT HEIGHTS - ELE9ATION I
S��� T<PICAL ATCT HEIGHTS - ELE9ATION II
S��� T<PICAL ATCT HEIGHTS - ELE9ATION III
S��� BUILDING SECTIONS III
S��� BUILDING SECTIONS I9
S��� STAIR ENLARGED PLAN AND T<PICAL DETAILS
S��� STEEL COLUMN SCHEDULE
S��� T<PICAL STEEL COLUMN DETAILS I
S��� T<PICAL STEEL COLUMN DETAILS II
S��� T<PICAL STEEL BEAM DETAILS II
INDEX - ELECTRICAL
E��� ELECTRICAL S<MBOLS ABBRE9IATIONS
E��� ELECTRICAL ABBRE9IATIONS
| E��� ELECTRICAL GROUND LE9EL - POWER | TELECOM PLAN |
| E��� ELECTRICAL FIRST INTERMEDIATE LE9EL - POWER | TELECOM PLAN |
| E���A ELECTRICAL T<PICAL SHAFT LE9EL - POWER | TELECOM PLAN |
E���B ELECTRICAL MECHANICAL ACCESS LE9EL �SHORTEST TOWER HEIGHT� -
| POWER | TELECOM PLAN |
| E��� ELECTRICAL SUB-UNCTION LE9EL - POWER | TELECOM PLAN |
| E��� ELECTRICAL -UNCTION LE9EL - POWER | TELECOM PLAN |
| E���A ELECTRICAL CONSOLE ACCESS LE9EL - POWER | TELECOM PLAN ���� |
SF CAB�
E���B ELECTRICAL CONSOLE ACCESS LE9EL - POWER TELECOM PLAN ����
SF CAB�
| E��� ELECTRICAL CAB LE9EL - POWER | TELECOM PLAN |
| E��� ELECTRICAL ROOF LE9EL - POWER | TELECOM PLAN |
| E��� ELECTRICAL GROUND LE9EL - GROUNDING | CABLE TRA< PLAN |
| E��� ELECTRICAL FIRST INTERMEDIATE LE9EL - GROUNDING | CABLE TRA< |
PLAN
E���A ELECTRICAL T<PICAL SHAFT LE9EL - GROUNDING CABLE TRA< PLAN
E���B ELECTRICAL MECHANICAL ACCESS LE9EL �SHORTEST TOWER HEIGHT�
| - GROUNDING | CABLE TRA< PLAN |
| E��� ELECTRICAL SUB-UNCTION LE9EL - GROUNDING | CABLE TRA< PLAN |
| E��� ELECTRICAL -UNCTION LE9EL - GROUNDING | CABLE TRA< PLAN |
| E���A ELECTRICAL CONSOLE ACCESS LE9EL - GROUNDING | CABLE TRA< |
PLAN ���� SF CAB�
E���B ELECTRICAL CONSOLE ACCESS LE9EL - GROUNDING CABLE TRA<
PLAN ���� SF CAB�
| E��� ELECTRICAL CAB LE9EL - GROUNDING | CABLE TRA< PLAN |
| E��� ELECTRICAL ROOF LE9EL - GROUNDING | CABLE TRA< PLAN |
E��� ELECTRICAL LIGHTNING PROTECTION ELE9ATION
E��� ELECTRICAL PANEL SCHEDULE SHEET I
E��� ELECTRICAL PANEL SCHEDULE SHEET II
E��� ELECTRICAL PANEL SCHEDULE SHEET III
E��� ELECTRICAL ANTENNA AND AIR TERMINAL MOUNTING DETAILS
E��� ELECTRICAL E�G� ATS� UPS� LOAD BAN. INTERCONNECTION DIAGRAM
E��� ELECTRICAL SINGLE-LINE DIAGRAM
E��� ELECTRICAL FEEDER�CONDUIT SCHEDULE
INDEX - MECHANICAL
M��� MECHANICAL SUB-UNCTION LE9EL - DUCTWOR. PLAN
M���A MECHANICAL CONSOLE ACCESS LE9EL - DUCTWOR. PLAN ���� SF CAB�
M���B MECHANICAL CONSOLE ACCESS LE9EL - DUCTWOR. PLAN ���� SF CAB�
INDEX OF DRAWINGS
SHEET
NUMBER SHEET NAME
INDEX - PLUMBING
P��� PLUMBING NOTES
INDEX - FIRE PROTECTION
F��� FIRE PROTECTION NOTES
F��� FIRE PROTECTION FIRE ALARM SE4UENCE OF OPERATIONS
IMPORTANT:
THE DIMENSIONS,
SPECIFICATIONS, AND
NOTES SHOWN ON THIS
DRAWING ARE
CONCEPTUAL AND
PROVIDED FOR BIDDING
PURPOSES ONLY. THE
FAA DOES NOT ASSUME
RESPONSIBILITY FOR
THEIR ACCURACY. THE
DESIGN-BUILDER IS
REQUIRED TO VERIFY
THE INFORMATION
BEFORE USING IT IN THE
JON IKEDA EYUNG GOV
A
A AMP, AMPERE
@ AT
A/C AIR CONDITIONING
A/S AUDIBLE STROBE
AAV AUTOMATIC AIR VENT
ABA ARCHITECTURAL BARRIERS ACT
ABG ABOVE FINISHED GRADE
AC ALTERNATING CURRENT, ABOVE CEILING
ACC AIR COOLED CHILLER
ACDFC AIR COOLED DRY FLUID COOLER
ACI AMERICAN CONCRETE INSTITUTE
ACT ACOUSTICAL CEILING TILE
ADJ ADJUSTABLE
AF AMPERE FRAME
AFD ABOVE FINISHED DOOR
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AGL ABOVE GROUND LEVEL
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
AL AIRPORT LIGHTING
AL-GL ALUMINUM AND GLASS
ALT ALTERNATE
ALUM ALUMINUM
AMM AMMETER
AMSL ABOVE MEAN SEA LEVEL
ANN ANNUNCIATOR
ANOD ANODIZED
ANSI AMERICAN NATIONAL STANDARDS
INSTITUTE
AO ANALOG OUTPUT
AOA AIRPORT OPERATIONS AREA
AP ANNUNCIATOR POINT, ACCESS PANEL
APD AIR PRESSURE DROP
APPD APPROVED
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ARTS AUTOMATED RADAR
AS AIR SEPARATOR
ASHP AIR-SOURCE HEAT PUMP
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATION AND
AIR CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AT AMPERE TRIP, AIR TRAFFIC
ATC AIRPORT TRAFFIC CONTROL
ATCT AIRPORT TRAFFIC CONTROL TOWER
ATS AUTOMATIC TRANSFER SWITCH
ATOS ABOVE TOP OF SLAB
ATV ATMOSPHERIC VENT
AUTO AUTOMATIC
AUX AUXILIARY
AV AUTOMATIC VENT
AVB AIR VAPOR BARRIER
AVG AVERAGE
AWG AMERICAN WIRE GAGE
AWS AMERICAN WELDING SOCIETY
B
BAT CHGR BATTERY CHARGER
BBHWH BASEBOARD HOT WATER HEATER
B/B BACK TO BACK
BCKP BACKUP
BD BOARD
BDD BACKDRAFT DAMPER
BF BELOW FLOOR (PIPE SIZE)
BFC BELOW FINISHED CEILING
BFP BACKFLOW PREVENTER
BI BACKWARD INCLINED
BITS BYPASS ISOLATION TRANSFER SWITCH
BITUM BITUMINOUS
BL BASE LINE
BLDG BUILDING
BLK BLACK
BLKG BLOCKING
BM BEAM
BO BOTTOM OF
BOC BOTTOM OF CURB
BOD BOTTOM OF DUCT, BASIS OF DESIGN
BOF BOTTOM OF FIXTURE
BOP BOTTOM OF PIPING
BOT BOTTOM
BP BOOSTER PUMP
BPU BREAKER PROGRAMMING UNIT
BSA BOARD OF STANDARD AND APPEALS
BSDC BARE SOFT DRAWN COPPER
BSMT BASEMENT
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BTWN BETWEEN
C
C CONDUIT
C TO C CENTER TO CENTER
CAF COMBUSTION AIR FAN
CANT CANTILEVER
CAP CAPACITY
CAV CONSTANT AIR VOLUME
CB CATCH BASIN
CBCR CURVED BLADE CEILING REG.
CCTV CLOSED CIRCUIT TELEVISION
CD CEILING DIFFUSER, CONDENSATE
DRAIN
CEM CEMENT
CENTRIF CENTRIFUGAL
CF CUBIC FOOT/FEET
CFM CUBIC FEET PER MINUTE
CG CORNER GUARD
CH CHILLER
CHKD CHECKERED
CHW CHILLED WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CKT CIRCUIT
CL CENTER LINE
CLF CURRENT LIMITING FUSE
CLG CEILING
CLL CONTRACT LIMIT LINE
CLO CLOSET
CLR CLEAR
CM CENTIMETER
CMU CONCRETE MASONRY UNIT
CO COMPANY
EUH ELECTRIC UNIT HEATER
EW EACH WAY
EWC ELECTRICAL WATER COOLER
EWH ELECTRIC WALL HEATER, ELECTRIC WATER
HEATER
EWT ENTERING WATER TEMPERATURE
EXC EXCAVATION
EXH EXHAUST
EXP EXPANSION
EXST EXISTING
F
F FIRE WATER SUPPLY
FA FIRE ALARM
FAA FEDERAL AVIATION ADMINISTRATION
FACP FIRE ALARM CONTROL PANEL
FACT FACTORY
FAI FRESH AIR INTAKE
FBO FURNISHED BY OTHERS
FC FACE OF CURB, FLEX CONNECTION
FCC FIRE COMMAND CENTER
FCO FLOOR CLEANOUT
FCU FAN COIL UNIT
FCV FLOW CONTROL VALVE
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FDR FEEDER
FE FREIGHT ELEVATOR, FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FFE FINISHED FLOOR ELEVATION
FG FIBERGLASS
FH FULL HEIGHT, FIRE HYDRANT
FHC FIRE HOSE CABINET
FHR FIRE HOSE RACK
FHV FIRE HOSE VALVE
FIG FIGURE
FIN FINISH
FIXT FIXTURE
FLA FULL LOAD AMPERES
FLASH FLASHING
FLEX FLEXIBLE
FLR FLOOR
FLS FLOW SWITCH, FIRE AND LIFE SAFETY
FLUOR FLUORESCENT
FM FACTORY MUTUAL, FORCE MAIN
FO FINISH OPENING, FIBER OPTIC
FOB FACE OF BUILDING
FOD FACE OPERATED DAMPER
FOG FUEL OIL GAGE
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOT FIBER OPTIC TERMINAL, FUEL OIL TRANSFER
FP FIREPROOF, FIRE PUMP, FLOOR PENETRATION
FPM FEET PER MINUTE
FPSC FIREPROOF SELF-CLOSING
FPU FIELD PROGRAMMING UNIT
FR FIRE RATING
FR FRAME
FRP FIBERGLASS REINFORCED POLY
FRT FIRE RETARDANT TREATED
FS FLOW SWITCH, FLOOR SINK, FAR SIDE
FSD FIRE/SMOKE DAMPER
FSP FIRE STANDPIPE
FSS FUSIBLE SAFETY SWITCH
FT FOOT (FEET)
FTG FOOTING
FTR FIN TUBE RADIATION
FURN FURNISH/FURNITURE
FURR FURRING
FV FULL VOLTAGE
FVC FIRE VALVE CABINET
FW FIRE WATER, FILTERED WATER
FWD FORWARD, FIRE SPRINKLER WATER DRAIN
FWS FIRE WATER SUPPLY
FX FIRE EXTINGUISHER
G
G GAS, GROUND
GA GAUGE
GAL GALLON
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GEN GENERAL
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GFE GOVERNMENT FURNISHED EQUIPMENT
GFM GOVERNMENT FURNISHED MATERIAL
GL GLASS
GND GROUND CONNECTOR
GOVT GOVERNMENT
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GR GRADE
GRN GREEN
GRND GROUND
GRS GALVANIZED RIGID STEEL
GSHP GROUND-SOURCE HEAT PUMP
GT GREASE TRAP
GWB GYPSUM WALLBOARD
GX GENERAL EXHAUST
GYP GYPSUM
GYP PLAS GYPSUM PLASTER
H
HAZMAT HAZARDOUS MATERIALS
HB HOSE BIB
HC HOLLOW CORE
HCLNG HUNG CEILING
HDW HARDWARE
HDWD HARDWOOD
HEX HEXAGONAL
HH HAND HOLE
HK HOOK
HM HOLLOW METAL
HNDRL HANDRAIL
HO HOLD OPEN
HOA HAND-OFF-AUTOMATIC
HORIZ HORIZONTAL
HP HIGH POINT
HP HORSE POWER
HPS HIGH PRESSURE SODIUM
HR HOUR
HS HIGH STRENGTH, HEADED STUD
HSB HIGH STRENGTH BOLT
HT HEIGHT
HTG HEATING
HTR HEATER
HU HUMIDIFIER
HVAC HEATING, VENTILATING, AIR
CONDITIONING
HVY HEAVY
ABBREVIATIONS
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
COND CONDENSATE
CONF CONFERENCE
CONFIG CONFIGURATION
CONN CONNECTION
CONSTR CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORDCOORDINATE
COR CONTRACTING OFFICER'S REPRESENTATIVE
CORR CORRIDOR
CP CENTER POINT
CPC CRITICAL POWER CENTER
CPT CARPET
CPU CENTRAL PROCESSING UNIT
CR CONTROL RELAY
CS CONTROL SWITCH
CS CAST STONE
CSF CHEMICAL SHOT FEEDER
CSK COUNTERSUNK
CT CERAMIC TILE, COOLING TOWER, CABLE TRAY
CLT CONTROL
CTR CENTER
CU CONDENSING UNIT, COPPER
CU FT CUBIC FOOT/FEET
CV CONSTANT VOLUME, CONTROL VAVLE
CVC CENTRAL VACCUM CLEARNER
CW COLD (DOMESTIC) WATER
CWP CHILLED WATER PUMP
CWR CHILLED WATER RISER
CWS CHILLED WATER SUPPLY
CWV COMBINATION WASTE AND VENT
CY YD CUBIC YARD
D
D DRAIN
D PNL DISTRIBUTION PANEL
DA DINING ALCOVE OR DINING AREA
DAMP DAMPER
DB BRY BULB, DIRECT BURIAL, DUCTBANK
DBA DEFORMED BAR ANCHOR
DBL DOUBLE
DC DIRECT CURRENT
DCV BFP DOUBLE CHECK VALVE BACKFLOW
PREVENTOR
DDC DIRECT DIGITAL CONTROL
DDH DESIGN DATA HANDBOOK
DEB DIRECT EARTH BURY
DEG DEGREE
DEMO DEMOLISH
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DF DEGREES FARENHEIT
DG DOOR GRILLE
DGP DATA GATHERING PANEL
DH DOUBLE HUNG
DHW DOMESTIC HOT WATER
DIA DIAMETER
DIAG DIAGONAL
DIFF DIFFUSER
DIM DIMENSION
DIR DIRECTIONAL
DISC DISCONNECT
DIV DIVISION
D.L. DEAD LOAD
DM DEMAND METER
DN DOWN
DO DOOR OPENING
DOAS DEDICATED OUTDOOR AIR SYSTEM
DP DIFFERENTIAL PRESSURE
DPDT DOUBLE POLE DOUBLE THROW
DPST DOUBLE POLE SINGLE THROW
DPT DIFFERENTIAL PRESSURE TRANSMITTER
DR DINING ROOM
DR DOOR
DS DOWNSPOUT
DSF DESTRATIFICATION FAN
DT DOUBLE THROW, DIAPHRAM TANK, DOUBLE TEE
DTS DOUBLE THROW SWITCH
DU DWELLING UNIT
DW DISHWASHER
DWBP DOMESTIC WATER BOOSTER PUMP
DWDI DOUBLE WIDTH DOUBLE INLET
DWG DRAWING
DWL DOWEL
DX DRYER EXHAUST
E
E EAST
EA EACH
EAT ENTERING AIR TEMPERATURE
ECP ENGINE CONTROL PANEL
EDAM ELECTRICAL DATA ACQUISITION AND
MONITORING
EDH ELECTRICAL DUCT HEATER
E.E. EACH END
EES EARTH ELECTRODE SYSTEM
EF EXHAUST FAN
EG ENGINE GENERATOR, EXHAUST GTRILL
EMERGENCY GENERATOR
EH ELECTRIC HEATER, ELECTRONIC HUMIDIFIER
EHC ELECTRIC HEATING COIL
EIFS EXTERIOR INSULATION FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC
ELEV ELEVATOR
EMCS ENERGY MANAGEMENT AND CONTROL SYSTEM
EMER EMERGENCY
EMI ELECTROMAGNETIC INTERFACE
EMS ENERGY MANAGEMENT SYSTEM
EMT ELECTRIC METALLIC TUBING
ENCL ENCLOSURE
ENGR ENGINEER
ENTR ENTRANCE
E.O.R ENGINEER OF RECORD
EOS EDGE OF SLAB
EP ELECTRICAL PANEL
EPMS ELECTRICAL POWER MONITORING SYSTEM
EPS EXPANDED POLYSTYRENE
EQ EQUAL
EQUIP EQUIPMENT
ER EXHAUST REGISTER
ERMS ENVIRONMENTAL REMOTE MONITORING
SYSTEM
E.S. EACH SIDE
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
HW HOT WATER
HWP HOT WATER PUMP
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
HYD HYDRANT
HZ HERTZ
I
IC INTERCOMMUNICATION, INTERCOM
ID INSIDE DIAMETER
IE INVERT ELEVATION
IN INCH(ES)
INCAND INCANDESCENT
INCL INCLUDE(D)
INDIC INDICATOR
INSUL INSULATION
INT INTERIOR
INTERM INTERMEDIATE
INV INVERT
INV EL INVERT ELEVATION
IPS IRON PIN SET
ISMS INTEGRATED SECURITY MANAGEMENT
SYSTEM
ISO ISOCYANURATE
ITEA INFORMATION TECHNOLOGY
EQUIPMENT AREA
ITER INFORMATION TECHNOLOGY
EQUIPMENT ROOM
IRMA INVERTED ROOF MEMBRANE ASSEMBLY
J
JAN JANITOR
JB JUNCTION BOX
JP JOCKEY PUMP
JT JOINT
K
K KIPS
KA KILOAMPERES
KAIC KILO-AMPS INTERRUPTING CAPACITY
KCMIL THOUSAND CIRCULAR MILLS
KD KNOCK DOWN
KIT KITCHEN
KO KNOCK OUT
KP KICK PLATE
KSI 1000 POUNDS PER SQUARE INCH
KTTE KITCHENETTE
KV KILOVOLT
KVA KILOVOLT AMPERES
KVAR KILOVOLT AMPERES-REACTIVE
KW KILOWATT
KWH KILOWATT HOUR
KX KITCHEN EXHAUST
L
L&S LOUVER AND SCREEN
LAM LAMINATE(D)
LAT LEAVING AIR TEMPERATURE
LAUN LAUNDRY
LAV LAVATORY
LB(S) POUND(S)
LBG LINEAR BAR GRILLE
LBD LINEAR BAR DIFFUSER
LBR LINEAR BAR RETURN
LBS POUNDS
LD LINEAR DIFFUSER
LDR LEADER
LF LINEAR FOOT
LFS LIGHTIG FIXTURE SCHEDULE
LIB LIBRARY
LIN CL LINEN CLOSET
L.L. LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONG LONGITUDINAL
LOSP LOCAL OPERATING STATUS PANEL
LP LOW POINT
LR LIVING ROOM
LRA LOCKED ROTOR AMPERE
LRAG LINEAR RETURN AIR GRILLE
LRG LINEAR RETURN GRILLE
LS LIGHT STANDARD
LSD LINEAR SLOT DIFFUSER
LT LIQUID TIGHT
LTG LIGHT
LT WT LIGHTWEIGHT
LV LOW VOLTAGE
LVL LEVEL
LWT LEAVING WATER TEMPERATURE
M
M METER
MACH MACHINE
MAG MAGNETIC DOOR HOLD OPEN
MAINT MAINTENANCE
MAS MASONRY
MAX MAXIMUM
MB MASTER BATHROOM
MBH THOUSAND BTU/HOUR
MBP MAINTENANCE BYPASS PANEL
M BR MASTER BEDROOM
MCB MOLDED CASE BREAKER
MCC MOTOR CONTROL CENTER
MCM THOUSAND CIRCULAR MILLS
MCP MOTOR CIRCUIT PROTECTOR
MD MANUAL DAMPER
MDF MEDIUM DENSITY FIBERBOARD
MDL MULTIPLE DWELLING LAW
MDT MAIN DISTRIBUTION TERMINAL
MECH MECHANICAL
MED MEDIUM
MEMB MEMBRANE
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING VALUE
MEZZ MEZZANINE
MFR MANUFACTURER
MG MOTOR GENERATOR
MH MANHOLE
MIL THOUSANDTHS OF AN INCH
MIN MINIMAL, MINUTE, MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
ML MODULE LINE
MLO MAIN LUGS ONLY
mm MILLIMETER
MO MASONRY OPENING
MOD MODIFIED
MOD MOTOR OPERATED DAMPER
MP MIDPOINT
MPG MULTI-POINT GROUND
MPH MILES PER HOUR
MSL MEAN SEA LEVEL
MTD MOUNTED
MTL METAL
MUA MAKE-UP AIR
MULL MULLION
MUW MAKE-UP WATER
MV MANUAL VENT
MVA MEGAVOLT AMPERE
MVD MANUAL VOLUME DAMPER
MWP MEMBRANE WATERPROOFING
N
N NORTH
NA NOT APPLICABLE
NC NON-CORROSIVE
NC NOISE CRITERIA
N.C. NORMALLY CLOSE
NEC NATIONAL ELECTRIC CODE
NEG NEGATIVE
NEMA NATIONAL ELECTRICAL MANUFACTURERS'
ASSOCIATION
NFHB NON-FREEZING HOSE BIB
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NG NATURAL GAS
NHC NO HUNG CEILING
NIC NOT IN CONTRACT
NK NECK
NO NUMBER
N.O. NORMALLY OPEN
NOM NOMINAL
N.S. NEAR SIDE
NTE NOT TO EXCEED
NTS NOT TO SCALE
O
O/O OUT TO OUT
OA OUTSIDE AIR
OAF OUTSIDE AIR FAN
OBD OPPOSED BLADE DAMPER
OC ON CENTER
OD OUTSIDE DIAMETER
ODP OPEN DRIP PROOF
OE OPEN END
OF OVERFLOW ROOF DRAIN
OFF OFFICE
OH OPPOSITE HAND, OVERHEAD
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPT OPTION
ORD OVERFLOW ROOF DRAIN
ORL OVERFLOW ROOF LEADER
OSA OUTSIDE SUPPLY AIR
OSCO OUTSIDE CLEANOUT
OVHD OVERHEAD
OZ OUNCES
P
P PAINT
PA PUBLIC ASSEMBLY
PABX PRIVATE AUTOMATIC BRANCH
EXCHANGE
PAF POWDER ACTIVATED FASTERNERS
PART PARTITION
PB PULL BOX
PC POINT OF CURVANCE
PC PIECE
PE PASSENGER ELEVATOR
PCF POUNDS PER CUBIC FOOT
PCHWR PRIMARY CHILLED WATER RETURN
PCHWS PRIMARY CHILLED WATER SUPPLY
PCMS POWER CONTROL MONITORING
SYSTEM
PCS POWER CONDITIONING SYSTEM
PD PRESSURE DROP
PED PEDESTRIAN
PERF PERFORATED
PF POWER FACTOR
PFD PERFORATED FACE DIFFUSER
PFR PERFORATED FACE RETURN
PH ELECTRICAL PHASE
PH PUBLIC HALL
PI PRESSURE INDICATOR
PIU POWER INDUCTION UNIT
PJF PREFORMED JOINT FILLER
PL PROPERTY LINE
PL PLATE
PL PLUMBING
PL POE PLUMBING POINT OF ENTRY
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLAT PLATFORM
PLBG PLUMBING
PLCS PLACES
PLYWD PLYWOOD
PM POWER MANHOLE
PMB POWER MIXING BOX
PNL PANEL, PANELBOARD
POB POINT OF BEGINNING
POC POINT OF CONNECTION
POE POINT OF ENTRY
POL POLISH(ED)
POS POSITIVE, POSITION
POSS POSSIBLE
POT POINT OF TANGENCY
PP POWER POLE, PATCH PANEL
PR PAIR
PR POWDER ROOM
PREFAB PREFABRICATED
PRESS PRESSURE
PRMY PRIMARY
PRKG PARKING
PROJ PROJECTION
PROP PROPERTY
PRSR PRESSURIZATION
PRV PRESSURE REDUCING VALVE
PS PRESSURE SWITCH
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQAURE INCH GAGE
PT POINT
PT PRESSURE TRANSMITTER, PRESSURE-
TEMPERATURE PORT
PTAC PACKAGED TERMINAL AIR CONDITIONER
PTB POST TENSIONED BEAM
PTD PAINTED
PTN PARTITION
PVC POLYVINYLCHLORIDE
PVMT PAVEMENT
PVG PAVING
UNFIN
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
UPC UNIFORM PLUMBING CODE
UPS,U UNINTERUPTIBLE POWER SUPPLY
UR URINAL
UTIL UTILITY
UTP UNSHIELDED TWISTED PAIR
V
V VOLT, VOLTAGE, VENT
VA VOLT AMPERE, VOICE ALARM
VAC VACANT, VACCUME
VAV VARIABLE AIR VOLUME
VB VACUUM BREAKER
VCT VINYL COMPOSITION TILE
VD VOLUME DAMPER - MANUAL
VDT VIDEO DISPLAY TERMINAL
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VFD VARIABLE FREQUENCY DRIVE
VIF VERIFY IN FIELD
VM VOLTMETER
VOL VOLUME
VPF VESTIBULE PRESSURIZATION FAN
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W
W WEST, WIDTH, WATT
W/ WITH
W/C WATER TO CEMENT
W/D WASHER DRYER
W/O WITHOUT
WB WET BULB
WC WATER CLOSET, WATER COLUMN,
WALL COVERING
WCO WALL CLEANOUT
WCR WITHSTAND AND CLOSING RATING
WD WOOD
WDW WINDOW
WG WATER GAGE
WH WATER HEATER, WALL HEATER,
WALL HYDRANT
WHA WATER HAMMER ARRESTER
WI WROUGHT IRON
WIC WALK IN CLOSET
WL WORK LINE
W.L. WIND LOAD
WM WIRE MESH, WATT METER
WMS WIRE MESH SCREEN
WP WATERPROOFING
WP WORK POINT
WP SUBSCRIPT "WP" APPLIED TO ANY SYMBOL
INDICATES WEATHERPROOF NEMA TYPE 3R
OR EQUIVALENT, UON
WPD WATER PRESSURE DROP
WR WATER RESISTANT
WSCT WAINSCOT
WSW WASHDOWN SUPPLY WATER
WT WATER TANK, WEIGHT
WTR WATER
WWF WELDED WIRE FABRIC
X
X AUXILIARY RELAY
XDCR TRANSDUCER
XFMR TRANSFORMER
XFR TRANSFER
XMTR TRANSMITTER
XPS EXTRUDED POLYSTYRENE
Y
Y WYE
Y- WYE DELTA
YD YARD
Z
Z IMPEDANCE
Q
QT QUARRY TILE
QTY QUANTITY
QUA QUARTER
R
R RED, RISER, RADIATOR, RADIUS
REFRIGERANT, RANGE
RA RETURN AIR, REMOTE ANNUNCIATOR
RACP REMOTE ACCESS CONTROL PANEL
RAD RADIATOR
RAG RETURN AIR GRILLE
RAR RETURN AIR REGISTER
RB RUBBER BASE
RC RESILIENT CHANNEL
RCB REINFORCED CONCRETE BEAM
RCP REFLECTED CEILING PLAN
REINFORCED CONCRETE PIPE
RD ROOF DRAIN
RDF RUBBER RAISED DISK FLOOR
RE RESIDENT ENGINEER
REBAR REINFORCING STEEL BAR
REC RECESSED
REC'D RECEIVED
RECP RECEPTACLE
RECT RECTIFIER
REF REFERENCE
REF REFRIGERATOR
REG REGISTER
REINF REINFORCED
REQD REQUIRED
RESIL RESILIENT
RESIST RESISTANT
RET RETURN
REV REVISION
RF RETURN FAN
RFI RADIO FREQUENCY INTERFERANCE
RG RETURN GRILLE
RGS RIGID GALVANIZED STEEL
RH RIGHT HAND
RL RAIN LEADER
RM ROOM
RMH ROOF MOUNTED ROOF
RML RADAR MICROWAVE LINK
RMS ROOT MEAN SQUARE
RO ROUGH OPENING
RO REVERSE OSMOSIS
ROW RIGHT-OF-WAY
RP BP REDUCED PRESSURE BACKFLOW
PREVENTER
RPM ROTATIONS PER MINUTE,
REVOLUTIONS PER MINUTE
RPZ REDUCED PRESSURE ZONE
RPZ BFP REDUCED PRESSURE ZONE
BACKFLOW PREVENTER
RQMTS REQUIREMENTS
RTN RETURN
RTU ROOF TOP UNIT
RV RELIEF VALVE
S
S SOUTH, STAIN COLOUR, SANITARY
S/S STAINLESS STEEL
SA SLEEPING AREA, SUPPLY AIR
SAN SANITARY
SC SPIN IN COLLAR WITH VOLUME
DAMPER. SENSIBLE COOLING
S.C. SOLID CORE
SCC SECURITY CONTROL CENTER
SCHED SCHEDULE
SCHWP SECONDARY CHILLED WATER PUMP
SCHWR SECONDARY CHILLED WATER RETURN
SCHWS SECONDARY CHILLED WATER SUPPLY
SCND SECONDARY
SCP SYSTEM CONTROL PANEL, SMOKE
CONTROL PANEL
SD SOAP DISPENSER
SD SPLITTER DAMPER STORM DRAIN,
SMOKE DETECTER
S.D. SUPPLY DIFFUSER
SDSTSMS SELF DRILLING SELF TAPPING
SHEET METAL SCREWS
SE SERVICE ELEVATOR
SEC SECONDARY
SECT SECTION
SENS SENSIBLE
SEP SEPARATE
SF SQUARE FOOT (FEET)
SG SUPPLY GRILLE
SGL SINGLE
SHDWN SHUT DOWN
SHLD SHIELDED
SHT SHEET
SIM SIMILAR
SMACNA SHEET METAL AND AIR CONDITIONING
CONTRACTORS NATIONAL ASSOCIATION
SO SLAB OPENING
SOV SHUT-OFF VALVE
SP STANDPIPE, STATIC PRESSURE(IN W.G.),
SINGLE POLE, SUMP PUMP
SPEC SPECIFICATION
SPF STAIRWELL PRESSURIZATION FAN
SPKR SPEAKER
SPR SPRINKLER
SPST SINGLE POLE SINGLE THROW
SPT STATIC PRESSURE TRANSMITTER
SPVR SUPERVISORY CONDITION
SQ SQUARE
SQ.F.T. SQUARE FEET
SR SUPPLY REGISTER
SRG SIGNAL REFERENCE GRID
SS SOLID SURFACE, STAINLESS STEEL,
SANITARY SEWER
S/S START-STOP
ST SHUNT TRIP
STA STATION
STC SOUND TRANSMISSION CLASS
STD STANDARD
STGP SIGNAL TRANSPORT GROUND PLANE
STL STEEL
STP SHIELDED TWISTED PAIR
STOR STORAGE
STRUCT STRUCTURAL
SUBJ SUBJUNCTION
SUSP SUSPENDED
SW SHEAR WALL, SWITCH, SELF WEIGHT
SWBD SWITCHBOARD
SWG SIDEWALL GRILLE
SWGR SWITCHGEAR
SWR SIDEWALL REGISTER
SWSI SINGLE WIDTH SINGLE INLET
SWSR SIDE WALL SUPPLY REGISTER
SY SQUARE YARD
SYMM SYMMETRICAL
SYS SYSTEM
T
T TREAD, TRANSDUCER
T&B TOP & BOTTOM
T&G TONGUE & GROOVE
T&P TEMPERAURE & PRESSURE
T/ TOP OF
TB TERMINAL BOX, TERMIAL BOARD
TC TRASH CHUTE, TRIP COIL, TOTAL
COOLING, TIME CLOCK
TD TIME DELAY, TRENCH DRAIN
TEF TOILET EXHAUST FAN
TEL TELEPHONE
TELCO TELEPHONE COMPANY
TEMP TEMPERATURE
TER TERRAZZO
TERM TERMINAL
TFDS TERMINAL FACILITIES DESIGN STANDARD
TG TRANSFER GRILLE
THK THICK
THRD THREAD
TO TOP OF
TOC TOP OF CURB, TOP OF CONRETE
TOD TOP OF DUCT
TOFF TOP OF FINISH FLOOR
TOIL TOILET
TOP TOP OF PARAPET
TOPO TOPOGRAPHY
TOS TOP OF SLAB, TOP OF STEEL
TOSTL TOP OF STEEL
TOW TOP OF WALL
TOWB ATCT AND ATTACHED BASE
BUILDING
TP TRAP PRIMER, TWISTER PAIR
TRACO TERMINAL RADAR APPROACH
CONTROL BUILDING
TRBL TROUBLE CONDITION
TS TWO SPEED
TSP TOTAL STATIC PRESSURE,
TRAP SEAL PRIMER
T^STAT THERMOSTAT
TT TEMPERATURE TRANSMITTER
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION, TEMPERATURE
VALVE
TVSS TRANSIENT VOLTAGE SURGE
SUPPRESSOR (GFM)
TW TEMPERED WATER
TWY TAXIWAY
TX TOILET EXHAUST
TYP TYPICAL
U
UBC UNIFORM BUILDING CODE
UC UNDER CUT
UG UNDERGROUND
UGP UNDERGROUND POWER
UH UNIT HEATER
UL UNDERWRITER'S LABORATORY
SOW SCOPE OF WORK
TBD TO BE DEFINED
UNEX UNEXCAVATED
UNF UNFUSED
UNFINISHED
REV APPROVED DATE DESCRIPTION JCN REDLINE DATE APVD
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
ISSUED BYDESIGNED
DRAWN
CHECKED
JCNDATE
DRAWING NO REV
E
D
C
B
A
F
G
H
5678 4 3 2 1
SUBMITTED BY APPROVED BY
E
D
C
B
A
F
G
H
5678 4 3 2 1
REVIEWED BY
FAA OFFICE WASHINGTON, DC
ATCT (FINAL STANDARD V1.1 - 06/26/24)
GENERAL
GENERAL ABBREVIATIONS
CITY STAIRPORT
Designer
Author
Checker
WASD-D-ATCT- G002
IMPORTANT:
THE DIMENSIONS,
SPECIFICATIONS, AND
NOTES SHOWN ON THIS
DRAWING ARE
CONCEPTUAL AND
PROVIDED FOR BIDDING
PURPOSES ONLY. THE
FAA DOES NOT ASSUME
RESPONSIBILITY FOR
THEIR ACCURACY. THE
DESIGN-BUILDER IS
REQUIRED TO VERIFY
THE INFORMATION
BEFORE USING IT IN THE
ARCHITECTURAL
1. INTRODUCTION
SITE ADAPTED DESIGN SHALL CONFORM WITH THE CODES AND STANDARDS LISTED IN SECTION Z OF THE
SCOPE OF WORK (LATEST EDITION AT THE TIME OF DESIGN).
NOTE THAT THE TFDS DOCUMENT CONTAINS NUMEROUS REFERENCES TO OTHER REGULATIONS,
STANDARDS, FEDERAL REQUIREMENTS AND SPECIFIC FAA REQUIREMENTS DOCUMENTS THAT MUST BE INCORPORATED INTO THE SITE-ADAPTED DESIGNS, SOME WHICH ARE PUBLICLY AVAILABLE AND SOME WHICH
ARE CONFIDENTIAL TO FAA.
PER TFDS SECTION 12.7.(H), THE EGRESS REQUIREMENTS OF NFPA 101 TAKES PRECEDENCE OVER THE REQUIREMENTS OF THE IBC EGRESS CHAPTER REQUIREMENTS. WHERE NFPA 101 DOES NOT ADDRESS A DESIGN OR COMPLIANCE ISSUE, THE DESIGN-BUILDER MUST REFER TO THE IBC EGRESS CHAPTER
REQUIREMENTS.
THIS TOWER IS INTENDED TO BE A STANDARD ATCT DESIGN THAT IS ADAPTABLE UP TO 119'-10" FOR RAPID DEPLOYMENT AT VARIOUS LOCATIONS IN THE U.S. AND ITS TERRITORIES.THE SHAFT IS NON-OCCUPIED AND PROVIDES ACCESS TO THE INTERMEDIATE, SUBJUNCTION, JUNCTION AND CONSOLE ACCESS LEVELS.
2. APPLICABLE CODES AND STANDARDS
4. TYPE OF CONSTRUCTION
A. CONSTRUCTION TYPE (IBC TABLE 412.2.1.1)
MINIMUM REQUIRED: IB (FOR HEIGHT UP TO 240 FEET)
5. BUILDING INSULATION
6. CONSTRUCTION MATERIALS AND FINISHES
A. EXTERIOR FINISHES:
REFER TO TFDS SECTION 12.5. ONLY NON-COMBUSTIBLE EXTERIOR WALL ASSEMBLIES ARE TO BE USED. ANY EXTERIOR WALL ASSEMBLY UTILIZING COMBUSTIBLE COMPONENTS WHICH IS REQUIRED TO PASS NFPA 285
TEST IS PROHIBITED. (TFDS 6.1)
EXTERIOR WALL SYSTEM:
PROVIDE CONVENTIONAL STICK-BUILT OR UNITIZED WALL SYSTEM WITH AIR-WATER-VAPOR BARRIER, INSULATION, RAINSCREEN SUB FRAMING AND STAINLESS STEEL RAINSCREEN PANELS.
RAINSCREEN SYSTEM:
OPEN JOINT RAINSCREEN PANELS TO BE MOUNTED OUTBOARD OF AIR-WATER-VAPOR BARRIER AND INSULATION TO INCLUDE AIR GAP BETWEEN BACK FACE OF RAINSCREEN PANELS AND FRONT FACE OF INSULATION, AS INDICATED IN THE ARCHITECTURAL DRAWINGS. CLADDING PANEL AND SUPPORT SYSTEM TO BE APPROVED FOR
USE ACCORDING TO THE LOCAL BUILDING CODE.
WALL CLADDING MATERIAL:
HIGHLY DESIRABLE BETTERMENT: 0.125" THICK STAINLESS STEEL GRADE 316 WITH SATIN, NON-DIRECTIONAL BEAD
BLAST FINISH.
DESIRABLE BETTERMENT: 0.125" THICK STAINLESS-STEEL GRADE 304 WITH SATIN, NON-DIRECTIONAL BEAD BLAST
FINISH.
STANDARD DESIGN: 0.1875" (3/16") THICK ALUMINUM ALLOY 3003 H14 METALLIC POWDER COATING TO MATCH
CLEAR ANODIZED FINISH PER AAMA 2605.
A. WALL CLADDING:
WATER RESISTANT AND FIRE RESISTANT SEMI RIGID MINERAL WOOL INSULATION TO BE USED WITHIN THE EXTERIOR WALL, SOFFIT AND CORE CLADDING ASSEMBLY. INSULATION TO RECEIVE BLACK MAT FACER FINISH TO CONCEAL INSULATION VISIBILITY THROUGH OPEN JOINTED CLADDING SYSTEM. THICKNESS OF THE INSULATION INTEGRATED INTO THE EXTERIOR WALL, SOFFIT AND CORE CLADDING ASSEMBLY TO BE CODE
COMPLIANT AND PER SITE-SPECIFIC CONDITIONS.
NOTE: SYSTEM DEPTH FROM FACE OF CLADDING TO FACE OF BACK-UP WALL TO BE MAINTAINED AT CONSISTENT
DEPTH AS DOCUMENTED IN THE ARCHITECTURAL DRAWINGS.
7. WATER AND MOISTURE PROOFING
3. ACCESSIBILITY
ACCESSIBILITY SHALL BE AS PER THE ARCHITECTURAL BARRIERS PORTION OF THE AMERICANS WITH DISABILITIES ACT AND ARCHITECTURAL BARRIERS ACT ACCESSIBILITY GUIDELINE (ADA/ABA), AS PUBLISHED BY THE UNITED STATES ACCESS BOARD, DATED JULY 23, 2004. THIS DOCUMENT IS AVAILABLE AT WWW.ACCESS- BOARD.GOV. NOTE THAT THE EQUIPMENT SPACES BELOW THE JUNCTION LEVEL ARE EXEMPT FROM THESE
REQUIREMENTS PER ABA SECTION F203.6.
AN ACCESSIBLE ROUTE IS NOT REQUIRED TO SERVE THE CAB AND THE FLOOR IMMEDIATELY BELOW THE CAB (NFPA 101 SECTION 11.3.4.4.3). THIS STANDARD DESIGN INCLUDES THE CONSOLE ACCESS LEVEL AS THE FLOOR IMMEDIATELY BELOW THE CAB. THEREFORE, AN ACCESSIBLE MEANS OF EGRESS IS REQUIRED FROM THE
OCCUPIED LEVEL(S) BELOW THE CONSOLE ACCESS LEVEL, WHICH IS THE JUNCTION LEVEL.
THE DESIGN-BUILDER IS RESPONSIBLE FOR CONFIRMING THE LOCAL ACCESSIBILITY REQUIREMENTS. IF THEY EXIST, THE MOST STRINGENT WILL PREVAIL BETWEEN LOCAL CODES AND ADA/ABA GUIDELINES. THE CRITERIA OF THESE STANDARDS SHOULD BE CONSIDERED A MINIMUM IN PROVIDING ACCESS TO THE PHYSICALLY DISABLED. WHERE DIMENSIONS FOR CLEARANCES ARE STATED, ALLOWANCE SHOULD BE MADE IN THE DESIGN FOR CONSTRUCTION TOLERANCES TO ENSURE THAT THE FINISHED CONSTRUCTION IS IN FULL COMPLIANCE.
B. OCCUPIABLE INVERTED ROOF (INTERMEDIATE LEVEL ROOF, JUNCTION LEVEL ROOF & CATWALK):
PROVIDE EXTRUDED POLYSTYRENE (XPS) INSULATION FOR HIGH-LOAD APPLICATIONS, WITH MINIMUM 60PSI
COMPRESSIVE STRENGTH. SEE ARCHITECTURAL DRAWING A610.
C. CONVENTIONAL ROOF AT CAB:
PROVIDE POLYISOCYANURATE BOARD INSULATION WITH MINIMUM 25 PSI COMPRESSIVE
STRENGTH. SEE ARCHITECTURAL DRAWING A610.
EXTERIOR WALL SYSTEM AT CORE:
PROVIDE STANDING SEAM METAL RAINSCREEN WALL PANELS TO BE MOUNTED ON CONCRETE CORE WALL OUTBOARD OF AIR-WATER-VAPOR BARRIER AND INSULATION TO INCLUDE AIR GAP BETWEEN BACK FACE OF RAINSCREEN PANELS AND FRONT FACE OF INSULATION, AS INDICATED IN THE ARCHITECTURAL DRAWINGS.
CLADDING PANEL AND SUPPORT SYSTEM TO BE APPROVED FOR USE ACCORDING TO THE LOCAL BUILDING CODE.
WALL CLADDING MATERIAL:
STANDARD DESIGN: 16 GAUGE OR 1.5MM (0.059") THICK PRE-WEATHERED ZINC.
SOFFIT SYSTEM:
SOFFIT CLADDING MATERIAL: SAME AS EXTERIOR WALL SYSTEM
INCLINED METAL ROOF SYSTEM:
ROOF CLADDING MATERIAL: SAME AS EXTERIOR WALL SYSTEM.
TOWER BASE CLADDING:
STONE BASE AT THE GROUND LEVEL OF BUILDING PANELIZED TO MATCH WIDTH OF TOWER METAL CLADDING.
HEIGHT OF STONE PANEL TO BE INCREASED FOR LOCATIONS THAT EXPERIENCE HEAVY SNOW ACCUMULATION AND WILL HAVE HIGHER EXPOSURE TO SNOW REMOVAL TOOLS, MACHINERY, AND DEICING SALT.
BASE MATERIAL: PROVIDE STONE SPECIES PER REGIONAL SUPPLY.
PUNCHED GLAZED OPENINGS:
GLASS THICKNESS AND INSULATION AS REQUIRED TO COMPLY WITH SITE-SPECIFIC ACOUSTICAL, THERMAL, ENERGY EFFICIENCY, WIND PRESSURE, SECURITY AND SEISMIC REQUIREMENTS.PUNCHED WINDOW SYSTEM TO
BE APPROVED FOR USE ACCORDING TO LOCAL BUILDING CODE.
VISUAL LIGHT REFLECTANCE (VLR) TO BLEND WITH ADJACENT RAINSCREEN CLADDING MATERIAL. SAFETY
GLASS WHERE REQUIRED BY RELEVANT CODE.
CURTAIN WALL AT CAB:
INFILL GLAZING TO BE DOUBLE LAMINATED AT INBOARD AND OUTBOARD PANES, DOUBLE GLAZING UNIT (DGU), USING UNCOATED LOW IRON ANNEALED GLASS AS PER FAA'S CAB GLAZING SPECIFICATIONS, TFDS AND
SECTION B20 OF THE SCOPE OF WORK.
B. INTERIOR FINISHES:
INTERIOR FINISHES WILL BE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION C10 AND C20 OF THE SCOPE OF WORK NFPA 101 CHAPTER 10, IBC CHAPTER 8AND FAA TERMINAL FACILITIES DESIGN STANDARD (TFDS) VERSION 2.1.
SIGNS SHALL BE PROVIDED IN ACCORDANCE WITH F216 AND F203 OF THE ARCHITECTURAL BARRIERS ACT AND
ICC A117.1 AS REFERENCED BY THE IBC.
9. SIGNAGE
8. VERTICAL CONVEYANCE
ELEVATOR PLANNING AND DESIGN SHALL COMPLY WITH CHAPTER 14 OF THE TFDS AND ALL APPLICABLE ELEVATOR, LIFE SAFETY, AND BUILDING CODES. HOISTWAY HAS BEEN PRELIMARILY SIZED FOR STRINGENT
SEISMIC REQUIREMENTS.
DESIGN SHALL COMPLY WITH THE REQUIREMENTS FOR EMERGENCY DOORS IN BLIND HOISTWAYS PER ASME 17.1.
ATCT ELEVATORS SHALL HAVE MINIMUM DIMENSIONS THAT WILL ACCOMMODATE A STRETCHER OF 24 INCHES
BY 84 INCHES.
A. EXTERIOR WALL AND SOFFIT ASSEMBLY:
PROVIDE AIR AND VAPOR BARRIER MEMBRANE.
B. CORE CLADDING:
PROVIDE MEMBRANE TO FUNCTION AS AN AIR BARRIER, VAPOR BARRIER AND A WATER-RESISTIVE BARRIER TO
CREATE A TRULY CONTINUOUS, MONOLITHIC AIR, VAPOR AND WATER BARRIER.
C. OCCUPIABLE INVERTED ROOF (INTERMEDIATE LEVEL ROOF, JUNCTION ROOF & CATWALK):
PROVIDE FABRIC-REINFORCED, RUBBERIZED ASPHALT SYSTEM. INCORPORATE LEAK DETECTION.
D. CONVENTIONAL ROOF AT CAB:
PROVIDE FULLY ADHERED RUBBERIZED ASPHALT VAPOR BARRIER MEMBRANE.INCORPORATE LEAK DETECTION.
E. PENETRATIONS:
ALL PENETRATIONS SHALL BE FIRE STOPPED AND SEALED WITH A MEMBRANE AND SEALANT COMPATIBLE WITH
THE ADJACENT SUBSTRATE AND WATER/ MOISTURE MEMBRANES
REV APPROVED DATE DESCRIPTION JCN REDLINE DATE APVD
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
ISSUED BYDESIGNED
DRAWN
CHECKED
JCNDATE
DRAWING NO REV
E
D
C
B
A
F
G
H
5678 4 3 2 1
SUBMITTED BY APPROVED BY
E
D
C
B
A
F
G
H
5678 4 3 2 1
REVIEWED BY
FAA OFFICE WASHINGTON, DC
ATCT (FINAL STANDARD V1.1 - 06/26/24)
GENERAL
BASIS OF DESIGN
(1 OF 3)
CITY STAIRPORT
Designer
Author
Checker
WASD-D-ATCT- G020
BASIS OF DESIGN
IMPORTANT:
THE DIMENSIONS,
SPECIFICATIONS, AND
NOTES SHOWN ON THIS
DRAWING ARE
CONCEPTUAL AND
PROVIDED FOR BIDDING
PURPOSES ONLY. THE
FAA DOES NOT ASSUME
RESPONSIBILITY FOR
THEIR ACCURACY. THE
DESIGN-BUILDER IS
REQUIRED TO VERIFY
THE INFORMATION
BEFORE USING IT IN THE
MECHANICAL
1. EXECUTIVE OVERVIEW
MECHANICAL STANDARD DESIGN SHALL CONFORM TO ALL REQUIREMENTS OF THE LATEST VERSIONS OF THE INTERNATIONAL CODE COUNCIL MODEL CODES (INCLUDING ALL THE RELEVANT NFPA VERSIONS AND OTHER CODES AS REFERENCED IN CHAPTER 35 OF THE IBC) AS WELL AS ALL APPLICABLE REQUIREMENTS OF THE FAA TERMINAL FACILITIES DESIGN STANDARD (TFDS). NOTE THAT THE TFDS DOCUMENT CONTAINS NUMEROUS REFERENCES TO OTHER REGULATIONS, STANDARDS, FEDERAL REQUIREMENTS AND SPECIFIC FAA REQUIREMENT DOCUMENTS THAT MUST BE INCORPORATED INTO THE DESIGNS, SOME OF WHICH ARE PUBLICLY AVAILABLE AND SOME OF WHICH ARE CONFIDENTIAL TO THE FAA. THE DESIGN SHALL BE LIFE CYCLE COST (LCC) -EFFECTIVE AND CAPABLE TO ACHIEVE ENERGY CONSUMPTION AT LEAST 30% LOWER THAN THE BASELINE
LEVELS IN ASHRAE STANDARD 90.1 IN ACCORDANCE WITH FEDERAL REQUIREMENTS.
MECHANICAL DESIGN SHALL CONFORM WITH THE LATEST VERSIONS OF THE ABOVE-MENTIONED CODES
AND STANDARDS AT THE TIME OF DESIGN.
THE DESIGN INFORMATION CONTAINED HEREIN REPRESENTS THE REQUIREMENTS AND THE STANDARD DESIGN THAT WILL BE SITE-ADAPTED FOR AIRPORT TRAFFIC CONTROL TOWER (ATCT) LOCATIONS THROUGHOUT THE UNITED STATES. THOSE SYSTEMS NOT SPECIFICALLY IDENTIFIED SHALL BE DESIGNED BY THE DESIGN-BUILDER AS PART OF THE SITE ADAPTATION PROCESS FOR A PARTICULAR LOCALE. THE INTENT IS THAT THE BASIC CONFIGURATIONS SHOWN WILL NOT BE REQUIRED TO BE MODIFIED OR CHANGED AS PART OF THIS SITE
ADAPTATION PROCESS.
TO THE GREATEST EXTENT POSSIBLE, PHYSICAL SPACE REQUIREMENTS FOR SYSTEMS AND EQUIPMENT INDICATED ON THE DRAWINGS REFLECT REASONABLE WORST-CASE SCENARIOS BASED ON PRELIMINARY DESIGN CRITERIA APPLICABLE FOR VARIOUS LOCATIONS THROUGHOUT THE U.S., WITH LIMITED EXCEPTIONS.
2. GOVERNING CODES AND REGULATIONS
ALL SYSTEMS SHALL BE DESIGNED TO ACCOMMODATE THE FOLLOWING CRITERIA, AS APPLICABLE FOR
SITE-SPECIFIC CONDITIONS.
A. INDOOR AND OUTDOOR AIR DESIGN CONDITIONS: ALL HVAC SYSTEMS CAPACITIES SHALL BE BASED ON COOLING AND HEATING LOAD REQUIREMENTS DETERMINED THROUGH LOAD CALCULATION PROCEDURES REFERENCED IN ASHRAE STANDARD 90.1. ALL HEATING AND COOLING SYSTEMS SHALL BE SUITABLE FOR
THE DESIGN CONDITIONS FOUND ON SITE.
B. OUTDOOR VENTILATION AND AIR FILTRATION: ALL OCCUPIED SPACES SHALL BE DESIGNED TO BE VENTILATED. ALL OUTSIDE AIR INTAKES SHALL BE PROVIDED WITH HIGH QUALITY FILTRATION IN ACCORDANCE
WITH MINIMUM REQUIREMENTS IN TFDS 9.5-H.
C. ENERGY PERFORMANCE: THE DESIGN INCLUDES SHALL INCLUDE ENERGY CONSERVING MEASURES TO ARRIVE AT THE LOWEST POSSIBLE ENERGY CONSUMPTION THAT IS ECONOMICALLY FEASIBLE IN ACCORDANCE
WITH THE FAA SUSTAINABILITY GOALS (TFDS SECTION 3.4) AND FEDERAL REGULATIONS.
D. THE HVAC SYSTEM APPROACH FOR THE UPPER OCCUPIED LEVELS SHALL CONSIST OF VARIABLE AIR VOLUME (VAV) SYSTEMS OR DEDICATED OUTSIDE AIR SYSTEMS (DOAS) LOCATED WITHIN MECHANICAL EQUIPMENT ROOMS (IN A 2N ARRANGEMENT). A 2N ARRANGEMENT REFERS TO TWICE THE AMOUNT OF REQUIRED RESOURCES/CAPACITY AVAILABLE IN THE SYSTEM. THE DOAS AND VAV AHUS SHALL BE PROVIDED WITH DUCTED STEAM HUMIDIFICATION AND MERV 15 FINAL FILTERS, HEPA, ACTIVATED CARBON, DEPENDING ON SITE-SPECIFIC
AIR CONDITIONS AND AS REQUIRED TO MEET AIR QUALITY REQUIREMENTS IN TFDS 9.5-G
E. AIR HANDLING UNITS (IN A 2N ARRANGEMENT) SHALL BE PROVIDED IN SEPARATE MECHANICAL EQUIPMENT ROOMS TO SERVE THE CAB AND TO MEET SPACE TEMPERATURE AND HUMIDITY LEVELS AS REQUIRED IN SECTION 9.8. AIR DISTRIBUTION SYSTEM AT THE CAB SHALL BE DESIGNED TO PREVENT GLASS FOGGING AND
TO MEET AL REQUIREMENTS IN TFDS 9.5-A.
F. GENERAL EXHAUST FANS AND TOILET EXHAUST FANS SHALL BE PROVIDED ON VARIOUS FLOORS OF THE
BUILDING.
G. VERTICAL PIPING DISTRIBUTION SHALL BE LOCATED WITHIN A DEDICATED PIPE CHASE SHAFT WITHIN THE BUILDING CORE (A SEPARATE CHASE IS PROVIDED FOR ELECTRICAL AND LOW-VOLTAGE SYSTEM
DISTRIBUTION).
H. COMPUTER ROOM AIR CONDITIONING (CRAC) UNITS SHALL BE PROVIDED FOR THE TECHNOLOGY SPACES, ELECTRICAL POWER ROOMS AND ELEVATOR MACHINE ROOM.
3. DESIGN CRITERIA
4. TECHNICAL GUIDANCE AND CONSIDERATIONS FOR SITE ADAPTATION
AS GUIDANCE TO THE SITE ADAPTATION PROCESS, THE FOLLOWING REQUIREMENTS SHALL BE CONSIDERED IN
DESIGN DECISIONS.
A. PASSENGER ELEVATORS'S HOISTWAY SHALL BE PRESSURIZED IN ACCORDANCE WITH APPLICABLE CODE
REQUIREMENTS (INCLUDING NFPA 101).
B. POST FIRE SMOKE PURGE SHALL BE ACCOMPLISHED BY UTILIZING THE STAIR AND ELEVATOR FANS. A DEDICATED SMOKE EXHAUST FAN SHALL BE PROVIDED ABOVE THE HUNG CEILING OF THE CAB TO EXHAUST THE CAB AFTER A SMOKE EVENT. DOORS TO THE EXTERIOR TO BE MANUALLY OPENED.
C. SUPPLY AND RETURN AIR DUCT DISTRIBUTION ON THE CAB ACCESS LEVEL SHALL BE SPECIFICALLY COORDINATED TO MAINTAIN FAA-REQUIRED CLEARANCE TO IT CABLE TRAYS AND REMOTE CUP RACKS. SEE
MECHANICAL DRAWINGS M105.
D. THE SUBJUNCTION AND JUNCTION LEVEL HAVE BEEN DESIGNED TO OPERATE WITH A DOAS SYSTEM, BUT DUE TO INCREASED CEILING HEIGHT REQUIREMENTS ASSOCIATED WITH A VAV SYSTEM, THE CEILING HEIGHTS HAVE BEEN ADJUSTED TO INCLUDE A VAV SYSTEM AS A SITE ADAPTATION. THE MER ROOM A AND SHAFT ADJACENT ALSO INCLUDE SPACE NECESSARY TO INCLUDE VAV SYSTEM AHU AND RISERS TO THE JUNCTION
LEVEL.
E. THE LOCATION OF TERMINAL DEVICES, DIFFUSERS, AND CRAC UNITS SERVING ELECTRONICS ROOMS SHALL
BE DEPENDENT ON SITE-SPECIFIC LAYOUT AND SHALL BE COORDINATED WITH THE FAA.
F. FOR SITES WITH ASHRAE DESIGN WINTER CONDITIONS NEAR OR BLLOW FREEZING (32°F). THE DESIGN- BUILDER'S SITE ADAPTATION SHALL CONSIDER UTILIZING A GLYCOL HOT WATER SYSTEM THROUGHOUT THE
BUILDING FOR FREEZE PROTECTION.
G. SIZING OF THE MER SPACES AND PUMPS ROOMS WERE DEVELOPED ASSUMING OUTDOOR DESIGN CONDITIONS WITH EXTREMES IN BOTH SUMMER AND WINTER (HIGH SENSIBLE AND LATENT HEAT, AND EXTREME COLD). IT IS NOT EXPECTED THAT MORE SPACE WILL BE NEEDED TO BLOCK MECHANICAL EQUIPMENT, HOWEVER, THE MER AND PUMP ROOM SPACES SHALL NOT DECREASE IN SIZE EITHER.
H. ALL HVAC EQUIPMENT FOR THE PROJECT SHALL BE PROVIDED WITH VIBRATION ISOLATION PER TFDS 9.15-A.
I. ALL TERMINAL UNITS (NOT SHOWN) FOR THE PROJECT SHALL BE PROVIDED WITH DISCONNECT
SWITCHES.
J. ALL CRAC UNITS (NOT SHOWN) FOR THE PROJECT SHALL BE PROVIDED WITH SMOKE DETECTORS.
K. PROVIDE SOUND ATTENUATORS TO COMPLY WITH NOISE CRITERIA (NC) VALUES IN TFDS 5.6 AND 9.15-A.
L. ALL DIFFUSERS SHALL BE FLUSH FACE. BORDER TYPES SHALL BE COMPATIBLE WITH
ARCHITECTURAL CEILING TYPE FOR THE ROOM IN WHICH THE AIR DEVICE IS LOCATED.
M. ALL SUPPLY DIFFUSERS AND REGISTERS/GRILLES SHALL BE SELECTED TO PERFORM WITHIN THE
ELECTRICAL
1. GOVERNING CODES AND REGULATIONS
ALL SYSTEMS SHALL BE DESIGNED TO MEET THE DEMAND OF ALL REQUIRED LOADS INCLUDING BUT NOT LIMITED TO THE PROPOSED SITE-SPECIFIC MEP SYSTEMS DESIGNED BY THE DESIGN-BUILDER
AND TO ACCOMMODATE THE FOLLOWING CRITERIA:
A. BATTERY BACKUP FOR UPS SHALL BE VIA 5-YEAR VRLA, 15 MINUTES BEGINNING OF LIFE. UPS AND
BATTERIES SHALL BE GOVERNMENT FURNISHED.
THE TELECOMMUNICATION POINT OF ENTRY (POE) WILL BE THE MAIN CONNECTION TO THE TOWER. THE ENTRY INTO THE ATCT WILL BE MADE FROM TWO (2) SEPARATE MANHOLE VAULTS PLACED WITHIN 25 FEET OF THE BUILDING ENVELOPE. MANHOLES SHALL BE SIZED AND INSTALLED BASED ON INDIVIDUAL SITE NEEDS AND
THE TOPOGRAPHY OF THE TERRAIN.
B. MANHOLE 1 WILL BE ALLOCATED FOR CARRIER USE. CONNECTION FROM THE MANHOLE TO THE CARRIER
POINT OF PRESENCE SHALL BE COORDINATED.
C. MANHOLE 2 SHALL BE ALLOCATED FOR CONNECTIONS TO THE TERMINAL RADAR APPROACH CONTROL (TRACON) FACILITIES, SECURITY FACILITIES AND OTHER BASE BUILDING FACILITY CONNECTIONS FROM LOCATIONS ON THE CAMPUS. ALL CONNECTIONS FROM THE MANHOLE TO OTHER PARTS OF THE CAMPUS
SHALL BE COORDINATED.
SURGE SUPPRESSION DEVICE (SPD) SHALL BE INSTALLED IN THE POE ROOM NEAR CONDUIT ENTRY FOR ALL FAA FACILITY INCOMING CABLES, AND ALL CABLES AND CONDUITS WILL BE GROUNDED. SUPPRESSION ENCLOSURE SHALL BE EQUIPPED WITH DIN RAIL AND SURGE PROTECTION RATED PROPERLY FOR THE CABLES IT SHALL SERVE AND THE LEVEL OF PROTECTION REQUIRED. ALL CABLES CONNECTING FROM OTHER FAA
CAMPUS FACILITY SHALL BE TERMINATED HERE.
A CABLE TRAY SYSTEM SHALL BE DEPLOYED FOR VERTICAL AND HORIZONTAL SUPPORT OF
TELECOMMUNICATION CABLING. ALL CABLE TRAYS SHALL BE MADE OF STEEL AND SHALL BE SEISMICALLY BRACED ACCORDING TO LOCAL REQUIREMENTS. CABLE TRAYS SHALL CONFORM TO CURRENT NEMA STANDARDS AND PUBLICATIONS VE-1 AND SHALL BE UL CLASSIFIED/LISTED AS EQUIPMENT GROUNDING CONDUCTORS. ALL CABLE TRAYS SHALL BE GROUNDED AND BONDED PER NATIONAL, STATE AND LOCAL CODES
AND FAA STANDARDS.
CABLE TRAYS PENETRATING WALLS AND SLABS SHALL USE EZ PATH OR EQUIVALENT FIRE-RATED SYSTEM
AND SHALL BE GROUNDED AND BONDED IN ACCORDANCE WITH FAA STANDARDS.
THE STRUCTURED CABLING BACKBONE SHALL BE PRIMARILY MULTI-STRAND SINGLE-MODE FIBEROPTIC CABLING AND MULTI-PAIR CAT5E FROM THE POE ROOM TO THE EQUIPMENT ROOM. TERMINATION LOCATIONS SHALL BE ESTABLISHED AT EACH END TO FACILITATE CROSS-CONNECTIONS. ALL LAN CABLING SHALL BE A
MINIMUM OF CATEGORY-6 UTP CABLING.
D. THE ELECTRICAL DISTRIBUTION FOR THIS FACILITY SHALL ADOPT THE FAA-PROVIDED SINGLE LINE DIAGRAM. THERE ARE NO 'NON-ESSENTIAL' LOADS AS PART OF THIS FACILITY. THE WHOLE FACILITY IS GENERATOR-BACKED AND ALL LOADS THAT ARE NOT UPS/CRITICAL OR FIRE LIFE SAFETY (FLS) ARE TO
BE FED FROM THE ESSENTIAL DISTRIBUTION.
E. A SINGLE DEDICATED UTILITY SERVICE TRANSFORMER IS TO BE PROVIDED AND COORDINATED WITH THE
LOCAL SERVICE PROVIDER.
F. LIGHTNING PROTECTION AND GROUNDING FOR THE FACILITY IS ABOVE AND BEYOND THE CODE
REQUIREMENTS OF NFPA 780, UL96A AND FAA-STD-19F.
G. ELECTRONICS DESIGN SHALL PROVIDE AN "APPLICATIONS-INDEPENDENT" CABLING SYSTEM, WHICH WILL ALLOW ANY TECHNOLOGY TO BE CONNECTED OVER THE CABLING SYSTEM. THROUGH ADHERENCE TO DOCUMENTED FAA-SPECIFIC DESIGN CRITERIA AND SPECIFICATIONS, NATIONAL, STATE AND LOCAL CODES AND INDUSTRY STANDARDS, THE INSTALLED STRUCTURED COMMUNICATIONS SYSTEM SHALL ENABLE FREE
SELECTION OF EQUIPMENT BASED ON FAA NEEDS.
ELECTRICAL DESIGN SHALL CONFORM TO ALL REQUIREMENTS OF THE LATEST VERSIONS OF THE INTERNATIONAL CODE COUNCIL MODEL CODES (INCLUDING ALL THE RELEVANT NFPA VERSIONS AND OTHER CODES AS REFERENCED IN CHAPTER 35 OF THE IBC) AS WELL AS ALL APPLICABLE REQUIREMENTS OF THE FAA TERMINAL FACILITIES DESIGN STANDARD (TFDS). NOTE THAT THE TFDS DOCUMENT CONTAINS NUMEROUS REFERENCES TO OTHER REGULATIONS, STANDARDS, FEDERAL REQUIREMENTS AND SPECIFIC FAA REQUIREMENTS DOCUMENTS THAT MUST BE INCORPORATED INTO THE SITE-ADAPTED DESIGNS, SOME OF WHICH ARE
PUBLICLY AVAILABLE AND SOME OF WHICH ARE CONFIDENTIAL TO FAA.
ELECTRICAL DESIGN SHALL CONFORM WITH THE LATEST VERSIONS OF THE ABOVE-MENTIONED CODES AND STANDARDS AT THE TIME OF DESIGN AS WELL AS THE MOST RECENT ELECTRONIC INDUSTRIES ASSOCIATION (EIA)/TELECOMMUNICATION INDUSTRIES ASSOCIATION (TIA) STANDARDS GOVERNING TELECOMMUNICATIONS CABLING AND SERVICES INSTALLATION, PATHWAYS AND SPACES AND ADMINISTRATION.
2. DESIGN CRITERIA
RADIUS OF CABLE TRAY FITTINGS 12" UNLESS OTHERWISE INDICATED.
PRIOR TO ORDERING ANY COMPONENTS, PROVIDE CABLE TRAY INSTALLATION SUBMITTAL. THIS SUBMITTAL SHALL INCLUDE SCALED 11X17 DRAWINGS INDICATING EXACT CABLE TRAY DIMENSIONS, EXACT INSTALL DIMENSIONS FROM WALLS AND EXACT INSTALLATION DIMENSIONS OF FAA FURNISHED ELECTRONIC EQUIPMENT RACKS. FULLY COORDINATE INSTALLATION DRAWINGS WITH LIGHTING AND OTHER ELECTRICAL DEVICES, DUCTWORK AND PIPING, FIRE PROTECTION SYSTEM AND ALL OTHER CEILING MOUNTED DEVICES.
DESIGN-BUILDER MUST FIELD COORDINATE THE EXACT LOCATION OF LIGHTING FIXTURES WITH EXISTING OVERHEAD EQUIPMENT TO FACILITATE SERVICE, MAINTENANCE, AND REPAIR OR REPLACEMENT OF
COMPONENTS.
SUSPENDED LUMINAIRES SHALL BE ANCHORED TO THE PRIMARY STRUCTURE TO RESIST SEISMIC DESIGN
FORCES IN ACCORDANCE WITH THE IBC AND CONTRACT DOCUMENTS.
PLUMBING
1. GOVERNING CODES AND REGULATIONS
THE PLUMBING SYSTEM SHALL BE DESIGNED TO ACCOMMODATE THE FOLLOWING CRITERIA, AS APPLICABLE
FOR SITE-SPECIFIC CONDITIONS.
PLUMBING DESIGN SHALL CONFORM TO ALL REQUIREMENTS OF THE LATEST VERSION OF THE INTERNATIONAL CODE COUNCIL MODEL CODES (INCLUDING ALL THE RELEVANT NFPA VERSIONS AND OTHER CODES AS REFERENCED IN CHAPTER 35 OF THE INTERNATIONAL BUILDING CODE) AS WELL AS ALL APPLICABLE REQUIREMENTS OF THE FAA TERMINAL FACILITIES DESIGN STANDARD (TFDS). NOTE THAT THE TFDS DOCUMENT CONTAINS NUMEROUS REFERENCES TO OTHER REGULATIONS, STANDARDS, FEDERAL REQUIREMENTS AND SPECIFIC FAA REQUIREMENTS DOCUMENTS THAT MUST BE INCORPORATED INTO THE DESIGNS, SOME OF WHICH
ARE PUBLICLY AVAILABLE AND SOME OF WHICH ARE CONFIDENTIAL TO FAA.
PLUMBING DESIGN SHALL CONFORM WITH THE LATEST VERSIONS OF THE ABOVE-MENTIONED CODES AND
STANDARDS AT THE TIME OF DESIGN.
2. DESIGN CRITERIA
A. DOMESTIC WATER
ONE (1) DOMESTIC WATER SERVICE AND ONE (1) FIRE PROTECTION WATER SERVICE SHALL BE BROUGHT INTO THE BUILDING FROM THE CITY/AIRPORT WATER MUNICIPAL MAIN. THE DOMESTIC WATER SERVICE SHALL BE METERED AND PROVIDED WITH A BACKFLOW PREVENTER AS REQUIRED BY THE LOCAL AHJ. THE FIRE PROTECTION SERVICE SHALL BE PROVIDED WITH AN APPROVED BACKFLOW PREVENTER WITH A BYPASS METER AS REQUIRED BY THE LOCAL AHJ. THE DOMESTIC WATER SERVICE SHALL SUPPLY WATER TO THE DOMESTIC
WATER BOOSTER PUMP SKIDS, WHICH WILL SERVE THE ENTIRE BUILDING, IF REQUIRED.
DOMESTIC WATER MAKEUP AND BACKFLOW PREVENTERS SHALL BE PROVIDED AT ALL POINTS OF CONNECTION
WITH:
• HVAC SYSTEMS
• SPACE HEATING SYSTEMS
THE DOMESTIC HOT WATER SYSTEM SHALL BE INSTALLED PARALLEL TO THE DOMESTIC COLD WATER SYSTEM AS DESCRIBED ABOVE. DOMESTIC HOT WATER SHALL BE SUPPLIED IN ACCORDANCE WITH TFDS 10.1-A AND 10.1-B.
B. SANITARY/VENT
A COMPLETE SOIL, WASTE AND VENT SYSTEM SHALL BE PROVIDED FROM ALL PLUMBING FIXTURES, MECHANICAL EQUIPMENT, AND FLOOR DRAINS. THE SYSTEM SHALL BE ARRANGED FOR GRAVITY FLOW TO A
POINT OF CONNECTION TO THE CITY/AIRPORT MUNICIPAL SEWER.
C. STORMWATER
A COMPLETE STORM DRAINAGE SYSTEM SHALL BE PROVIDED TO SERVE THE ROOF, ALL ROOF TERRACES AND CATWALKS. THE SYSTEM SHALL BE ARRANGED FOR PRIMARY ROOF DRAINAGE GRAVITY FLOW TO A POINT OF CONNECTION TO THE CITY/AIRPORT MUNICIPAL STORM SEWER. SECONDARY ROOF DRAINAGE SHALL BE SEPARATED FROM THE PRIMARY SYSTEM AND BE GRAVITY FLOW TO SPILL OVERFLOW ONTO GRADE. STORM SIZING SHALL BE DEFINED BASED ON RAINFALL, DEPENDING ON THE SITE-SPECIFIC LOCATIONS.
SCUPPER OVERFLOW DRAINS SHALL BE UTILIZED ON THE CAB LEVEL CATWALK TO MINIMIZE THE AMOUNT OF
STORMWATER PIPE ROUTED WITHIN THE CONSOLE ACCESS LEVEL.
FIRE PROTECTION
1. GOVERNING CODES AND REGULATIONS
THE FIRE PROTECTION SYSTEM SHALL BE DESIGNED TO ACCOMMODATE THE FOLLOWING CRITERIA, AS
APPLICABLE FOR SITE-SPECIFIC CONDITIONS.
A. FIRE SERVICE
ONE (1) FIRE WATER SERVICE SHALL BE BROUGHT INTO THE BUILDING FROM ONE (1) INDEPENDENT STREET MAIN. FIRE WATER SERVICE MAIN SHALL BE PROVIDED WITH BACKFLOW PREVENTION ASSEMBLY AND WATER METERING AS REQUIRED BY THE LOCAL WATER DEPARTMENT STANDARDS. LOCATE METERS FOR WATER
DEPARTMENT ACCESS.
B. COMBINED STANDPIPE SYSTEM
THE COMBINATION STANDPIPE/SPRINKLER SYSTEM SHALL SERVE THE ENTIRE BUILDING.
C. FIRE DEPARTMENT CONNECTIONS
THE COMBINATION STANDPIPE/SPRINKLER SYSTEM SERVING THE ENTIRE BUILDING WILL BE SUPPLEMENTED WITH FIRE DEPARTMENT CONNECTIONS LOCATED AROUND THE BASE OF THE BUILDING AS REQUIRED BY THE
INTERNATIONAL BUILDING CODE AND THE LOCAL AHJ.
D. SPRINKLER SYSTEMS
WET SPRINKLER SYSTEMS:
BUILDING SHALL BE PROTECTED THROUGHOUT WITH WET-PIPE FIRE SPRINKLER SUPPRESSION SYSTEM IN
ACCORDANCE WITH THE LATEST EDITION OF NFPA 13 TO THE FOLLOWING PARAMETERS:
STANDARD BUSINESS USE AREAS INCLUDING OFFICES, TRAINING, CONFERENCE AND BREAK AREAS SHALL
BE CLASSIFIED AS 'LIGHT HAZARD OCCUPANCIES'.
MECHANICAL ROOMS, STORAGE ROOMS, GENERATOR ROOMS AND OTHER AREAS WITH MODERATE
QUANTITIES OF COMBUSTIBILITY SHALL BE CLASSIFIED AS 'ORDINARY HAZARD'.
FIRE PROTECTION DESIGN SHALL CONFORM TO ALL REQUIREMENTS OF THE LATEST VERSION OF THE INTERNATIONAL CODE COUNCIL MODEL CODES (INCLUDING ALL THE RELEVANT NFPA VERSIONS AND OTHER CODES AS REFERENCED IN CHAPTER 35 OF THE INTERNATIONAL BUILDING CODE) AS WELL AS ALL APPLICABLE REQUIREMENTS OF THE FAA TERMINAL FACILITIES DESIGN STANDARD (TFDS). NOTE THAT THE TFDS
DOCUMENT CONTAINS NUMEROUS REFERENCES TO OTHER REGULATIONS, STANDARDS, FEDERAL
REQUIREMENTSAND SPECIFIC FAA REQUIREMENTS DOCUMENTS THAT MUST BE INCORPORATED INTO THE DESIGNS, SOME OF WHICH ARE PUBLICLY AVAILABLE AND SOME OF WHICH ARE CONFIDENTIAL TO FAA.
FIRE PROTECTION DESIGN SHALL CONFORM WITH THE LATEST VERSIONS OF THE ABOVE-MENTIONED CODES
AND STANDARDS AT THE TIME OF DESIGN.
2. DESIGN CRITERIA
ALL SYSTEMS SHALL BE HYDRAULICALLY DESIGNED AND INCLUDE THE LARGER OF 7 PSI OR 10% SAFETY
FACTOR.
DRY SPRINKLER SYSTEMS:
WHERE AREAS ARE SUBJECT TO FREEZING, DRY PIPE FIRE SPRINKLER SYSTEMS SHALL BE UTILIZED AND SHALL
CONFORM TO THE REQUIREMENTS OF NFPA 13.
DO NOT UTILIZE DRY BARREL SPRINKLER HEADS CONNECTED TO WET PIPE SPRINKLER SYSTEMS. PROVIDE FIRE SPRINKLERS LISTED NITROGEN GENERATORS AND MONITORING SYSTEM FOR ALL DRY PIPE SYSTEMS. SYSTEMS SHALL BE FILLED WITH INERT NITROGEN GAS TO INHIBIT CORROSION. SYSTEMS SHALL BE MONITORED BY THE
FIRE ALARM FOR OFF NORMAL CONDITIONS.
ARCHITECTURAL CEILING TYPE FOR THE ROOM IN WHICH THE AIR DEVICE IS LOCATED.
M. ALL SUPPLY DIFFUSERS AND REGISTERS/GRILLES SHALL BE SELECTED TO PERFORM WITHIN THE
ACOUSTICAL CRITERIA FOR THE SPACES SERVED THROUGHOUT THE ATCT.
N. ALL AIR DEVICES AND REGISTERS/GRILLES SHALL BE TESTED IN ACCORDANCE WITH ASHRAE
STANDARD 70-2006.
O.…